Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “LAUNCHING FACILITY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

NASA’s Space Launch System: Launch Capability for Lunar Exploration and Transformative Science

Excitement is building for the first launch of NASA’s Space Launch System (SLS), a unique exploration asset for the agency’s Artemis lunar program as well as for a new generation of science missions. SLS is designed for an array of missions beyond Earth’s orbit. The flexible system, which can be configured for Orion, cargo or Orion with co-manifested payload missions, offers high escape velocities to send more mass to deep space destinations. When configured with an 8.4 m-diameter fairing, SLS offers unmatched payload volume for human exploration and science missions. The initial Block 1 variant will insert at least 26 metric tons (t) to trans-lunar injection (TLI) and the more powerful Block 1B vehicle will launch 34-37 t to TLI using a new-development upper stage. Much of the initial SLS Block 1 vehicle is complete, including the upper stage and payload section, the core stage, engines and the solid rocket boosters. The first mission, Artemis I, launching from modernized and upgraded facilities at Kennedy Space Center (KSC), will be an uncrewed test flight of SLS, Orion and ground processing, with a primary objective of testing Orion’s heat shield at lunar re-entry velocity. Artemis I will have accommodations for 13 6U CubeSat payloads. These CubeSat missions will be deployed along the upper stage disposal trajectory after Orion separates from the vehicle. A rare opportunity for CubeSats to be deployed beyond low Earth orbit (LEO), Artemis I CubeSat missions range from searching for hydrogen and other volatiles on the lunar South Pole to studying the acceleration mechanisms of solar and interplanetary particles from a heliocentric trajectory. With manufacturing of the initial vehicle complete, fabrication and procurement is progressing for the second flight of SLS and Orion, Artemis II. Also an SLS Block 1 and Orion flight launching from KSC, Artemis II will mark the return of American astronauts to deep space with a lunar flyby-free return trajectory mission. With the Artemis III flight, NASA has the goal to land the first woman and the next man on the Moon. Infrastructure beyond SLS will be required for this effort, including elements of the lunar Gateway as well as lunar rovers, landers and additional commercially supplied launch services. SLS, as the only vehicle with the capability to lift 26 t of mass to TLI in its initial Block 1 variant, will remain a key component of this new-era exploration program. Future variants – Block 1B and Block 2 –will lift 34-45 t to TLI. This paper will discuss the status of testing and integration for the Artemis I vehicle, manufacturing progress for the second vehicle and the manifest outlook for primary, co-manifested and secondary payloads in the current deep space exploration environment.

Creech, Stephen D.↗

Launch Pad in a Box

NASA Kennedy Space Center (KSC) is developing a new deployable launch system capability to support a small class of launch vehicles for NASA and commercial space companies to test and launch their vehicles. The deployable launch pad concept was first demonstrated on a smaller scale at KSC in 2012 in support of NASA Johnson Space Center's Morpheus Lander Project. The main objective of the Morpheus Project was to test a prototype planetary lander as a vertical takeoff and landing test-bed for advanced spacecraft technologies using a hazard field that KSC had constructed at the Shuttle Landing Facility (SLF). A steel pad for launch or landing was constructed using a modular design that allowed it to be reconfigurable and expandable. A steel flame trench was designed as an optional module that could be easily inserted in place of any modular steel plate component. The concept of a transportable modular launch and landing pad may also be applicable to planetary surfaces where the effects of rocket exhaust plume on surface regolith is problematic for hardware on the surface that may either be damaged by direct impact of high speed dust particles, or impaired by the accumulation of dust (e.g., solar array panels and thermal radiators). During the Morpheus free flight campaign in 2013-14, KSC performed two studies related to rocket plume effects. One study compared four different thermal ablatives that were applied to the interior of a steel flame trench that KSC had designed and built. The second study monitored the erosion of a concrete landing pad following each landing of the Morpheus vehicle on the same pad located in the hazard field. All surfaces of a portable flame trench that could be directly exposed to hot gas during launch of the Morpheus vehicle were coated with four types of ablatives. All ablative products had been tested by NASA KSC and/or the manufacturer. The ablative thicknesses were measured periodically following the twelve Morpheus free flight tests. The thermal energy from the Morpheus rocket exhaust plume was only found to be sufficient to cause appreciable ablation of one of the four ablatives that were tested. The rocket exhaust plume did cause spalling of concrete during each descent and landing on a landing pad in the hazard field. The Extended Abstract ASE Earth and Space Conference April, 2016 - Orlando, FL concrete surface was laser scanned following each Morpheus landing, and the total volume of spalled concrete that eroded between the first and final landings of the Morpheus Project's test campaign was estimated. This paper will also describe a new deployable launch system (DLS) capability that is being developed at KSC and was publicly announced in May 2015 (KSC Partnerships, 2015). The DLS is a set of multi-user Ground Support Equipment that will be used to test and launch small class launch vehicles. The system is comprised of four main elements: the Launch Stand, the Flame Deflector, the Pad Apron and the KAMAG transporter. The system elements are designed to be deployed at launch or test sites within the KSC/CCAFS boundaries. The DLS is intended to be used together with the Fluid and Electrical System of the Universal Propellant Servicing Systems and Mobile Power Data and Communications Unit.

Ablatives Testing↗

Launch Pad in a Box

NASA Kennedy Space Center (KSC) is developing a new deployable launch system capability to support a small class of launch vehicles for NASA and commercial space companies to test and launch their vehicles. The deployable launch pad concept was first demonstrated on a smaller scale at KSC in 2012 in support of NASA Johnson Space Center's Morpheus Lander Project. The main objective of the Morpheus Project was to test a prototype planetary lander as a vertical takeoff and landing test-bed for advanced spacecraft technologies using a hazard field that KSC had constructed at the Shuttle Landing Facility (SLF). A steel pad for launch or landing was constructed using a modular design that allowed it to be reconfigurable and expandable. A steel flame trench was designed as an optional module that could be easily inserted in place of any modular steel plate component. The concept of a transportable modular launch and landing pad may also be applicable to planetary surfaces where the effects of rocket exhaust plume on surface regolith is problematic for hardware on the surface that may either be damaged by direct impact of high speed dust particles, or impaired by the accumulation of dust (e.g., solar array panels and thermal radiators). During the Morpheus free flight campaign in 2013-14, KSC performed two studies related to rocket plume effects. One study compared four different thermal ablatives that were applied to the interior of a steel flame trench that KSC had designed and built. The second study monitored the erosion of a concrete landing pad following each landing of the Morpheus vehicle on the same pad located in the hazard field. All surfaces of a portable flame trench that could be directly exposed to hot gas during launch of the Morpheus vehicle were coated with four types of ablatives. All ablative products had been tested by NASA KSC and/or the manufacturer. The ablative thicknesses were measured periodically following the twelve Morpheus free flight tests. The thermal energy from the Morpheus rocket exhaust plume was only found to be sufficient to cause appreciable ablation of one of the four ablatives that were tested. The rocket exhaust plume did cause spalling of concrete during each descent and landing on a landing pad in the hazard field. The Extended Abstract ASE Earth and Space Conference April, 2016 - Orlando, FL concrete surface was laser scanned following each Morpheus landing, and the total volume of spalled concrete that eroded between the first and final landings of the Morpheus Project's test campaign was estimated. This paper will also describe a new deployable launch system (DLS) capability that is being developed at KSC and was publicly announced in May 2015 (KSC Partnerships, 2015). The DLS is a set of multi-user Ground Support Equipment that will be used to test and launch small class launch vehicles. The system is comprised of four main elements: the Launch Stand, the Flame Deflector, the Pad Apron and the KAMAG transporter. The system elements are designed to be deployed at launch or test sites within the KSC/CCAFS boundaries. The DLS is intended to be used together with the Fluid and Electrical System of the Universal Propellant Servicing Systems and Mobile Power Data and Communications Unit

Mobile Launch Pad Development↗

NASA Collaborative Design Processes

This is Block 1, the first evolution of the world's most powerful and versatile rocket, the Space Launch System, built to return humans to the area around the moon. Eventually, larger and even more powerful and capable configurations will take astronauts and cargo to Mars. On the sides of the rocket are the twin solid rocket boosters that provide more than 75 percent during liftoff and burn for about two minutes, after which they are jettisoned, lightening the load for the rest of the space flight. Four RS-25 main engines provide thrust for the first stage of the rocket. These are the world's most reliable rocket engines. The core stage is the main body of the rocket and houses the fuel for the RS-25 engines, liquid hydrogen and liquid oxygen, and the avionics, or "brain" of the rocket. The core stage is all new and being manufactured at NASA's "rocket factory," Michoud Assembly Facility near New Orleans. The Launch Vehicle Stage Adapter, or LVSA, connects the core stage to the Interim Cryogenic Propulsion Stage. The Interim Cryogenic Propulsion Stage, or ICPS, uses one RL-10 rocket engine and will propel the Orion spacecraft on its deep-space journey after first-stage separation. Finally, the Orion human-rated spacecraft sits atop the massive Saturn V-sized launch vehicle. Managed out of Johnson Space Center in Houston, Orion is the first spacecraft in history capable of taking humans to multiple destinations within deep space. 2) Each element of the SLS utilizes collaborative design processes to achieve the incredible goal of sending human into deep space. Early phases are focused on feasibility and requirements development. Later phases are focused on detailed design, testing, and operations. There are 4 basic phases typically found in each phase of development.

Jones, Davey↗

Continuation of the University of Michigan Sounding Rocket Program

This interim report gives the activity on this grant through 31 October 1998, and the planned activities for the next fiscal year. A Project Initiation Conference (PIC) was held at the Wallops Flight Facility (WFF), with planning for the launch of flight 36.174 in Fall 1998. However, following the PIC, the WFF personnel decided that the experiment telemetry system had to be completely rewired, which required substantial design and wiring changes on the experiment side of the payload. These costs had not been anticipated in the FY98 budget, and used up considerable resources of the experimenters. In addition, the telemetry re-design was not completed until Fall 1998, so that there was no opportunity for a launch in 1998 (the Jupiter window closes in late November 1998 and it will reopen in late summer 1999). A Design Review was held by telecon with WFF personnel on 26 October 1998, with plans for the 36.174 launch now in late August 1999 with a launch window which extends into winter 2000. On a more positive note, we have been developing a vacuum UV calibration chamber in Michigan's Space Physics Research Lab, for future measurements of our experiment components, and this facility is now undergoing initial measurements of various calibration lamps in preparation for testing of the telescope UV reflective efficiency. This facility will greatly increase our ability to optimize our experiment for UV efficiency, which has been lacking in the past, and it will be made available for support of other NASA missions at Michigan and for visitors from other institutions. For the next flight 36.174, the following activities will be accomplished: (1) prepare the experiment, including replacement and upgrading of critical components, at University of Michigan; (2) pre-integrate the payload at the Wallops Flight Facility; (3) perform final far-UV calibration of instrument (4) perform final alignment, integration, and electrical checks at WSMR; (5) launch payload from WSMR and check condition of recovered payload; (6) perform post-flight calibration, if necessary and applicable (7) reduce and analyze flight data. The following pages contain information from the experimenter package for the Design Review for the next flight, 36.174, listing the plans, changes, and schedule for this flight.

Clarke, John↗

High-altitude balloon-launched aircraft - A piloted simulation study

A real-time piloted simulation at the NASA Dryden Flight Research Facility was used to study the feasibility of launching a research aircraft from a high-altitude balloon. In the study, the simulated aircraft was launched in a nosedown attitude at zero airspeed from 110,000 ft. After launch, the pilot flew the aircraft through a near-maximum-lift pullout and then through a zoom climb to a trimmed, l-g flight condition at the test altitude. The study included parametric variations to measure the effects of launch altitude, gross weight, Mach number limit, and parachute size on the test altitude attained. The aerodynamic model of the simulated aircraft was based on flight test results, low Reynolds number windtunnel tests, and computational models; the model included significant Mach number and Reynolds number effects at high altitude. A small parachute was included in the simulation to limit Mach number during the pullout to avoid adverse transonic effects and their resultant energy losses. A small rocket motor was included in the simulation and was investigated for boosting the aircraft to a higher test altitude. In the study, a test altitude of approximately 95,000 ft was attained without rocket boost, and a test altitude in excess of 100,000 ft was attained using small rocket boost.

Murray, James E.↗

Debris/ice/TPS assessment and integrated photographic analysis for Shuttle Mission STS-45

The Debris Team has developed and implemented measures to control damage from debris in the Shuttle operational environment and to make the control measures a part of routine launch flows. These measures include engineering surveillance during vehicle processing and closeout operations, facility and flight hardware inspections before and after launch, and photographic analysis of mission events. Photographic analyses of mission imagery from launch, on-orbit, and landing provide significant data in verifying proper operation of systems and evaluating anomalies. In addition to the Kennedy Space Center (KSC) Photo/Video Analysis, reports from Johnson Space Center, Marshall Space Flight Center, and Rockwell International-Downey are also included to provide an integrated assessment of each Shuttle mission.

Katnik, Gregory N.↗

Debris/ice/TPS assessment and integrated photographic analysis for Shuttle Mission STS-56

The Debris Team developed and implemented measures to control damage from debris in the Shuttle operational environment and to make the control measures a part of routine launch flows. These measures include engineering surveillance during vehicle processing and closeout operations, facility and flight hardware inspections before and after launch, and photographic analysis of mission events. Photographic analyses of mission imagery from launch, on-orbit, and landing provide significant data in verifying proper operation of systems and evaluating anomalies. In addition to the Kennedy Space Center (KSC) Photo/Video Analysis, reports from JSC, MSFC, and Rockwell International--Downey are also included in this document to provide an integrated assessment of the mission.

Katnik, Gregory N.↗

Debris/Ice/TPS Assessment and Integrated Photographic Analysis of Shuttle Mission STS-104

The Debris Team has developed and implemented measures to control damage from debris in the Shuttle operational environment and to make the control measures a part of routine launch flows. These measures include engineering surveillance during vehicle processing and closeout operations, facility and flight hardware inspections before and after launch, and photographic analysis of mission events. Photographic analyses of mission imagery from launch, on-orbit, and landing provide significant data in verifying proper operation of systems and evaluating anomalies. In addition to the Kennedy Space Center Photo/Video Analysis, reports from Johnson Space Center and Marshall Space Flight Center are also included in this document to provide an integrated assessment of the mission.

Oliu, Armando↗

Debris/Ice/TPS Assessment and Integrated Photographic Analysis of Shuttle Mission STS-105

The Debris Team has developed and implemented measures to control damage from debris in the Shuttle operational environment and to make the control measures a part of routine launch flows. These measures include engineering surveillance during vehicle processing and closeout operations, facility and flight hardware inspections before and after launch, and photographic analysis of mission events. Photographic analyses of mission imagery from launch, on-orbit, and landing provide significant data in verifying proper operation of systems and evaluating anomalies. In addition to the Kennedy Space Center Photo/Video Analysis, reports from Johnson Space Center and Marshall Space Flight Center are also included in this document to provide an integrated assessment of the mission.

Oliu, Armando↗

Debris/Ice/TPS Assessment and Integrated Photographic Analysis of Shuttle Mission STS-108

The Debris Team has developed and implemented measures to control damage from debris in the Shuttle operational environment and to make the control measures a part of routine launch flows. These measures include engineering surveillance during vehicle processing and closeout operations, facility and flight hardware inspections before and after launch, and photographic analysis of mission events. Photographic analyses of mission imagery from launch, on-orbit, and landing provide significant data in verifying proper operation of systems and evaluating anomalies. In addition to the Kennedy Space Center Photo/Video Analysis, reports from Johnson Space Center and Marshall Space Flight Center are also included in this document to provide an integrated assessment of the mission.

Oliu, Armando↗

Debris/Ice/TPS Assessment and Integrated Photographic Analysis of Shuttle Mission STS-109

The Debris Team has developed and implemented measures to control damage from debris in the Shuttle operational environment and to make the control measures a part of routine launch flows. These measures include engineering surveillance during vehicle processing and closeout operations, facility and flight hardware inspections before and after launch, and photographic analysis of mission events. Photographic analyses of mission imagery from launch, on-orbit, and landing provide significant data in verifying proper operation of systems and evaluating anomalies. In addition to the Kennedy Space Center Photo/Video Analysis, reports from Johnson Space Center and Marshall Space Flight Center are also included in this document to provide an integrated assessment of the mission.

Oliu, Armando↗

Debris/Ice/TPS Assessment and Integrated Photographic Analysis of Shuttle Mission STS-110

The Debris Team has developed and implemented measures to control damage from debris in the Shuttle operational environment and to make the control measures a part of routine launch flows. These measures include engineering surveillance during vehicle processing and closeout operations, facility and flight hardware inspections before and after launch, and photographic analysis of mission events. Photographic analyses of mission imagery from launch, on-orbit, and landing provide significant data in verifying proper operation of systems and evaluating anomalies. In addition to the Kennedy Space Center Photo/Video Analysis, reports from Johnson Space Center and Marshall Space Flight Center are also included in this document to provide an integrated assessment of the mission.

Oliu, Armando↗

Common Data Acquisition Systems (DAS) Software Development for Rocket Propulsion Test (RPT) Test Facilities - A General Overview

The advent of the commercial space launch industry and NASA's more recent resumption of operation of Stennis Space Center's large test facilities after thirty years of contractor control resulted in a need for a non-proprietary data acquisition system (DAS) software to support government and commercial testing. The software is designed for modularity and adaptability to minimize the software development effort for current and future data systems. An additional benefit of the software's architecture is its ability to easily migrate to other testing facilities thus providing future commonality across Stennis. Adapting the software to other Rocket Propulsion Test (RPT) Centers such as MSFC, White Sands, and Plumbrook Station would provide additional commonality and help reduce testing costs for NASA. Ultimately, the software provides the government with unlimited rights and guarantees privacy of data to commercial entities. The project engaged all RPT Centers and NASA's Independent Verification & Validation facility to enhance product quality. The design consists of a translation layer which provides the transparency of the software application layers to underlying hardware regardless of test facility location and a flexible and easily accessible database. This presentation addresses system technical design, issues encountered, and the status of Stennis' development and deployment.

Hebert, Phillip W., Sr.↗

UNDERFLIGHT CALIBRATION OF SOHO/CDS AND HINODE/EIS WITH EUNIS-07

Flights of Goddard Space Flight Center's Extreme Ultraviolet Normal Incidence Spectrograph (EUNIS) sounding rocket in 2006 and 2007 provided updated radiometric calibrations for Solar and Heliospheric Observatory/Coronal Diagnostic Spectrometer (SOHO/CDS) and Hinode/Extreme Ultraviolet Imaging Spectrometer (Hinode/EIS). EUNIS carried two independent imaging spectrographs covering wavebands of 300-370 A in first order and 170-205 A in second order. After each flight, end-to-end radiometric calibrations of the rocket payload were carried out in the same facility used for pre-launch calibrations of CDS and EIS. During the 2007 flight, EUNIS, SOHO/CDS, and Hinode/EIS observed the same solar locations, allowing the EUNIS calibrations to be directly applied to both CDS and EIS. The measured CDS NIS 1 line intensities calibrated with the standard (version 4) responsivities with the standard long-term corrections are found to be too low by a factor of 1.5 due to the decrease in responsivity. The EIS calibration update is performed in two ways. One uses the direct calibration transfer of the calibrated EUNIS-07 short wavelength (SW) channel. The other uses the insensitive line pairs, in which one member was observed by the EUNIS-07 long wavelength (LW) channel and the other by EIS in either the LW or SW waveband. Measurements from both methods are in good agreement, and confirm (within the measurement uncertainties) the EIS responsivity measured directly before the instrument's launch. The measurements also suggest that the EIS responsivity decreased by a factor of about 1.2 after the first year of operation (although the size of the measurement uncertainties is comparable to this decrease). The shape of the EIS SW response curve obtained by EUNIS-07 is consistent with the one measured in laboratory prior to launch. The absolute value of the quiet-Sun He II 304 A intensity measured by EUNIS-07 is consistent with the radiance measured by CDS NIS in quiet regions near the disk center and the solar minimum irradiance recently obtained by CDS NIS and the Solar Dynamics Observatory/Extreme Ultraviolet Variability Experiment.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

sonde (00)

The balloon-borne sounding system (SONDE) provides in situ measurements (vertical profiles) of both the thermodynamic state of the atmosphere, and the wind speed and direction. Sonde operations can provide important constraints for model simulations if used during field campaigns where multiple stations are operated around a central location with baseline measurements, such as a mobile facility. When deployed, sondes are launched at scheduled intervals.

54 ENVIRONMENTAL SCIENCES↗

IMP mission

The program requirements and operations requirements for the IMP mission are presented. The satellite configuration is described and the missions are analyzed. The support equipment, logistics, range facilities, and responsibilities of the launching organizations are defined. The systems for telemetry, communications, satellite tracking, and satellite control are identified.

Source record↗