Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “LAUNCHING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

NASA’s SLS (Space Launch System) Rocket Ready for Artemis II Lunar Mission

In early 2026, NASA will launch the Artemis II mission, an approximately 10-day long lunar mission that will fly three NASA astronauts and one CSA (Canadian Space Agency) astronaut on a free-return trajectory around the Moon, following a one-day checkout of their Orion spacecraft in Earth orbit. The mission will be the first to launch astronauts aboard NASA’s Orion spacecraft and on top of the agency’s SLS (Space Launch System) rocket. The mission will also deploy four 12U CubeSats as secondary payloads from the Orion stage adapter, following Orion separation and departure. The payloads, developed by four of NASA’s international partners, will perform a variety of science and technology investigations. The SLS and Orion for the mission are currently stacked in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida and are undergoing final preparations to rollout to Launch Pad 39B for a tanking test before launch. In addition to preparations for the Artemis II mission, significant progress is being made on the SLS for the Artemis III mission, which is targeted to return astronauts to the lunar surface no later than 2029. Major components of the core stage and solid rocket boosters are already at NASA Kennedy undergoing build-up for the mission. Data from the Artemis II launch and mission, as well as progress to subsequent missions, as available, will be presented.

Bruce Askins↗

Successful Demolition of Historic Cape Canaveral Air Force Station Launch Facilities: Managing the Process to Maximize Recycle Value to Fund Demolition

This paper will present the history of the Atlas 36 and Titan 40 Space Launch Complexes (SLC), the facility assessment process, demolition planning, recycle methodology, and actual facility demolition that resulted in a 40% reduction in baseline cost. These two SLC launched hundreds of payloads into space from Cape Canaveral Air Force Station (AFS), Florida. The Atlas-Centaur family of rockets could lift small- to medium-size satellites designed for communications, weather, or military use, placing them with near pinpoint accuracy into their intended orbits. The larger Titan family was relied upon for heavier lifting needs, including launching military satellites as well as interplanetary probes. But despite their efficiency and cost-effectiveness, the Titan rockets, as well as earlier generation Atlas models, were retired in 2005. Concerns about potential environmental health hazards from PCBs and lead-based paint chipping off the facilities also contributed to the Air Force's decision in 2005 to dismantle and demolish the Atlas and Titan missile-launching systems. Lockheed Martin secured the complex following the final launch, removed equipment and turned over the site to the Air Force for decommissioning and demolition (D and D). AMEC was retained by the Air Force to perform demolition planning and facility D and D in 2004. AMEC began with a review of historical information, interviews with past operations personnel, and 100% facility assessment of over 100 structures. There where numerous support buildings that due to their age contained asbestos containing material (ACM), PCB-impacted material, and universal material that had to be identified and removed prior to demolition. Environmental testing had revealed that the 36B mobile support tower (MST) exceeded the TSCA standard for polychlorinated biphenyls (PCB) paint (<50 ppm), as did the high bay sections of the Titan Vertical Integration Building (VIB). Thus, while most of the steel structures could be completely recycled, about one-third of 36B MST and the affected areas of the VIB were to be consigned to an on-site regulated waste landfill. In all, it is estimated that approximately 10,000,000 kg (11,000 tons) of PCB-coated steel will be land-filled and 23,000,000 kg (25,000 tons) will be recycled. The recycling of the steel and other materials made it possible to do additional demolition by using these funds. Therefore, finding ways to maximize the recycle value of materials became a key factor in the pre-demolition characterization and implementation strategy. This paper will present the following: - Critical elements in demolition planning working at an active launch facility; - Characterization and strategy to maximize steel recycle; - Waste disposition strategy to maximize recycle/reuse and minimize disposal; - Recycle options available at DOD installations that allow for addition funds for demolition; - Innovation in demolition methodologies for large structures - explosive demolition and large-scale dismantlement; - H and S aspects of explosive demolition and large scale dismantlement. In conclusion: The Cape Canaveral AFS Demolition Program has been a great success due to the integration of multiple operations and contractors working together to determine the most cost-effective demolition methods. It is estimated that by extensive pre-planning and working with CCAFS representatives, as well as maximizing the recycle credits of various material, primarily steel, that the government will be able to complete what was base-lined to be a $30 M demolition program for < $20 M. Other factors included a competitive subcontractor environment where they were encouraged with incentives to maximize recycle/reuse of material and creative demolition solutions. Also, by overlapping multiple demolition tasks at multiple facilities allowed for a reduction in field oversight. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Identification of Noise Sources During Rocket Engine Test Firings and a Rocket Launch Using a Microphone Phased-Array

A 70 microphone, 10-foot by 10-foot, microphone phased array was built for use in the harsh environment of rocket launches. The array was setup at NASA Wallops launch pad 0A during a static test firing of Orbital Sciences' Antares engines, and again during the first launch of the Antares vehicle. It was placed 400 feet away from the pad, and was hoisted on a scissor lift 40 feet above ground. The data sets provided unprecedented insight into rocket noise sources. The duct exit was found to be the primary source during the static test firing; the large amount of water injected beneath the nozzle exit and inside the plume duct quenched all other sources. The maps of the noise sources during launch were found to be time-dependent. As the engines came to full power and became louder, the primary source switched from the duct inlet to the duct exit. Further elevation of the vehicle caused spilling of the hot plume, resulting in a distributed noise map covering most of the pad. As the entire plume emerged from the duct, and the ondeck water system came to full power, the plume itself became the loudest noise source. These maps of the noise sources provide vital insight for optimization of sound suppression systems for future Antares launches.

acoustics↗

Conceptual Launch Vehicle and Spacecraft Design for Risk Assessment

One of the most challenging aspects of developing human space launch and exploration systems is minimizing and mitigating the many potential risk factors to ensure the safest possible design while also meeting the required cost, weight, and performance criteria. In order to accomplish this, effective risk analyses and trade studies are needed to identify key risk drivers, dependencies, and sensitivities as the design evolves. The Engineering Risk Assessment (ERA) team at NASA Ames Research Center (ARC) develops advanced risk analysis approaches, models, and tools to provide such meaningful risk and reliability data throughout vehicle development. The goal of the project presented in this memorandum is to design a generic launch 7 vehicle and spacecraft architecture that can be used to develop and demonstrate these new risk analysis techniques without relying on other proprietary or sensitive vehicle designs. To accomplish this, initial spacecraft and launch vehicle (LV) designs were established using historical sizing relationships for a mission delivering four crewmembers and equipment to the International Space Station (ISS). Mass-estimating relationships (MERs) were used to size the crew capsule and launch vehicle, and a combination of optimization techniques and iterative design processes were employed to determine a possible two-stage-to-orbit (TSTO) launch trajectory into a 350-kilometer orbit. Primary subsystems were also designed for the crewed capsule architecture, based on a 24-hour on-orbit mission with a 7-day contingency. Safety analysis was also performed to identify major risks to crew survivability and assess the system's overall reliability. These procedures and analyses validate that the architecture's basic design and performance are reasonable to be used for risk trade studies. While the vehicle designs presented are not intended to represent a viable architecture, they will provide a valuable initial platform for developing and demonstrating innovative risk assessment capabilities.

Launch Vehicle↗

Airborne Simulation of Launch Vehicle Dynamics

In this paper we present a technique for approximating the short-period dynamics of an exploration-class launch vehicle during flight test with a high-performance surrogate aircraft in relatively benign endoatmospheric flight conditions. The surrogate vehicle relies upon a nonlinear dynamic inversion scheme with proportional-integral feedback to drive a subset of the aircraft states into coincidence with the states of a time-varying reference model that simulates the unstable rigid body dynamics, servodynamics, and parasitic elastic and sloshing dynamics of the launch vehicle. The surrogate aircraft flies a constant pitch rate trajectory to approximate the boost phase gravity turn ascent, and the aircraft's closed-loop bandwidth is sufficient to simulate the launch vehicle's fundamental lateral bending and sloshing modes by exciting the rigid body dynamics of the aircraft. A novel control allocation scheme is employed to utilize the aircraft's relatively fast control effectors in inducing various failure modes for the purposes of evaluating control system performance. Sufficient dynamic similarity is achieved such that the control system under evaluation is configured for the full-scale vehicle with no changes to its parameters, and pilot-control system interaction studies can be performed to characterize the effects of guidance takeover during boost. High-fidelity simulation and flight-test results are presented that demonstrate the efficacy of the design in simulating the Space Launch System (SLS) launch vehicle dynamics using the National Aeronautics and Space Administration (NASA) Armstrong Flight Research Center Fullscale Advanced Systems Testbed (FAST), a modified F/A-18 airplane (McDonnell Douglas, now The Boeing Company, Chicago, Illinois), over a range of scenarios designed to stress the SLS's Adaptive Augmenting Control (AAC) algorithm.

airborne simulation↗

Rationales for the Lightning Launch Commit Criteria

Since natural and triggered lightning are demonstrated hazards to launch vehicles, payloads, and spacecraft, NASA and the Department of Defense (DoD) follow the Lightning Launch Commit Criteria (LLCC) for launches from Federal Ranges. The LLCC were developed to prevent future instances of a rocket intercepting natural lightning or triggering a lightning flash during launch from a Federal Range. NASA and DoD utilize the Lightning Advisory Panel (LAP) to establish and develop robust rationale from which the criteria originate. The rationale document also contains appendices that provide additional scientific background, including detailed descriptions of the theory and observations behind the rationales. The LLCC in whole or part are used across the globe due to the rigor of the documented criteria and associated rationale. The Federal Aviation Administration (FAA) adopted the LLCC in 2006 for commercial space transportation and the criteria were codified in the FAA's Code of Federal Regulations (CFR) for Safety of an Expendable Launch Vehicle (Appendix G to 14 CFR Part 417, (G417)) and renamed Lightning Flight Commit Criteria in G417.

Lightning Advisory Panel↗

Motivation for Air-Launch: Past, Present, and Future

Air-launch is defined as two or more air-vehicles joined and working together, that eventually separate in flight, and that have a combined performance greater than the sum of the individual parts. The use of the air-launch concept has taken many forms across civil, commercial, and military contexts throughout the history of aviation. Air-launch techniques have been applied for entertainment, movement of materiel and personnel, efficient execution of aeronautical research, increasing aircraft range, and enabling flexible and efficient launch of space vehicles. For each air-launch application identified in the paper, the motivation for that application is discussed.

history↗

Motivation for Air-Launch: Past, Present, and Future

Air-launch is defined as two or more air-vehicles joined and working together, that eventually separate in flight, and that have a combined performance greater than the sum of the individual parts. The use of the air-launch concept has taken many forms across civil, commercial, and military contexts throughout the history of aviation. Air-launch techniques have been applied for entertainment, movement of materiel and personnel, efficient execution of aeronautical research, increasing aircraft range, and enabling flexible and efficient launch of space vehicles. For each air-launch application identified in the paper, the motivation for that application is discussed.

air-launch↗

Lunar Landing and Launch Pad Construction – Concepts and Criteria

When a lander vehicle launches or lands on the Moon, the rocket engine exhaust plume impinges on the surface and interacts with the regolith to create blast ejecta and associated cratering of the surface. Lunar regolith blast ejecta travels at high velocities (>2,000 m/s) for long distances (kilometers) in a vacuum environment [1] creating hazards for surrounding assets and it can also impact the bottom of the lander vehicle, risking damage to the engines, thermal insulation and sensors. Ballistic particles can possibly enter cislunar space and achieve orbit as debris, if the ejecta is sufficiently energetic. The cratering and regolith erosion can endanger the vehicle itself by affecting the soil stability under the landing gear. Landing on unpredictable terrain with varying topography, natural craters and rock hazards is also hazardous risks tipping a lander at dangerous angles in extreme conditions that may also violate maximum slope angles for subsequent launch operations. During launch (Figure 1), an overpressure pulse created by the ignition of the rocket engines can pose significant ejecta risks to the vehicle. Dust clouds raised during landing limit the efficacy of sensors and reduce visibility for the astronaut pilots, creating significant real-time risk during landing site selection by the pilot or computer navigation system. Future lunar spaceports will require mitigations to these launch and landing risks [2]. There are four main objectives of this effort:1) To establish the state of the art in LLP construction methodologies. 2) To propose criteria for trade studies of LLP concepts. 3) To publicly share the authors’ ideas for potential LLP solutions. 4) To serve as the starting point for future development of LLP technologies. Establishing the state of the art in the area of off-Earth Launch & Landing Pad concepts will base-line the work that has been completed thus far and highlight the wide span between current Technology Readiness Levels (TRLs)and operational readiness. The authors aim to communicate the need for funding in this area in the near term by illustrating that there is much work to be completed before a truly viable option exists. Setting forth criteria for trade studies of LLP concepts is important for several reasons. The first and most straightforward is to establish a framework for performing trade studies on LLP concepts. This will enable NASA to select the most promising concepts for continued development, and it will also help technology developers understand how their concepts compare with others and the priorities of development effort.

landing pad↗

Pedestal Hazard Abatement and Soil Removal Construction Completion Report for Launch Complex 34, Solid Waste Management Unit CC054, Cape Canaveral Space Force Station, Florida

This Construction Completion Report summarizes the activities associated with implementation of an interim measure (IM) for hazard abatement of the Launch Pedestal and soil removal at Launch Complex 34 (LC34), Cape Canaveral Space Force Station, Florida. The purpose of the hazard abatement IM was to mitigate any continuing source of contamination associated with residual paint on the Launch Pedestal that contained polychlorinated biphenyls (PCBs). Sampling determined that residual PCB concerns were limited to the steel elements on the top-side of the Pedestal, which included the torus ring, feed pipe, down pipes, pipe straps and shields, remaining steel cover plates and bolts, and railing support steel. The IM also mitigated the potential spread of contamination to surrounding areas by removing fallen metal fragments from the concrete launch pad, as well as soil from trenches on the launch pad where PCB-containing paint chips may have accumulated prior to or during Pedestal hazard abatement activities.

Complex 34↗

An Overview of Contamination Control for the James Webb Space Telescope Launch Campaign

The James Webb Space Telescope (JWST) is a large, infrared space telescope operating at Lagrange point 2. JWST is a joint effort between NASA, ESA, and CSA and was launched from the Centre Spatial Guyanais (CSG) on an Ariane 5 rocket in December 2021. The three-month launch campaign utilized enhanced contamination controls to meet JWST’s strict cleanliness requirements. Prior to launch, JWST was permitted to only be exposed to ISO Class 7 cleanrooms, whereas the processing facilities at CSG are ISO Class 8. NASA, ESA, Arianespace, and CNES implemented temporary upgrades to the nominal contamination control operations for the launch campaign unique to JWST, including the use of vetted, portable High Efficiency Particulate Air (HEPA) filter walls, pre-entrance cleanliness acceptance surveys of each facility and the intra-plant transporter, tightened cleanroom protocols, upgraded garmenting and laundering techniques, cleaning of Self-Contained Atmospheric Protection Ensemble (SCAPE) suits, increased maintenance, staffed pre-cleaning stations, adaptation of the house purge network, and a contamination control enclosure atop the Ariane 5 launcher prior to fairing encapsulation. The Ariane 5 fairing interior and Vehicle Equipment Bay membrane also received multiple cleanings, detailed inspections, and verification sampling to achieve necessary cleanliness levels. The fairing itself was specially sealed to protect the inner environment with just a small, door porthole accessible via diving board for final closeout of the purge interface. All of these enhancements together allowed JWST to meet its contamination requirements for launch, ensuring successful post-separation deployments and mission science.

Contamination Control↗

Overview of Contamination Control for the James Webb Space Telescope Launch Campaign

The James Webb Space Telescope (JWST) is a large, infrared space telescope operating at Lagrange point 2. JWST is a joint effort between NASA, ESA, and CSA and was launched from the Centre Spatial Guyanais (CSG) on an Ariane 5 rocket in December 2021. The three-month launch campaign utilized enhanced contamination controls to meet JWST’s strict cleanliness requirements. Prior to launch, JWST was permitted to only be exposed to ISO Class 7 cleanrooms, whereas the processing facilities at CSG are ISO Class 8. NASA, ESA, Arianespace, and CNES implemented temporary upgrades to the nominal contamination control operations for the launch campaign unique to JWST, including the use of vetted, portable High Efficiency Particulate Air (HEPA) filter walls, pre-entrance cleanliness acceptance surveys of each facility and the intra-plant transporter, tightened cleanroom protocols, upgraded garmenting and laundering techniques, cleaning of Self-Contained Atmospheric Protection Ensemble (SCAPE) suits, increased maintenance, staffed pre-cleaning stations, adaptation of the house purge network, and a contamination control enclosure atop the Ariane 5 launcher prior to fairing encapsulation. The Ariane 5 fairing interior and Vehicle Equipment Bay membrane also received multiple cleanings, detailed inspections, and verification sampling to achieve necessary cleanliness levels. The fairing itself was specially sealed to protect the inner environment with just a small, doored porthole accessible via diving board for final closeout of the purge interface. All these enhancements together allowed JWST to meet its contamination requirements for launch, ensuring successful post-separation deployments and mission science.

James Webb Space Telescope↗

Overview of Contamination Control for the James Webb Space Telescope Launch Campaign

The James Webb Space Telescope (JWST) is a large, infrared space telescope operating at Lagrange point 2. JWST is a joint effort between NASA, ESA, and CSA and was launched from the Centre Spatial Guyanais (CSG) on an Ariane 5 rocket in December 2021. The three-month launch campaign utilized enhanced contamination controls to meet JWST’s strict cleanliness requirements. Prior to launch, JWST was permitted to only be exposed to ISO Class 7 cleanrooms, whereas the processing facilities at CSG are ISO Class 8. NASA, ESA, Arianespace, and CNES implemented temporary upgrades to the nominal contamination control operations for the launch campaign unique to JWST, including the use of vetted, portable High Efficiency Particulate Air (HEPA) filter walls, pre-entrance cleanliness acceptance surveys of each facility and the intra-plant transporter, tightened cleanroom protocols, upgraded garmenting and laundering techniques, cleaning of Self-Contained Atmospheric Protection Ensemble (SCAPE) suits, increased maintenance, staffed pre-cleaning stations, adaptation of the house purge network, and a contamination control enclosure atop the Ariane 5 launcher prior to fairing encapsulation. The Ariane 5 fairing interior and Vehicle Equipment Bay membrane also received multiple cleanings, detailed inspections, and verification sampling to achieve necessary cleanliness levels. The fairing itself was specially sealed to protect the inner environment with just a small, doored porthole accessible via diving board for final closeout of the purge interface. All these enhancements together allowed JWST to meet its contamination requirements for launch, ensuring successful post-separation deployments and mission science.

James Webb Space Telescope, launch, contamination,↗

A Microphone Phased Array for Launch Acoustics Application

A new, portable, phased array of microphones is built at NASA Ames Research Center specifically for the harsh environment encountered in launch pads of rocket vehicles. It uses 70 piezoresistive, dynamic pressure sensors, optimally distributed on a 10.5ft diameter open frame dome structure. The open frame is light yet robust to sustain the high wind load of typical seaside launch pads, and the blast and acoustic loads from the launch. A 200-ft long cable bundle carries the microphone signals to a weather-protected cabinet containing the data systems, and allows for the placement of the array tall structures. The array is equipped with an infra-red camera and a visible wavelength camera for imaging the launch pad. The beamformed noise maps will be superimposed on the video footages collected by the cameras for correct identification of the noise sources. The array is tested with very loud speaker sources to determine the beamforming ability using different schemes, such as the conventional beamforming, orthogonal-functional beamforming, and spectral element methods. A comparative study was conducted to determine the minimum attainable spatial resolution. Data from a validation test in an outdoor setup, where the array was placed on a Telehandler at several different heights and distances from either a single or a pair of speakers, is presented in this paper. The final goal is to use the array during NASA’s Artemis-II launch to determine the distribution of noise sources on the Mobile Launcher.

Acoustics↗

Beyond Gravity Single Launch Payload Accommodations Shock Testing

The Vulcan Centaur launch vehicle is purpose-built to meet all the U.S. government’s National Security Space Launch (NSSL) needs. A shock test for the Centaur V’s payload accommodations (PLA), single launch (SL) configuration was successfully conducted at NASA’s Marshall Space Flight Center (MSFC) in Huntsville, Alabama, in May 2021. This test was a joint effort between MSFC, Beyond Gravity and United Launch Alliance. The primary purpose of the shock test was to characterize the shock environment induced by the separation event on components attached to the PLA and its interfaces. Additional test requirements included: (1) verifying the payload fairing (PLF) did not contact the flight hardware during the mechanical separation of the PLF horizontal separation system (HSS) and (2) evaluating the performance of the HSS spring packages during jettison. The data acquired during the PLF SL shock test will be used to validate the shock predictions from pre-test analysis of the launch vehicle and the PLF separation analysis. This paper provides an overview of the PLA SL shock test planning and execution as well as the required catch system, instrumentation and results.

separation↗

Beyond Gravity Single Launch Payload Accommodations Shock Testing

The Vulcan Centaur launch vehicle is purpose-built to meet all the U.S. government’s National Security Space Launch (NSSL) needs. A shock test for the Centaur V’s payload accommodations (PLA), single launch (SL) configuration was successfully conducted at NASA’s Marshall Space Flight Center (MSFC) in Huntsville, Alabama, in May 2021. This test was a joint effort between MSFC, Beyond Gravity and United Launch Alliance. The primary purpose of the shock test was to characterize the shock environment induced by the separation event on components attached to the PLA and its interfaces. Additional test requirements included: (1) verifying the payload fairing (PLF) did not contact the flight hardware during the mechanical separation of the PLF horizontal separation system (HSS) and (2) evaluating the performance of the HSS spring packages during jettison. The data acquired during the PLF SL shock test will be used to validate the shock predictions from pre-test analysis of the launch vehicle and the PLF separation analysis. This paper provides an overview of the PLA SL shock test planning and execution as well as the required catch system, instrumentation and results.

separation↗

Space Launch System Base Aerothermodynamics Post-Flight Reconstruction for Artemis I

Artemis I was the first uncrewed integrated test flight of the NASA heavy-lift, human-rated, exploration-class launch vehicle, Space Launch System (SLS), and Orion spacecraft. Artemis I successfully launched from Pad39B at NASA Kennedy Space Center on November 16th, 2023. The integrated test flight is composed of launch and ascent of the SLS vehicle from lift-off to RS-25 main engine cut-off (MECO), interim cryogenic propulsion stage (ICPS) in-space flight and Orion’s trajectory around the moon and landing in the Pacific Ocean which occurred on December 11th, 2023. The SLS total thrust of 8,800,000 lbf is powered by four LOX/LH2 RS-25 engines and two 5-segment solid rocket boosters. As a result, base flow environments for this vehicle are highly complex and extreme. SLS base aerothermodynamics covers rocket plume-induced convection and radiation of the vehicle’s aft region during powered flight from lift-off to MECO. This work discusses the SLS base flow physics observed during Artemis I and comparisons of post-flight reconstruction with pre-flight models and Space Shuttle data. This is the first time in-depth base heating flight reconstruction has been investigated for an exploration-class launch vehicle since the Saturn V Program.

aerothermodynamics↗

Space Launch System Base Aerodynamics Post-Flight Reconstruction for Artemis I

Artemis I was the first uncrewed integrated test flight of the NASA heavy-lift, human-rated, exploration-class launch vehicle, Space Launch System (SLS), and Orion spacecraft. Artemis I successfully launched from Pad39B at NASA Kennedy Space Center on November 16th, 2022. The integrated test flight was composed of launch and ascent of SLS vehicle from lift-off to RS-25 main engine cut-off (MECO), interim cryogenic propulsion stage (ICPS) in-space flight and Orion’s trajectory around the moon and landing in the Pacific Ocean which occurred on December 11th, 2022. The SLS total thrust of 8,800,000 lbf was powered by four LOX/LH2 RS-25 engines and two 5-segment solid rocket boosters. As a result, the base flow field had highly complex phenomena and regimes. SLS base aerodynamics covers vehicle base pressure and integrated axial force during powered flight from lift-off to MECO. This work discusses the SLS base flow physics observed during Artemis I and comparisons of post-flight reconstruction with pre-flight models and Space Shuttle data. This was the first time in-depth base aerodynamics flight reconstruction has been investigated for an exploration-class launch vehicle since the Saturn V Program.

aerothermodynamics↗