Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Integer programming.”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

A parametric approach to identify synergistic domains of process intensification for reactive separation

Process intensification aims to combine multiple tasks within multi-functional units to drastically improve economic, energy or sustainability metrics of a chemical process. Limited work exists to systematically identify the synergistic domains where intensification outperforms its nonintensified counterpart. In this work, we computationally derive the synergistic domains of a reactive separation system. Specifically, we first postulate general models for both intensified and nonintensified systems. We use these models to generate data to train a ReLU-type artifical neural network (ANN). Further, the trained ReLU-NN model is formulated as a multi-parametric mixed-integer linear program (mp-MILP), and the critical regions of this mp-MILP define the synergistic feasible domains of intensification. We have derived these synergistic domains of vapor–liquid equilibrium (VLE)-based reactive separation for several industrial applications. These synergistic domains enable quick screening of properties that favor intensification.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Integrated membrane material design and system synthesis

In designing membrane systems, the synergy between membrane materials and the process design is often overlooked. In this paper, we present a mixed-integer nonlinear programming (MINLP) model for synthesizing membrane systems while simultaneously designing the respective membrane materials for multicomponent gas separation. The approach considers superstructure representations for systems with: (1) same, (2) potentially different, and (3) property-targeting membrane materials. In the first two systems, the selection of membrane material is a decision, while in the final type, membrane permeances are subject to optimization. Physics-based surrogate models are used to describe permeation in crossflow and countercurrent flow permeators. We show that, through a case study of biogas upgrading, our approach obtains high quality solutions. Furthermore, we use the proposed approach while considering permeance-based production cost to find the optimal membrane.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Relaxations of the steady optimal gas flow problem for a non-Ideal gas

Natural gas ranks second in U.S. primary energy consumption. Because most production sites are remote, gas must be transported through pipeline networks equipped with compressors, valves, and other components. For both economic efficiency and system reliability, it is desirable to operate these networks optimally. The governing physics across pipeline components entails nonlinear, non-convex equality and inequality constraints, and the most general steady-flow operations problem is a Mixed-Integer Nonlinear Program (MINLP).This work focuses on one such steady-flow problem-the Optimal Gas Flow (OGF) for a natural gas pipeline network-which minimizes production cost subject to the steady-flow physics. For day-to-day operations, the ability to quickly compute a globally optimal solution and a strong lower bound for varying demand profiles is crucial. A promising strategy is to build tight relaxations of the OGF’s nonlinear constraints. However, many nonlinearities arising from non-ideal equations of state either lack relaxations or have relaxations that do not scale to realistic network sizes. We address this gap by combining recent advances in polyhedral relaxations for univariate functions to construct tight, computationally efficient relaxations of the OGF with a non-ideal equation of state. These relaxations solve within seconds on a standard laptop. In conclusion, we demonstrate their quality through extensive numerical experiments on very large-scale test networks from the literature and find that the proposed approach proves optimality in 92% of tested instances.

03 NATURAL GAS↗

Optimization of battery swapping infrastructure for e-commerce drone delivery

Drone delivery is widely-researched to alter the current e-commerce delivery convention for providing short delivery lead times. Yet, flight range of drones, constrained by the available battery technology, sets a milestone toward realizing the sole-drone delivery. To tackle with the flight range limitation, locating automated battery swapping machines (ABSM) have been proposed and a few studies modeled the problem. Using the ABSMs, drones can be loaded with fully-charged batteries along the route to a demand location. Here, we introduce a mixed-integer nonlinear program to model the problem. The objective of the program is to optimally select ABSM locations, determine the delivery-mode choices (drone-only, truck-only, and mixed delivery) of demand locations, find drone delivery routes, and approximate the baseline requirements for the number of drones and batteries needed. The program minimizes the overall delivery system costs including: ABSM, delivery, drone ownership, battery inventory, and service congestion. A cutting-plane method is developed to find exact solutions in finite iterations. Computational experiments showed that the method quickly yields the optimal solution to instances with less than 60 ABSM candidates and 20 demand locations. A case study shows that the optimal drone delivery infrastructure can save almost 20% cost compared to the conventional truck-only delivery. Sensitivity analyses were conducted to reveal the impact of key parameters in the decision-making and found that a decrease in the ABSM and drone costs highly affect the system cost.

25 ENERGY STORAGE↗

An efficient MILP framework for integrating nonlinear process dynamics and control in optimal production scheduling calculations

The emphasis currently placed on enterprise-wide decision making and optimization has led to an increased need for methods of integrating nonlinear process dynamics and control information in scheduling calculations. The inevitable high dimensionality and nonlinearity of first-principles dynamic process models makes incorporating them in scheduling calculations challenging. In this work, we describe a general framework for deriving data-driven surrogate models of the closed-loop process dynamics. Focusing on Hammerstein–Wiener and finite step response (FSR) model forms, we show that these models can be (exactly) linearized and embedded in production scheduling calculations. The resulting scheduling problems are mixed-integer linear programs with a special structure, which we exploit in a novel and efficient solution strategy. A polymerization reactor case study is utilized to demonstrate the merits of this method. Finally, our framework compares favorably to existing approaches that embed dynamics in scheduling calculations, showing considerable reductions in computational effort.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Recent advances and challenges in optimization models for expansion planning of power systems and reliability optimization

Optimization models for expansion planning of power systems aim to determine capacities, investment timing, and location of power systems to satisfy the power demands while minimizing the total cost. The models have become complex in recent years to reflect both regulations on conventional energy sources and the increasing penetration of renewable energy sources (RES). This paper reviews the basic concepts and optimization models for expansion planning of power systems. We first explain the definition and features of generation expansion planning (GEP), transmission expansion planning (TEP), and generation and transmission expansion planning (GTEP). To address the computational challenges of large-scale expansion planning problems, we review several simplifications including temporal and spatial aggregation, and decomposition methods. This paper also addresses power system reliability defined as the probability of satisfying the load demand while withstanding failures of components. Finally, the goal of this paper is to provide a research overview, discuss trends in expansion planning of power systems, and suggest directions for future research.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Qualitative trend analysis based on a mixed-integer representation

Shape constrained spline fitting is a useful method to impose prior knowledge onto flexible semi-parametric models during parameter estimation. Most typically, the function shape is imposed through order restrictions on the regression coefficients. The intended shape is considered known or selected based on heuristic rules. In this study, we present a method to estimate the optimal set of order restrictions to segment a univariate data series into episodes with distinct shapes. This is also known as the qualitative trend analysis (QTA) problem. The obtained solution uses a trade-off between lack-of-fit and model complexity. Further, our practical implementation takes inspiration from the generalized order restricted information criterion (GORIC) for inequality-constrained model selection. From this, one learns (a) that QTA can be formulated as a mixed-integer quadratic program (MIQP) and (b) that the newly proposed mixed order restricted information criterion (MORIC) enables optimal segmentation. This is illustrated through didactic case studies.

42 ENGINEERING↗

Stochastic optimization of cellulosic biofuel supply chain incorporating feedstock yield uncertainty

The global goal to reduce dependence on fossil fuels and to mitigate greenhouse gas emissions has resulted in research focused on environment friendly and socio-economically sustainable renewable energy sources. However, commercial production of bio-energy is constrained by biomass supply uncertainty and associated costs. This study presents an integrated approach to determining the optimal biofuel supply chain considering biomass yield uncertainty. A two-stage stochastic mixed integer linear programming is utilized to minimize the expected system cost while incorporating yield uncertainty in the strategic level decisions related to biomass production and biorefinery investment. Applicability of the stochastic model is illustrated through a case study of switchgrass-based biofuel in west Tennessee.

09 BIOMASS FUELS↗

Electric vehicle supply equipment location and capacity allocation for fixed-route networks

Electric vehicle (EV) supply equipment location and allocation (EVSELCA) problems for freight vehicles are becoming more important because of the trending electrification shift. Some previous works address EV charger location and vehicle routing problems simultaneously by generating vehicle routes from scratch. Although such routes can be efficient, introducing new routes may violate practical constraints, such as drive schedules, and satisfying electrification requirements can require dramatically altering existing routes. To address the challenges in the prevailing adoption scheme, we approach the problem from a fixed -route perspective. We develop a mixed -integer linear program, a clustering approach, and a metaheuristic solution method using a genetic algorithm (GA) to solve the EVSELCA problem. The clustering approach simplifies the problem by grouping customers into clusters, while the GA generates solutions that are shown to be nearly optimal for small problem cases. A case study examines how charger costs, energy costs, the value of time (VOT), and battery capacity impact the cost of the EVSELCA. Charger equipment costs were found to be the most significant component in the objective function, leading to a substantial reduction in cost when decreased. VOT costs exhibited a significant decrease with rising energy costs. Further, an increase in VOT resulted in a notable rise in the number of fast chargers. Longer EV ranges decrease total costs up to a certain point, beyond which the decrease in total costs is negligible.

33 ADVANCED PROPULSION SYSTEMS↗

Multistage Stochastic optimization for mid-term integrated generation and maintenance scheduling of cascaded hydroelectric system with renewable energy uncertainty

The uncertainties resulting from the escalating penetration of renewable energy resources pose severe challenges to the efficient operation of modern power systems. Hydroelectricity is characterized by its flexibility, controllability, and reliability, and thus becomes one of the most ideal energy resources to hedge against such uncertainties. This paper studies the mid-term integrated generation and maintenance scheduling of a cascaded hydroelectric system (CHS) consisting of multiple cascaded reservoirs and hydroelectric units. To precisely describe the mid-term water regulation policies, the hydraulic coupling relationship and water-energy nexus of CHS are incorporated into the proposed optimization model. The uncertainties of natural water inflow and the power outputs of wind/solar energy generation are taken into consideration and captured via a stochastic process modeled by a scenario tree. A multistage stochastic optimization (MSO) approach is developed to coordinate the complementary operations of multiple energy resources, by optimizing the mid-term water resource management, generation scheduling, and maintenance scheduling of CHS. The proposed MSO model is formulated as a large-scale mixed-integer linear program that presents significant computational intractability. To address this issue, a tailored Benders decomposition algorithm is developed. Two real-world case studies are conducted to demonstrate the capability and characteristics of the proposed model and algorithm. The computational results show that the proposed MSO model can exploit the flexibility of hydroelectricity to efficiently respond to variable wind and solar power, and reserve water resources for the generation in peak months to reduce the consumption of fossil fuel. Furthermore, the proposed solution approach also exhibits promising computational efficiency when handling large-scale models.

13 HYDRO ENERGY↗

Design and analysis of optimal pre-cooling in residential buildings

Existing pre-cooling strategies provide a means of shifting or reducing the peak demand and/or energy cost in residential buildings. However, majority of them are rule-based and therefore may not be optimal in terms of cost saving, leaving room for improvement. In this paper, an integer linear programming problem that accounts for the thermal properties of a specific home, HVAC system capacity, utility rate structure, and weather conditions and makes use of a home thermal model is formulated. This problem determines the HVAC on/off control signal that minimizes the 24-h energy cost while maintaining thermal comfort and calculates the corresponding optimal indoor air temperature. The model is constructed using home thermal properties identified via data training in real-time. Through simulation, the energy performance of the proposed optimal pre-cooling strategy is investigated and compared with three rule-based operation strategies from the literature. It is found that the optimal strategy requires the least energy consumption without sacrificing thermal comfort. The superb energy performance of the optimal strategy is attributed to a longer runtime of the HVAC system in cool outdoor air conditions and to the elimination of deadband in HVAC operation, which is required by the rule-based strategies, to allow the indoor air temperature to stay near the thermal comfort upper bound as much as possible. In terms of energy cost, the rule-based operation strategies require 3.52, 1.90, and 2.79, respectively, while the optimal strategy only requires 1.52. These figures represent a saving of 56.82%, 20.00%, and 45.52%, respectively. The results suggest that the optimal strategy is indeed significantly more effective than the existing rule-based operation strategies.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Model predictive control for optimal dispatch of chillers and thermal energy storage tank in airports

Cost of energy consumption is one of the biggest operational cost for airports, and it is increasing from time to time as airports expand to support growing number of passengers. Various factors affect the energy consumption including efficiency of airport Heating Ventilation and Air conditioning (HVAC) systems, which in turn depends on the efficiency of individual subsystems. Here, in this paper, we present an optimal scheduling method for the central plant system at Dallas Fort Worth airport, involving chillers, pumps, and a thermal energy storage (TES) system. A model predictive control (MPC) problem is formulated to minimize both energy and demand charge costs while satisfying the cooling needs of the airport. The proposed Mixed-Integer Nonlinear Programming (MINLP) formulation includes performance curve based models for chillers and pumps and a simplified state of charge model for TES. The formulation also includes predictions of cooling load and chilled water return temperature. Simulation results for a month in summer show savings around 10% compared to the baseline. Initial recommendations based on insights from simulation results to the manual operation procedures resulted in significant savings. Field test results show a 7% chiller efficiency improvement.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Integration of cryogenic energy storage with renewables and power plants: Optimal strategies and cost analysis

Energy storage is critical for overcoming challenges associated with the intermittency and the variable availability of renewable sources for decarbonizing the energy sector. Cryogenic energy storage (CES) is of interest due to its high technology readiness level, no geographical limitations, and moderate round-trip efficiency. The time-varying nature of demands and renewable availability needs to be considered at the design and integration stages of energy storage. We develop a mixed-integer nonlinear program (MINLP) model to obtain the energy storage costs on a daily basis for different scenarios that typically arise over an entire year. Using this optimization-based framework, we address key decision-making questions towards energy transition: What is the energy cost when CES is integrated with renewables and power plants? How does each scenario affect the overall energy cost? How much storage is needed for complete transition to renewables? What is the optimal integration towards 100% renewable energy? What are the optimal storage designs for both renewables and fossil-based power generation with current and future energy demands? Here, we discuss different scenarios and solutions to these questions.

25 ENERGY STORAGE↗

Evaluating the Impact of Off-Design CHP Performance on the Optimal Sizing and Dispatch on Hybrid Renewable-CHP Distributed Energy Resources

The maturation of distributed energy resources (DER) has prompted the exploration of their deployment in commercial building applications due to their potential to supply energy at lower costs and emissions rates compared to centralized generation. While several software tools exist for evaluating the techno-economic potential of integrated renewable energy and combined heat and power (CHP) systems for distributed generation applications, many suffer from poor accuracy in capturing off-design (part load and changes in ambient air temperature and pressure) performance characteristics of microturbines, combustion turbines, or internal combustion engines. Thus, this paper presents a methodology for integrating these off-design characteristics in the mixed-integer linear program within REopt, a hybrid DER screening tool. The economic impact of the CHP off-design performance is observed through several application studies of various hybrid system configurations in different climates. Each study indicates how CHP off-design performance influences optimal sizing and dispatch decisions and therefore overall system economic value. We observe through case studies that modeling without the off-design effects, depending on the CHP prime mover and site, can result in Net Present Value predictions of hybrid systems that can be overoptimistic in frequently hot climates (up to 52%), too conservative in frequently cold climates (up to 11%), or unaffected (+/-1%) in temperate climates. Cases also highlight several advantages of hybrid systems relative to non-hybrid systems such as total economic value and the systems' ability to mitigate potentially negative consequences attributed to off-design performance.

ambient de-rate↗

Optimization of harvest and logistics for multiple lignocellulosic biomass feedstocks in the northeastern United States

A mixed-integer linear programming model was developed to optimize the multiple biomass feedstock supply chains, including feedstock establishment, harvest, storage, transportation, and preprocessing. The model was applied for analyses of multiple biomass feedstocks at county level for 13 states in the northeastern United States. In the base case with a demand of 180,000 dry Mg/year of biomass, the delivered costs ranged from $\$67.90$ to $\$86.97$ per dry Mg with an average of $\$79.58$ /dry Mg. The biomass delivered costs by county were from $\$67.90$ to 150.81 per dry Mg across the northeastern U.S. Considered the entire study area, the delivered cost averaged $\$85.30$ /dry Mg for forest residues, $\$84.47$ /dry Mg for hybrid willow, $\$99.68$ for switchgrass and $\$97.87$ per dry Mg for Miscanthus. Seventy seven out of 387 counties could be able to deliver biomass at $84 per dry Mg or less a target set by US DOE by 2022. A sensitivity analysis was also conducted to evaluate the effects of feedstock availability, feedstock price, moisture content, procurement radius, and facility demand on the delivered cost. Lastly, our results showed that procurement radius, facility capacity, and forest residue availability were the most sensitive factors affecting the biomass delivered costs.

09 BIOMASS FUELS↗

Time-Dependent Electric Bus and Charging Station Deployment Problem

Battery electric buses (BEBs) have gained popularity due to their emission-free and energy-efficient features. Many transit authorities worldwide have set goals to gradually replace their bus fleets with BEBs. Considering the potential decline in BEB battery and charger prices, this study proposes a time-dependent bus fleet transition model to determine the optimal bus fleet transition plan, which includes selecting the bus lines to be electrified, determining the timing and type of BEBs to be purchased, and deploying on-route fast chargers and depot chargers. The model is a bi-objective integer linear program that considers the trade-off between electrified transit mileages and bus electrification costs. A normalized normal constraint method is applied to solve the bi-objective optimization model. The effectiveness of the proposed model is tested using a real-world bus network. Additionally, sensitivity analyses are conducted to better understand the impact of different parameter values on the optimal solutions. Our proposed model can provide transit authorities with a powerful tool to make informed decisions about their BEB fleet replacement plans.

ADVANCED PROPULSION SYSTEMS↗

Optimization under uncertainty of a hybrid waste tire and natural gas feedstock flexible polygeneration system using a decomposition algorithm

Market uncertainties motivate the development of flexible polygeneration systems that are able to adjust operating conditions to favor production of the most profitable product portfolio. However, this operational flexibility comes at the cost of higher capital expenditure. A scenario-based two-stage stochastic nonconvex Mixed-Integer Nonlinear Programming (MINLP) approach lends itself naturally to optimizing these trade-offs. This work studies the optimal design and operation under uncertainty of a hybrid feedstock flexible polygeneration system producing electricity, methanol, dimethyl ether, olefins or liquefied (synthetic) natural gas. A recently developed C++ based software framework (named GOSSIP) is used for modeling the optimization problem as well as its efficient solution using the Nonconvex Generalized Benders Decomposition (NGBD) algorithm. Two different cases are studied: The first uses estimates of the means and variances of the uncertain parameters from historical data, whereas the second assesses the impact of increased uncertain parameter volatility. The value of implementing flexible designs characterized by the value of the stochastic solution (VSS) is in the range of 260–405 M$ for a scale of approximately 893 MW of thermal input. Increased price volatility around the same mean results in higher expected net present value and VSS as operational flexibility allows for asymmetric exploitation of price peaks.

42 ENGINEERING↗