Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Grid Reliability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Electrolyte and Cutoff Potential Effects on Cycle Life of Li4Ti5O12/LiNi0.9Mn0.1O2 Batteries for Behind-the-Meter Storage Applications

Behind-the-Meter Storage (BTMS) is a stationary battery energy storage system that is connected to the electrical distribution system on the customer's side of the utility's service meter. BTMS systems are used to store electrical energy from the grid as well as inconstant, renewable energy, such as local solar and wind generation. A successful BTMS system will allow the customer to pair their energy generation and storage to optimize electrical consumption from the grid, improving reliability and minimizing cost. For BTMS applications, batteries must be designed and optimized with different set of criteria from other leading segments of the Li-ion battery market, like transportation, due the system being stationary and proximal to the residential or commercial building it's benefitting. BTMS applications prioritize safety, cost (low/no-critical materials), reliability (20-year calendar life), and durability (10,000 cycle life), while having the ability to (minimally) compromise energy density and rate capability. Lithium titanate (Li4Ti5O12-, LTO) is a promising anode candidate for BTMS applications due to its high safety and capacity retention, while maintaining a reasonable 160 mAhg-1 reversable capacity and composition of relatively abundant materials. (1) Specifically, LTO has a high working voltage which helps to prevent Li dendrite formation, improving safety. Furthermore, LTO also has negligible lithiation-based volume change, leading to less mechanical pulverization, or loss of active material, upon cycling. For the cathode, materials with little or no Co are of high interest due to the high cost and low abundance of Co. LiMn2O4 (LMO) has been paired with LTO for BTMS applications in the past due to its safety, low cost (abundancy), and reasonably high operating voltage. (2-4) However, the low capacity of LMO limits energy density and specific energy. While not the highest priority for BTMS applications, increasing energy density will enable deployment in space constrained BTMS applications and decrease total cost. LiNi0.9Mn0.1O2 (LN-MO) is a recently developed material with promise due to its high operating voltage and relatively low price. (5) However, Ni-rich layered oxides, including LNMO, tend to struggle with capacity retention during high-voltage cycling due to mechanical pulverization, irreversible phase transitions, and unstable solid-electrolyte interphase. The study presented here focuses on building an understanding of how electrolyte solvent and varied cutoff potentials will impact the cycle life of LTO/LN-MO cells. Specifically, a comparison is provided between ethylene carbonate (EC), ethyl methyl carbonate (EMC), fluoroethylene carbonate (FEC), and Gen2 electrolyte solvents with 1M Lithium hexafluorophosphate (LiPF6) salt, cycling to two upper termination potentials, 2.6V and 2.7V. Electrochemical testing and diagnostics (e.g., differential capacity analysis, area specific impedance, constant voltage hold, and rate capability) and post-mortem characterization will be used to understand the aging behavior and failure mechanisms of the 8 cell combinations (four electrolytes and two voltage cutoffs). Cells with FEC electrolyte showed a lower initial capacity compared to cells with Gen2, EMC, and EC cycling at both voltages; however, the cells with FEC showed consistent trends in capacity retention with 2.6V and 2.7V termination potentials, while the cells with the other electrolytes showed much higher rates of capacity loss when cycling to the higher voltage. These results indicate that FEC may play a role in improving durability of high-voltage, Ni-rich electrode systems for use in high-cycle applications, such as BTMS.

electrolyte↗

Intelligent Vehicle Charging Benefits Assessment Using EV Project Data

PEVs can represent a significant power resource for the grid. An IVCI with bi-direction V2G capabilities would allow PEVs to provide grid support services and thus generate a source of revenue for PEV owners. The fleet of EV Project vehicles represents a power resource between 30 MW and 90 MW, depending on the power rating of the grid connection (5-15 kW). Aggregation of vehicle capacity would allow PEVs to participate in wholesale reserve capacity markets. One of the key insights from EV Project data is the fact that vehicles are connected to an EVSE much longer than is necessary to deliver a full charge. During these hours when the vehicles are not charging, they can be participating in wholesale power markets providing the high-value services of regulation and spinning reserves. The annual gross revenue potential for providing these services using the fleet of EV Project vehicles is several hundred thousands of dollars to several million dollars annually depending on the power rating of the grid interface, the number of hours providing grid services, and the market being served. On a per vehicle basis, providing grid services can generate several thousands of dollars over the life of the vehicle.

33 ADVANCED PROPULSION SYSTEMS↗

Hydrogen Fueling Station in Honolulu, Hawaii Feasibility Analysis

The Department of Energy Hydrogen & Fuel Cells Program Plan (September 2011) identifies the use of hydrogen for government and fleet electric vehicles as a key step for achieving “reduced greenhouse gas emissions; reduced oil consumption; expanded use of renewable power…; highly efficient energy conversion; fuel flexibility…; reduced air pollution; and highly reliable grid-support.” This report synthesizes several pieces of existing information that can inform a decision regarding the viability of deploying a hydrogen (H2) fueling station at the Fort Armstrong site in Honolulu, Hawaii.

08 HYDROGEN↗

Guidelines for Implementing Advanced Distribution Management Systems: Requirements for DMS Integration with DERMS and Microgrids

This guideline focuses on the integration of DMS with DERMS and microgrids connected to the distribution grid by defining generic and fundamental design and implementation principles and strategies. It starts by addressing the current status, objectives, and core functionalities of each system, and then discusses the new challenges and the common principles of DMS design and implementation for integration with DERMS and microgrids to realize enhanced grid operation reliability and quality power delivery to consumers while also achieving the maximum energy economics from the DER and microgrid connections.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advanced Demonstration and Test Reactor Options Study

Global efforts to address climate change will require large-scale decarbonization of energy production in the United States and elsewhere. Nuclear power already provides 20% of electricity production in the United States (U.S.) and is increasing in countries undergoing rapid growth around the world. Because reliable, grid-stabilizing, low emission electricity generation, energy security, and energy resource diversity will be increasingly valued, nuclear power’s share of electricity production has a potential to grow. In addition, there are non electricity applications (e.g., process heat, desalination, hydrogen production) that could be better served by advanced nuclear systems. Thus, the timely development, demonstration, and commercialization of advanced nuclear reactors could diversify the nuclear technologies available and offer attractive technology options to expand the impact of nuclear energy for electricity generation and non-electricity missions. The purpose of this planning study is to provide transparent and defensible technology options for a test and/or demonstration reactor(s) to be built to support public policy, innovation and long term commercialization within the context of the Department of Energy’s (DOE’s) broader commitment to pursuing an “all of the above” clean energy strategy and associated time lines. This planning study includes identification of the key features and timing needed for advanced test or demonstration reactors to support research, development, and technology demonstration leading to the commercialization of power plants built upon these advanced reactor platforms. This planning study is consistent with the Congressional language contained within the fiscal year 2015 appropriation that directed the DOE to conduct a planning study to evaluate “advanced reactor technology options, capabilities, and requirements within the context of national needs and public policy to support innovation in nuclear energy”. Advanced reactors are defined in this study as reactors that use coolants other than water. Advanced reactor technologies have the potential to expand the energy applications, enhance the competitiveness, and improve the sustainability of nuclear energy.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Estimated U.S. Energy Use in 2010: Contributions from Fossil, Nuclear, and Renewable Energy

A diagram of major energy sources for each sector of the U.S. economy depicted as flows in a Sankey diagram. Proportions of fossil, nuclear, and renewable energy provided for electricity generation and ultimately used by the residential, industrial, commercial, and transportation sectors of the economy are shown. This diagram rearranges and segregates information originally published by Lawrence Livermore National Laboratory, based on data from the Energy Information Administration's Annual Energy Review, 2010.

environmental & water↗

Solar-to-Grid: Trends in System Impacts, Reliability, and Market Value in the United States with Data Through 2019

With continued deployment of solar across the United States, assessing the interactions of solar with the power system is an increasingly important complement to studies tracking the cost and performance of solar plants. This project focuses on the historical contribution to reliability, trends in market value, and impacts on the bulk power system of solar deployed in the U.S. through the end of 2019.

14 SOLAR ENERGY↗

Value and Role of Pumped Storage Hydro under High Variable Renewables

A project team, led by GE Research, was tasked by the U.S Department of Energy (DOE) to study the value and role of pumped storage hydro (PSH) under high variable renewables. The study was majority funded by DOE’s Office of Energy Efficiency and Renewable Energy (EERE) through a program managed by EERE’s Water Power Technologies Office. The project team for the study consists of three organizations – GE Research, GE Energy Consulting, and GE Renewables.

13 HYDRO ENERGY↗

Solar-to-Grid: Trends in System Impacts, Reliability, and Market Value in the United States with Data Through 2020

With continued deployment of solar across the United States, assessing the interactions of solar with the power system is an increasingly important complement to studies tracking the cost and performance of solar plants. This project focuses on the historical contribution to reliability, trends in market value, and impacts on the bulk power system of solar deployed in the U.S. through the end of 2020. The scope of this analysis includes the seven organized U.S. wholesale power markets and is based on historical hourly solar generation profiles for each individual plant larger than 1 MW or county-level aggregate profiles for smaller solar. In addition, we present a limited set of results for ten utilities that are outside of the independent system operator (ISO)/regional transmission organization (RTO) markets.

14 SOLAR ENERGY↗

A Short-Term Solar Forecasting Platform Using a Physics-Based Smart Persistence Model and Data Imputation Method

Electrical energy plays vital role in our socio-economic activity and therefore ensuring the reliability of the electric grid, from the generation, transmission and distribution level is critical. In order to maintain the power system parameter viz., frequency, voltage, etc., optimally, balancing of generation and consumption is very much essential. However, solar energy is infirm power by nature this is due to cloud cover / other local phenomena. Hence, Photovoltaic (PV) power generation brings a significant challenge to the grid operator due to the variability of the solar energy. The complexity of this challenge in terms of planning and dispatch ability of PV resources, aggravates with the high penetration of solar energy into the electric grid. In this setting, reliable solar radiation forecasting models based on accurate and quality input data become essential. In order to develop a suitable model for predicting solar radiation, quality historical / real time measurement is also needed. Under this study NIWE and NREL jointly developed / tested short-term solar forecasting frameworks using a smart persistence and physics-based smart persistence models for intra-hour forecasting of solar radiation (PSPI) and benchmarked 9 different data imputation techniques in 15 Solar Radiation Resource Assessment (SRRA) stations, located at different parts of India. During any measurement campaign, due to various technical reasons, we may miss few observations. However, the missing observation often reduce the performance of any forecasting model. Therefore, suitable data imputation method would assist us to obtain continuous observation of solar radiation. A station-by-station and method-by-method analysis was carried out to understand the performance of each model. Based on our analysis, among all the data imputation methods, the Kalman data imputation method is better for Indian Weather condition. In addition, Kalman StructTS, Linear, Stine and Arima methods yield slightly inferior accuracy compared to Kalman, but outperform the other methods. The extended solar radiation data are used by solar forecasting models to provide the prediction of solar radiation at 15 SRRA stations. As far as short term forecasting model is concerned, the PSPI model outperforms the Smart Persistence model. However, the forecast error is increases with the forecasting horizon.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Stochastic Models, Indices & Optimization Algorithms for Pricing & Hedging Reliability Risks in Modern Power Grids: Data Plan - Princeton

We collected and cleaned the synthetic grid data produced by NREL for the Texas and New York synthetic grids. We developed a high dimensional joint stochastic model for load at the zone level, and solar and wind power productions at the asset level, capturing the spatial and temporal dependencies between all the variables, and demonstrated how such a model could be fitted to historical data. We designed and implemented a simulation engine which can produce Monte Carlo scenarios for the hourly day-ahead values of load, and solar and wind power productions at the spatial and temporal resolutions of the historical data used to fit the model. Finally we developed an open-source Python package which can, from an input grid model, efficiently use forecasts and large numbers of Monte Carlo scenarios to provide unit commitment and economic dispatch for each of these scenarios. The high dimensional stochastic model and the subsequent Monte Carlo simulation engine were implemented in the package PGscen and the corresponding UC and ED optimization programs in the package Vatic.

14 SOLAR ENERGY↗

Using National-Scale Data to Inform Coal Power Plant Redevelopment and Coal Community Revitalization Planning

In the United States, individual coal plants have high variation in their construction and operation. Coal plants commonly have multiple units, with different commissioning ages, operational position, and maintenance conditions – even multiple fuels. These units may be in changing states of utilization, with variation in productivity depending on economic contexts. Coal plants themselves may be temporarily offline, mothballed, retired, or decommissioned due to owner/operator portfolios or market conditions, and the current posture of the plant may be difficult to ascertain without local news sources (Tarekegne et al. 2021). Anticipated dates of plant closures are prospectively represented to regulators and to the Energy Information Administration (EIA), but may also experience uncertainty due to the engineering, environmental, economic and social complexity of closing a very large power plant. As noted in this report, closure of the first unit to the last within a single plant may span more than 20 years. Yet tracking and predicting the position of our nation’s coal fleets on a national scale is deeply important. In developing a case for federal datasets and an approach to building and curating these data, this report identified that data must have high fidelity at the plant-level to be meaningful in aggregate. Plant-scale detail is also a match for its application: national priorities in federal investment range from economic revitalization for coal plant communities to maintaining reliable electric grid operations. This document is organized into a statistical review of coal plant retirements, past and prospective, in the United States; trends in the relationship between closures and existing federal investment programs for community revitalization; and potential methods for accelerating site redevelopment through advanced geospatial analysis based on federal data.

01 COAL, LIGNITE, AND PEAT↗

Queued Up: 2025 Edition – Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2024 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with interconnection.fyi, Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 49 non-ISO balancing areas), which collectively represent ~97% of currently installed U.S. electric generating capacity. The dataset includes requests submitted to queues through the end of 2024, and only includes requests seeking to connect to the transmission grid (not distribution-connected or behind-the-meter projects). The files below include both a PDF report and an Excel data file. The PDF report analyzes interconnection data and metrics through the end of 2024. The Excel data file includes (a) the full project-level interconnection queue dataset through 2024, (b) a codebook (data dictionary) describing each data field, and (c) 35 additional tabs featuring tables summarizing a range of interconnection metrics. Key highlights from the Queued Up: 2025 Edition (featuring data through 2024) include: • As of the end of 2024, there were ~10,300 projects actively seeking grid interconnection in the U.S., representing 1,400 GW of generation and approximately 890 GW of storage. • Historic withdrawal rates alongside relatively fewer new requests resulted in a 12% decrease in total active queue volume compared to the prior year. • Active natural gas capacity (136 GW, +72% year-over-year) increased in 2024, while solar (956 GW, -12%), storage (890 GW, -13%), and wind (271 GW, -26%) capacity decreased. • 408 GW of capacity already has a draft or executed interconnection agreement (IA) but has not yet reached commercial operations. • The time projects spend in queues before reaching COD is increasing. For the regions with available data, the median duration from IR to COD has doubled from <2 years for projects built in 2000-2007 to over 4 years for those built in 2018-2024. • Ultimately, most of this proposed capacity will not be built. Only 13% of capacity that submitted interconnection requests from 2000-2019 had reached commercial operations by the end of 2024; 77% of that capacity had been withdrawn and 10% was still active. • FERC Order 2023 and various other reforms are being implemented. These are important measures to reduce interconnection bottlenecks and enhance grid system reliability, but it is too early to measure and assess their full impact. • New additions for the 2025 edition include: (a) additional detail on data processing and gaps; (b) updates on interconnection reforms; (c) new analysis on interconnection agreements, and more.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Methods for Assessing Opportunities for Ring Dam Pumped Storage Hydropower

There is growing interest in new pumped storage hydropower (PSH) deployment to provide a range of grid flexibility, reliability, and resiliency services under an evolving and uncertain future power sector. The National Laboratory of the Rockies develops open PSH resource assessment and cost modeling tools to help evaluate PSH deployment opportunities, and this report describes expansions to those tools to consider an additional PSH system configuration - ring-dam reservoirs built on flat topographical features that are constructed from roller-compacted concrete material. This reservoir type is common among current PSH proposals and requires new methods to identify sites with this reservoir geometry throughout the United States and characterize the associated dam cost. Cost characterization for ring dam reservoirs required collecting historical dam cost data for earthen, rockfill, and roller-compacted concrete dams and regressing equations that relate costs between alternative materials. The ring dam site identification algorithm follows a 5-step procedure to identify circular geometry reservoirs. Once ring dam reservoirs are identified, they are then paired with potential dry-gully reservoirs, and the full set of potential paired reservoirs is cost-optimized to produce a least-cost set of potential PSH sites with no overlapping reservoirs. The resulting analysis found 1,663 ring-dam to dry-gully systems in the contiguous United States that are lower cost than any overlapping dry-gully to dry-gully systems, 29 in Alaska, and none in Hawaii or Puerto Rico. These systems constitute 1.5 TW of capacity in the contiguous United States and nearly 29 GW in Alaska, demonstrating that under suitable topography and head, ring-dam systems can provide cost-effective PSH opportunities. The greatest density of these opportunities are found in the intermountain west where there are mesas and flat land at bases of mountain ranges, but continued work could incorporate additional site characteristics or consider more complex reservoir shapes to find additional PSH deployment opportunities.

13 HYDRO ENERGY↗