Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Flight Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

What made Apollo a success/ques/

Manned Spacecraft Center spacecraft development, mission design and planning, flight crew operations for Apollo, discussing spacecraft design principles

Low, G. M.↗

On optimal scheduling and air traffic control in the near terminal area

A scheme is proposed for automated air traffic control of landing aircraft in the vicinity of the airport. Each aircraft is put under the control of an airport-based computer as soon as it enters the near-terminal area (NTA). Scheduling is done immediately thereafter. The aircraft is given a flight plan which, if followed precisely, will lead it to the runway at a prespecified time. The geometry of the airspace in the NTA is chosen so that delays are executed far from the outer marker, and violations of minimum altitude and lateral separations are avoided. Finally, a solution to the velocity mix problem is proposed.

Sarris, A. H.↗

Broadcast control of air traffic

Concepts of increased pilot participation in air traffic control are presented. The design of an air traffic control system for pilot usage is considered. The operating and safety benefits of LF/VLF approaches in comparison to current nonprecision approach procedures and systems are discussed. With a good national system plan, flight testing and validation, and the use of local differential, or general diurnal, corrections, the LF/VLF system would provide service superior to that presently available.

Litchford, G. B.↗

Apollo experience report: Mission planning for Apollo entry

The problems encountered and the experience gained in the entry mission plans, flight software, trajectory-monitoring procedures, and backup trajectory-control techniques of the Apollo Program should provide a foundation upon which future spacecraft programs can be developed. Descriptions of these entry activities are presented. Also, to provide additional background information needed for discussion of the Apollo entry experience, descriptions of the entry targeting for the Apollo 11 mission and the postflight analysis of the Apollo 10 mission are presented.

Graves, C. A.↗

Space shuttle safety - A hybrid vehicle breeds new problems.

Discussion of a few novel problems raised by the design and flight plan of the space shuttle and by the dangerous cargos it might carry. Among the problems cited are those connected with the inspection of the bearings of the propellant turbopumps, particularly those of the hydrogen pump, for evidence of spalling, as well as problems arising in the inspection of the high-temperature parts of the combustor and turbine section of the airbreathing turbofan for shuttle booster and orbiter, and problems resulting from the possibility of fire hazard due to spontaneous ignition of fuel vapor in the fuel tank vapor space.

Pinkel, I. I.↗

Progress in electrochemical storage for battery systems

Efforts to improve electrochemical systems for space use relate to: (1) improvement of conventional systems; (2) development of fuel cells to practical power systems; and (3) a search for new systems that provide gains in energy density but offer comparable life and performance as conventional systems. Improvements in sealed conventional systems resulted in the areas of materials, charge control methods, cell operations and battery control, and specific process controls required during cell manufacture. Fuel-cell systems have been developed for spacecraft but the use of these power plants is limited. For present and planned flights, nickel-cadmium, silver-zinc, and silver-cadmium systems will be used. Improvements in nickel-cadmium batteries have been applied in medical and commercial areas.

Ford, F. E.↗

The development of an augmentor wing jet STOL research aircraft (modified C-8A). Volume 2: Analysis of contractor's flight test

The initial flight test phase of the modified C-8A airplane was conducted. The primary objective of the testing was to establish the basic airworthiness of the research vehicle. This included verification of the structural design and evaluation of the aircraft's systems. Only a minimum amount of performance testing was scheduled; this has been used to provide a preliminary indication of the airplane's performance and flight characteristics for future flight planning. The testing included flutter and loads investigations up to the maximum design speed. The operational characteristics of all systems were assessed including hydraulics, environmental control system, air ducts, the vectoring conical nozzles, and the stability augmentation system (SAS). Approaches to stall were made at three primary flap settings: up, 30 deg and 65 deg, but full stalls were not scheduled. Minimum control speeds and maneuver margins were checked. All takeoffs and landings were conventional, and STOL performance was not scheduled during this phase of the evaluation.

Skavdahl, H.↗

NASA overview of electric propulsion.

The current NASA technology program aimed at auxiliary and primary electric propulsion is summarized. The early application of this technology continues to be a major goal of the program. The status and objectives of the presently planned flight experiments and the future technology goals in auxiliary electric propulsion are reviewed. Progress and direction of on-going programs for developing the technology of solar electirc primary propulsion are also presented.

Lazar, J.↗

Photography of a lithium vapor trail during the daytime.

Barium and lithium vapors were released from sounding rockets in the thermosphere and observed from aboard a jet aircraft at an altitude of 40,000 ft. The purpose of the releases was to demonstrate the feasibility of an all-weather technique for observing chemical releases and to evaluate methods of observing daytime releases. The selected flight plan of the aircraft allowed a series of observations of the trail from two different straight line paths. Data were recorded photographically. The reduction in sky brightness at the 40,000-ft altitude as compared to the ground allows the use of a filter with a 10-A bandwidth for trail photography in the daytime. These photographs verified the calculation of the usable angular field of the narrow-band filters. Photographs of a 45-min-old trail of lithium vapor were obtained up to 20 min after sunrise at the aircraft. It is concluded that now vapor trail observations may be made during the daytime without regard to weather and logistic restrictions.

Bedinger, J. F.↗

Engineering evaluation of 24 channel multispectral scanner

The results of flight tests to evaluate the performance of the 24 channel multispectral scanner are reported. The flight plan and test site are described along with the time response and channel registration. The gain and offset drift, and moire patterns are discussed. Aerial photographs of the test site are included.

Lambeck, P. F.↗

Assess program: Interactive data management systems for airborne research

Two data systems were developed for use in airborne research. Both have distributed intelligence and are programmed for interactive support among computers and with human operators. The C-141 system (ADAMS) performs flight planning and telescope control functions in addition to its primary role of data acquisition; the CV-990 system (ADDAS) performs data management functions in support of many research experiments operating concurrently. Each system is arranged for maximum reliability in the first priority function, precision data acquisition.

Munoz, R. M.↗

An airborne remote sensing system for urban air quality

Several NASA sponsored remote sensors and possible airborne platforms were evaluated. Outputs of dispersion models for SO2 and CO pollution in the Washington, D.C. area were used with ground station data to establish the expected performance and limitations of the remote sensors. Aircraft/sensor support requirements are discussed. A method of optimum flight plan determination was made. Cost trade offs were performed. Conclusions about the implementation of various instrument packages as parts of a comprehensive air quality monitoring system in Washington are presented.

Duncan, L. J.↗

Skylab mission report, third visit

An evaluation is presented of the operational and engineering aspects of the third Skylab visit, including information on the performance of the command and service module and the experiment hardware, the crew's evaluation of the visit, and other visit-related areas of interest such as biomedical observations. The specific areas discussed are contained in the following: (1) solar physics and astrophysics investigations; (2) Comet Kohoutek experiments; (3) medical experiments; (4) earth observations, including data for the multispectral photographic facility, the earth terrain camera, and the microwave radiometer/scattermometer and altimeter; (5) engineering and technology experiments; (6) food and medical operational equipment; (7) hardware and experiment anomalies; and (8) mission support, mission objectives, flight planning, and launch phase summary. Conclusions discussed as a result of the third visit to Skylab involve the advancement of the sciences, practical applications, the durability of man and systems in space, and spaceflight effectiveness and economy.

Source record↗

The 1973 Mariner mission to Venus and Mercury. II

The heart of the spacecraft downlink is the flight data subsystem (FDS). The FDS combines the functions of science and engineering measurement control. The FDS can generate six principal telemetry formats, each of which may be transmitted directly to earth. Spacecraft engineering subsystems are considered, giving attention to the power subsystem, the attitude control subsystem, the propulsion subsystem, devices for temperature control, and the tracking subsystem. The mission operations system is also discussed together with the flight plan.

Hooke, A. J.↗

Apollo Soyuz test project press kit: USA-USSR

The goals and program of the mission are described. Operations from preflight crew training through splashdown are included. Spacecraft and launch vehicle configurations are given. The 27 joint and unilateral experiments to be performed are described. A flight plan and a schedule of activities is included, together with brief crew biographies. The ground support system is discussed; it includes control centers in Houston and Moscow, and an ATS satellite to relay ground-air-ground communications. The global tracking network and the television transmission system are also described.

Source record↗

Apollo Telescope Mount experiments technology

The Skylab Apollo Telescope Mount (ATM) experiments, consisting of a white light coronagraph, four ultraviolet instruments, two X-ray telescopes and two hydrogen-alpha telescopes, observed the sun daily for nine solar rotations. The ATM instruments were individually larger, more complex, and provided better spatial resolution than previous solar satellite instruments. An additional major advantage of the telescope complex was its ability to simultaneously collect multispectral data of specific solar phenomena. To maximize the scientific benefits of the orbiting observatory, a coordinated observing program involving worldwide ground-based observatories was conducted. A description of the Skylab, the ATM, and the ATM experiments is given, and the daily process of flight planning and execution is described.

Keathley, W. C.↗