Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Environmental Protection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

New technology for recovering residual metals from nonmetallic fractions of waste printed circuit boards

Highlights: • Vibrated gas-solid fluidized bed can recycle residual metals from WPCBs. • Glass fibers have bad effect on vibrated gas-solid fluidized bed segregation. • Each size fraction has its own optimum segregation parameters. • Fine size fraction has the worst segregation efficiency. - Abstract: Recycling of waste printed circuit boards is important for environmental protection and sustainable resource utilization. Corona electrostatic separation has been widely used to recycle metals from waste printed circuit boards, but it has poor separation efficiency for finer sized fractions. In this study, a new process of vibrated gas-solid fluidized bed was used to recycle residual metals from nonmetallic fractions, which were treated using the corona electrostatic separation technology. The effects of three main parameters, i.e., vibration frequency, superficial air flow velocity, and fluidizing time on gravity segregation, were investigated using a vibrating gas-solid fluidized bed. Each size fraction had its own optimum parameters. Corresponding to their optimal segregation performance, the products from each experiment were analyzed using an X-ray fluorescence (XRF) and a scanning electron microscope (SEM) equipped with an energy dispersive spectrometer (EDS). From the results, it can be seen that the metal recoveries of −1 + 0.5 mm, −0.5 + 0.25 mm, and −0.25 mm size fractions were 86.39%, 82.22% and 76.63%, respectively. After separation, each metal content in the −1 + 0.5 or −0.5 + 0.25 mm size fraction reduced to 1% or less, while the Fe and Cu contents are up to 2.57% and 1.50%, respectively, in the −0.25 mm size fraction. Images of the nonmetallic fractions with a size of −0.25 mm indicated that a considerable amount of clavate glass fibers existed in these nonmetallic fractions, which may explain why fine particles had the poorest segregation performance.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Letter Report to Address Comments on the Closure Report for Corrective Action Unit 224: Decon Pad and Septic Systems, Nevada Test Site, Nevada, Revision 0, March 2008

The Closure Report (CR) for Corrective Action Unit (CAU) 224, Decon Pad and Septic Systems, was approved by the Nevada Department of Environmental Protection (NDEP) on November 01, 2007. The approval letter contained the following two comments: Comment 1--For 06-05-01, 06-17-04, 06-23-01 provide evidence that the 6 inch VCP pipe originating from building CP-2 is no longer active and sealed to prevent possible future contamination. Comment 2--For the area that includes 06-03-01, provide evidence that active lines are no longer feeding the North and South lagoons and have been sealed to prevent possible future contamination. To address these comments, closure documentation was reviewed, and site visits were conducted to locate and document the areas of concern. Additional fieldwork was conducted in March 2008 to seal the lines and openings described in the two comments. Photographs were taken of the closed drains and lines to document that the NDEP comments were adequately addressed and potential inadvertent discharge to the environment has been eliminated. Investigation and closure documentation was reviewed to identify the locations of potential drains, lines, and other features that could receive and/or transmit liquid. Based on the investigation findings and subsequent closure activities, no openings, distribution boxes, or other features (excluding known floor drains at CP-2) that could receive liquid were found at the CP-2 location (Figure 1), and potential manholes for the north and south sewage lagoons were identified for Corrective Action Site (CAS) 06-03-01 (Figure 2). The distribution box identified in Figure 1 was not located during the investigation and was assumed to have been previously removed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Post-Closure Inspection Report for Corrective Action Unit 92: Area 6 Decon Pond Facility

This Post-Closure Inspection Report provides an analysis and summary of inspections for Corrective Action Unit (CAU) 92, Area 6 Decon Pond Facility. CAU 92 was closed according to the Resource Conservation and Recovery Act (RCRA) Part B Operational Permit (Nevada Division of Environmental Protection [NDEP], 1995) and the Federal Facility Agreement and Consent Order (FFACO) of 1996 (FFACO, 1996; as amended January 2007). Closure activities were completed on February 16, 1999, and the Closure Report (U.S. Department of Energy, Nevada Operations Office, 1999) was approved and a Notice of Completion issued by NDEP on May 11, 1999. CAU 92 consists of two Corrective Action Sites (CASs): CAS 06-04-01, Decon Pad Oil/Water Separator, and CAS 06-05-02, Decontamination Pond (RCRA). Both CASs have use restrictions; however, only CAS 06-05-02 requires post-closure inspections. Visual inspections of the cover and fencing at CAS 06-05-02 are performed quarterly. Additional inspections are conducted if precipitation occurs in excess of 1.28 centimeters (cm) (0.50 inches [in.]) in a 24-hour period. This report covers calendar year 2007. Quarterly site inspections were performed in March, June, September, and December of 2007. All observations indicated the continued integrity of the unit. No issues or concerns were noted, and no corrective actions were necessary. Copies of the inspection checklists and field notes completed during each inspection are included in Appendix A of this report, and photographs taken during the site inspections are included in Appendix B of this report. Two additional inspections were performed after precipitation events that exceeded 1.28 cm (0.50 in.) within a 24-hour period during 2007. No significant changes in site conditions were noted during these inspections, and no corrective actions were necessary. A copy of the inspection checklists and field notes completed during these additional inspections are included in Appendix A. Precipitation records for 2007 are included in Appendix C.

54 ENVIRONMENTAL SCIENCES↗

Rehabilitation of Westbay{sup R} Wells with PCE-Contaminated Tubing Fluid - 19250

In November 2015, tetrachloroethylene, also known as PCE, was discovered in groundwater samples collected from a Westbay{sup R} multi-level groundwater monitoring well at the Idaho National Laboratory (INL).a The result was unexpected due to the remote location of the well. Subsequent investigation determined that PCE was not present in the groundwater. The detected PCE was due to inadvertent contamination of the tubing fluid in the Westbay well-monitoring system. Further investigation showed that three of the 11 Westbay wells at the INL contained PCE-contaminated tubing fluid at concentrations above the U.S. Environmental Protection Agency maximum contamination level (5 μg/L); the three wells were identified for rehabilitation as part of the INL well maintenance program. Well rehabilitation would either remove and replace the PCE-contaminated tubing fluid or remove the PCE from the tubing fluid. The interior of the Westbay well casing is isolated from the surrounding groundwater and filled with tubing fluid (either distilled or potable water). Groundwater samples are collected by opening sealed ports using a specialized sampling device. The unique construction prevents the direct interaction of the groundwater and tubing fluid. The tubing fluid also supports the structural integrity of the Westbay wells. The unique construction of the Westbay wells-i.e., the small diameter (5.08 cm [2 in.]) and the depths of the tubing fluid ranging from 144.8 to 419 m (475 to 1,376 ft) below ground surface-posed unique challenges to the rehabilitation. Because the tubing fluid provides structural integrity to the Westbay well, the fluid cannot be removed and then replaced without damaging the integrity of the Westbay well. Additionally, the small diameter of the systems and the associated depths limit the availability of equipment that can be used for the rehabilitation. After an evaluation of potential methods, it was determined that the use of an in-well, granular-activated-carbon filtration swab deployed via a wire line would provide the safest and most cost-effective method for rehabilitation. Rehabilitation commenced during the summer of 2018 and is ongoing with measurable success. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Corrective Action Investigation Plan for Corrective Action Unit 104: Area 7 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada, Revision 0

CAU 104 comprises the 15 CASs listed below: (1) 07-23-03, Atmospheric Test Site T-7C; (2) 07-23-04, Atmospheric Test Site T7-1; (3) 07-23-05, Atmospheric Test Site; (4) 07-23-06, Atmospheric Test Site T7-5a; (5) 07-23-07, Atmospheric Test Site - Dog (T-S); (6) 07-23-08, Atmospheric Test Site - Baker (T-S); (7) 07-23-09, Atmospheric Test Site - Charlie (T-S); (8) 07-23-10, Atmospheric Test Site - Dixie; (9) 07-23-11, Atmospheric Test Site - Dixie; (10) 07-23-12, Atmospheric Test Site - Charlie (Bus); (11) 07-23-13, Atmospheric Test Site - Baker (Buster); (12) 07-23-14, Atmospheric Test Site - Ruth; (13) 07-23-15, Atmospheric Test Site T7-4; (14) 07-23-16, Atmospheric Test Site B7-b; (15) 07-23-17, Atmospheric Test Site - Climax These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on April 28, 2011, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 104. The releases at CAU 104 consist of surface-deposited radionuclides from 30 atmospheric nuclear tests. The presence and nature of contamination at CAU 104 will be evaluated based on information collected from a field investigation. Radiological contamination will be evaluated based on a comparison of the total effective dose (TED) to the dose-based final action level (FAL). The presence of TED exceeding the FAL is considered a radiological contaminant of concern (COC). Anything identified as a COC will require corrective action. The TED will be calculated as the total of separate estimates of internal and external dose. Results from the analysis of soil samples will be used to calculate internal radiological dose. Thermoluminescent dosimeters will be used to measure external radiological dose. Based on process knowledge of the releases associated with the nuclear tests and radiological survey information about the location and shape of the resulting contamination plume, it was determined that the releases from the nuclear tests are co-located and will be investigated concurrently. A field investigation will be performed to define areas where TED exceeds the FAL and to determine whether other COCs are present at the site. The investigation will also collect information to determine the presence and nature of contamination associated with migration and excavation, as well as any potential releases discovered during the investigation. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS.

54 ENVIRONMENTAL SCIENCES↗

Evapotranspiration Cover for the 92-Acre Area Retired Mixed Waste Pits: Interim CQA Report

This Interim Construction Quality Assurance (CQA) Report is for the 92-Acre Evapotranspiration Cover, Area 5 Waste Management Division (WMD) Retired Mixed Waste Pits, Nevada National Security Site, Nevada for the period of January 20, 2011 to May 12, 2011. This Interim Construction Quality Assurance (CQA) Report is for the 92-Acre Evapotranspiration Cover, Area 5 Waste Management Division (WMD) Retired Mixed Waste Pits, Nevada National Security Site, Nevada for the period of January 20, 2011 to May 12, 2011. Construction was approved by the Nevada Division of Environmental Protection (NDEP) under the Approval of Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) for Corrective Action Unit (CAU) 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada, on January 6, 2011, pursuant to Subpart XII.8a of the Federal Facility Agreement and Consent Order. The project is located in Area 5 of the Radioactive Waste Management Complex (RWMC) at the Nevada National Security Site (NNSS), formerly known as the Nevada Test Site, located in southern Nevada, approximately 65 miles northwest of Las Vegas, Nevada, in Nye County. The project site, in Area 5, is located in a topographically closed basin approximately 14 additional miles north of Mercury Nevada, in the north-central part of Frenchman Flat. The Area 5 RWMS uses engineered shallow-land burial cells to dispose of packaged waste. The 92-Acre Area encompasses the southern portion of the Area 5 RWMS, which has been designated for the first final closure operations. This area contains 13 Greater Confinement Disposal (GCD) boreholes, 16 narrow trenches, and 9 broader pits. With the exception of two active pits (P03 and P06), all trenches and pits in the 92-Acre Area had operational covers approximately 2.4 meters thick, at a minimum, in most areas when this project began. The units within the 92-Acre Area are grouped into the following six informal categories based on physical location, waste types and regulatory requirements: (1) Pit 3 Mixed Waste Disposal Unit (MWDU); (2) Corrective Action Unit (CAU) 111; (3) CAU 207; (4) Low-level waste disposal units; (5) Asbestiform low-level waste disposal units; and (6) One transuranic (TRU) waste trench.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

96 Park Way Vicinity Property Remediation Challenges at the FUSRAP Maywood Superfund Site, Maywood, New Jersey - 19216

The Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS), 'the Project,' was transferred to the US Army Corps of Engineers (USACE) in 1997. Shortly thereafter, USACE initiated FUSRAP remediation efforts on 24 commercial and residential properties and, in addition, the Project team evaluated properties previously addressed at the FMSS. One of those properties was located at 96 Park Way in Rochelle Park, New Jersey. The property history included removal of contaminated soil in 1985 by the US Department of Energy (US DOE). Soil sampling performed after removal of contaminated soil indicated the cleanup met applicable guidelines in place at the time. A Five-Year Review of the FMSS conducted by the US Environmental Protection Agency (USEPA) in 2009 found that 96 Park Way did not meet the current residential cleanup levels for the site and recommended additional study and remediation, if warranted. The current levels are established in the approved cleanup plan for the FMSS (known as the Record of Decision [ROD]) issued in 2003. Based on USEPA's recommendation, USACE carefully reviewed all available records for the property. The review considered the differences between the soil cleanup standards used in the 1980's and the 2003 ROD standards, which are slightly more restrictive for deeper soils. The USACE conducted detailed field studies at 96 Park Way in 2014-15 to address the USEPA findings. This work included gamma walkover surveys and soil sampling to depths of approximately 3.5 meters. The results identified three discrete areas at depth that did not meet the ROD residential soil cleanup standard: two areas bordering an adjacent highway (New Jersey Route 17) and one along railroad property adjacent to the site. To address these areas, soil removal actions were conducted in 2016-17. The principal challenge with construction, engineering, and community relations was the property housed two sensitive facilities: a long-term assisted care living facility and a short-term post-surgery rehabilitation center. The operations at these facilities could not be interrupted in any way during FUSRAP activities. The three FUSRAP-impacted areas were addressed and restored in coordination with the USEPA, property management, and local officials. Site restoration presented a particular challenge well after the remedial action was completed, as the property owner and the government disagreed on the level of restoration. Those negotiations are ongoing as of this writing. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual Site Environmental Report: 2008 (ASER) for the SLAC National Accelerator Laboratory

This report provides information about environmental programs during the calendar year of 2008 at the SLAC National Accelerator Laboratory (SLAC), Menlo Park, California. Activities that span the calendar year, i.e., stormwater monitoring covering the winter season of 2008/2009 (October 2008 through May 2009), are also included. Production of an annual site environmental report (ASER) is a requirement established by the United States Department of Energy (DOE) for all management and operating (M&O) contractors throughout the DOE complex. SLAC is a federally-funded research and development center with Stanford University as the M&O contractor. Under Executive Order (EO) 13423, Strengthening Federal Environmental, Energy, and Transportation Management, and DOE Order 450.1A, Environmental Protection Program, SLAC effectively implements and integrates the key elements of an Environmental Management System (EMS) to achieve the site's integrated safety and environmental management system goals. For normal daily activities, SLAC managers and supervisors are responsible for ensuring that policies and procedures are understood and followed so that: (1) Worker safety and health are protected; (2) The environment is protected; and (3) Compliance is ensured. Throughout 2008, SLAC continued to improve its management systems. These systems provided a structured framework for SLAC to implement 'greening of the government' initiatives such as EO 13423 and DOE Orders 450.1A and 430.2B. Overall, management systems at SLAC are effective, supporting compliance with all relevant statutory and regulatory requirements. SLAC continues to demonstrate significant progress in implementing and integrating EMS into day-to-day operations and construction activities at SLAC. The annual management review and ranking of environmental aspects were completed this year by SLAC's EMS Steering Committee, the Environmental Safety Committee (ESC), and twelve objectives and targets were established for 2008. For each objective and target, a work plan, or Environmental Management Program (EMP) was completed and progress reports were routinely provided to SLAC senior management and the DOE SLAC Site Office (SSO). During 2008, there were no reportable releases to the environment from SLAC operations. In addition, many improvements in waste minimization, recycling, stormwater management, groundwater restoration, and SLAC's chemical management system (CMS) were continued during the year. The following are amongst SLAC's environmental accomplishments for 2008: a composting program at SLAC's onsite cafeteria was initiated, greater than 800 cubic feet of legacy radioactive waste were packaged and shipped from SLAC, a chemical redistribution program was developed, SLAC reduced the number of General Services Administration leased vehicles from 221 to 164, recycling of municipal waste was increased by approximately 140 tons during 2008, and site-wide releases of sulfur hexafluoride were reduced by 50 percent. In 2008, no radiological incidents occurred that increased radiation levels or released radioactivity to the environment. In addition to managing its radioactive wastes safely and responsibly, SLAC worked to reduce the amount of waste generated. SLAC has implemented programs and systems to ensure compliance with all radiological requirements related to the environment. Specifically, the Radiation Protection Radiological Waste Management Group developed a training course to certify Radioactive Waste Generators, conducted a training pilot, and developed a list of potential radioactive waste generators to train. Twenty eight generators were trained in 2008. As a best management practice, SLAC also reduced its tritium inventory by at least 95 percent by draining one of its accelerator cooling water systems; with the cooperation of the South Bayside System Authority, the West Bay Sanitary District and the DOE, SLAC discharged the cooling water to the sanitary sewer according to federal regulations and replenished the system with clean water. In 2008, the SLAC Environmental Restoration Program personnel continued work on site characterization and evaluation of remedial alternatives at four sites with volatile organic compounds in groundwater and several areas with polychlorinated biphenyls and low concentrations of lead in soil. SLAC is regulated under a site cleanup requirements order (board order) issued by the California Regional Water Quality Control Board (RWQCB), San Francisco Bay Region in May 2005 for the investigation and remediation of impacted soil and groundwater at SLAC. The board order lists specific tasks and deadlines for completion of groundwater and soil characterization and other remediation activities. All 2008 submittals to the RWQCB were completed and submitted on time.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Perspective on the Successes of the NNSS Underground Test Area (UGTA) Activity - 20221

Between 1951 and 1992, 828 underground nuclear tests were performed at the Nevada National Security Site (NNSS). Underground testing was done in five major testing areas, which included (1) Frenchman Flat, (2) Rainier Mesa/Shoshone Mountain, (3) Yucca Flat/Climax Mine (4) Central Pahute Mesa, and (5) Western Pahute Mesa. About one third of the underground tests were detonated near, at or below the water table, and thus radioactive contamination was introduced to the groundwater system. The U.S. Department of Energy's Underground Test Area (UGTA) Activity was established in the late 1990's to address the fate and movement of residual radioactivity in groundwater, and characterize the risk that it may pose to NNSS workers and the offsite public. It has accomplished this goal through a process of iterative groundwater sampling and numerical groundwater flow and transport modeling, and long-term monitoring. The UGTA Activity draws on the expertise of scientists in the fields of geology, hydrology, radiochemistry, and risk assessment from the U.S. DOE staff, the lead contractor (currently Navarro) and many other organizations, in cooperation with the governing regulatory body, the State of Nevada's Division of Environmental Protection (NDEP). Los Alamos National Laboratory (LANL) is one of the participating research organizations involved with the UGTA Activity. Under the direction of DOE and the lead contractor, LANL's role in UGTA has evolved over time from an initial focus on geologic characterization, to conducting field and laboratory experiments, and finally to its current role of providing modeling and geochemistry expertise to characterize the rates and directions of groundwater and radionuclide movement. In its current role, LANL has either developed or provided the numerical tools for developing flow and transport models in each of the four major testing areas. In addition, LANL has provided an independent assessment of future groundwater flow and transport behavior through the analysis of naturally-occurring geochemical and isotopic tracers in groundwater. The five major testing areas are now in different stages of investigation or closure: (1) Frenchman Flat is in its fifth year of post closure modeling; (2) The Rainier Mesa/Shoshone Mountain Closure Report has been submitted to NDEP and is awaiting approval; (3) The Yucca Flat/Climax Mine Closure Report is under development; and (4) Central and (5) Western Pahute Mesa is still undergoing investigation and flow and transport model development. The success of the UGTA Activity in reaching or approaching closure in three of the five major testing areas is primarily due to the DoE's focus on regulatory closure requirements, but also is in part attributable to a rigorous internal review process and the involvement of NDEP and Nye County water professionals as participants and observers in the reviews. County and state involvement in the internal review process has promoted trust that the U.S. DOE is deeply committed to ensuring the present and future safely of NNSS workers and the surrounding communities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Concept of Operations: National Technology Test Bed Network for Water Resource Recovery

There is an urgency to advancing wastewater technologies due to aging water infrastructure and emerging regulations. A crosscutting working group proposes a conceptual design for a test bed network to understand and evaluate wastewater technologies to drive acceptance and deployment of new technologies to enhance performance. The working group includes contributors from the U.S. Department of Energy, the U.S. Environmental Protection Agency, the U.S. National Science Foundation, and the Water Research Foundation (formerly known as the Water Environment & Reuse Foundation). Upgrading today's aging wastewater treatment infrastructure to a new generation of water resource recovery facilities (WRRFs) requires the development and deployment of innovative technologies. The path to technology adoption depends on expensive, time consuming, and often repetitive cycles of testing and validation. Existing water resource recovery technology testing facilities (e.g., test beds) are underutilized and cannot, by themselves, broaden technology uptake. It has been proposed that technology adoption could be accelerated by a network linking these test facilities with innovators, manufacturers, utilities, regulators, policymakers, and educators. This document proposes a structure for a National Test bed Network (TBN) for water resource recovery. The concepts for its operation are explored herein. This document identifies drivers to launch a TBN and critical needs for successful implementation of the network. An important driver to technology implementation at WRRFs is the relationship between local utilities and state regulators. The TBN could provide access to validated performance data and facilitate deployment. To link the stakeholders and accelerate deployment, the TBN will require standards for methods, data quality, data management, and data security. These standards will enable validation of performance and will expand the “toolbox” that utilities and regulators could consider. Design, set up, and launch of this toolbox is beyond the scope of operations of utilities and regulators and will likely require external support to achieve full operation. Herein, a pathway is proposed to achieve this full operation. This document defines the function of a WRRF TBN. It also proposes a structure for the TBN to achieve its stated goals and mission. Finally, this document summarizes findings from several sources, including a series of workshops about the TBN concept, operators of test beds in ancillary industries, and discussions with regulators and permitting agencies. A description of this work was published in the peer-reviewed literature (Mihelcic 2017).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

2012 Update to the Site Discharge Pollution Prevention Plan, Rev. 1: Sandia/Mortandad Watershed Receiving Waters: Sandia Canyon, Cañada del Buey, Mortandad Canyon, and Ten-Site Canyon (Vol. 2)

Two historical industrial activity areas are associated with S001, S-SMA-0.25: Sites 03-013(a) and 03-052(f). Solid Waste Management Unit (SWMU) 03-013(a) is a 1500-ft-long corrugated metal pipe (CMP) storm drain that served building 03-0038. The storm drain ran underground around building 03-0038, east along the south side of the Otowi Building (building 03-0261) and connected to four other storm drains before daylighting 100 ft east of the Otowi Building where it became an open concrete- and rock-lined ditch. The open drain continued past transportable office buildings (buildings 03-1616 and 03-1617) and passed beneath streets and sidewalks to a point northeast of the Oppenheimer Study Center (building 03-0207) where it discharged to the SWMU 03-052(f) outfall before draining into Sandia Canyon. Most of the CMP associated with SWMU 03-013(a) was removed in 2004 to accommodate the construction of the National Security Science Building (03-1400) and a new parking structure (03-1402) east of the Otowi Building. The CMP was managed as nonhazardous/nonradioactive industrial waste. Inspection of the drainline trench showed no evidence of a release from the drainpipe. A new storm drainline was installed west of SWMU 03-052(f) to manage storm water runoff from the new parking structure. The new storm drain discharges to SWMU 03-052(f). Potential contaminants associated with industrial materials historically managed at this Site are metals and petroleum products. SWMU 03-052(f) is a formerly permitted outfall (U.S. Environmental Protection Agency [EPA] 03A023) that received wastewater from floor drains [Area of Concern (AOC) 03-013(b)], sinks, water fountains, and a storm drain [SWMU 03-013(a)], which served building 03-0038 until 1987 when the drains in building 03-0038 were rerouted to the Technical Area 03 (TA-03) sanitary sewer system. Stoddard solvents, dry acid, and caustic materials from the maintenance shop were discarded through sinks and floor drains to this outfall. Spent paint solvents and cutting oils contaminated with machined beryllium particles may also have been released to the floor drains during the 1960s and 1970s. In addition, cooling water for welding torches was discharged directly to the drains. The first spill was approximately 200 gal. of a water-waste oil mixture that was discharged when an automatic compressor blowdown mechanism failed. A second spill from a ruptured air-compressor oil line resulted in the release of approximately 1 qt of compressor oil to the drain. This spill produced an oily sheen on the surface of the water at the SWMU 03-052(f) outfall. A third spill occurred when approximately 15 gal. of diesel fuel was released from a ruptured truck fuel line into the utilities construction trench between buildings 03-1793 and 03-1794. On the same day, a clay sewer pipe in the utility trench broke, releasing approximately 2000 gal. of wastewater into the excavation. A sump was used to remove the wastewater from the excavation, and the wastewater was discharged to SWMU 03-052(f). The diesel-contaminated asphalt and soil were removed and disposed of. Runoff from parking lots and the surrounding areas also discharges to the outfall. Outfall 03A023 was removed from the National Pollutant Discharge Elimination System (NPDES) permit on July 11, 1997. Potential contaminants associated with industrial materials historically managed at this Site are volatile organic solvents, petroleum products, and metals included in discharges from the maintenance contractor’s shop in building 03-38 and three reported petroleum hydrocarbon spills.

54 ENVIRONMENTAL SCIENCES↗

Argonne National Laboratory summary site environmental report for calendar year 2007.

This summary of Argonne National Laboratory's Site Environmental Report for calendar year 2007 was written by 20 students at Downers Grove South High School in Downers Grove, Ill. The student authors are classmates in Mr. Howard's Bio II course. Biology II is a research-based class that teaches students the process of research by showing them how the sciences apply to daily life. For the past seven years, Argonne has worked with Biology II students to create a short document summarizing the Site Environmental Report to provide the public with an easy-to-read summary of the annual 300-page technical report on the results of Argonne's on-site environmental monitoring program. The summary is made available online and given to visitors to Argonne, researchers interested in collaborating with Argonne, future employees, and many others. In addition to providing Argonne and the public with an easily understandable short summary of a large technical document, the participating students learn about professional environmental monitoring procedures, achieve a better understanding of the time and effort put forth into summarizing and publishing research, and gain confidence in their own abilities to express themselves in writing. The Argonne Summary Site Environmental Report fits into the educational needs for 12th grade students. Illinois State Educational Goal 12 states that a student should understand the fundamental concepts, principles, and interconnections of the life, physical, and earth/space sciences. To create this summary booklet, the students had to read and understand the larger technical report, which discusses in-depth many activities and programs that have been established by Argonne to maintain a safe local environment. Creating this Summary Site Environmental Report also helps students fulfill Illinois State Learning Standard 12B5a, which requires that students be able to analyze and explain biodiversity issues, and the causes and effects of extinction. The same standard requires that Illinois students examine the impact of diminishing biodiversity due to human activity. An example of this would be the Argonne Restoration Prairie, which is discussed within the report. Because humans had to destroy part of a natural prairie in order to build, they must also plant an equivalent amount of prairie to make up for what was destroyed. The summary project perfectly meets Illinois State Learning Standard 13B section 5b, which requires students to be able to design and conduct an environmental impact study, analyze findings, and justify recommendations. Students volunteered for the project for two main reasons: We would become published authors, and could include that fact on important documents, like college applications, and we felt we were doing a good deed for the public, considering that without our summary the public may have no real idea how Argonne complies with various environmental protection acts and programs within the state. The summarization process was not easy, considering that we had never seen much of this kind of information before, especially in such detail. The project required a high level of commitment from all involved. This commitment ensured that the summary would be done on time and would be available to the public in the shortest time possible. Argonne representatives Norbert Golchert and Dave Baurac met with students and gave background information on Argonne and explained the importance of the research being done. In addition, they explained in-depth how the public benefits from the summarization. At the end of the presentation, students asked some questions, which were answered in specifics. The Report was divided into 10 sections, with groups of two students covering each section. The groups were eager to begin work on their assigned sections. After reading the complete report each group focused on a particular section. After much careful reading and analysis, we produced an outline. From the outline, partners divided work equally and began to carefully summarize. Groups summaries were edited, not only within groups, but also by other groups, in order to acquire a different perspective. Finally, Mr. Howard, our Biology II instructor, took a final look at the products before sending them off for the final review by Argonne. The final project was a 16-page pamphlet. The students reacted positively to the project. Asked if she was glad that she chose to work on the Argonne project, Katie Hanson said, 'Yes. I have enjoyed having the opportunity to become a published author. Also, it is an honor to be able to work with a prestigious, nationally recognized laboratory such as Argonne'. There were difficult aspects as well. Student Olga Zagariya said the hardest part of the project was 'trying to choose which information to put in the summary and which information to leave out, because it all seemed to be important'. It seems that everyone was satisfied with his or her section.

54 ENVIRONMENTAL SCIENCES↗

An Historic Perspective of NPDES Individual Permit for Storm Water Discharges from Solid Waste Management Units at Los Alamos National Laboratory - 18667

The Los Alamos National Laboratory (LANL) and the associated communities of Los Alamos and White Rock are located in Los Alamos County in north-central New Mexico approximately 60 mi north-northeast of Albuquerque and 25 mi northwest of Santa Fe. The 36-mi{sup 2} facility is situated on the Pajarito Plateau, which consists of a series of fingerlike mesas separated by deep east-to-west oriented canyons cut by predominately ephemeral and intermittent streams. The mesa tops range in elevation from approximately 7800 ft. on the flanks of the Jemez Mountains to about 6200 ft. at their eastern termination above the Rio Grande Canyon. The land surrounding the Laboratory is largely undeveloped. Public access to much of the facility is limited for safety and security reasons. Large tracts of surrounding land are held by the U.S. Forest Service (Santa Fe National Forest), the Bureau of Land Management (Bandelier National Monument), the General Services Administration and San Ildefonso Pueblo. Storm water discharges from Solid Waste Management Units (SWMUs) have been regulated at the LANL since the early 1990's and have evolved into an Individual Stormwater Permit (IP) that may be one of the most complex in the nation. Historically, storm water discharges from SWMUs at LANL were regulated under a nationwide general permit using a watershed based approach requiring a Storm Water Pollution Prevention Plan (SWPPP), monitoring at sub-watershed scale 'USGS like' gage stations, and inspection and maintenance of erosion controls. In 2001, the Cerro Grande Fire destroyed many Laboratory structures, residential homes and over 80,000 acres of forested lands in the upper watershed above Los Alamos that significantly changed the local hydrology. Several years later, a Federal Facilities Compliance Agreement (FFCA) was issued by U.S. Environmental Protection Agency (USEPA) that was followed by a Clean Water Act lawsuit filed by concerned citizens, the result of which required more focus on stormwater discharges from individual SWMUs and an IP covering over 400 Sites. The IP contains non-numeric technology-based effluent limitations, coupled with a comprehensive, coordinated inspection and monitoring program, to minimize pollutants in LANL's storm water discharges associated with historical industrial activities from specified Sites. Non-numeric technology-based effluent limitations include minimizing pollutants in discharges through erosion and sedimentation controls, management of run-on and runoff, employee training, inspection and maintenance of controls, annual reporting and public involvement. The IP establishes Target Action Levels (TALs) that are equivalent to New Mexico State water-quality criteria. These TALs are used as benchmarks to determine the effectiveness of control measures implemented under the IP. That is, storm water quality sample results from SWMU discharges are compared with applicable TALs. If one or more sample results exceed a TAL, LANL must take additional corrective action. The TAL results are also confounded by high levels of naturally occurring constituents such as aluminum and gross alpha, and urban constituents such as copper, zinc and PCBs which may not be a source from the regulated SWMU. Due to the remote rugged terrain, security access issues, number of monitoring locations, stringent TALs, reporting requirements and public involvement requirements, this permit is likely one of the most stringent and complex in the country. The Laboratory has implemented this permit in a compliant manner for the past seven years and is anticipating the issuance of a new permit in the next few months. This paper will cover permit requirements related to control measure installations, monitoring, reporting and public involvement as well as process improvements and remaining water quality initiatives such as developing studies to address issues such as discriminating between natural background levels and LANL-related contaminants during the execution of this unique permit. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Post-Closure Inspection and Monitoring Report for Corrective Action Unit 110: Area 3 WMD U-3ax/bl Crater, Nevada Test Site, Nevada, For the Period July 2007-June 2008

This Post-Closure Inspection and Monitoring Report (PCIMR) provides the results of inspections and monitoring for Corrective Action Unit (CAU) 110, Area 3 WMD [Waste Management Division] U-3ax/bl Crater. This PCIMR includes an analysis and summary of the site inspections, repairs and maintenance, meteorological information, and soil moisture monitoring data obtained at CAU 110 for the period July 2007 through June 2008. Site inspections of the cover were performed quarterly to identify any significant changes to the site requiring action. The overall condition of the cover, perimeter fence, and use restriction (UR) warning signs was good. However, settling was observed that exceeded the action level as specified in Section VII.B.7 of the Hazardous Waste Permit Number NEV HW021 (Nevada Division of Environmental Protection, 2005). This permit states that cracks or settling greater than 15 centimeters (6 inches) deep that extend 1.0 meter (m) (3 feet [ft]) or more on the cover will be evaluated and repaired within 60 days of detection. Two areas of settling and cracks were observed on the south and east edges of the cover during the September 2007 inspection that exceeded the action level and required repair. The areas were repaired in October 2007. Additional settling and cracks were observed along the east side of the cover during the December 2007 inspection that exceeded the action level, and the area was repaired in January 2008. Significant animal burrows were also observed during the March 2008 inspection, and small mammal trapping and relocation was performed in April 2008. The semiannual subsidence surveys were performed in September 2007 and March 2008. No significant subsidence was observed in the survey data. Monument 5 shows the greatest amount of subsidence (-0.02 m [-0.08 ft] compared to the baseline survey of 2000). This amount is negligible and near the resolution of the survey instruments; it does not indicate that subsidence is occurring overall on the cover. Soil moisture results obtained to date indicate that the CAU 110 cover is performing well. Time Domain Reflectometry (TDR) data show regular changes in the shallow subsurface with significant rain events; however, major changes in volumetric moisture content (VMC) appear to be limited to 1.8 m (6 ft) below ground surface or shallower, depending on the location on the cover. At 2.4 m (8 ft) below the cover surface, TDR data show soil moisture content remained between 9 and 15 percent VMC, depending on the TDR location. The west portion of the cover tends to reflect a lower moisture content and less variability in annual fluctuations in moisture content at this depth. Results of soil moisture monitoring of the cover indicate that VMC at the compliance level (at 2.4 m [8 ft] below the cover surface) is approaching a steady state. If the moisture content at this level remains consistent with recent years, then a recommendation may be made for establishing compliance levels for future monitoring.

54 ENVIRONMENTAL SCIENCES↗

Implementation of Enhanced Attenuation at the DOE Mound Site OU-1 Landfill: Accelerating Progress and Reducing Costs - 16270

A field demonstration of enhanced attenuation (EA) was initiated in 2014 to expedite the remediation of industrial solvents in the groundwater impacted by the former landfill Operable Unit 1 (OU-1) at the US Department of Energy (DOE) Mound, Ohio, Site. EA uses active engineering solutions to alter the target site so that the contaminant plume will passively stabilize and shrink. For OU-1, the EA was implemented by targeted injection of an electron donor (vegetable oil) to create 'structured geochemical zones'. Volatile organic compounds (VOCs) in the altered subsurface system encounter alternating anaerobic and aerobic environments along the plume flow path. The effect of these structured geochemical zones is effective and rapid degradation of parent compounds such as trichloroethene (TCE) and tetrachloroethene (PCE), and daughter compounds such as cis-1,2-dichloroethene and vinyl chloride. EA at Mound OU-1 provides a transition to natural attenuation and is an alternative to the baseline pump-and-treat (P and T) system. Industrial solvents (primarily TCE) and other VOCs that originated from the former solid-waste landfill contaminated the groundwater in the Buried Valley Aquifer beneath the Mound site. A groundwater P and T system was initiated in 1996 to control the plume, and a soil vapor extraction system was installed and operated from 1997 to 2003 to remove the bulk of the VOC sources from the vadose zone. Physical removal of the landfill waste and contaminated soil was performed between 2006 and 2010. Approximately 76,100 cubic meters (99,500 cubic yards) of material were removed from the OU-1 landfill area. Operation of the groundwater P and T system continued throughout this period. The principles and technical basis of the ongoing EA field demonstration were developed by the Interstate Technology and Regulatory Council. The goal of the EA implementation is to provide a bridge between active groundwater treatments and monitored natural attenuation. EA relies on understanding and manipulating the contaminant mass balance. Technologies are applied to sustainably reduce the contaminant loading from the source and/or increase the rate of natural attenuation processes within the plume. In 2014, a core team that included DOE, the US Environmental Protection Agency (EPA), the Ohio EPA, and technical support organizations evaluated remedial options for OU-1. During the 2014 evaluation, the team projected a cleanup time frame for the baseline P and T system of 26 additional years and a cleanup time frame for the EA remedy of 13 years. On the basis of that evaluation, EPA approved the implementation of the EA remedy that required the shutdown of the P and T system. The combination of technologies implemented for OU-1 EA included (a) neat vegetable oil in the vadose zone in the former landfill and (b) emulsified vegetable oil within the footprint of the groundwater plume. In the first part of the deployment, neat oil spreads laterally and forms a thin layer on the water table beneath residual soil sources to intercept and reduce future VOC loading and to reduce oxygen inputs to the local groundwater. In the second part of the deployment, emulsified oil forms active bioremediation anaerobic treatment zones within the plume footprint to degrade existing groundwater contaminants (via reductive dechlorination, co-metabolism, or both) and stimulates long-term attenuation capacity in the down-gradient aerobic plume (via co-metabolism). The results from the first year of the field demonstration indicate that the dissolved TCE and PCE plumes have decreased in size and mass. Statistical tests indicate that the VOC concentrations in the majority of the source-area wells are decreasing. The VOC concentrations throughout the plume are projected to be below the target maximum contaminant level of 2 to 5 μg/L within 5 to 10 years-sooner than the design projection of 13 years. The biogeochemistry and microbial community within the structured geochemical zones are consistent with the design and appear to be stable. At Mound OU-1, EA has accelerated progress toward the remedial action objectives and reduced costs. Ongoing monitoring will determine whether the EA remedy has transitioned the site into monitored natural attenuation status and whether the EA will continue to be effective, timely, and sustainable. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Biodiesel Impact on Engine Lubricant Dilution During Active Regeneration of Aftertreatment Systems

Experiments were conducted with ultra low sulfur diesel (ULSD) and 20% biodiesel blends (B20) to compare lube oil dilution levels and lubricant properties for systems using late in-cylinder fuel injection for aftertreatment regeneration. Lube oil dilution was measured by gas chromatography (GC) following ASTM method D3524 to measure diesel content, by Fourier transform infrared (FTIR) spectrometry following a modified ASTM method D7371 to measure biodiesel content, and by a newly developed back-flush GC method that simultaneously measures both diesel and biodiesel. Heavy-duty (HD) engine testing was conducted on a 2008 6.7L Cummins ISB equipped with a diesel oxidation catalyst (DOC) and diesel particle filter (DPF). Stage one of engine testing consisted of 10 consecutive repeats of a forced DPF regeneration event. This continuous operation with late in-cylinder fuel injection served as a method to accelerate lube-oil dilution. Stage two consisted of 16 hours of normal engine operation over a transient test cycle, which created an opportunity for any accumulated fuel in the oil sump to evaporate. Light duty (LD) vehicle testing was conducted on a 2010 VW Jetta equipped with DOC, DPF and a NOx storage catalyst (NSC). Vehicle testing comprised approximately 4,000 miles of operation on a mileage-accumulation dynamometer (MAD) using the U.S. Environmental Protection Agency's Highway Fuel Economy Cycle because of the relatively low engine oil and exhaust temperatures, and high DPF regeneration frequency of this cycle relative to other cycles examined. Comparison of the lube oil dilution analysis methods suggests that D3524 does not measure dilution by biodiesel. The new back-flush GC method provided analysis for both diesel and biodiesel, in a shorter time and with lower detection limit. Thus all lube oil dilution results in this paper are based on this method. Analysis of the HD lube-oil samples showed only 1.5% to 1.6% fuel dilution for both fuels during continuous operation under DPF regeneration events. During the second stage of HD testing, the ULSD lube-oil dilution levels fell from 1.5% to 0.8%, while for B20, lube-oil dilution levels fell from 1.6% to 1.0%, but the fuel in the oil was 36% biodiesel. For the LD vehicle tests, the frequency of DPF regeneration events was observed to be the same for both ULSD and B20. No significant difference between the two fuels' estimated soot loading was detected by the engine control unit (ECU), although a 23% slower rate of increase in differential pressure across DPF was observed with B20. It appears that the ECU estimated soot loading is based on the engine map, not taking advantage of the lower engine-out particulate matter from the use of biodiesel. After 4,000 miles of LD vehicle operation with ULSD, fuel dilution in the lube-oil samples showed total dilution levels of 4.1% diesel. After 4,000 miles of operation with B20, total fuel in oil dilution levels were 6.7% consisting of 3.6% diesel fuel and 3.1% biodiesel. Extrapolation to the 10,000-mile oil drain interval with B20 suggests that the total fuel content in the oil could reach 12%, compared to 5% for operation on ULSD. Analysis of the oil samples also included measurement of total acid number, total base number, viscosity, soot, metals and wear scar; however, little difference in these parameters was noted.

09 BIOMASS FUELS↗

A Frozen Soil Barrier to Control Groundwater Inflow into Damaged Reactors at the Fukushima Daiichi Nuclear Power Station - 16613

Reactor buildings and support facilities at the Fukushima Daiichi Nuclear Power Station (F1 Site) were damaged by a March 2011 tsunami. In response, the Tokyo Electric Power Company (TEPCO) is implementing a number of countermeasures to limit the releases and impacts of contaminated water to the surrounding environment. The diverse countermeasures work together in an integrated manner to provide different types, and several levels, of environmental protection. In general, the strategy represents an example of a 'defense in depth' concept that is used for nuclear facilities around the world. One of the key countermeasures is a frozen soil barrier encircling the damaged reactor facilities. The frozen barrier is intended to limit the flow of water into the area, reduce the amount of water entering damaged reactors, and reduce the resulting volume of contaminated water that requires treatment and storage. The frozen soil barrier was designed and installed by a team from TEPCO and Kajima Corporation. A group of scientists and engineers from US Department of Energy National Laboratories provided independent evaluation of the frozen barrier design and operational plans along with technical recommendations to the TEPCO team. The frozen soil barrier design extends to about 30 m depth; the bottom of the barrier is in a low permeability interval, and the total barrier length around the reactors is just over 1.5 km. The barrier required 1927 total boreholes: 1568 for freeze pipes plus 359 for temperature monitoring arrays. Drilling of all of the boreholes was completed November 9, 2015. Construction of the refrigeration plant is complete and all of the above ground piping/manifolds are in the final stages of construction. The DOE laboratory independent assessment of the frozen soil barrier concluded that the technical characteristics of a frozen barrier are relatively well suited to Fukushima-specific hydrogeologic conditions and the need for reducing the inflow of water into damaged reactors at the F1 Site. The scale of the Fukushima barrier is bounded by industry experience and the equipment and infrastructure proposed for the ground freezing is well understood. The on-site pilot test at Fukushima indicated predictable ground freezing and supported the full scale design parameters. These factors increase the confidence in the frozen soil barrier project underway at Fukushima. TEPCO is currently working with the Japanese Nuclear Regulatory Authority (NRA), providing operational plans/strategies for the frozen soil barrier and modeling results of the projected performance. Full scale frozen soil barrier operations are to begin after authorization from NRA. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗