Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Energy Systems Integration Facility”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Enabling Electric Propulsion for Flight - Hybrid Electric Aircraft Research at AFRC

Advances in electric machine efficiency and energy storage capability are enabling a new alternative to traditional propulsion systems for aircraft. This has already begun with several small concept and demonstration vehicles, and NASA projects this technology will be essential to meet energy and emissions goals for commercial aviation in the next 30 years. In order to raise the Technology Readiness Level of electric propulsion systems, practical integration and performance challenges will need to be identified and studied in the near-term so that larger, more advanced electric propulsion system testbeds can be designed and built. Researchers at NASA Armstrong Flight Research Center are building up a suite of test articles for the development, integration, and validation of these systems in a real world environment.

electric propulsion↗

Intelligent industrial demand response to increase grid flexibility and reliability: A review

The rapid transition toward renewable energy has introduced challenges in grid stability due to the intermittency of non-dispatchable sources like solar and wind. Industrial Demand Response (IDR) offers a promising, cost-effective solution that adjusts energy consumption patterns to align with supply, increases renewable utilization, and reduces costs. This review provides an updated analysis of IDR, sorting technologies into five categories: energy storage, scheduled energy usage, operational flexibility, on-site generation, and intelligent operations. Energy storage solutions, while requiring little flexibility, often have the longest payback periods. While slightly better, on-site generation also has longer payback periods, ranging from 5 to 20 years or more. Scheduled energy usage, operational flexibility, and intelligent operations allow significant peak reduction at lower capital costs but require greater flexibility. While 15–20 % peak reduction is within the range of all five categories, scheduled energy use and on-site energy generation are shown to have reductions of up to 70–80 % in select scenarios. Combining multiple IDR strategies from these five categories maximizes both financial and operational benefits. Synergistic approaches are shown to enhance grid stability while reducing costs. As the grid evolves, IDR will enable a more flexible, renewable-powered future that will benefit industrial facilities and the broader energy system.

Demand flexibility↗

Demonstration and Evaluation of a Non-Invasive, Low-Cost, Strap-On Sensor for Natural Gas Meters

The U.S. General Services Administration (GSA) is interested in installing internet-connected, gas submeters to better understand gas consumption in its portfolio of buildings. The GSA in partnership with the National Renewable Energy Laboratory conducted a demonstration to assess a specific submeter technology. This technology was implemented at two GSA separate facilities located in Dallas, Texas. This demonstration evaluated hardware and software installations and integrations, data integrity and accuracy, and included an economic analysis. This demonstration evaluated a gas submeter technology provided by the vendor Vata Verks, who produces a non-invasive strap-on submeter. The company was founded with a mission to conserve water (and eventually gas) cheaply and simply, as explained on its website. The product intends to streamline submeter deployments for gas and water by eliminating most hardware costs while allowing for easy integration of submetered data into other systems such as the Building Automation System and removing tenant and building disruption This demonstration evaluated the product features when used on a gas utility meter.

03 NATURAL GAS↗

Multi-package development at Fermilab with Spack

The Spack package manager has been widely adopted in the supercomputing community as a means of providing consistently built on-demand software for the platform of interest. Members of the high-energy and nuclear physics (HENP) community, in turn, have recognized Spack’s strengths, used it for their own projects, and even become active Spack developers to better support HENP needs. Code development in a Spack context, however, can be challenging as the provision of external software via Spack must integrate with the developed packages’ build systems. Spack’s own development features can be used for this task, but they tend to be inefficient and cumbersome. We present a solution pursued at Fermilab called MPD (multi-package development). MPD aims to facilitate the development of multiple Spack-based packages in concert without the overhead of Spack’s own development facilities. In addition, MPD allows physicists to create multiple development projects with an interface that insulates users from the many commands required to use Spack well.

Knoepfel, Kyle James [Fermilab]↗

140,142 Ce Neutron Cross Section Resolved Resonance Region Evaluation [Abstract]

A resolved resonance region evaluation of 140,142 Ce has been carried out by Oak Ridge National Laboratory. Requested by the US Nuclear Criticality Safety Program, this evaluation is based on recent high-resolution transmission and capture high-resolution measurements of nat Ce and 142 Ce conducted at JRC-GEEL at the Geel Linear Accelerator facility, as well as recently measured thermal constants available from the EXFOR database. Starting from the resonance parameters from the ENDF/B-VIII.0 library and following a preliminary R-matrix analysis, an updated set of resonance parameters and corresponding covariance information was derived by the fit of these experimental datasets using the Reich-Moore approximation of the R-matrix theory as implemented in the SAMMY code system. The resolved resonance region upper energy limit for 140 Ce was kept at 200 keV while the 142 Ce resonance region was extended from 13 to 26 keV. This new evaluation was found to be in good agreement not only with several integral quantities of interest to the reactor physics community, but also with the stellar Maxwellian-averaged cross section.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Multi-package development at Fermilab with Spack

The Spack package manager has been widely adopted in the supercomputing community as a means of providing consistently-built on-demand software for the platform of interest. Members of the high-energy and nuclear physics (HENP) community, in turn, have recognized Spack’s strengths, used it for their own projects, and even become active Spack developers to better support HENP needs. Code development in a Spack context, however, can be challenging as the provision of external software via Spack must integrate with the developed packages’ build systems. Spack’s own development features can be used for this task, but they tend to be inefficient and cumbersome. \medskip We present a solution pursued at Fermilab called MPD (multi-package development). MPD aims to facilitate the development of multiple Spack-based packages in concert without the overhead of Spack’s own development facilities. In addition, MPD allows physicists to create multiple development projects with an interface that insulates users from the many commands required to use Spack well.

Knoepfel, Kyle [Fermilab] (ORCID:000000031433889X)↗

SMR safety through HTTF modeling and benchmark efforts for code validation for gas-cooled reactor applications

Accurate modeling and simulation tools for thermal-hydraulics calculations are a key element needed to design and license new advanced reactors including Small Modular Reactors (SMR) and Microreactors. Uncertainties in modeling and simulation can have significant safety and economic implications. The High Temperature Test Facility (HTTF) at Oregon State University (OSU) is a scaled integral effects experiment designed to investigate transient behavior in high-temperature gas-cooled prismatic-block nuclear reactors. High-quality measurement data is available from the HTTF that is suitable for a thermal-hydraulics code validation benchmark for gas-cooled reactor simulations. Here, this paper summarizes individual HTTF modeling efforts to date for tool validation at Idaho National Laboratory (INL), Argonne National Laboratory (ANL), Oregon State University (OSU) and Canadian Nuclear Laboratories (CNL) using system thermal-hydraulics codes, Computational Fluid Dynamics (CFD) codes and system-CFD code couplings. Also, the paper introduces the ongoing OECD Nuclear Energy Agency (NEA) High Temperature Gas Reactor Thermal-Hydraulics (HTGR T/H) benchmark that allows for better comparisons of results between different international modeling teams. The benchmark provides well defined computational problems that include code-to-code comparisons and comparisons to measured data. These problems provide an avenue for quantifying accuracy and identifying sources of uncertainty in thermal-hydraulics calculations, including in measured thermophysical properties, as part of validation for gas-cooled reactor simulation tools.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

State of Common Grid Services Definitions

This document is prepared as part of the Department of Energy’s Grid Modernization Laboratory Consortium (GMLC) 2.5.2 project, whose goal is to develop and socialize a common set of grid service definitions relevant to grid-related interactions with distributed energy resources (DER: responsive generation, storage, and loads), and to advance the concept and requirements of the Energy Services Interface (ESI) to the point of launching related interface standards and guides that can be implemented in communication protocols and business process definitions. The notion of “grid services” is integral to the definition of an ESI because a key principle of the ESI is that it permits coordination between grid operators and DER facilities in a way that is service-oriented, with an understanding of performance expectations. This document reviews the current state of grid service definitions, including those actively used in the market today as well as new services that have been proposed for future implementation. The document describes grid services used in transmission as well as distribution systems. In defining grid services, this document also distinguishes between two fundamental concepts: an “operational objective” and a “grid service,” which describes a generator’s or customer’s expected physical performance in delivering power to or consuming power from the grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integrating AI Data Centers with the Power Grid

The rapid expansion of artificial intelligence (AI) has triggered an unprecedented surge in electricity demand, with US data center energy use projected to double or triple 2023 levels by 2028. This exponential growth places strain on grid infrastructure, which can hinder timely construction of desired computing capacity. To bridge this supply-demand gap, utilities and AI developers are increasingly turning to demand flexibility, a strategy that incentivizes shifting or reducing power use during peak periods of grid stress. Data centers are uniquely equipped for flexible operations due to their digital workloads, built-in redundancy, and onsite energy assets. This article outlines four primary mechanisms to enable data center flexibility: computational load flexibility (shifting tasks temporally or geographically), flexible use of core facility infrastructure adjustments, energy storage utilization, and onsite electricity generation. To encourage adoption, utilities are deploying new tariff designs, including voluntary interruptible service riders, mandated flexibility requirements, and streamlined interconnection processes for flexible loads. For the highly capitalized and rapidly growing AI industry, the primary motivators for embracing these strategies are expediting facility interconnection, satisfying emerging regulatory mandates, and mitigating community resistance. While demand flexibility cannot substitute the long-term need for new bulk power generation, it serves as an essential, immediate solution for enabling near-term deployment. By transforming data centers from grid stressors into stabilizing assets, flexible operations can ensure reliable grid integration, ease market pressures, and support a resilient power system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Enabling the Write-Once Read-Many (WORM) Dashboard and Web Interface for HPC Data Storage

Idaho National Laboratory (INL), supported by the Department of Energy Office of Nuclear Energy (DOE-NE) through the Nuclear Science User Facilities, provides access to supercomputer systems and data storage along with support staff for system management, software installation, cybersecurity, and user support to the broader DOE-NE user community. A key component of this is providing long-term or perpetual data storage as part of efforts to improve reproducibility in modeling and simulation in addition to supporting simulations with regulatory compliance requirements. This milestone details the deployment of a new type of storage option for users requiring tamper resistant perpetual storage of data and the associated support for data control and release via the data storage web interface. The perpetual data storage system is integrated within the Open OnDemand framework deployed at INL and is called the ?WORM? in recognition of its write-once read-many characteristics.

99 GENERAL AND MISCELLANEOUS↗

Environmental, Health and Safety Assessment Application of a Heat Integrated, Post-combustion CO2 Capture System Using Monoethanolamine and Hitachi H3-1 Solvent at the E.W. Brown Coal-fired Power Plant

An Environmental Health and Safety (EH&S) Assessment was completed for operation of a pilot scale carbon dioxide (CO2) capture system (CCS) at the Louisville Gas & Electric (LG&E) and Kentucky Utilities (KU) Energy, LLC (LG&E-KU) E. W. Brown Generating Station in Harrodsburg, Mercer County, Kentucky. The pilot system was evaluated using two CO2 capture solvents, monoethanolamine (MEA) and Hitachi’s H3-1 solvent. The purpose of the EH&S Assessment was to determine if there were any unacceptable environmental, health or safety concerns that may prevent operation or environmental permitting of a larger scale pilot scale plant. The assessment included review of process flow diagrams, input and output flow rates for primary materials, literature describing similar processes and chemicals used or created during the process, actual air emission and wastewater test data and air emission calculations. The evaluation included identification of risks related to hazardous chemicals, air emissions, wastewater discharges, solid wastes generated and employee hazards. Most potential EH&S issues that were identified are commonly found and successfully managed at large industrial facilities. No risks were identified that could not be successfully managed or would likely prevent implementation or environmental permitting of the pilot or larger scale plant. Potential exposures and resulting health risks from exposure to low concentrations of nitrosamines generated from degradation of the Hitachi H3-1 and possibly MEA solvents may be a health concern for site workers, but additional investigation is needed to accurately assess this risk. Applying the information gained from operating the pilot plant, performing air emission testing and used solvent testing to a large-scale facility at a commercial coal-fired electric generating plant suggests additional air emission control measures may be necessary to reduce potential site worker health risks and possibly community risks. Depending upon the location and regional air quality, considerable effort may be required to obtain the necessary air permit for construction and operation of a similarly configured large-scale PCCCS facility.

gas separation↗

Description of FY25 Theory and Simulation Performance Target: Development of an integrated modeling framework for fusion reactor design and assessment

The urgency to deliver fusion power is growing now more than ever, with increasing pressure for both public programs and private companies to meet milestones timelines and overcome significant remaining technical challenges to ensure growth of a nascent fusion industry in time to meet rapidly growing clean energy demands. With incredible advancements in computation and years of investment in fusion model development and validation, integrated modeling is poised to fill a key role in accelerating the timeline to a fusion pilot plant (FPP). Future fusion pilot plants will operate in regimes far beyond current experience, and device design will rely on physics-based prediction and extrapolation. Many concepts will also rely on simulation to assess safety (shielding, tritium management, materials activation and lifetimes), economics and scalability before the decision to build. Importantly, integrated simulation can be used to reveal and solve the complexities of system integration that may otherwise not be apparent in physical components or models developed in isolation. New experimental test facilities that produce relevant conditions to validate and resolve key technical challenges for various subsystems (materials, blankets, fuel cycle, etc.) have been repeatedly called for by the fusion community but are not yet realized. Integrated modeling has an important role in identifying realistic load conditions (thermal, electromagnetic, plasma, neutron and photon loads, etc.) and defining the components and experiments for these test facilities in order to ensure meaningful validation that sufficiently reduces modeling uncertainties and technical risk for the full integrated reactor. The Fusion REactor Design and Assessment (FREDA) SciDAC project is building a component-based integrated modeling framework & data structure to enable self-consistent, multi-fidelity, iterative optimization workflows for the fusion reactor design process. FREDA aims to shorten the time to viable designs by providing a set of flexible workflows to support the various stages of the design process using an integrated model hierarchy, ranging from the simple analytic descriptions to the highest fidelity, theory-based plasma and engineering modeling developed by the fusion and fission communities. These tools are expected to be needed for timely support of FPP design in the milestone program and in the FIRE collaboratives. The plasma simulation backbone of FREDA is IPS-FASTRAN with newly developed coupled Core-Edge Pedestal-SOL (CESOL) workflows, which is being extended to the far-SOL region up to the plasma facing components. FREDA incorporates the FERMI engineering modeling suite and will enable self-consistent evaluation of the thermal shields, limiters, blanket, magnets, and other surrounding structures with predictions of temperatures, erosion, dpa, activation, tritium generation and transport, creep, corrosion, material degradation, etc. Parametric generation of 3D CAD enables rapid iteration of component geometry in response to plasma and loading specifications.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Demonstration of μCHP in Light Commercial Hot Water Applications

Internal combustion engine driven combined heat and power (CHP) systems produce power while the waste heat is recovered and used for another purpose. For µCHP systems (less than 50kWe output) overall efficiencies can reach over 90% for products currently on the market throughout the world. On a fuel basis this offers an advantage over using grid-based power and another fuel for heat. Additionally, the cost of natural gas on an energy unit basis is significantly less expensive than electric power. This difference can lead to substantial savings for the end user of a CHP system. In some parts of the world, particularly Germany and Japan, µCHP has become a common part of the heat and distributed generation equipment mix. Market analysis conducted in 2012 showed that in North America there is potential of a 5,300 units per year market for µCHP, resulting in an annual energy savings of approximately 13.5 TBtu and more than $84 million in annual customer savings. However, µCHP still has not seen much market penetration in North America. This study helps to identify some of the reasons why, address roadblocks that still need to be overcome and provide experience to established best practices. Nine commercial sites were initially identified (fitness club, surgical center, senior community, resort and spa, commercial laundry, two multi-family housing, restaurant and manufacturing facility). Systems from two different manufacturers were installed at five sites total, but due to unforeseen circumstances, only three of those sites were finally commissioned: test data were collected by Oak Ridge National Laboratory. While not all systems were installed as intended, the project resulted in the following key findings: Micro combined heat and power is an unfamiliar technology for building owners and plumbing and electrical contractors that serve the buildings most suited for µCHP. Manufacturers will need to be aggressive in providing training and providing broad support to successfully bring the technology to market.; The proper integration of µCHP into other building systems is the most critical part of a successful installation. Manufacturers will need to be able to provide the expertise to train, advise and support the mechanical contractors during the design and installation of the heat integration system.; Regulations governing µCHP varies across the country. There are a few UL standards (UL 2200 and UL 1741) that apply nationally. Emissions are governed by EPA except in California where the California Air Resources Board (CARB) has established their own standard. Requirements that dictate installation and interconnection are dependent on local building codes and local utility processes and requirements. Some out of date building codes do not offer clear guidance for these requirements, leading to confusion. This makes developing training and determining broadly applicable best practices difficult.; Installation costs of µCHP are a key factor in making an installation successful. It is critical that these costs and all national, state and local regulations be understood and accounted for by all parties involved in the installation before a project is undertaken.; A robust customer service organization is important to meet the needs of the customers. These systems require annual maintenance and service and local capability is needed to keep costs inline.

03 NATURAL GAS↗

Environmental, Health and Safety Assessment Application of a Heat Integrated, Post-combustion CO 2 Capture System Using Monoethanolamine and Hitachi H3-1 Solvent at the E.W. Brown Coal-Fired Power Plant

An Environmental Health and Safety (EH&S) Assessment was completed for operation of a pilot scale carbon dioxide (CO 2 ) capture system (CCS) at the Louisville Gas & Electric (LG&E) and Kentucky Utilities (KU) Energy, LLC (LG&E-KU) E. W. Brown Generating Station in Harrodsburg, Mercer County, Kentucky. The pilot system was evaluated using two CO 2 capture solvents, monoethanolamine (MEA) and Hitachi’s H3-1 solvent. The purpose of the EH&S Assessment was to determine if there were any unacceptable environmental, health or safety concerns that may prevent operation or environmental permitting of a larger scale pilot scale plant. The assessment included review of process flow diagrams, input and output flow rates for primary materials, literature describing similar processes and chemicals used or created during the process, actual air emission and wastewater test data and air emission calculations. The evaluation included identification of risks related to hazardous chemicals, air emissions, wastewater discharges, solid wastes generated and employee hazards. Most potential EH&S issues that were identified are commonly found and successfully managed at large industrial facilities. No risks were identified that could not be successfully managed or would likely prevent implementation or environmental permitting of the pilot or larger scale plant. Potential exposures and resulting health risks from exposure to low concentrations of nitrosamines generated from degradation of the Hitachi H3-1 and possibly MEA solvents may be a health concern for site workers, but additional investigation is needed to accurately assess this risk. Applying the information gained from operating the pilot plant, performing air emission testing and used solvent testing to a large-scale facility at a commercial coal-fired electric generating plant suggests additional air emission control measures may be necessary to reduce potential site worker health risks and possibly community risks. Depending upon the location and regional air quality, considerable effort may be required to obtain the necessary air permit for construction and operation of a similarly configured large-scale PCCCS facility.

gas separation↗

FRIB Beam Power Ramp-up: Status and Plans

After project completion on scope, on cost, and ahead of schedule, the Facility for Rare Isotope Beams began operations for scientific users in May of 2022. The ramp-up to a beam power of 400 kW is planned over a six-year period; 1 kW was delivered for initial user runs from in 2022, and 5 kW was delivered as of February 2023. Test runs with 10 kW 36Ar and 48Ca beams were conducted in July 2023. Upgrade plans include doubling the primary-beam energy to 400 MeV/nucleon for enhanced discovery potential (¿FRIB 400¿). This talk reports on the strategic plans towards high power operations emphasizing challenges and resolutions in beam-interception devices and targetry systems, radiation protection and controls, and legacy system renovation and integration.

43 PARTICLE ACCELERATORS↗

Characterization facility for magneto-optic media and systems

Objectives of this research are: (1) to measure the hysteresis loop, Kerr rotation angle, anisotropy energy profile, Hall voltage, and magnetoresistance of thin-film magneto-optic media using our loop-tracer; (2) measure the wavelength-dependence of the Kerr rotation angle, Theta(sub k), and ellipticity, epsilon(sub k), for thin-film media using our magneto-optic Kerr spectrometer (MOKS); (3) measure the dielectric tensor of thin-film and multilayer samples using our variable-angle magneto-optic ellipsometer (VAMOE); (4) measure the hysteresis loop, coercivity, remanent magnetization, saturation magnetization, and anisotropy energy constant for thin film magnetic media using vibrating sample magnetometry; (5) observe small magnetic domains and investigate their interaction with defects using magnetic force microscopy; (6) perform static read/write/erase experiments on thin-film magneto-optic media using our static test station; (7) integrate the existing models of magnetization, magneto-optic effects, coercivity, and anisotropy in an interactive and user-friendly environment, and analyze the characterization data obtained in the various experiments, using this modeling package; (8) measure focusing- and tracking-error signals on a static testbed, determine the 'feedthrough' for various focusing schemes, investigate the effects of polarization and birefringence, and compare the results with diffraction-based calculations; and (9) measure the birefringence of optical disk substrates using two variable angle ellipsometers.

Mansuripur, M.↗

Optimized V1G and V2G Electric Vehicle Fleet Management and Grid Transaction at Marine Corps Air Station Miramar in San Diego, CA

The overall technical goal of the project was to demonstrate an all-electric bi-directional non-tactical fleet at Marine Corps Air Station (MCAS) Miramar that was integrated and controlled with other distributed energy resources (DERs) (i.e., PV, stationary battery, and building loads) to provide resilience to critical electric loads in the event of grid outages, to minimize charging costs, and to provide economic energy resources to electricity markets. In this project, the specific, technical objectives were: 1. Demonstrate that bi-directional electric vehicles can provide critical complementary services to fixed storage batteries in microgrid applications while performing function as non-tactical vehicles. 2. Demonstrate participation of bi-directional (V2G) and unidirectional (V1G) PEVs for demand management and minimization of charging costs. 3. Demonstrate integration of multiple DERs for grid service participation. US Marine Corps Air Station (MCAS) Miramar in San Diego was the site of this electric vehicle-to-microgrid-utility grid test and demonstration project. Existing microgrid assets in this study included (1) a public works building; (2) a 30-kW rooftop photovoltaic (PV) system and (3) a separate 250 kW carport PV system. In this project, six bi-directional V2G vans were located at the MCAS Miramar’s showcase building-scale microgrid to develop and test technical capabilities that V2G can provide in microgrid applications (e.g., cost reduction and resiliency). These resources provided aggregated demand management and simulated participation in current retail DR programs. The vehicles used in this demonstration were selected because they provided functionality that MCAS Miramar needed, 15 passenger transport and facilities work cargo carrying capacity, and bi-directional charging capability that the research project required. All vehicles in this study were manufactured and distributed by VIA Motors, Inc. There were six vehicles total and each was VIA’s VTRUX eREV V2G model, a modified General Motors Chevrolet 2500 2WD van. Three of the vans were configured as passenger vans and the other three were configured as cargo vans. Each van had an on-board bi-direcrtional inverter/charger, Bel Power Solutions model 350INVCHGT150-120-240-8G nominally rated at +/-15 kW. The VIA van’s charging connector follows the J1772 charging protocol. The bi-directional EVSEs demonstrated in this study were manufactured by Coritech, Inc. Each VGI-80-AC charging station enabled enhanced V2G charging capability to a Clipper Creek CS-100 charging module. The enhanced capabilities included ethernet communication following the SEP2.0 protocol with a distributed energy resource function set and an operator screen displaying real-time SOC, voltage, and current. The VGI-80-AC charging stations are classified as level 2 with a maximum current output of 80 A or effectively 19 kW. The VIA van’s onboard charger limited the charging and discharging power to 15 kW in each direction. A control computer was installed in the EWOC and connected to an existing monitor. The V2G control communication network was a completely stand-alone closed system that did not have any connection to any other networks on the base. A cybersecure remote communication connection was created with a cellular modem, firewall hardware, and a virtual private network configuration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A variable X-ray chopper system for phase-sensitive detection in synchrotron X-ray scanning tunneling microscopy

An ultra-high-vacuum compatible X-ray chopper system has been designed, constructed and integrated into the XTIP beamline at the Advanced Photon Source at Argonne National Laboratory. The XTIP beamline can operate at soft X-ray energies from 400 eV to 1900 eV while providing a focused beam down to about 10 µm × 10 µm into the synchrotron X-ray scanning tunneling microscopy (SX-STM) endstation instrument. The X-ray chopper is a critical component for separating topographic information from chemical information in SX-STM through phase-sensitive current detection. Depending on the experimental needs, the modulation frequency can be controlled from 100 Hz to 10 kHz. In addition, the chopper system is fully bakeable and can achieve a base pressure of 10 -10 mbar. Facilities for active water cooling have been designed, but passive cooling through copper braids has been shown to be sufficient at standard chopping frequencies. Using an Fe/Al 2 O 3 /CoAl(111) sample, the separation of the SX-STM current into a chemical component and a stable feedback signal is demonstrated.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗