Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Downlink Data”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Advanced technology for a satellite multichannel demultiplexer/demodulator

Satellite on-board processing is needed to efficiently service multiple users while at the same time minimizing earth station complexity. The processing satellite receives a wideband uplink at 30 GHz and down-converts it to a suitable intermediate frequency. A multichannel demultiplexer then separates the composite signal into discrete channels. Each channel is then demodulated by bulk demodulators, with the baseband signals routed to the downlink processor for retransmission to the receiving earth stations. This type of processing circumvents many of the difficulties associated with traditional bent-pipe repeater satellites. Uplink signal distortion and interference are not retransmitted on the downlink. Downlink power can be allocated in accordance with user needs, independent of uplink transmissions. This allows the uplink users to employ different data rates as well as different modulation and coding schemes. In addition, all downlink users have a common frequency standard and symbol clock on the satellite, which is useful for network synchronization in time division multiple access schemes. The purpose of this program is to demonstrate the concept of an optically implemented multichannel demultiplexer (MCD). A proof-of-concept (POC) model has been developed which has the ability to receive a 40 MHz wide composite signal consisting of up to 1000 40 kHz QPSK modulated channels and perform the demultiplexing process. In addition a set of special test equipment (STE) has been configured to evaluate the performance of the POC model. The optical MCD is realized as an acousto-optic spectrum analyzer utilizing the capability of Bragg cells to perform the required channelization. These Bragg cells receive an optical input from a laser source and an RF input (the signal). The Bragg interaction causes optical output diffractions at angles proportional to the RF input frequency. These discrete diffractions are optically detected and output to individual demodulators for baseband conversion. Optimization of the MCD design was conducted in order to achieve a compromise between two opposing sources of signal degradation: adjacent channel interference and intersymbol interference. The system was also optimized to allow simple, inexpensive ground stations communications with the MCD. These design goals led to the realization of a POC MCD which demonstrates the demultiplexing function with minimal signal degradation. Performance evaluation results using the STE equipment indicate that the dynamic range of the demultiplexer in the presence of adjacent and multiple channel loading is 40 - 50 dB. Measured bit error rate (BER) probabilities varied from the predicted theoretical results by one dB or less. The performance of the proof-of-concept model indicate that the development of a space qualified optically implemented MCD are feasible. The advantages to such an implementation include reduced size, weight and power and increased reliability when compared with electronic approaches. All of these factors are critical to on-board satellite processors. Further optimization can be conducted which trade ground station complexity and MCD performance to achieve desired system results.

Abramovitz, Irwin J.↗

Viking lander design and systems integration

Malfunction protection requires redundancy planning and mechanization in Viking lander design and systems integration in order to maximize the chance of getting the data back through the Orbiter. Various subsystems are discussed that protect the downlink to man on the ground in the framework of systems integration and insure the basic objectives of Viking: to land on a planet and to acquire data from its surface.

Goodlette, J.↗

The Imager for Mars Pathfinder Insurance Pan

The Imager for Mars Pathfinder (IMP) obtained a full panorama of the Sagan Memorial Station landing site on Sol 2, before the IMP mast was deployed. The images in this panorama were taken in 4 filters (including stereo) and losslessly compressed to provide a high-quality multispectral survey of the landing site even if the IMP mast did not successfully deploy; this data set was therefore called the Insurance Pan. It was completed late in the afternoon of Sol 2, just before the IMP mast was (successfully) deployed. The data were stored in memory and returned to Earth after it became clear that downlink rates were higher than expected. The Insurance Pan horizontal (azimuth) coverage is nearly complete, with gaps caused by pointing errors and data packet losses. Stereo data were acquired in the blue (445 nm) filter, as well as right-eye green (531 nm), orange (600 nm), and near-infrared (752 nm) data.

K E Herkenhoff↗

Magellan mapping update - A matter of gravity

In order to obtain gravity data for Venus, the Magellan spacecraft will furnish an unmodulated downlink carrier signal which is coherent with a highly stable uplink from the NASA-JPL Deep Space Network. After the removal of gross Doppler shifts induced by planetary motions and Magellan's primary orbital motion, residual Doppler shifts will indicate miniscule gravity variations in the mass distributions at, and below, the Venusian surface. These gravity measurements are valuable for understanding the nature and origin of features identifiable with imaging data.

Doody, Dave↗

Performance of three-way data types during Voyager's encounter with Neptune

Voyager's flyby of Neptune in August of 1989 was the most distant planetary encounter ever achieved. Round trip light travel time was more than eight hours, exceeding view periods at two of the three tracking station sites. Consequently, the majority of radiometric tracking was accomplished by transmitting the uplink from one station, and receiving the downlink at a different station. This procedure defines three-way data. Dependence on three-way data for orbit determination is one distinguishing element of Voyager's successful encounter with Neptune. This paper addresses the performance of three-way range and Doppler data supporting pre-encounter orbit determination and post-encounter orbit reconstruction. Also, calibrations which reduce systematic errors inherent to three-way data are described and analyzed.

Roth, D. C.↗

Apollo 16/AS-511/LM-11 operational calibration curves. Volume 1: Calibration curves for command service module CSM 113

Calibration curves for the Apollo 16 command service module pulse code modulation downlink and onboard display are presented. Subjects discussed are: (1) measurement calibration curve format, (2) measurement identification, (3) multi-mode calibration data summary, (4) pulse code modulation bilevel events listing, and (5) calibration curves for instrumentation downlink and meter link.

Demoss, J. F.↗

X-Ray Polarization Capabilities of a Small Explorer Mission

X-ray polarization measurements hold great promise for studying the geometry and emission mechanisms in the strong gravitational and magnetic fields that surround black holes and neutron stars. In spite of this, the observational situation remains very limited; the last instrument dedicated to X-ray polarimetry flew decades ago on OSO-8, and the few recent measurements have been made by instruments optimized for other purposes. However, the technical capabilities to greatly advance the observational situation are in hand. Recent developments in micro-pattern gas detectors allow use of the polarization sensitivity of the photo-electric effect, which is the dominant interaction in the band above 2 keV. We present the scientific and technical requirements for an X-ray polarization observatory consistent with the scope of a NASA Small Explorer (SMEX) mission, along with a representative catalog of what the observational capabilities and expected sensitivities for the first year of operation could be. The mission is based on the technically robust design of the Gravity and Extreme Magnetism SMEX (GEMS) which completed a Phase B study and Preliminary Design Review in 2012. The GEMS mission is enabled by time projection detectors sensitive to the photo-electric effect. Prototype detectors have been designed, and provide engineering and performance data which support the mission design. The detectors are further characterized by low background, modest spectral resolution, and sub-millisecond timing resolution. The mission also incorporates high efficiency grazing incidence X-ray mirrors, design features that reduce systematic errors (identical telescopes at different azimuthal angles with respect to the look axis, and mounted on a rotating spacecraft platform), and a moderate capability to perform Target of Opportunity observations. The mission operates autonomously in a low earth, low inclination orbit with one to ten downlinks per day and one or more uplinks per week. Data and calibration products will be made available through the High Energy Astrophysics Science and Archival Research Center (HEASARC).

GEMS↗

Long-range communications with Pioneer 10 at Jupiter

The longest two-way telecommunications link ever established connected Pioneer 10 with its controllers and experimenters on earth during the first Jovian encounter. This radio link, operating in the 2.1 and 2.3 gigahertz frequency bands, maintained high-quality communications over a distance of 5-1/2 astronomical units. The data collected by eleven on-board advanced scientific instruments were transmitted to the investigators, providing a new wealth of information about the largest planet of the solar system. A descriptive review is presented of the spacecraft design and the ground data system configuration with an analysis of the telecommunications downlink. Pioneer 10, aided by Jupiter's gravitational field, is the first spacecraft to leave the solar system. A plaque attached to the spacecraft represents man's first attempt to send a message to another intelligence within our galaxy.

Dickerson, L. W.↗

A spectral feature design system for the HIRIS/MODIS era

A spectral feature design system for high-dimensional multispectral data is described. This system utilizes hard-limited or infinitely clipped optimal transforms and canonical analysis to extract the spectral features for data volume reduction and classification purposes. The design procedure is intended to be application-specific in order to make it maximally effective for each use. Although it could be used in a variety of circumstances, the procedure was designed with satellite data collection in mind, such as will be needed with the High-Resolution Imaging Spectrometer (HIRIS), a land-oriented Earth observational sensor intended for launch in the mid-1990s. The computation required for the steps prior to the actual satellite data collection are straightforward and could be done with readily available subroutines. The procedure is also defined in such a way as to require only very simple onboard calculations. The tests reported provide substantial data volume reduction in the satellite-to-Earth downlink and subsequent computation phases, while maintaining satisfactory classification accuracy.

Chen, Chih-Chien Thomas↗

Simulating The SSF Information System

Freedom Operations Simulation Test (FROST) computer program simulates operation of SSF information system, tracking every packet of data from generation to destination, for both uplinks and downlinks. Collects various statistics concerning operation of system and provides reports of statistics at intervals specified by user. FROST also incorporates graphical-display capability to enhance interpretation of these statistics. Written in SIMSCRIPT 11.5.

Deshpande, Govind K.↗

Multimission Software Reuse in an Environment of Large Paradigm Shifts

The ground data systems provided for NASA space mission support are discussed. As space missions expand, the ground systems requirements become more complex. Current ground data systems provide for telemetry, command, and uplink and downlink processing capabilities. The new millennium project (NMP) technology testbed for 21st century NASA missions is discussed. The program demonstrates spacecraft and ground system technologies. The paradigm shift from detailed ground sequencing to a goal oriented planning approach is considered. The work carried out to meet this paradigm for the Deep Space-1 (DS-1) mission is outlined.

Wilson, Robert K.↗

Large Multispectral and Albedo Panoramas Acquired by the Pancam Instruments on the Mars Exploration Rovers Spirit and Opportunity

Introduction. The panoramic camera (Pancam) multispectral, stereoscopic imaging systems on the Mars Exploration Rovers Spirit and Opportunity [1] have acquired and downlinked more than 45,000 images (~35 Gbits of data) over more than 700 combined sols of operation on Mars as of early January 2005. A large subset of these images were acquired as part of 26 large multispectral and/or broadband "albedo" panoramas (15 on Spirit, 11 on Opportunity) covering large ranges of azimuth (12 spanning 360 ) and designed to characterize major regional color and albedo characteristics of the landing sites and various points along both rover traverses.

Bell, J. F., III↗

Aerocapture Design Study for a Titan Polar Orbiter

In 2014 a team at NASA Goddard Space Flight Center (GSFC) studied the feasibility of using active aerocapture to reduce the chemical Delta V requirements for inserting a small scientific satellite into Titan polar orbit. The scientific goals of the mission would be multi-spectral imaging and active radar mapping of Titan's surface and subsurface. The study objectives were to: (i) identify and select from launch window opportunities and refine the trajectory to Titan; (ii) study the aerocapture flight path and refine the entry corridor; (iii) design a carrier spacecraft and systems architecture; (iv) develop a scientific and engineering plan for the orbital portion of the mission. Study results include: (i) a launch in October 2021 on an Atlas V vehicle, using gravity assists from Earth and Venus to arrive at Titan in January 2031; (ii) initial aerocapture via an 8-km wide entry corridor to reach an initial 350X6000 km orbit, followed by aerobraking to reach a 350X1500 km orbit, and a periapse raise maneuver to reach a final 1500 km circular orbit; (iii) a three-part spacecraft system consisting of a cruise stage, radiator module, and orbiter inside a heat shield; (iv) a 22-month mission including station keeping to prevent orbital decay due to Saturn perturbations, with 240 Gb of compressed data returned. High-level issues identified include: (i) downlink capability - realistic downlink rates preclude the desired multi-spectral, global coverage of Titan's surface; (ii) power - demise of the NASA ASRG (Advanced Stirling Radioisotope Generator) program, and limited availability at present of MMRTGs (Multi-Mission Radioisotope Generators) needed for competed outer planet missions; (iii) thermal - external radiators must be carried to remove 4 kW of waste heat from MMRTGs inside the aeroshell, requiring heat pipes that pass through the aeroshell lid, compromising shielding ability; (iv) optical navigation to reach the entry corridor; (v) the NASA requirement of continuous critical event coverage for the orbiter, especially during the peak heating of the aerocapture when the radio link will be broken. In conclusion, although Titan aerocapture allows for considerable savings in propellant mass, this comes at a cost of increased mission complexity. Further architecture study and refinement is required to reduce high-level mission risks and to elucidate the optimum architecture.

Nixon, Conor A.↗

Operability on the Europa Clipper Mission: Challenges and Opportunities

Flight and ground system operability has been a focus area on the Europa Clipper Project since early in its formulation phase. This has given the operations team the opportunity to influence the design, with a goal of increasing overall system operability. This paper presents example operability challenges, opportunities, and solutions arising from the pre-Critical Design Review (CDR) system design. The integrated wing assembly design directly couples a scientific instrument (the REASON sounding radar) to the spacecraft’s power source (solar array wing panels). Impacts to mission operations of this design include: increased slew durations; solar array pointing constraints during inner cruise, Europa flybys, and orbit trim maneuvers; and stray light intrusions into the stellar reference units’ keep out zones. The use of CCSDS File Delivery Protocol (CFDP) Class-2 for reliable downlink of the large volume of Europa Clipper science data is described, along with nominal and off-nominal use cases. The effort to improve post-launch spacecraft visibility by adding a third low-gain antenna to the spacecraft is detailed. The design of the bulk data store has necessitated the implementation of accountable data products (ADPs), accountability identifiers (AIDs), and metadata packets to provide end-to-end science data accountability. To streamline and automate the flight rules generation and checking process, a first order and temporal logic-based solution of expressing flight rules without ambiguity, and whose programmatic implementation can be automated, is proposed. The focus on operability has had a positive influence on Europa Clipper design decisions, although cost, schedule, budget, heritage, and other technical concerns have many times outweighed operability concerns. However, experience to date demonstrates that this approach to operability results in more thorough, balanced consideration of the effect of early design trades and decisions on the operations phase of a mission than seen in many previous missions, and provides operations development insight into prioritizing work to go.

Signorelli, Joel↗

Operability on the Europa Clipper Mission: Challenges and Opportunities

Flight and ground system operability has been a focus area on the Europa Clipper Project since early in its formulation phase. This has given the operations team the opportunity to influence the design, with a goal of increasing overall system operability. This paper presents example operability challenges, opportunities, and solutions arising from the Critical Design Review (CDR) system design. The integrated wing assembly design directly couples a scientific instrument (the REASON sounding radar) to the spacecraft’s power source (solar array wing panels). Impacts to mission operations of this design include: increased slew durations; solar array pointing constraints during inner cruise, Europa flybys, and orbit trim maneuvers; and stray light intrusions into the stellar reference units’ keep out zones. The use of CCSDS File Delivery Protocol (CFDP) Class-2 for reliable downlink of the large volume of Europa Clipper science data is described, along with nominal and off-nominal use cases. The effort to improve post-launch spacecraft visibility by adding a third low-gain antenna to the spacecraft is detailed. The design of the bulk data store has necessitated the implementation of accountable data products (ADPs), accountability identifiers (AIDs), and metadata packets to provide end-to-end science data accountability. To streamline and automate the flight rules generation and checking process, a first order and temporal logic-based solution of expressing flight rules without ambiguity, and whose programmatic implementation can be automated, is proposed. The focus on operability has had a positive influence on Europa Clipper design decisions, although cost, schedule, budget, heritage, and other technical concerns have many times outweighed operability concerns. However, experience to date demonstrates that this approach to operability results in more thorough, balanced consideration of the effect of early design trades and decisions on the operations phase of a mission than seen in many previous missions, and provides operations development insight into prioritizing work to go.

Kumar, Meghana↗

ICESat 2/ATLAS Onboard Flight Science Receiver Algorithms: Purpose, Process, and Performance

The Advanced Topographic Laser Altimetry System (ATLAS) is the sole instrument on the Ice, Cloud, and land Elevation Satellite 2 (ICESat-2). Without some method of reducing the transmitted data, the volume of ATLAS telemetry would far exceed the normal X-band downlink capability or require many more ground station contacts. The ATLAS Onboard Flight Science Receiver Algorithms (hereinafter Receiver Algorithms or Algorithms) control the amount of science data that is telemetered from the instrument, limiting the data volume by distinguishing surface echoes from background noise, and allowing the instrument to telemeter data from only a small vertical region about the signal. This is accomplished through the transfer of the spacecraft's location and attitude to the instrument every second, use of an onboard Digital Elevation Model, implementation of signal processing techniques, and use of onboard relief and surface type reference maps. Extensive ground testing verified the performance of the Algorithms. On-orbit analysis shows that the Algorithms are working as expected from the ground testing; they are performing well and meeting the mission requirements.

Algoritms, Signal Processing, Optimization, Flight↗

AMO EXPRESS: A Command and Control Experiment for Crew Autonomy Onboard the International Space Station

NASA is investigating a range of future human spaceflight missions, including both Mars-distance and Near Earth Object (NEO) targets. Of significant importance for these missions is the balance between crew autonomy and vehicle automation. As distance from Earth results in increasing communication delays, future crews need both the capability and authority to independently make decisions. However, small crews cannot take on all functions performed by ground today, and so vehicles must be more automated to reduce the crew workload for such missions. NASA's Advanced Exploration Systems Program funded Autonomous Mission Operations (AMO) project conducted an autonomous command and control experiment on-board the International Space Station that demonstrated single action intelligent procedures for crew command and control. The target problem was to enable crew initialization of a facility class rack with power and thermal interfaces, and involving core and payload command and telemetry processing, without support from ground controllers. This autonomous operations capability is enabling in scenarios such as initialization of a medical facility to respond to a crew medical emergency, and representative of other spacecraft autonomy challenges. The experiment was conducted using the Expedite the Processing of Experiments for Space Station (EXPRESS) rack 7, which was located in the Port 2 location within the U.S Laboratory onboard the International Space Station (ISS). Activation and deactivation of this facility is time consuming and operationally intensive, requiring coordination of three flight control positions, 47 nominal steps, 57 commands, 276 telemetry checks, and coordination of multiple ISS systems (both core and payload). Utilization of Draper Laboratory's Timeliner software, deployed on-board the ISS within the Command and Control (C&C) computers and the Payload computers, allowed development of the automated procedures specific to ISS without having to certify and employ novel software for procedure development and execution. The procedures contained the ground procedure logic and actions as possible to include fault detection and recovery capabilities. The autonomous operations concept includes a reduction of the amount of data a crew operator is required to verify during activation or de-activation, as well as integration of procedure execution status and relevant data in a single integrated display. During execution, the auto-procedures (via Timerliner) provide a step-by-step messaging paradigm and a high-level status upon termination. This messaging and high-level status is the only data generated for operator display. To enhance situational awareness of the operator, the Web-based Procedure Display (WebPD) provides a novel approach to the issues of procedure display and execution tracking. WebPD is a web based application that serves as the user interface for electronic procedure execution. It incorporates several aspects of the HTML5 standard. Procedures are written in a dialect of XML called Procedure Representation Language (PRL). WebPD tracks execution status in the procedure or procedures being displayed. WebPD aggregates and simplifies the auto-sequence execution status information, and formatted to be easily followed and understood by an operator who is not dedicated to actively monitoring the task. WebPD also provides an integrated data and control interface to pause or halt the execution in order to provide a check point of operation and to examine progress before starting the next sequence of activities. For this demonstration, the procedure was initiated and monitored from the ground. As the Timeliner sequences executed, their high-level execution status was written to PLMDM memory. This memory is read and downlinked via Ku-Band at a 1 Hz rate. The data containing the high-level execution status is de-commutated on the ground, and rebroadcast for WebPD consumption. A future demonstration will be performed onboard, with ISS astronauts initiating the operations instead of ground controllers. The AMO EXPRESS experiment demonstrated activation and de-activation of EXPRESS rack 7, providing the capability of future single button activations and deactivations of facility class racks. The experiment achieved numerous technical and operations 'firsts' for the ISS

Stetson, Howard K.↗