Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DECOMMISSIONING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Blue Ribbon Commission, Yucca Mountain Closure, Court Actions - Future of Decommissioned Reactors, Operating Reactors and Nuclear Power - 13249

Issues related to back-end of the nuclear fuel cycle continue to be difficult for the commercial nuclear power industry and for the decision makers at the national and international level. In the US, the 1982 NWPA required DOE to develop geological repositories for SNF and HLW but in spite of extensive site characterization efforts and over ten billion dollars spent, a repository opening is nowhere in sight. There has been constant litigation against the DOE by the nuclear utilities for breach of the 'standard contract' they signed with the DOE under the NWPA. The SNF inventory continues to rise both in the US and globally and the nuclear industry has turned to dry storage facilities at reactor locations. In US, the Blue Ribbon Commission on America's Nuclear Future issued its report in January 2012 and among other items, it recommends a new, consent-based approach to siting of facilities, prompt efforts to develop one or more geologic disposal facilities, and prompt efforts to develop one or more consolidated storage facilities. In addition, the March 2011 Fukushima Daiichi accident had a severe impact on the future growth of nuclear power. The nuclear industry is focusing on mitigation strategies for beyond design basis events and in the US, the industry is in the process of implementing the recommendations from NRC's Near Term Task Force. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Novel Serpentine Robot Combinations for Inspection in Hard-to-Reach Areas of Damaged or Decommissioned Structures - 17335

U.S. government agencies, particularly the Dept. of Energy, need robotic tools to handle and inspect high-consequence materials - materials for which mishandling would result in great risk to both application operators and the general public. The remediation and documentation of nuclear waste has become a problem of national significance and it cannot be addressed without robotic tools. The use of robots bypasses the danger and decreases the preparation time to handle harmful materials. In the 1980's and 90's, the US Dept. of Energy (DOE) invested heavily in robotic technologies as part of a comprehensive program of research and development aimed at enabling safer and more efficient cleanup of nuclear waste sites. For the next generation of harder, more complex clean-up problems, there is a clear need for more R and D. There is a clear need for flexible, quickly deployable robotic technologies that can be configured to respond to unforeseen situations -- or can be purpose-built for planned activities -- while keeping human workers safe, yet effective. Modularity and inter-operability are core capabilities for inspection tasks in contaminated facilities with a large variety of inspection problems. With any tool, familiarity breeds ingenuity, and ingenuity leads to new innovations in efficiency, effectiveness, safety, and performance. For example, the simple screwdriver can be held fourteen different ways by an experienced machinist who knows exactly what he or she wants to accomplish at any given moment. As a tool, robots are no different. To maximize the efficiency, effectiveness, safety and performance, redeployment and reuse of familiar tools is essential. Modularity can assist with re-deployment and modularity manifests itself in both hardware and software. In some applications of inspection of high-consequence materials, a common concern has been the simplicity of the tool -- often correlated with cost (which is not always accurate) -- in case it becomes unrecoverable. In the case of robots, which have complex user interfaces and complex dynamics of interaction, the lack of familiarity can lead to clumsy operations and reduced accumulation of knowledge. As a result, while incremental successes may be achieved with sequential uses of different robots, there often is little knowledge gain that is generalizable across multiple uses. Total cost often goes down when a more sophisticated, but more familiar tool, can be used more frequently.An example is the inspection of the H-Canyon Exhaust Air Tunnel at the Savannah River Site nuclear waste facility in the United States [1]. This is a particularly nasty environment, due to the acidic gases, large amounts of erosion and debris, and wet, mucky puddles. Over the past twelve years, six inspections have been attempted with five different robotic vehicles. In fact, these inspections have been successful with their limited, but progressively increasing objectives, although most robots have been abandoned in the tunnel. While each vehicle has cost less than $75,000 (the sacrificial part), the total costs of development have been much higher. The robots used to investigate changed much from iteration to iteration and it is not clear a strong body of generalizable expertise was built up across trials. The authors of this study demonstrated the combination of two types of modular, serpentine, re-configurable robots for locomotion over complex terrains and the inspection of hard-to-reach areas. The MOTHERSHIP is a tread/limb/serpentine hybrid robot design for locomotion over complex terrains, while the CMU snake robot provides highly articulated inspection of highly confined spaces. The demonstration at the Portsmouth Gaseous Diffusion Plant involves a combination of the two whereby gross locomotion is achieved with the MOTHERSHIP and the CMU Snake deploys a sensor package to gather data from behind and under obstacles. Although statically configured in its present state, the combined robot is built of individual modules for which reconfiguration has been demonstrated in both labs at Purdue and CMU. In future work, much higher degrees of reconfiguration and re-purposing of both software and hardware are easily achievable with these unique platforms. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Coal-dependent Communities in Transition: Identifying Best Practices to Ensure Equitable Outcomes

The U.S. coal industry is experiencing a sharp increase in the numbers of retired and/or decommissioned coal-fired power plants across the U.S. In the years between 2010-2019, around 102 gigawatts (GW) of coal-fired generating capacity has been announced to be decommissioned, representing more than 546 coal-fired power plant units, and an additional 17 GW is planned to be decommissioned by 2025. This change in the energy production landscape presents an impact on the social, environmental, and economic prospects of coal-dependent communities. This report examined the role of communities in the coal power plant decommissioning process and provided community-identified best practices to ensure an equitable process. The experiences of four coal-dependent communities—Wise County, VA, Muskegon, MI, Anderson County, TN, and Becker, MN—are presented as case studies to understand the impacts of the decommissioning process, and associated best practices, from the communities’ perspective. The report results highlight the need to recognize that the decommissioning decision-making process must be community-based to be equitable. Each community’s input is key to the transition away from coal power because there is no one-size-fits-all development plan. In other words, each community’s trajectory through the decommissioning process—from the retirement decision-making stage to the final site redevelopment phase—is unique because each community has distinct needs and wants from the energy transition. What is best for one community may not be suited for another. Ultimately, the framework for site development and community revitalization post-decommissioning cannot be universal because each community’s profile—from a social, cultural, and economic perspective—is different. Community impacts of power plant decommissioning are not limited to job and revenue losses. Communities are likely to be impacted culturally, socially, environmentally, and have long-term health-based impacts that should be acknowledged and addressed in post-retirement plans. Commonly identified decommissioning best practices include: Early and continued engagement throughout, with a number of mediums for communication and feedback (e.g., in-person sessions, virtual meetings, written comment opportunities); Early planning of post-decommissioning projects to replace lost jobs, revenue, and economic activity; Recognition (and mitigation, if possible) of social impacts on the community due to plant closure; Transparency throughout the process, with trusted information being provided about the decommissioning process and timeline; potential impacts on the workforce, economy, and environment; and the feasibility of alternative site uses; Identification of funding sources, technical experts, and/or strategic partnerships to support decommissioning and the affected communities upfront; and, Acknowledgment of communities as stakeholders who have a role in the conversation and right to determine their futures. Three key areas for assisting coal-dependent communities affected by the energy transition: Technical assistance: assessment of site feasibility for alternative uses or to repower with new technologies; Cross-partnership engagement and collaboration: facilitate knowledge-sharing of “lessons learned” about the decommissioning process between communities and provide guidance for decision-making processes; and, Financial assistance: access to grant and/or loan programs to assist with redevelopment survey, bolster community economic security through job creation, and cover environmental clean-up costs. Technical assistance, cross-partnership engagement, and financial aid can be mobilized to help communities throughout various stages of the decommissioning process, including the retirement decision, the site reclamation phase, and eventual revitalization of the site and surrounding community.

01 COAL, LIGNITE, AND PEAT↗

Development of Digital Mock-Up for the Assessment of Dismantling Scenarios

As the number of superannuated research reactors and nuclear power plants increase, dismantling nuclear power facilities has become a big issue. However, decommissioning a nuclear facility is still a costly and possibly hazardous task. So prior to an actual decommission, what should be done foremost is to establish a proper procedure. Due to the fact that a significant difference in cost, exposure to a radiation, and safety might occur, a proper procedure is imperative for the entire engineering process. The purpose of this paper is to develop a system for evaluating the decommissioning scenarios logically and systematically. So a digital mockup system with functions such as a dismantling schedule, decommissioning costs, wastes, worker's exposure dose, and a radiation distribution was developed. Also on the basis of the quantitative information calculated from a DMU system and the data evaluated by decommissioning experts about qualitatively evaluating the items, the best decommissioning scenarios were established by using the analytic hierarchy process (AHP) method. Finally, the DMU was implemented in the thermal column of KRR-1 and adequate scenarios were provided after comparing and analyzing the two scenarios. In this paper, we developed the virtual environment of KRR-1 by using computer graphic technology and simulating the dismantling processes. The data-computing modules were also developed for quantitatively comparing the decommissioning scenarios. The decommissioning DMU system was integrated with both the VE system and the data-computing modules. In addition, we presented a decision-making method for selecting the best decommissioning scenario through the AHP. So the scenarios can be evaluated logically and quantitatively through the decommissioning DMU. As an implementation of the AHP, the plasma cutting scenario and the nibbler cutting scenario of the thermal column were prioritized. The fact that the plasma cutting scenario ranked the better than the nibbler cutting scenario is that the plasma scenario mostly got the higher scores than the nibbler scenario in the decommissioning cost and safety sections that have high weighting factors. Finally we decided that the plasma cutting scenario is appropriate to dismantle the thermal column. This study has a great meaning in that it can present a reliable scenario through the decommissioning DMU system while this work had only been done through a subjective evaluation in the past. The DMU system will be applied to the KRR-1 decommissioning project to obtain the best scenarios. We believe it will be a useful engineering tool for other nuclear facility decommissioning.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Bradwell - The first UK Nuclear Site to Enter Care and Maintenance - 18152

Magnox Ltd, a Cavendish Fluor company, is currently decommissioning twelve nuclear sites on behalf of the UK Nuclear Decommissioning Authority (NDA). Ten of these sites are former Power Stations; the other two are closed Research and Development facilities. An overall strategy for decommissioning the Magnox sites has been agreed between Magnox and the NDA. For all but one of these sites the decommissioning strategy involves an extended quiescent period, known as Care and Maintenance (C and M), during which remaining radiological hazards reduce naturally through radioactive decay. After this quiescent period the sites will be restored to an agreed end state through further decommissioning and clearance work. Sites in C and M will not be permanently manned. They will be passively safe such that prompt action will not be required in response to an alarm or fault. Preparing a nuclear site for C and M involves several inter-related strands of work including definition of the intended physical configuration of the site during C and M (the C and M entry state), establishing a safety case to support that configuration, carrying out the physical works needed to deliver the C and M entry state, preparing arrangements and a team to manage the site during C and M and consolidating the knowledge and information needed to support C and M and final clearance of the site. To enter C and M there needs to be a carefully controlled transition of site, personnel and management system into the agreed C and M configuration. Bradwell, a site on the east coast of England, was selected as part of the overall decommissioning strategy for 'early' entry into C and M; Bradwell is scheduled to enter C and M in late 2018, several years in advance of the next scheduled site, with the intent of carrying learning forward from Bradwell to the subsequent sites. Bradwell is now in the final stages of preparation for C and M. Decommissioning commenced on completion of defueling in 2005. A clearly defined C and M entry state was established early in decommissioning and, through interaction with Regulators and internal and external stakeholders, developed as a shared target, thus providing certainty to the scope of the overall decommissioning project. The site has subsequently been systematically decommissioned to meet this target C and M entry state. All legacy waste has been retrieved and packaged into robust disposal containers, the reactor buildings have a new weather envelope, and much of the site is empty space with concrete hardstanding where facilities used to exist and bare rooms where plant used to operate. The remaining radiological and environmental hazards are not significant. During C and M, which is anticipated to last for 70 years, Bradwell will be managed remotely without the requirement for personnel to be present on site, with the possible exception of an ongoing security presence when the site first enters C and M. In terms of UK decommissioning, many of the projects undertaken at Bradwell were first of a kind. The company operates under a programmed organisational and delivery model, which will enable innovation and learning from Bradwell to be carried forward across the whole Magnox fleet. In addition to decommissioning tools and techniques, processes to manage decommissioning, optimise the C and M entry state to reduce the burden on the UK taxpayer and to transition a site into C and M have been developed. This, in addition to taking people from Bradwell and seeding them into Magnox and the broader UK nuclear industry, should help to provide long term cost savings and delivery efficiencies across the entire NDA estate. This paper describes the journey of Bradwell Site through decommissioning and into C and M, highlighting the innovation and challenges that have contributed to the success of delivering the first UK nuclear site into Care and Maintenance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Long Term Storage with Surveillance of Canadian Prototype Nuclear Power Reactors

Atomic Energy of Canada (AECL) was originally formed by the government of Canada in 1952 to perform research in radiation and nuclear areas. In the mid 1950's Canada decided to limit itself to peaceful uses of nuclear energy and AECL embarked on several research and development programs, one of them being the development of nuclear power plants. This led to the development of the CANDU{sup TM} design of heavy water power reactors, of which there are now 29 operating around the world. This presentation discusses the present state of the first two CANDU{sup TM} prototype reactors and a prototype boiling light water reactor and lessons learnt after being in a long-term storage with surveillance state for more than 20 years. AECL facilities undergo decommissioning by either a prompt or a deferred removal approach. Both approaches are initiated after an operating facility has been declared redundant and gone through final operational shutdown. For the deferred approach, initial decommissioning activities are performed to put the facility into a sustainable, safe, shutdown state to minimize the hazards and costs of the ensuing extended storage with surveillance (SWS) or Safestor phase. At the appropriate time, the facility is dismantled and removed, or put into a suitable condition for re-use. AECL has a number of facilities that were built during its history, and some of these are now redundant or will become redundant in the near future. The deferred removal approach is part of AECL's decommissioning strategy for several reasons: 1. Reduction in radiation doses to workers during the final dismantling, 2. No facilities are available yet in Canada for the management of quantity of wastes arising from decommissioning, 3. Financial constraints presented by the number of facilities that will undergo decommissioning, compared to the availability of funds to carry out the work. This has led to the development of a comprehensive decommissioning plan that includes all of AECL's redundant and presently operating facilities. Several significant issues have arisen over the decades these reactors have been in the SWS phase. With the long time frames encompassed by this approach to decommissioning, the storage and maintenance of facility information for future decommissioning, and the knowledge and training of successive generations of staff to perform facility inspections and maintenance are major issues. Complacency of both staff and management is a potential issue. The problem arises primarily because these facilities have been put into a comparatively low hazard state, are remotely located, and not much changes over time and changes are slow. During the period that these facilities have been in this state, regulatory scrutiny and expectations have increased. This along with continuing changes in regulatory staff requires a continuous education and communication activity with the regulator. Because of the long time frames involved, the building structures continue to deteriorate slowly, and repairs and maintenance are required upon occasion. The costs can be significant, for example, to replace a roof. When these occasions arise, the balance of cost and benefit is always questioned, i.e., 'Wouldn't it be better to spend the money on dismantling rather than fixing?'. One positive note is that ancillary buildings that either have very low radiation hazards or were decontaminated during the initial decommissioning activities have been used for several alternate uses. This has helped to defray costs, and also keeps an interest in maintaining the building structures and systems in good condition during the SWS phase. Over the past few years, the lessons learnt from these and other facilities in SWS, have been addressed in a holistic manner by moving from a short-term, project-oriented approach to a comprehensive, long term stewardship approach. Key to this approach was the development of an integrated plan to decommission all of AECL's facilities. One of the prime results of the implementation of this plan was the development of an organizational structure that addressed the lessons learnt to date including information management, quality assurance, training, waste management, funding, etc. that are required to successfully maintain these prototype reactors until they can be fully decommissioned.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Characterisation Progress at the Windscale Pile Reactors. Challenges and Results

The decommissioning of the Windscale Pile 1 reactor, fifty years after the 1957 fire, is one of the most technically challenging decommissioning projects in the United Kingdom, if not the world. The decommissioning is being performed by an Alliance of the United Kingdom Atomic Energy Authority (UKAEA), CH2M HILL International Nuclear Services (CHNS) Ltd. and AMEC, NNC. The 1957 Windscale Pile 1 accident is summarized. The resulting fire caused significant characterisation challenges. Challenges to intrusive characterization included hypothesized uranium hydride causing re-ignition of the core fire, unknown fuel configurations leading to a reactor criticality and graphite dust explosions. As a result, the Pile 1 facilities were sealed, isolated and managed in a monitoring and surveillance regime while plans for dismantling were developed. For years the intrusive inspection of the fire damaged region of Pile 1, estimated to contain 15 tonnes of fuel, was precluded based on safety grounds. In June of 2006 the United Kingdom Health and Safety Directorate approved a new Pile 1 safety case that successfully demonstrated that Pile 1 presents a minimal safety risk with no credible risk of a core fire, criticality or graphite dust explosion. Adoption of the new safety case enabled the intrusive inspections of the fire damaged region. Characterisation activities planned and performed since the safety case approval, were prioritised relative to the results potential to mitigate decommissioning project risks. D-Void examinations, irradiation foil hole intrusive inspections, bio-shield and thermal shield plate characterizations were performed. Results obtained allow determination of waste stream composition and confirmation of assumed design conditions. Changes to the strategic approach to safely and efficiently decommission the two Windscale Pile Reactors include waste packaging and storage facilities and confirmation of design assumptions. Fuel channel endoscope inspections have confirmed the strategic approach to safely and efficiently decommission the Windscale Pile 1 Reactor. The first detailed images from deep within the Pile 1 fire affected zone(FAZ) since the 1957 fire are discussed. The decommissioning impacts of these images are provided. Characterisation has confirmed design assumptions and supported decommissioning option evaluation. The results confirmed that the decommissioning strategy of a top down approach, employing an array of light weight, high payload robotic arms to remove the damaged fuel, the graphite core, activated metals and concrete remains the most efficient decommissioning method. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of the Manuela 3D/Radiation Scanning Tool at Nuclear Facilities - 20437

Licensees, facility operators and decommissioning contractors have a need for comprehensive, accurate and precise radiological and topographical data to plan and execute safe and efficient Decontamination and Decommissioning (D and D) projects. Traditional approaches rely greatly upon labor and administratively intensive data collection methods that require considerable time and effort to glean the relevant data to plan and perform work in a radiological work area. Orano Decommissioning Services has developed and utilized at French nuclear facilities a lightweight portable scanning instrument called MANUELA (Mobile Apparatus for Nuclear Expertise Localization Assistance). Recently Orano conducted demonstrations at two United States nuclear facilities using MANUELA that may prove useful in areas of the fuel cycle including: - ALARA (As Low As Reasonably Achievable) planning during facility operations; - Scoping and site characterization during the D and D planning phase; - Remedial action support during active decommissioning work; - Radiation and modeling planning for plant modifications; - Support Final Status Survey and demonstration of 'end state' compliance for license termination. MANUELA is currently being evaluated for use during decommissioning of nuclear facilities and could aide in demonstrating compliance with end state criteria after decommissioning. Of particular interest are decommissioning projects planned for various sites across the United States. Most of these sites present unique challenges and opportunities to safely and efficiently decommission in a regulatory compliant manner. The two demonstration site's current conditions of relatively low radiation levels inside containment proved to be ideal platforms to deploy the MANUELA instrument for evaluation of the complex geometries typically found in a nuclear facility. The MANUELA instrument was able to precisely identify local hot spots of the reactor system's primary equipment and was able to simultaneously overlay the dose information onto the scanned 3D images. Using data like this, a licensee would be able to make informed technical and personnel decisions on methods to remediate, shield or properly dispose of the radioactive source term. MANUELA can be used throughout the decommissioning process to validate progress and continue to refine the work activities to optimize the efforts of the crew which reduces downtime waiting for survey results, whereas traditional survey methodology relies on a physical survey to be performed and the data transcribed onto survey maps that are only two dimensional. The traditional format tends to be inaccurate and difficult to interpret the precise location(s) of hot spots or generalized dose rates. The resultant scan also allows the user to know the exact extent of the survey versus transposing information onto a map with only a portion of the map area scanned. MANUELA also compiles all of the relevant survey data into a downloadable table format which includes the measurement identification number, time stamp, point space location on the XYZ plane, and the dose rate value. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Study of TRR Radial Thermal Shielding Dismantling Process - 20063

The decommissioning of nuclear facilities has become an important worldwide topic because many nuclear power facilities will permanently cease operation in the foreseeable future. Taiwan Research Reactor (TRR) has stepped into the decommissioning phase in 2004, and the dismantling processes will start in 2022. TRR is a heavy water reactor designed by Canatom Company with output thermal power 40 MW. On January 3, 1973, it reaches criticality. TRR had been operated for 15 years and was permanently shut down in early 1988. The decommissioning plan of TRR was approved in 2004. According to the Nuclear Reactor Facilities Regulation Act in Taiwan, a nuclear facility must be dismantled in 25 years after stepping into the decommissioning phase. Therefore, TRR decommissioning must be completed before 2029. One of the most important tasks of TRR decommissioning is to dismantle reactor body. In the task of TRR decommissioning, mechanical cutting with remote handling is used to dismantle radial thermal shielding, which are the internal components of the TRR. This study outlines the internal components of the TRR and explains the difficulties encountered during the dismantling processes. Considering the structure and radiation dose rate of TRR and its internal components, the dismantling method and packaging method are properly arranged to complete the TRR dismantling task. This study describes the process of dismantling the radial thermal shielding during the dismantling processes and considers the impact of the radiation dose on the staff during the operation. The calculation of the radiation dose rate for the personnel during the segmentation process is based on the evaluation result by using VRdose. If the calculation of personnel working dose rate is too high, we will increase the shielding or use remote handling to reduce the operator's exposure dose in the dismantling processes to comply with the As Low As Reasonably Achievable (ALARA) principle. In this study, the latest developments in the TRR decommissioning program are described. It also provides usable experience and information regarding the future decommissioning of other nuclear facilities or nuclear power plants in Taiwan. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Using Digital and Web-Based Platforms to Enhance Nuclear Power Plant Knowledge Transfer - 20203

As the workforce ages, the loss of experienced personnel can result in a loss of important knowledge. Updating Electric Power Research Institute (EPRI) research and guidance with the latest technology developments and operating experience is an important method to transfer knowledge between the retiring and incoming workforce. Studies suggest that the incoming workforce is accustomed to using digital and/or internet-based platforms to find information and may have a higher comfort with these types of platforms than they have with static, written reports. Additionally, the ease and speed of updating and delivering content through digital formats may offer an effective method for knowledge transfer and combining information from multiple reports into a single access point. EPRI has recently produced an online Decommissioning Hub available to members and is working on replicating the effort in the area of radioactive waste management called the Radwaste Web References. EPRI has extensive guidance in both disciplines. The Decommissioning Hub uses a wiki format to provide a platform that allows for both the updating of that guidance resulting from new research and new operating experiences, and combining related topical information from multiple reports. It also allows users to access the information based on key words and topical searches, and can be a tool for users to input experience to share with others. The Decommissioning Hub is accessed via a web-based portal and includes topical pages; experience summaries; a question and answer capability; and a smart search function of all EPRI decommissioning reports. Use of a wiki format allows users to input new experiences or modify existing experience summaries to add additional detail. EPRI moderates all content. The experience data base has been initially populated with information available in published EPRI reports and unpublished information currently available within EPRI. Moving forward, population of the database will continue with information available within the open literature, new information developed from current decommissioning projects, and user inputs. The web site became active in late 2017, and a major update will be issued in early 2020. Larger scale updates are planned biannually, and smaller-scale updates will occur continuously. Capturing and applying lessons learned from industry experiences is a hallmark of the global nuclear industry. This is even more important in the decommissioning technology area since very few plant staff have relevant experience and thus there is a steep learning curve. Moreover, decommissioning involves a number of complex, non-routine and specialized tasks. The web-accessible and searchable experience database provides an easy-to-use resource for capturing and disseminating practical experiences from completed and ongoing decommissioning projects. The EPRI Radwaste Web References will build upon the philosophy and objectives of the Radwaste Desk References that were published in the 1990's. The purpose of the original Radwaste Desk References was to provide nuclear power plant professionals with a how-to manual for managing radioactive waste. The Radwaste Web References will adopt this original purpose and will be a wiki type web site that provide fundamental practical and theoretical information, operating experience (OE), and information about advanced technologies and methods. As much as practicable, features that allow for interaction between users to share OE, best practices, and benchmarking will be added. Where they exist and are appropriate, the various EPRI Guidelines documents on radwaste topics will be updated and incorporated into the Radwaste Web References. The first Radwaste Web Reference will be on Low Level Waste Characterization and will build upon the EPRI Low Level Waste Characterization Guidelines (EPRI Report TR-107201, 1996) and will be available in 2020. The next Radwaste Web Reference will be on the topic of liquid radioactive waste processing and management, tentatively set for unveiling in 2021. This paper summarizes the EPRI's previous experiences with web-based platforms and future plans in this area. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Disposal of Large Reactor Components - Rulemaking to Address Funding of Disposal Costs

The paper will explore the current challenges of financing the disposal costs for disposing of large reactor components such as reactor pressure vessel heads and steam generators and the resulting delays in disposal caused by the current regulatory requirements. The paper also will discuss a recent rulemaking petition submitted by EnergySolutions to the US Nuclear Regulatory Commission designed to improve the regulatory process by providing a process to permit funds from decommissioning trust funds to be used to fund disposal of large reactor components. If granted, the disposal of these large components could be expedited where reactor licensees have sufficient decommissioning trust funds available. Perspectives on the rulemaking will be addressed. In conclusion: NRC should provide serious consideration to this Petition. There is support in the industry for granting this Petition. As of the date this paper was submitted, there have been no negative comments. Granting this Petition is prudent and consistent with the underlying purpose of 10 C.F.R. 50.82(a)(8) and 10 CFR 20.1406. It provides flexibility without any adverse impact on the public health and safety. It should facilitate the decommissioning process by providing a regulatory framework to allow removing MRCs from sites, resulting in (1) the source term at the site being reduced, (2) the site workers being exposed to less radiation, (3) eliminating an unnecessary regulatory burden as the costs associated with maintaining the MRCs on-site and providing protection to the workers as a result of those components can be avoided, (4) the overall cost to decommission the site being reduced, and (5) more funds being made available to decommission the reactor at the time the reactor ceases operation. Finally, the framework would provide the demonstration by a site-specific decommissioning cost estimate and the associated funding program that adequate funds are available to dispose of these components as well as complete site decommissioning for unrestricted release consistent with the NRC requirements. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Knowledge Management in Nuclear Liabilities Regulation in the UK - 18155

Within the UK's nuclear safety regulator (Office for Nuclear Regulation; ONR) nuclear liabilities regulation addresses the safe management of radioactive waste, decommissioning and land quality through a facility's lifetime. Higher activity radioactive waste (HAW) could be stored on site for up to 150 years prior to disposal, Magnox decommissioning sites are planned to be in Care and Maintenance for up to 70 years and Sellafield decommissioning is not planned to be complete until after 2100. The long timescales over which decommissioning occurs and radioactive waste is managed is a challenge to maintaining a suitable level of knowledge to effectively and efficiently regulate nuclear liabilities activities. There is a danger that implicit knowledge accumulated over decades could be lost as people retire. Effective knowledge capture and transfer are key elements in maintaining a workforce with the capacity and capability to deliver high levels of nuclear safety, given the demographics of the UK nuclear industry. Maintenance of recorded information over long timescales with changing technologies is necessary to allow safe storage and disposal of waste and intelligent response to incidents. As the safety regulator, ONR's ability to influence improvement in nuclear safety relies on our inspectors having access to high quality knowledge. The ONR Strategy 2016-2020 [1,2] commits to continue to recruit, retain and develop staff so that we have a core workforce with the capacity and capability to deliver high quality, enabling nuclear regulation. Over the next 30 years, the UK plans to develop a geological disposal facility and UK EDF power stations will transition into decommissioning. The ONR Knowledge Management Strategy sets out the activities planned to maintain specialist knowledge to support staff development and build organisational resilience. Guidance on waste management is given in 'The management of higher activity radioactive waste on nuclear licensed sites' (referred to as the Joint Guidance [3]) published by ONR and the UK environmental regulators. It includes our expectations for managing information and records relating to radioactive waste, and introduces the concept of Radioactive Waste Management Cases (RWMCs). Our expectation is that knowledge and records must both be managed and transferred in such a way that future licensees are properly equipped to ensure that waste continues to be managed in a manner that prevents or minimises hazards to human health and the environment. RWMCs are an effective vehicle for demonstrating how the key elements of long-term safety and environmental performance will be delivered over the life cycle of the waste. They give a history of how the waste has been managed, capturing information and change over time. This paper will look at the challenges to managing knowledge in the UK nuclear industry, focusing on the safe management of radioactive waste, decommissioning and land quality. It will look at the problems faced by both licensees and ONR, drawing out common challenges. The paper will outline the approach taken within ONR to capture and communicate waste management and decommissioning knowledge and experience. Finally, it will look at how ONR regulates and influences how knowledge and records are dealt with in the industry to ensure safe nuclear liabilities management in the long term. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

International Government Collaboration in ISD (In Situ Decommissioning/In Situ Disposal) - 19261

In situ decommissioning (ISD) is considered by IAEA as the permanent entombment of a legacy facility in 'a structurally long lived material' (e.g. concrete) and is considered a solution only under 'exceptional circumstances' (e.g. following a severe accident). However, this definition of ISD as 'only' entombment is not universally accepted; the approach has been implemented as a decommissioning approach by the US Dept of Energy in the past decade at the Savannah River Site (P and R reactors)2,3, the Hanford site (U Canyon) and at the Idaho site (CP601, CP640 and CP633). The application of ISD outside of the United States has been much less common for large facilities although its use for underground substructures (e.g. discarded pipelines) is commonplace. Proponents of ISD consider it beneficial since it eliminates the need to remove, package and transport contaminated equipment from a nuclear legacy site to a disposal facility and it maximizes the use of an existing nuclear site footprint by consolidating equipment in one place. ISD is considered to offer major safety benefits to both workers and the public, as well as major cost and schedule benefits to Government. Opponents of the approach cite the fact that, following ISD, the decommissioned facility has effectively become a long-term waste disposal site and that regulations pertaining to long term waste disposal have been circumvented. Given the increasing pressure on environmental cleanup budgets and schedules around the world, countries such as the United Kingdom, Canada and Japan are considering ISD in its various forms as a potential path forward for decommissioning certain facilities in lieu of the more traditional approaches of either deferred decommissioning or immediate decontamination/demolition. To address this emerging area of decommissioning, a Governmental Technical Information Exchange meeting was held in December 2017 at the DOE Savannah River Site in Aiken, SC, to bring together responsible parties from the US Dept of Energy (DOE), Atomic Energy of Canada Ltd (AECL), the UK Nuclear Decommissioning Authority (NDA) and the Japanese Atomic Energy Agency (JAEA) and those countries' respective regulatory agencies to share information about respective 'best practices' and challenges with ISD. Representatives from organizations such as IAEA and US Nuclear Regulatory Commission (US NRC) also participated to discuss their organizations' perspectives and position on ISD. Following the meeting, a series of Working Groups were established which have continued the dialogue in three key areas 5; - ISD-Defined: Identify and share case-specific ISD solutions which allows for the full spectrum of needs and which demonstrate that 'entombment' is not the only definition of 'ISD'. - Regulatory - Share and discuss regulatory concerns and challenges with ISD; - Benchmarking - Share information to support informed and transparent decision-making in ISD. This paper discusses the plans for ISD in some of the countries involved in the December meeting and provides an update on the topics being discussed, and progress being made, by the Working Groups that were formed at the meeting. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The TRANSCEND University Consortium: An Overview - 20106

The UK government is committed to nuclear energy having an important role in delivering a secure, low-carbon and affordable energy future. Projections indicate that between now and 2035, ∼14 GW of new nuclear generating capacity may be built. Successful delivery of this strategy recognises the need for research and development, skills development and international collaboration as key enablers. One key area is the decommissioning and clean-up of all civil nuclear licensed sites and the implementation of geological disposal of highly active wastes, with a central component being a joined-up approach to nuclear R and D across government, industry and academia which benefits the UK economy and ensures the security of supply. Essential to public acceptance of this strategy remains a demonstrable ability to safely manage and dispose of waste, with acceptance directly linked to having scientifically robust routes for its safe clean-up and disposal. There therefore remains an ongoing need for further research in the areas of decommissioning, immobilisation and management of nuclear waste, and there is significant government and stakeholder support for such research. Given the needs of both new nuclear power generation and legacy wastes, there is a requirement to develop innovative approaches to waste management and decommissioning. Following on from earlier, highly successful projects supported by UK Research and Innovation's Energy Programme, the work of the TRANSCEND (Transformative Science and Engineering for Nuclear Decommissioning) consortium is part of the response to these needs, providing support to a strong and internationally leading group of researchers in this key technology area. The consortium is a collaboration between 11 universities, supported by 8 key industry partners, with a total funding of UK Pounds 9.5 M from the UK Engineering and Physical Research Council, the universities and key project partners. The research being carried out is multidisciplinary and covers both fundamental and applied topics, with 40 research projects clustered in four technical themes: integrated waste management; site decommissioning and remediation; spent fuels; and nuclear materials. Key aims of the consortium are to extend and further develop a relevant academic skill base in the UK associated with the needs of nuclear waste management and decommissioning, to train the next generation of UK researchers, equipping them with skills and experiences relevant to nuclear waste management and decommissioning issues, and to carry out cutting-edge research that has the potential to provide new and innovative pathways to better management of both legacy and future nuclear wastes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenges for Lithuania: Ignalina NPP Early Closure

As a condition of accession into the European Union (EU), Lithuania is committed to the closure and decommissioning of Ignalina NPP comprising two RBMK-1500 reactor units (Fig. 1). It was agreed in a special protocol to the Accession Treaty that, in return for adequate EU financial assistance, Unit 1 would be closed before 2005 and Unit 2 by the end of 2009. The first unit was duly shut down on December 31, 2004. Lithuania, which has borders with Russia (Kaliningrad territory), Poland, Latvia and Belarus, spent fifty years as part of the Soviet Union and was deeply integrated into its economy and electrical infrastructure. At the break-up of the USSR, Lithuania inherited electricity generating capacity designed to supply the north-west region including ownership of Ignalina NPP located in the north-east of the country. Ignalina NPP Unit 1 was commissioned in 1983, Unit 2 in 1987; the planned lifespan of each unit was 30 years. Construction of a third unit was started but never completed. Since Lithuania became independent in 1990, Ignalina NPP has typically contributed more than 70% of national power supply. The town of Visaginas (population approx. 30,000) was purpose built to serve the plant and staff were brought in from throughout the USSR. With 3200 direct employees, Ignalina NPP remains by far the largest employer. Although there are pockets of Russian-language speakers in communities throughout Lithuania, Visaginas is the only example on a whole-town scale. Thus closure of Ignalina NPP within the restricted timescale required by the EU Accession Treaty commitment set an exceptional challenge to Lithuania. However, since the preparatory phase of decommissioning started in 2000, notable progress has been made, experience gained and lessons learnt. At present Unit 1 remains partially fueled in a state of care and maintenance. Partly burnt fuel is being transferred from Unit 1 to Unit 2 for further irradiation in order to minimize the commitment of new fuel thereby reducing operating costs and the final quantity of spent fuel. Design and construction of the facilities for spent fuel storage, waste processing and free-release is ongoing. The siting of the Near Surface Repository is now in the final stages of approval and construction of the landfill facility is under tendering. In order to facilitate the approval process and minimize the transport of waste, both disposal facilities will be within the boundary of the NPP site. Approximately 450 staff are employed at the shutdown Unit 1 for the safe maintenance of essential systems. The total staffing level at the plant is currently being reduced by around 200 each year, with a larger release to take place at the closure of Unit 2. It is envisaged that 2000 staff will be required for the dismantling operations. Although Ignalina NPP is still in the early stages of closure and decommissioning, some important lessons have already been learnt: Firstly, the importance considering social and financial issues as well as technical factors in deciding the decommissioning strategy. This should be done before the preparation is started of the FDP. The same broad consideration should also be given to the economic restructuring of the local area. Consultation is necessary with local and national authorities, and other stakeholders up to ensure a common vision. At Ignalina NPP it was considered essential to staff morale and the maintenance of a strong safety culture to guarantee the special social and employment benefits to dismissed staff in law [9]. At the same time, measures were also adopted to encourage certain key personnel to remain at the plant until closure. The case of Lithuania, which at independence had no legislative framework or management infrastructure for radioactive waste, may be exceptional; however, for all decommissioning projects it is necessary to have, from the outset, a clear strategy on waste storage and disposal. Finally, coordination at all levels must be assured, especially with the involvement of the nuclear regulators and other regulatory authorities, to achieve a smooth progression from operation into decommissioning.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Dismantling of Loop-Type Channel Equipment of MR Reactor in NRC 'Kurchatov Institute' - 13040

In 2009 the project of decommissioning of MR and RTF reactors was developed and approved by the Expert Authority of the Russian Federation (Gosexpertiza). The main objective of the decommissioning works identified in this project: - complete dismantling of reactor equipment and systems; - decontamination of reactor premises and site in accordance with the established sanitary and hygienic standards. At the preparatory stage (2008-2010) of the project the following works were executed: loop-type channels' dismantling in the storage pool; experimental fuel assemblies' removal from spent fuel repositories in the central hall; spent fuel assembly removal from the liquid-metal-cooled loop-type channel of the reactor core and its placement into the SNF repository; and reconstruction of engineering support systems to the extent necessary for reactor decommissioning. The project assumes three main phases of dismantling and decontamination: - dismantling of equipment/pipelines of cooling circuits and loop-type channels, and auxiliary reactor equipment (2011-2012); - dismantling of equipment in underground reactor premises and of both MR and RTF in-vessel devices (2013-2014); - decontamination of reactor premises; rehabilitation of the reactor site; final radiation survey of reactor premises, loop-type channels and site; and issuance of the regulatory authorities' de-registration statement (2015). In 2011 the decommissioning license for the two reactors was received and direct MR decommissioning activities started. MR primary pipelines and loop-type facilities situated in the underground reactor hall were dismantled. Works were also launched to dismantle the loop-type channels' equipment in underground reactor premises; reactor buildings were reconstructed to allow removal of dismantled equipment; and the MR/RTF decommissioning sequence was identified. In autumn 2011 - spring 2012 results of dismantling activities performed are: - equipment from underground rooms (No. 66, 66A, 66B, 72, 64, 63) - as well as from water and gas loop corridors - was dismantled, with the total radwaste weight of 53 tons and the total removed activity of 5,0 x 10{sup 10} Bq; - loop-type channel equipment from underground reactor hall premises was dismantled; - 93 loop-type channels were characterized, chopped and removed, with radwaste of 2.6 x 10{sup 13} Bq ({sup 60}Co) and 1.5 x 10{sup 13} Bq ({sup 137}Cs) total activity removed from the reactor pool, fragmented and packaged. Some of this waste was placed into the high-level waste (HLW) repository of the Center. Dismantling works were executed with application of remotely operated mechanisms, which promoted decrease of radiation impact on the personnel. The average individual dose for the personnel was 1.9 mSv/year in 2011, and the collective dose is estimated as 0.0605 man x Sv/year. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Method for Implementing Subsurface Solid Derived Concentration Guideline Levels (DCGL) - 12331

The U.S. Nuclear Regulatory Commission (NRC) and other federal agencies currently approve the Multi-Agency Radiation Site Survey and Investigation Manual (MARSSIM) as guidance for licensees who are conducting final radiological status surveys in support of decommissioning. MARSSIM provides a method to demonstrate compliance with the applicable regulation by comparing residual radioactivity in surface soils with derived concentration guideline levels (DCGLs), but specifically discounts its applicability to subsurface soils. Many sites and facilities undergoing decommissioning contain subsurface soils that are potentially impacted by radiological constituents. In the absence of specific guidance designed to address the derivation of subsurface soil DCGLs and compliance demonstration, decommissioning facilities have attempted to apply DCGLs and final status survey techniques designed specifically for surface soils to subsurface soils. The decision to apply surface soil limits and surface soil compliance metrics to subsurface soils typically results in significant over-excavation with associated cost escalation. MACTEC, Inc. has developed the overarching concepts and principles found in recent NRC decommissioning guidance in NUREG 1757 to establish a functional method to derive dose-based subsurface soil DCGLs. The subsurface soil method developed by MACTEC also establishes a rigorous set of criterion-based data evaluation metrics (with analogs to the MARSSIM methodology) that can be used to demonstrate compliance with the developed subsurface soil DCGLs. The method establishes a continuum of volume factors that relate the size and depth of a volume of subsurface soil having elevated concentrations of residual radioactivity with its ability to produce dose. The method integrates the subsurface soil sampling regime with the derivation of the subsurface soil DCGL such that a self-regulating optimization is naturally sought by both the responsible party and regulator. This paper describes the concepts and basis used by MACTEC to develop the dose-based subsurface soil DCGL method. The paper will show how MACTEC's method can be used to demonstrate that higher concentrations of residual radioactivity in subsurface soils (as compared with surface soils) can meet the NRC's dose-based regulations. MACTEC's method has been used successfully to obtain the NRC's radiological release at a site with known radiological impacts to subsurface soils exceeding the surface soil DCGL, saving both time and cost. Having considered the current NRC guidance for consideration of residual radioactivity in subsurface soils during decommissioning, MACTEC has developed a technically based approach to the derivation of and demonstration of compliance with subsurface soil DCGLs for radionuclides. In fact, the process uses the already accepted concepts and metrics approved for surface soils as the foundation for deriving scaling factors used to calculate subsurface soil DCGLs that are at least equally protective of the decommissioning annual dose standard. Each of the elements identified for consideration in the current NRC guidance is addressed in this proposed method. Additionally, there is considerable conservatism built into the assumptions and techniques used to arrive at subsurface soil scaling factors and DCGLs. The degree of conservatism embodied in the approach used is such that risk managers and decision makers approving and using subsurface soil DCGLs derived in accordance with this method can be confident that the future exposures will be well below permissible and safe levels. The technical basis for the method can be applied to a broad variety of sites with residual radioactivity in subsurface soils. Given the costly nature of soil surveys, excavation, and disposal of soils as low-level radioactive waste, MACTEC's method for deriving and demonstrating compliance with subsurface soil DCGLs offers the possibility of significant cost savings over the traditional approach of applying surface soil DCGLs to subsurface soils. Furthermore, while yet untested, MACTEC believes that the concepts and methods embodied in this approach could readily be applied to other types of contamination found in subsurface soils. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗