Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Cost Analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Decommissioning costs - some international perspectives and initiatives. Presentation for Panel discussion. Session No. 024: 'Getting a Handle on Decommissioning Costs - a Global Perspective'

Financing for decommissioning: Are the cost estimates valid? Are the financing arrangements suitable? Are the fund management systems appropriate? Cost estimates are estimated, analysed and updated on a regular basis, but cost comparisons are not straight-forward. There is an incomplete understanding of variability between estimates. Multiple internal and external factors impact estimates: Institutional, legal and policy, purpose, Strategies and plans, overall context, Facility characteristics and history Contingencies and risk, Limited actual cost data. The financing arrangements: there exists a range of systems in place for the implementation of Funding Policy and Strategy, but there are Considerable variations in: Calculating funding requirements, contributions/provisions, Allocating risks and requirements for securities Managing funds and accounting, adjusting the system, Managing disbursements, Reporting and supervision. All cost estimates for future decommissioning activities include considerable uncertainties. These uncertainties will gradually diminish with growing experience from current and planned projects. Different costing methods have different data requirements. Their reliability depends on the extent to which various data are available and applicable to the specific case being considered. Independent of the assessment method, some uncertainty is inevitable in all estimates of future costs. Analysis of the costing method may be useful in order to locate the key uncertainties in each specific estimate. NEA's Decommissioning Cost Estimation Group (DCEG) was Created in 2008 to foster the exchange of information and experience. It Aims to enhance the credibility, reliability, and auditability of the cost estimation process. It Helps define international good practices in decommissioning cost estimation. However, some major challenges remain. Weaknesses in: Understanding relations between estimates and actual costs, Lack of relevant cost data, sharing data. How might be addressed: Improved sharing of cost data, Systematic analyses of estimates and actual costs, Developing benchmarking approaches.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Extending cost–benefit analysis for the sustainability impact of inter-urban Intelligent Transport Systems

The paper reports research involving three cost–benefit analyses performed on different ITS schemes (Active Traffic Management, Intelligent Speed Adaptation and the Automated Highway System) on one of the UK's busiest highways — the M42. The environmental scope of the assets involved is widened to take into account the possibility of new technology linked by ICT and located within multiple spatial regions. The areas focused on in the study were data centre energy emissions, the embedded emissions of the road-side infrastructure, vehicle tailpipe emissions, additional hardware required by the vehicles (if applicable) and safety, and all aspects of sustainability. Dual discounting is applied which aims to provide a separate discount rate for environmental elements. For ATM, despite the energy costs of the data centre, the initial implementation costs and mitigation costs of its embedded emissions, a high cost–benefit ratio of 5.89 is achieved, although the scheme becomes less effective later on its lifecycle due to rising costs of energy. ISA and AHS generate a negative result, mainly due to the cost of getting the vehicle on the road. In order to negate these costs, the pricing of the vehicle should be scaled depending upon the technology that is outfitted. Retrofitting on vehicles without the technology should be paid for by the driver. ATM will offset greenhouse gas emissions by 99 kt of CO{sub 2} equivalency over a 25 year lifespan. This reduction has taken into account the expected improvement in vehicle technology. AHS is anticipated to save 280 kt of CO{sub 2} equivalency over 15 years of operational usage. However, this offset is largely dependent on assumptions such as the level of market penetration. - Highlights: • Three cost–benefit analyses are applied to inter-urban intelligent transport. • For ATM, a high cost–benefit ratio of 5.89 is achieved. • ATM offsets greenhouse gas emissions by 99 kt of CO{sub 2} equivalency over 25 years. • ISA and AHS generate a negative result due to vehicle implementation costs. • AHS is anticipated to save 280 kt of CO{sub 2} equivalency over 15 years.

54 ENVIRONMENTAL SCIENCES↗

Systems cost performance analysis (study 2.3). Volume 1: Executive summary

A methodology for developing balanced designs of spacecraft subsystems which interrelates cost, performance, safety, and schedule considerations was developed. The methodology consists of a two-step process: selection of all hardware designs which satisfy the given performance and safety requirements; and estimating the cost and schedule required to design, build, and operate each spacecraft design. Aggregate equations were written to describe the performance, safety (reliability), cost, and schedule required for one type of stabilization and control subsystem in terms of the equipment used. The methodology was applied to unmanned, automated spacecraft subsystems, and the resulting model was implemented as a digital computer program.

Source record↗

Solar PV Manufacturing Cost Model Group: Installed Solar PV System Prices (Presentation)

EERE's Solar Energy Technologies Program is charged with leading the Secretary's SunShot Initiative to reduce the cost of electricity from solar by 75% to be cost competitive with conventional energy sources without subsidy by the end of the decade. As part of this Initiative, the program has funded the National Renewable Energy Laboratory (NREL) to develop module manufacturing and solar PVsystem installation cost models to ensure that the program's cost reduction targets are carefully aligned with current and near term industry costs. The NREL cost analysis team has leveraged the laboratories' extensive experience in the areas of project finance and deployment, as well as industry partnerships, to develop cost models that mirror the project cost analysis tools used by projectmanagers at leading U.S. installers. The cost models are constructed through a 'bottoms-up' assessment of each major cost element, beginning with the system's bill of materials, labor requirements (type and hours) by component, site-specific charges, and soft costs. In addition to the relevant engineering, procurement, and construction costs, the models also consider all relevant costs to aninstaller, including labor burdens and overhead rates, supply chain costs, and overhead and materials inventory costs, and assume market-specific profits.

14 SOLAR ENERGY↗

Cost Benefit Analysis of Solar PV for the City of Oldsmar, FL

The City of Oldsmar is in the early stages of exploring renewable energy opportunities as a part of their initiative to reduce energy costs, improve backup power capacity, and begin the transition to more sustainable operations. The city is particularly interested in deploying a floating or ground-mounted solar PV system at its wastewater treatment plant. Currently, there are no solar PV installations in Oldsmar and there has been hesitancy to implement such a project due to the possible capital costs and limited technical capacity. Despite this the initiative has gained internal buy-in among staff working for the city. To assist with gaining more buy-in and making future decisions the city sought technical assistance (TA) from the Energy to Communities (E2C) Expert Match Program. Through the Expert Match Program, the city received TA provided by the Pacific Northwest National Lab (PNNL) to evaluate the cost effectiveness of several solar options. This report details the analysis and results of the work performed for TA.

14 SOLAR ENERGY↗

Implementing Safeguards-by-Design

Executive Summary Excerpt Safeguards-by-Design (SBD) is an approach to the design and construction of nuclear facilities whereby safeguards are designed-in from the very beginning. It is a systematic and structured approach for fully integrating international and national safeguards (MC&A), physical security, and other proliferation barriers into the design and construction process for nuclear facilities. SBD is primarily a project management or project coordination challenge, and this report focuses on that aspect of SBD. The present report continues the work begun in 2008 and focuses specifically on the design process, or project management and coordination - the planning, definition, organization, coordination, scheduling and interaction of activities of the safeguards experts and stakeholders as they participate in the design and construction of a nuclear facility. It delineates the steps in a nuclear facility design and construction project, in order to provide the project context within which the safeguards design activities take place, describes the involvement of safeguards experts in the design process, the nature of their analyses, interactions and decisions, as well as describing the documents created and how they are used. Designing and constructing a nuclear facility is an extremely complex undertaking. The stakeholders in an actual project are many – owner, operator, State regulators, nuclear facility primary contractor, subcontractors (e.g. instrument suppliers), architect engineers, project management team, safeguards, safety and security experts, in addition to the IAEA and its team. The purpose of the present report is to provide a common basis for discussions amongst stakeholders to collaboratively develop a SBD approach that will be both practically useful and mutually beneficial. The principal conclusions from the present study are: • In the short term, the successful implementation of SBD is principally a project management problem. • Life-cycle cost analysis can be a useful tool in safeguards design. • An important obstacle to straight forward application of life-cycle cost analysis is that there is no single organization responsible for the entire life-cycle cost of the facility. • The Safeguards Effectiveness Report (SGER) is proposed as a focus for the safeguards design activities, and is intended to be a living document that contains increasing safeguards relevant scope and content as the facility design emerges. Further work is required in a number of areas. The authors note that other studies supported by NGSI are addressing the development of requirements and performance criteria, as well as contributing to the design toolkit through the development of technology, methodology, and safeguards guidelines for designers. With respect to further development of the SBD design process, the authors recommend: • In the short term, conduct a workshop with interested industry representatives, to ensure that their perspectives and needs are factored into further development. • In the short term, provide NGSI SBD project documents to IAEA, and support them in the conduct of an ‘SBD Workshop II.” • In the medium term, continue to support the SBD demonstration work started with the Next Generation Nuclear Plant project. • In the longer term, conduct further studies to examine the integration of SBD into projects with concurrent consideration of physical security and safety.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Cost Breakeven Analysis of Lunar In-Situ Propellant Production for Human Missions to the Moon and Mars

NASA is preparing to return humans to the lunar surface as a first step to a human exploration campaign of Mars. Both a sustained lunar campaign and a campaign of missions to Mars will require tens to hundreds of tonnes of propellant. Although this propellant could be delivered from Earth, an alternative approach is to use the potentially vast quantities of lunar ice to enable in-situ propellant production on the lunar surface. This study evaluates the cost breakeven for using lunar-derived propellants, as opposed to those delivered from Earth, in support of an extended human exploration campaign with both a multi-year presence on the Moon as well as multiple crewed missions to Mars. In so doing, the value of lunar propellant production is considered in the context of future exploration priorities, addressing the question: over what range of human missions to the lunar surface and Mars does in-situ propellant production trade favorably with propellant delivery from Earth on the basis of cost? The results of this analysis show that the magnitude and duration of the lunar campaign, more so than the Mars campaign, drive the breakeven and that without long lifetime ISRU systems, with greater than 5 years of autonomous operation before replacement, the demand in cis-lunar space for a Mars campaign favors propellant delivery from Earth.

Christopher A Jones↗

Cost Breakeven Analysis of Lunar In-Situ Propellant Production for Human Missions to the Moon and Mars

NASA is preparing to return humans to the lunar surface as a first step to a human exploration campaign of Mars. Both a sustained lunar campaign and a campaign of missions to Mars will require tens to hundreds of tonnes of propellant. Although this propellant could be delivered from Earth, an alternative approach is to use the potentially vast quantities of lunar ice to enable in-situ propellant production on the lunar surface. This study evaluates the cost breakeven for using lunar-derived propellants, as opposed to those delivered from Earth, in support of an extended human exploration campaign with both a multi-year presence on the Moon as well as multiple crewed missions to Mars. In so doing, the value of lunar propellant production is considered in the context of future exploration priorities, addressing the question: over what range of human missions to the lunar surface and Mars does in-situ propellant production trade favorably with propellant delivery from Earth on the basis of cost? The results of this analysis show that the magnitude and duration of the lunar campaign, more so than the Mars campaign, drive the breakeven and that without long lifetime ISRU systems, with greater than 5 years of autonomous operation before replacement, the demand in cis-lunar space for a Mars campaign favors propellant delivery from Earth.

Christopher A. Jones↗

Partial-Breast Irradiation Versus Whole-Breast Irradiation for Early-Stage Breast Cancer: A Cost-Effectiveness Analysis

Purpose: Accelerated partial-breast irradiation (PBI) is a new treatment paradigm for patients with early-stage breast cancer. Although PBI may lead to greater local recurrence rates, it may be cost-effective because of better tolerability and lower cost. We aim to determine the incremental cost-effectiveness of PBI compared with whole-breast radiation therapy (WBRT) for estrogen receptor-positive postmenopausal women treated for early-stage breast cancer. Methods and Materials: We developed a Markov model to describe health states in the 15 years after radiotherapy for early-stage breast cancer. External beam (EB) and MammoSite (MS) PBI were considered and assumed to be equally effective, but carried different costs. Patients received tamoxifen, but not chemotherapy. Utilities, recurrence risks, and costs were adapted from the literature; the baseline utility for no disease after radiotherapy was set at 0.92. Probabilistic sensitivity analyses were performed to model uncertainty in the PBI hazard ratio, recurrence pattern, and patient utilities. Costs (in 2004 US dollars) and quality-adjusted life-years were discounted at 3%/y. Results: The incremental cost-effectiveness ratio for WBRT compared with EB-PBI was $630,000/quality-adjusted life-year; WBRT strongly dominated MS-PBI. One-way sensitivity analysis found that results were sensitive to PBI hazard ratio, recurrence pattern, baseline recurrence risk, and no evidence of disease PBI utility values. Probabilistic sensitivity showed that EB-PBI was the most cost-effective technique over a wide range of assumptions and societal willingness-to-pay values. Conclusions: EB-PBI was the most cost-effective strategy for postmenopausal women with early-stage breast cancer. Unless the quality of life after MS-PBI proves to be superior, it is unlikely to be cost-effective.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Cost-effective treatment of swine wastes through recovery of energy and nutrients

Highlights: • Cost-effective swine waste treatment that recovers energy/nutrients was evaluated. • Ion exchange and struvite precipitation were considered for nutrient recovery. • Generally, more than 90% of N, P, and K{sup +} nutrients were recovered. • Life Cycle Cost Analysis was performed, showing significant advantages. - Abstract: Wastes from concentrated animal feeding operations (CAFOs) are challenging to treat because they are high in organic matter and nutrients. Conventional swine waste treatment options in the U.S., such as uncovered anaerobic lagoons, result in poor effluent quality and greenhouse gas emissions, and implementation of advanced treatment introduces high costs. Therefore, the purpose of this paper is to evaluate the performance and life cycle costs of an alternative system for treating swine CAFO waste, which recovers valuable energy (as biogas) and nutrients (N, P, K{sup +}) as saleable fertilizers. The system uses in-vessel anaerobic digestion (AD) for methane production and solids stabilization, followed by struvite precipitation and ion exchange (IX) onto natural zeolites (chabazite or clinoptilolite) for nutrient recovery. An alternative approach that integrated struvite recovery and IX into a single reactor, termed STRIEX, was also investigated. Pilot- and bench-scale reactor experiments were used to evaluate the performance of each stage in the treatment train. Data from these studies were integrated into a life cycle cost analysis (LCCA) to assess the cost-effectiveness of various process alternatives. Significant improvement in water quality, high methane production, and high nutrient recovery (generally over 90%) were observed with both the AD-struvite-IX process and the AD-STRIEX process. The LCCA showed that the STRIEX system can provide considerable financial savings compared to conventional systems. AD, however, incurs high capital costs compared to conventional anaerobic lagoons and may require larger scales to become financially attractive.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Space shuttle solid rocket booster cost-per-flight analysis technique

A cost per flight computer model is described which considers: traffic model, component attrition, hardware useful life, turnaround time for refurbishment, manufacturing rates, learning curves on the time to perform tasks, cost improvement curves on quantity hardware buys, inflation, spares philosophy, long lead, hardware funding requirements, and other logistics and scheduling constraints. Additional uses of the model include assessing the cost per flight impact of changing major space shuttle program parameters and searching for opportunities to make cost effective management decisions.

Forney, J. A.↗

System cost performance analysis (study 2.3). Volume 1: Executive summary

A study is described which was initiated to identify and quantify the interrelationships between and within the performance, safety, cost, and schedule parameters for unmanned, automated payload programs. The result of the investigation was a systems cost/performance model which was implemented as a digital computer program and could be used to perform initial program planning, cost/performance tradeoffs, and sensitivity analyses for mission model and advanced payload studies. Program objectives and results are described briefly.

Campbell, B. H.↗

Energy and Energy Cost Savings Analysis of the 2015 IECC for Commercial Buildings

This report provides an assessment as to whether new buildings constructed to the commercial energy-efficiency provisions of the 2015 IECC would save energy and energy costs as compared to the 2012 IECC. PNNL also compared the energy performance of the 2015 IECC with the corresponding Standard 90.1-2013. The purpose of this analysis is to help states and local jurisdictions make informed decisions regarding model code adoption.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Volume Averaged Height Integrated Radar Reflectivity (VAHIRR) Cost-Benefit Analysis

Lightning Launch Commit Criteria (LLCC) are designed to prevent space launch vehicles from flight through environments conducive to natural or triggered lightning and are used for all U.S. government and commercial launches at government and civilian ranges. They are maintained by a committee known as the NASA/USAF Lightning Advisory Panel (LAP). The previous LLCC for anvil cloud, meant to avoid triggered lightning, have been shown to be overly restrictive. Some of these rules have had such high safety margins that they prohibited flight under conditions that are now thought to be safe 90% of the time, leading to costly launch delays and scrubs. The LLCC for anvil clouds was upgraded in the summer of 2005 to incorporate results from the Airborne Field Mill (ABFM) experiment at the Eastern Range (ER). Numerous combinations of parameters were considered to develop the best correlation of operational weather observations to in-cloud electric fields capable of rocket triggered lightning in anvil clouds. The Volume Averaged Height Integrated Radar Reflectivity (VAHIRR) was the best metric found. Dr. Harry Koons of Aerospace Corporation conducted a risk analysis of the VAHIRR product. The results indicated that the LLCC based on the VAHIRR product would pose a negligible risk of flying through hazardous electric fields. Based on these findings, the Kennedy Space Center Weather Office is considering seeking funding for development of an automated VAHIRR algorithm for the new ER 45th Weather Squadron (45 WS) RadTec 431250 weather radar and Weather Surveillance Radar-1988 Doppler (WSR-88D) radars. Before developing an automated algorithm, the Applied Meteorology Unit (AMU) was tasked to determine the frequency with which VAHIRR would have allowed a launch to safely proceed during weather conditions otherwise deemed "red" by the Launch Weather Officer. To do this, the AMU manually calculated VAHIRR values based on candidate cases from past launches with known anvil cloud LLCC violations. An automated algorithm may be developed if the analyses from past launches show VAHIRR would have provided a significant cost benefit by allowing a launch to proceed. The 45 WS at the ER and 30th Weather Squadron (30 WS) at the Western Range provided the AMU with launch weather summaries from past launches that were impacted by LLCC. The 45 WS provided summaries from 14 launch attempts and the 30 WS fkom 5. The launch attempts occurred between December 2001 and June 2007. These summaries helped the AMU determine when the LLCC were "red" due to anvil cloud. The AMU collected WSR-88D radar reflectivity, cloud-to-ground lightning strikes, soundings and satellite imagery. The AMU used step-by-step instructions for calculating VAHIRR manually as provided by the 45 WS. These instructions were used for all of the candidate cases when anvil cloud caused an LLCC violation identified in the launch weather summaries. The AMU evaluated several software programs capable of visualizing radar data so that VAHIRR could be calculated and chose GR2Analyst from Gibson Ridge Software, LLC. Data availability and lack of detail from some launch weather summaries permitted analysis of six launch attempts from the ER and none from the WR. The AMU did not take into account whether or not other weather LCC violations were occurring at the same time as the anvil cloud LLCC since the goal of this task was to determine how often VAHIRR provided relief to the anvil cloud LLCC at any time during several previous launch attempts. Therefore, in the statistics presented in this report, it is possible that even though VAHIRR provided relief to the anvil cloud LLCC, other weather LCC could have been violated not permitting the launch to proceed. The results of this cost-benefit analysis indicated VAHIRR provided relief from the anvil cloud LLCC between about 15% and 18% of the time for varying 5-minute time periods based on summaries fkom six launch attempts and would have allowed launch to proceed that were otherwise "NO GO" due to the anvil cloud LLCC if the T-0 time occurred during the anvil cloud LLCC violations.

Bauman, William H., III↗

Modeling and control of beam-like structures

The most popular finite element codes are based upon appealing theories of convergence of modal frequencies. For example, the popularity of cubic elements for beam-like structures is due to the rapid convergence of modal frequencies and stiffness properties. However, for those problems in which the primary consideration is the accuracy of response of the structure at specified locations it is more important to obtain accuracy in the modal costs than in the modal frequencies. The modal cost represents the contribution of a mode in the norm of the response vector. This paper provides a complete modal cost analysis for beam-like continua. Upper bounds are developed for mode truncation errors in the model reduction process and modal cost analysis dictates which modes to retain in order to reduce the model for control design purposes.

Hu, A.↗

Cost-Effectiveness Analysis of Stereotactic Body Radiotherapy and Radiofrequency Ablation for Medically Inoperable, Early-Stage Non-Small Cell Lung Cancer

Purpose: The standard management of medically inoperable Stage I non-small-cell lung cancer (NSCLC) conventionally has been fractionated three-dimensional conformal radiation therapy (3D-CRT). The relatively poor local control rate and inconvenience associated with this therapy have prompted the development of stereotactic body radiotherapy (SBRT), a technique that delivers very high doses of irradiation typically over 3 to 5 sessions. Radiofrequency ablation (RFA) has also been investigated as a less costly, single-day therapy that thermally ablates small, peripheral tumors. The cost-effectiveness of these three techniques has never been compared. Methods and Materials: We developed a Markov model to describe health states of 65-year-old men with medically inoperable NSCLC after treatment with 3D-CRT, SBRT, and RFA. Given their frail state, patients were assumed to receive supportive care after recurrence. Utility values, recurrence risks, and costs were adapted from the literature. Sensitivity analyses were performed to model uncertainty in these parameters. Results: The incremental cost-effectiveness ratio for SBRT over 3D-CRT was $6,000/quality-adjusted life-year, and the incremental cost-effectiveness ratio for SBRT over RFA was $14,100/quality-adjusted life-year. One-way sensitivity analysis showed that the results were robust across a range of tumor sizes, patient utility values, and costs. This result was confirmed with probabilistic sensitivity analyses that varied local control rates and utilities. Conclusion: In comparison to 3D-CRT and RFA, SBRT was the most cost-effective treatment for medically inoperable NSCLC over a wide range of treatment and disease assumptions. On the basis of efficacy and cost, SBRT should be the primary treatment approach for this disease.

62 RADIOLOGY AND NUCLEAR MEDICINE↗