Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Checkout”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Space station prototype environmental/thermal control and life system - A current overview.

The Environmental Thermal Control and Life Support System (ETC/LSS) for a space station has progressed through the design phase into the fabrication of hardware. An overview of the current status of this program is presented with emphasis on the impact and implementation of commonality and maintainability concepts as well as the interface with an on-board checkout system. The programmatic techniques and procedural modifications employed and anticipated are treated.

Willis, N. C., Jr.↗

Atlas/Centaur-29 Intelsat IV (F5) flash flight report

ATLAS/CENTAUR-29 was launched from ETR Complex 36B, June 13, 1972, at a flight azimuth of 101 degrees. The ETR test number was 1240. The launch vehicle consisted of an ATLAS SLV-3C first stage and a CENTAUR second stage. The spacecraft was INTELSAT 4 (F-5). The launch occurred at the opening of the window. Indications are that the spacecraft was injected into the required transfer orbit and has achieved it's final orbit. All orbital parameters were extremely close to nominal. A nominal apogee motor burn took place at 2101 EDT on June 14, 1972 at 124 degrees East longitude and the final duty station of the spacecraft will be at 62 degrees East longitude. A two week communications checkout was started on or about June 15, 1972.

Source record↗

Analysis of space tug operating techniques supplemental report (study 2.4)

An analysis of space tug operating techniques is presented. The subjects discussed are: (1) sustaining engineering requirements, (2) off-site facility requirements, (3) evaluation of tug checkout alternatives, and (4) spares provisioning. Tables of data are included to clarify the written presentation.

Source record↗

Parametric analysis of RF communications and tracking systems for manned space stations

System performance, system interface compatibility, and system management and operations are analyzed for external and internal communications provided by the modular space station. Mathematical models are utilized to evaluate performances of the various communication links between the MSS and the tracking and data relay satellites, the shuttle, and the ground stations. Communication control design requirements are determined from overall MSS control design and checkout requirements are developed in a related systems study. Parallel design efforts consider equipment configurations for the external communication assembly baseband and the internal communication assembly to accommodate signal transfer and control. The recommended baseline design considers also interfaces between equipment groups and the critical functional and signal characteristics of these interfaces. The data processing assembly has direct communication circuits to the external communication assembly and the control interface is provided via a digital data bus and a remote acquisition and control unit.

Source record↗

A program of high resolution X-ray astronomy using sounding rockets

Two Aerobee 170 sounding rocket payloads were flown at the White Sands Missile Range: (1) a focusing X-ray collector on 31 March 1972; and (2) a high resolution telescope on 4 August 1972. Data has been reduced from each of these flights. In the first flight both the rocket and the experiment instrumentation performed adequately, and it is clear that at least the minimum scientific objectives were attained. In the second flight the attitude control system failed to point the telescope at the target for a sufficient length of time. However examination of final preflight checkout data and some flight data indicate that the instrumentation for this rocket payload was functioning according to expectations.

Source record↗

Space shuttle program. Expendable second stage reusable space shuttle booster. Volume 2: Technical summary. Book 2: Expendable second stage vehicle definition

A definition of the expendable second stage for use with the reusable space shuttle booster is presented. The subjects discussed are: (1) expendable second stage design, (2) structural subsystem, (3) propulsion subsystem, (4) avionics subsystems, (5) recovery and deorbit subsystem, and (6) expendable second stage vehicle installation, assembly, and checkout.

Source record↗

Safety assessment for EPS electron-proton spectrometer

A safety analysis was conducted to identify the efforts required to assure relatively hazard free operation of the EPS and to meet the safety requirements of the program. Safety engineering criteria, principles, and techniques in applicable disciplines are stressed in the performance of the system and subsystem studies; in test planning; in the design, development, test, evaluation, and checkout of the equipment; and the operating procedures for the EPS program.

Gleeson, P.↗

Apollo experience report: Flight instrumentation calibration

Three types of instrumentation-calibration data were used in the Apollo Program to provide the correct engineering data for tests and mission support. The command and service module instrumentation-component procurement specifications required individual-component calibration, and calibration data for these individual components (conventional-calibration data) were always used for mission data support. A mean standard type of calibration data derived from a statistical sampling of conventional-calibration data was used for test and checkout during the latter part of the Apollo Program. The lunar module instrumentation procurement specification permitted the use of standard-calibration data. These data were applicable to similarly instrumented measurements. The definition, merit, and application of each type of data are discussed.

Demoss, J. F.↗

SUMC-DV hardware manual

The assembly, the physical and electrical characteristics, and the basic electrical tests of the Space Ultrareliable Modular Computer Demonstration Vehicle (SUMC-DV), are described. The descriptions include: (1) the packaging concepts, physical assembly, design and fabrication using design automation techniques of 10 different types of custom CMOS LSI arrays; (2) the fabrication and testing of the various components including the LSI arrays; (3) the hierarchy of the memory complement and the clock generation and distribution system; (4) system testing techniques; and (5) the procedure employed in the electrical checkout of the system.

Feller, A.↗

Implementing instructions for KSC systems and safety training

The requirements for the safety training program are reported for KSC including transportation, inspection, checkout operations, maintenance of launch vehicles, spacecraft, ground support equipment, and launch teams. The responsibilities and mechanics for implementing the program are outlined.

Source record↗

Study of solid rocket motor for space shuttle booster, volume 2, book 2

A technical analysis of the solid propellant rocket engines for use with the space shuttle is presented. The subjects discussed are: (1) solid rocket motor stage recovery, (2) environmental effects, (3) man rating of the solid propellant rocket engines, (4) system safety analysis, (5) ground support equipment, and (6) transportation, assembly, and checkout.

Source record↗

Ground Operations Aerospace Language (GOAL)

GOAL, is a test engineer oriented language designed to be used to standardize procedure terminology and as the test programming language to be used for ground checkout operations in a space vehicle launch environment. The material presented concerning GOAL includes: (1) a historical review, (2) development objectives and requirements, (3) language scope and format, and (4) language capabilities.

Source record↗

The Unified S-band Ground System.

This paper describes how the design of the Unified S-band Ground System evolved from the technology available in the NASA's Deep Space Network and Scientific Satellite Network as well as the Manned Space Flight Network to fulfill the requirements of the Apollo program. The project organization established for this program proved to be an effective management technique for controlling the widely dispersed activities and maintaining the necessary liaison with other organizations involved in the overall program. The Manned Space Flight Network includes systems at three locations employing 26 meter antennas to support the lunar phases of the mission and a number of systems at other locations employing 9 meter antennas for support of the near earth phases of the mission. The tradeoffs of mission requirements and technical capability established the equipment parameters and the network configuration. An extensive checkout program which included the use of aircraft and spacecraft provided a thorough evaluation of the system prior to its commitment to operational support of the missions.

Varson, W. P.↗

LSI computer fabrication - SUMC/DV.

The SUMC/DV (Space Ultrareliable Modular Computer Demonstration Vehicle), which required the design and fabrication of ten different array types, was designed, partitioned, assembled, tested, and made completely operational in less than one year. This paper describes the assembly, the physical and electrical characteristics, and the basic electrical testing procedures used on SUMC/DV. The paper includes a description of the packaging concepts, the physical assembly, the fabrication and testing of the various components including the LSI/CMOS arrays, the hierarchy of the memory complement, the clock generation and distribution scheme, additional system testing techniques, and the procedure employed in the electrical checkout of the system.

Feller, A.↗

The Launch Processing System for Space Shuttle.

In order to reduce costs and accelerate vehicle turnaround, a single automated system will be developed to support shuttle launch site operations, replacing a multiplicity of systems used in previous programs. The Launch Processing System will provide real-time control, data analysis, and information display for the checkout, servicing, launch, landing, and refurbishment of the launch vehicles, payloads, and all ground support systems. It will also provide real-time and historical data retrieval for management and sustaining engineering (test records and procedures, logistics, configuration control, scheduling, etc.).

Springer, D. A.↗

Orbiting Astronomical Observatory heat pipe flight performance data.

The paper describes preflight and inflight performance checkout of the three isothermalizer heat pipes onboard the OAO-C spacecraft. The three pipes are: an axially grooved pipe, a pedestal artery pipe, and a self-priming spiral artery pipe. All pipes are 1/2-inch diameter tube rolled into a 48-inch diameter hoop. They are constructed of aluminum and use ammonia as working fluid. Periodic inflight performance checks have been made since launch in August 1972. No degradation in performance of any of the pipes has been detected. The flight data are in excellent agreement with ground test data.

Harwell, W.↗

Some considerations for Space Tug launch site support operations.

The study reported was undertaken to investigate the requirements placed on the Space Tug by the ground operations. On the basis of the results obtained, it will be possible to consider in future Tug systems studies the full spectrum of both ground and flight operations requirements in defining selected Tug configurations. The central core of the study consists of a functional analysis of ground operations during the Tug turnaround. Electronic system studies were initiated concurrently with the functional analysis study phase to evaluate interrelationships between ground and vehicle checkout and fault isolation capability.

Heald, D. A.↗