A Cable Car Transfer System for the Cigeo Access Ramps - An Original Approach - 17035
Andra is currently implementing the detailed engineering phase of the step-wise design of Cigeo (the French HLW and IL-LLW Deep Geological Repository). Various technical issues are at stake, including the definition and development of a key component: a funicular ('cable-car') system dedicated to the transfer (down the access ramp and leading to the underground infrastructures) of the shielding casks housing the waste disposal containers (packages). The present paper starts with a brief description of the Cigeo architecture (i.e. the surface utilities, the service and nuclear ramps, the various shafts and finally the underground facilities). A focus is then made on the 'nuclear ramp' dedicated to the transfer of the waste containers lodged inside the casks (those latter weighing some 100 to 130 metric tons each) and its main geometrical characteristics (slope, length, diameter, structure). Then a discussion follows to detail the rationale having led to the choice of a somehow 'sophisticated' funicular transfer system, at the expense of what could be called 'more conventional' and more straightforward transport solutions (like a transfer system by trucks or by rack and pinion trains). A systematic comparison is finally made between the various solutions, explaining and rating the pros and cons of each concept, via a multi-criteria analysis. This technical choice (and the related justification approach) was submitted to an Experts review at the end of the Preliminary Design phase of Cigeo and comforted by their strong support before the design freeze of this solution was integrated in Cigeo. The following part of the paper is then focused on a description of the main technical components and the mechanical performance of the cable-car system, its current state of design and the set of qualification tests (of key safety components) to be implemented before its effective construction. This article concludes with a timeline of the qualification tests and developments to come. The positive outcomes of this future technical test campaign will also pave the way for the future instruction of the Cigeo licensing file, scheduled as of mid-2018. (authors)