Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “BUDGET AND FUNDING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Improvement of the TOPEX and Jason Orbit Time Series: Precision Orbit Determination, Calibration, Validation and Improvement Through the Combined Reduction and Analysis of GPS, SLR, DORIS and Altimeter Data

Orbit error is a major component in the overall error budget of all altimeter satellite missions. Jason-I is no exception and a 1 cm radial orbit accuracy goal has been set, which represents a factor of two improvement over what is currently being achieved for TOPEX/Poseidon (TP). Our current analysis suggests this goal has been met and even improved upon, but the challenge is to be able to continually achieve this high accuracy, verify the performance and characterize and quantify the remaining errors over the lifetime of the mission. The computation, verification and error characterization of such high accuracy orbits requires the reduction and analysis of all available tracking data (GPS, SLR, DORIS and altimeter). Current analysis also indicates the history of TP orbits can be further improved employing new solution strategies developed and tested on Jason-I. Our research focuses on the calibration, validation and improvement of orbit accuracies using all available tracking data including altimetry. We will compute and distribute well centered Jason orbits with an accuracy of better than 1-cm in the radial component. In addition to the orbits themselves, a characterization of the orbit error will be distributed and accumulated as a time series of orbit performance metrics to track anomalies and trends. The long time series of orbit error characterization will enable a better understanding of the remaining orbit errors and its impact on the altimeter data analysis. As part of this research effort we are also significantly improving the current level of TP orbit accuracy, re-computing new high-accuracy TP orbits from the beginning of the TP mission and continuing into the future (as long as TP is healthy). Our funded research effort will result in a complete and consistent time series of improved orbits for both TP and Jason, significantly benefiting the long time series of altimeter data analysis and the TP/Jason dual mission. The resultant high accuracy orbits and the characterization of their error will allow further improvements to the accuracy and overall quality of the altimeter measurement time series making possible further strides in radar altimeter remote sensing.

Luthcke, Scott B.↗

NNSA?s Computing Strategy, Acquisition Plan, and Basis for Computing Time Allocation

This report is in response to the Omnibus Appropriations Act, 2009 (H.R. 1105; Public Law 111-8) in its funding of the National Nuclear Security Administration's (NNSA) Advanced Simulation and Computing (ASC) Program. This bill called for a report on ASC's plans for computing and platform acquisition strategy in support of stockpile stewardship. Computer simulation is essential to the stewardship of the nation's nuclear stockpile. Annual certification of the country's stockpile systems, Significant Finding Investigations (SFIs), and execution of Life Extension Programs (LEPs) are dependent on simulations employing the advanced ASC tools developed over the past decade plus; indeed, without these tools, certification would not be possible without a return to nuclear testing. ASC is an integrated program involving investments in computer hardware (platforms and computing centers), software environments, integrated design codes and physical models for these codes, and validation methodologies. The significant progress ASC has made in the past derives from its focus on mission and from its strategy of balancing support across the key investment areas necessary for success. All these investment areas must be sustained for ASC to adequately support current stockpile stewardship mission needs and to meet ever more difficult challenges as the weapons continue to age or undergo refurbishment. The appropriations bill called for this report to address three specific issues, which are responded to briefly here but are expanded upon in the subsequent document: (1) Identify how computing capability at each of the labs will specifically contribute to stockpile stewardship goals, and on what basis computing time will be allocated to achieve the goal of a balanced program among the labs. (2) Explain the NNSA's acquisition strategy for capacity and capability of machines at each of the labs and how it will fit within the existing budget constraints. (3) Identify the technical challenges facing the program and a strategy to resolve them.

36 MATERIALS SCIENCE↗

Collaborative Systemwide Monitoring and Evaluation Project (CSMEP) - Year 5 : Annual Report for FY 2008.

The Collaborative Systemwide Monitoring and Evaluation Project (CSMEP) is a coordinated effort to improve the quality, consistency, and focus of fish population and habitat data to answer key monitoring and evaluation questions relevant to major decisions in the Columbia River Basin. CSMEP was initiated by the Columbia Basin Fish and Wildlife Authority (CBFWA) in October 2003. The project is funded by the Bonneville Power Administration (BPA) through the Northwest Power and Conservation Council's Fish and Wildlife Program (NPCC). CSMEP is a major effort of the federal state and Tribal fish and wildlife managers to develop regionally integrated monitoring and evaluation (M&E) across the Columbia River Basin. CSMEP has focused its work on five monitoring domains: status and trends monitoring of populations and action effectiveness monitoring of habitat, harvest, hatcheries, and the hydrosystem. CSMEP's specific goals are to: (1) interact with federal, state and tribal programmatic and technical entities responsible for M&E of fish and wildlife, to ensure that work plans developed and executed under this project are well integrated with ongoing work by these entities; (2) document, integrate, and make available existing monitoring data on listed salmon, steelhead, bull trout and other fish species of concern; (3) critically assess strengths and weaknesses of these data for answering key monitoring questions; and (4) collaboratively design, implement and evaluate improved M&E methods with other programmatic entities in the Pacific Northwest. During FY2008 CSMEP biologists continued their reviews of the strengths and weaknesses (S&W) of existing subbasin inventory data for addressing monitoring questions about population status and trends at different spatial and temporal scales. Work was focused on Lower Columbia Chinook and steelhead, Snake River fall Chinook, Upper Columbia Spring Chinook and steelhead, and Middle Columbia River Chinook and steelhead. These FY2008 data assessments and others assembled over the years of the CSMEP project can be accessed on the CBFWA public website. The CSMEP web database (http://csmep.streamnet.org/) houses metadata inventories from S&W assessments of Columbia River Basin watersheds that were completed prior to FY2008. These older S&W assessments are maintained by StreamNet, but budget cutbacks prevented us from adding the new FY2008 assessments into the database. Progress was made in FY2008 on CSMEP's goals of collaborative design of improved M&E methods. CSMEP convened two monitoring design workshops in Portland (December 5 and 6, 2007 and February 11 and 12, 2008) to continue exploration of how best to integrate the most robust features of existing M&E programs with new approaches. CSMEP continued to build on this information to develop improved designs and analytical tools for monitoring the status and trends of fish populations and the effectiveness of hatchery and hydrosystem recovery actions within the Columbia River Basin. CSMEP did not do any new work on habitat or harvest effectiveness monitoring designs in FY2008 due to budget cutbacks. CSMEP presented the results of the Snake Basin Pilot Study to the Independent Scientific Review Panel (ISRP) in Portland on December 7, 2008. This study is the finalization of CSMEP's pilot exercise of developing design alternatives across different M&E domains within the Snake River Basin spring/summer Chinook ESU. This work has been summarized in two linked reports (CSMEP 2007a and CSMEP 2007b). CSMEP participants presented many of the analyses developed for the Snake Basin Pilot work at the Western Division American Fisheries Society (AFS) conference in Portland on May 4 to 7, 2008. For the AFS conference CSMEP organized a symposium on regional monitoring and evaluation approaches. A presentation on CSMEP's Cost Integration Database Tool and Salmon Viability Monitoring Simulation Model developed for the Snake Basin Pilot Study was also given to the Pacific Northwest Aquatic monitoring Partnership (PNAMP) steering committee in Portland on August 28, 2008. Further information on CSMEP strengths and weaknesses assessments and monitoring design products for FY2008 is presented in the main text and appendices of this Annual Report as well as being available on CBFWA's public website.

13 HYDRO ENERGY↗

NASA Laboratory Astrophysics Workshop 2006 Introductory Remarks

NASA Laboratory Astrophysics Workshop 2006, is the fourth in a series of workshops held at four year intervals, to assess the laboratory needs of NASA's astrophysics missions - past, current and future. Investigators who need laboratory data to interpret their observations from space missions, theorists and modelers, experimentalists who produce the data, and scientists who compile databases have an opportunity to exchange ideas and understand each other's needs and limitations. The multi-wavelength character of these workshops allows cross-fertilization of ideas, raises awareness in the scientific community of the rapid advances in other fields, and the challenges it faces in prioritizing its laboratory needs in a tight budget environment. Currently, we are in the golden age of Space Astronomy, with three of NASA s Great Observatories, Hubble Space Telescope (HST), Chandra X-Ray Observatory (CXO), and Spitzer Space Telescope (SST), in operation and providing astronomers and opportunity to perform synergistic observations. In addition, the Far Ultraviolet Spectroscopic Explorer (FUSE), XMM-Newton, HETE-2, Galaxy Evolution Explorer (GALEX), INTEGRAL and Wilkinson Microwave Anisotropy Probe (WMAP), are operating in an extended phase, while Swift and Suzaku are in their prime phase of operations. The wealth of data from these missions is stretching the Laboratory Astrophysics program to its limits. Missions in the future, which also need such data include the James Webb Space Telescope (JWST), Space Interferometry Mission (SIM), Constellation-X (Con-X), Herschel, and Planck. The interpretation of spectroscopic data from these missions requires knowledge of atomic and molecular parameters such as transition probabilities, f-values, oscillator strengths, excitation cross sections, collision strengths, which have either to be measured in the laboratory by simulating space plasma and interactions therein, or by theoretical calculations and modeling. Once the laboratory data are obtained, a key step to making them available to the observer is the creation and maintenance of critically compiled databases. Other areas of study, that are important for understanding planet formation, and for detection of molecules that are indicators of life, are also supported by the Laboratory Astrophysics program. Some examples are: studies of ices and dust grains in a space environment; nature and evolution of interstellar carbon-rich dust; and polycyclic aromatic hydrocarbons. In addition, the program provides an opportunity for the investigation of novel ideas, such as simulating radiative shock instabilities in plasmas, in order to understand jets observed in space. A snapshot of the currently funded program, mission needs, and relevance of laboratory data to interpreting observations, will be obtained at this workshop through invited and contributed talks and poster papers. These will form the basis for discussions in splinter groups. The Science Organization Committee will integrate the results of the discussions into a coherent White Paper, which will provide guidance to NASA in structuring the Laboratory Astrophysics program in subsequent years, and also to the scientific community in submitting research proposals to NASA for funding.

Hasan, Hashima↗

Subtask 3.4 – Fischer–Tropsch Fuels Development

Under Subtask 3.4, the Energy & Environmental Research Center (EERC) examined the opportunities and challenges facing Fischer–Tropsch (FT) technology in the United States today. Work was completed in two distinct budget periods (BPs). In BP1, the EERC examined the technical feasibility of using modern warm-gas cleanup techniques for FT synthesis. FT synthesis is typically done using more expensive and complex cold-gas sweetening. Warm-gas cleanup could greatly reduce capital and operating costs, making FT synthesis more attractive for domestic fuel production. Syngas was generated from a variety of coal and biomass types; cleaned of sulfur, moisture, and condensables; and then passed over a pilot-scale FT catalyst bed. Laboratory and modeling work done in support of the pilot-scale effort suggested that the catalyst was performing suboptimally with warm-gas cleanup. Long-term trends showed that the catalyst was also quickly deactivating. In BP3, the EERC compared FT catalyst results using warm-gas cleanup to results using cold-gas sweetening. A gas-sweetening absorption system (GSAS) was designed, modeled, and constructed to sweeten syngas between the gasifier and the pilot-scale FT reactor. Results verified that the catalyst performed much better with gas sweetening than it had with warm-gas cleanup. The catalyst also showed no signs of rapid deactivation when the GSAS was running. Laboratory tests in support of this effort verified that the catalyst had deactivated quickly in BP1 because of exposure to syngas, not because of any design flaw with the pilot-scale FT reactor itself. Based on these results, the EERC concludes that the two biggest issues with using syngas treated with warm-gas cleanup for FT synthesis are high concentrations of CO 2 and volatile organic matter. Other catalysts tested by the EERC may be more tolerant of CO 2 , but volatile matter removal is critical to ensuring long-term FT catalyst operation. This subtask was funded through the EERC–U.S. Department of Energy (DOE) Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FC26-08NT43291. Nonfederal funding for BP1 was provided by the North Dakota Industrial Commission’s (NDIC) Renewable Energy Council.

10 SYNTHETIC FUELS↗

Development of a Portable, Ground-based Ozone Lidar Instrument for Tropospheric Ozone Research and Educational Training

The objective of this research project is to develop a portable, eye-safe, ground-based ozone lidar instrument specialized for ozone differential absorption lidar (DIAL) measurements in the troposphere. This research project directly supports the goal of NASA's Earth Science Enterprise to understand the distribution and budget of tropospheric ozone (objective 1.5 of the Earth Science Strategic Enterprise Plan, 1998-2002). It can participate in ground validation experiments for TES, a tropospheric ozone satellite mission due to be launched in 2002. It can also be utilized for correlative ground measurements in future GTE (Global Tropospheric Experiment) and space-based ozone lidar missions, such as ORACLE. Multiple ground-based ozone lidar systems would improve the data obtained through current ozone-sonde networks. This prototype instrument could to serve as the basic unit for these and other future monitoring projects requiring multi-instrument networks, such as that proposed for the Global Tropospheric Ozone Project (GTOP). GTOP is currently being formulated by a scientific panel of the International Global Atmospheric Chemistry Project to meet its goal to better understand the processes that control the global distribution of tropospheric ozone. In order for the lidar to be widely deployed in networks, it must be fairly easy to use and maintain as well as being cost-competitive with a ground station launching ozonesondes several times a day. A second 2-year grant to continue this effort with students participating in ground tests and system improvements has been awarded by the Office of Equal Employment Opportunities (OEOP). This project also supports existing NASA lidar missions through its development of advanced, compact lidar technology. Innovations in both transmitters and receivers have been made in this project. Finally, this system could be modified in the future to probe more deeply into the stratosphere. This could be accomplished by increasing the emitted energy or optimizing the wavelengths for this purpose. In addition to NASA, this system has applications to the EPA, NOAA, and the DOD. An AFOSR grant has been awarded based on the results of this effort to fund advanced transmitter development at medium (20-40 mJ) energies. A second proposal to the DOD with a letter of support from Air Force Research Laboratory, has been submitted to extend this uv laser technology to 100 mJ levels. Thus, this project has enabled students and faculty at Hampton University to begin to develop research efforts in support of the mission of the DOD. This instrument will be based at Hampton University (HU) to meet our educational goal to train students in lidar technology as well as atmospheric ozone data analysis and interpretation. It will be also available for off-site measurement campaigns and will serve as a test bed for further instrument development. Later development beyond this grant to extend the scientific usefulness of the instrument may include incorporation of an aerosol channel and upgrading the laser to make stratospheric ozone measurements. Seven undergraduates, three graduate students, and one postdoctoral. researcher (formerly an HU student) have been active participants in this research effort.

Chyba, Thomas↗

A Technology Development Roadmap for a Near-Term Probe-Class X-ray Astrophysics Mission

This document presents a roadmap, including proposed budget and schedule, for maturing the instrumentation needed for an X-ray astrophysics Probe-class mission. The Physics of the Cosmos (PCOS) Program Office was directed to create this roadmap following the December 2012 NASA Astrophysics Implementation Plan (AIP). Definition of this mission is called for in the AIP, with the possibility of selection in 2015 for a start in 2017. The overall mission capabilities and instrument performance requirements were defined in the 2010 Astronomy and Astrophysics Decadal Survey report, New Worlds, New Horizons in Astronomy and Astrophysics (NWNH), in connection with the highly ranked International X-ray Observatory (IXO). In NWNH, recommendations were provided regarding the size of, and instrumentation needed by, the next large X-ray observatory. Specifically, the key instrumental capability would be an X-ray calorimeter spectrometer at the focus of a large mirror with angular resolution of 10 arc seconds (arcsec) or better. If possible, a grating spectrometer should also be incorporated into the instrument complement. In response to these recommendations, four instrumentation technologies are included in this roadmap. Three of these are critical for an X-ray mission designed to address NWNH questions: segmented X-ray mirrors, transition edge sensor calorimeters, and gratings. Two approaches are described for gratings, which represent the least mature technology and thus most in need of a parallel path for risk reduction. Also, while current CCD detectors would likely meet the mission needs for grating spectrum readout, specific improvements are included as an additional approach for achieving the grating system effective area requirement. The technical steps needed for these technologies to attain technology readiness levels (TRL) of 5 and 6 are described, as well as desirable modest risk reduction steps beyond TRL-6. All of the technology development efforts are currently funded through the NASA Physics of the Cosmos (PCOS) Strategic Astrophysics Technology (SAT) program; some through the end of FY13, others though FY14. These technology needs are those identified as critical for a near-term mission and briefly described in the 2012 NASA X-ray Mission Concepts Study. This Technology Development Roadmap (TDR) provides a more complete description of each, updates the status, and describes the steps to mature them. For each technology, a roadmap is presented for attaining TRL-6 by 2020 at the latest, and 2018 for most. The funding required for each technology to attain TRL-5 and TRL-6 is presented and justified through a description of the steps needing completion. The total funding required for these technologies to reach TRL-6 is relatively modest, and is consistent with the planned PCOS SAT funding over the next several years. The approximate annual cost through 2018 is $8M. The total cost for all technologies to be matured is $62M (including funding already awarded for FY13 and FY14). This can be contrasted to the $180M recommended by NWNH for technology development for IXO, primarily for the maturation of the mirror technology. The technology described in Section 3 of this document is exclusively that needed for a near-term Probe-class mission, to start in 2017, or for a mission that can be recommended by the next Decadal survey committee for an immediate start. It is important to note that there are other critical X-ray instrumentation technologies under development that are less mature than the ones discussed here, but are essential for a major X-ray mission that might start in the late 2020s. These technologies, described briefly in Section 4, are more appropriately funded through the Astronomy and Physics Research and Analysis (APRA) program.

Development↗

History and Logic Model NASA Goddard Space Flight Center Instrument and Payload Systems Engineering Technical Performance Study

Historically, some NASA missions have exceeded schedule and cost commitments. Studies suggest technical performance is a contributor. The 1980 NASA Project Management Study concluded, "one of the most significant contributors to cost and schedule growth is inadequate definition of technical and management aspects of a program..." (as cited in GAO/NSIAD-93-97, p. 11). The 1991 NASA Roles and Missions Report identified a "need for increased emphasis on technological readiness and requirements on the front end of a program" (as cited in GAO/NSIAD-93-97, p. 11). The 1992 NASA Program Costs Report stated that NASA officials identified, among other things, "insufficient definition studies... [and] program redesigns and technical complexities" as reasons for cost and schedule overruns (GAO/NSAID-93-97, p. 11). The 2002 Task Force on Acquisition of National Security Space Programs found "requirements definition and control issues, unhealthy cost bias in proposal evaluation, widespread lack of budget reserves required to implement high risk programs on schedule, and an overall underappreciation of the importance of appropriately staffed and trained system engineering staff to manage the technologically demanding and unique aspects of space programs" (DoD, 2003, p.i.) In 2007, The NASA Office of the Chief Engineer chartered the NASA Instrument Capability Study (NICS) “to determine whether NASA instrument developers are facing challenges that impact the capability to design and build quality instruments or whether there are flaws in the acquisition strategy evidenced by schedule delays, cost overruns, and increased technical risk via design deficiencies. The... team was also chartered to determine if occurrences [are]... isolated cases or if there are generic issues... If the issues [are] found to be generic, the team [is] to offer solutions to recover such capability" (NICS Report, 2008, p. vi). The 2008 NICS Report, led by Goddard Space Flight Center (GSFC), identified challenges to instrument technical performance consistent with findings from previous reports. In 2017, the Instrument Project Division (IPD) Implementation Study was initiated to determine if there was a change in meeting schedule and cost commitments after implementing certain NICS recommendations. In 2018, the Instrument Technical Performance Study was initiated to determine the current state of Instrument Technical Performance in the GSFC Payload & Instrument Systems Engineering Branch. The purpose of the combined studies is to answer the question, "Is there a relationship between meeting NASA scientific instrument technical success and meeting schedule and cost commitments? If yes, what is the relationship?" References Department of Defense Office of the Under Secretary of Defense for Acquisition, Technology, and Logistics. (2003). The report of the defense science board/ air force scientific advisory board joint task force on acquisition of national security space programs. Washington DC. Government Accounting Office. (1992). NASA program costs: Space missions require substantially more funding than initially estimated. GAO/NSIAD-93-97. Washington DC. National Aeronautics and Space Administration, National Oceanic and Atmospheric Agency, Department of Defense. (2008). The NASA instrument capability study final report. NP-2008-11-058-GSFC. Washington DC.

Robbins, Geraldine↗

Applying Costs, Risks and Values Evaluation (CRAVE) methodology to Engineering Support Request (ESR) prioritization

Given limited budget, the problem of prioritization among Engineering Support Requests (ESR's) with varied sizes, shapes, and colors is a difficult one. At the Kennedy Space Center (KSC), the recently developed 4-Matrix (4-M) method represents a step in the right direction as it attempts to combine the traditional criteria of technical merits only with the new concern for cost-effectiveness. However, the 4-M method was not adequately successful in the actual prioritization of ESRs for the fiscal year 1995 (FY95). This research identifies a number of design issues that should help us to develop better methods. It emphasizes that given the variety and diversity of ESR's one should not expect that a single method could help in the assessment of all ESR's. One conclusion is that a methodology such as Costs, Risks, and Values Evaluation (CRAVE) should be adopted. It also is clear that the development of methods such as 4-M requires input not only from engineers with technical expertise in ESR's but also from personnel with adequate background in the theory and practice of cost-effectiveness analysis. At KSC, ESR prioritization is one part of the Ground Support Working Teams (GSWT) Integration Process. It was discovered that the more important barriers to the incorporation of cost-effectiveness considerations in ESR prioritization lie in this process. The culture of integration, and the corresponding structure of review by a committee of peers, is not conducive to the analysis and confrontation necessary in the assessment and prioritization of ESR's. Without assistance from appropriately trained analysts charged with the responsibility to analyze and be confrontational about each ESR, the GSWT steering committee will continue to make its decisions based on incomplete understanding, inconsistent numbers, and at times, colored facts. The current organizational separation of the prioritization and the funding processes is also identified as an important barrier to the pursuit of cost-effectiveness. Perhaps the greatest barrier is that, at the working level, KSC's culture is so preoccupied with technical concerns that it seems almost oblivious to any cost concerns, let alone cost-effectiveness concerns. It is recommended that we must urgently begin to change that culture and seek a better balance between these two concerns.

Joglekar, Prafulla N.↗

Organic Rankine Cycle Integration and Optimization for High Efficiency CHP Genset Systems (Final Technical Report)

This project successfully advanced the integration of Organic Rankine Cycle (ORC) technology with reciprocating engine–based combined heat and power (CHP) systems to improve electrical efficiency, total CHP efficiency, and grid-responsive operation. Over three budget periods, the work progressed from high-temperature ORC component development and thermodynamic model validation to next-generation system design, working fluid transition, and techno-economic analysis. Key technical accomplishments include development and validation of a thermodynamic model capable of accurately predicting ORC performance across an expanded temperature and pressure envelope; successful identification and validation of low-global-warming-potential (GWP) working fluids—most notably R1233zd(E)—as viable replacements for R245fa; and demonstration of scalable ORC architectures suitable for integration with 1–20 MW class reciprocating engines. These advances enable flexible CHP configurations that can increase electrical output while maintaining high overall utilization of available thermal energy. The project also produced a clean-sheet design for a next-generation ORC system targeting substantially higher power output per unit, supported by detailed component selection, heat exchanger evaluation, and system-level modeling. Techno-economic analyses indicate that ORC-enabled flexible CHP systems can meet or exceed Department of Energy (DOE) efficiency targets while providing value to both facility operators and the electric grid.. Late-stage testing of the largest next-generation ORC prototype identified limitations related to pump net positive suction head (NPSH) requirements and condenser flooding under certain operating conditions. Although these issues constrained full validation of that configuration within the project timeframe, they provided clear and actionable design guidance for future system refinements. Importantly, validated modeling, smaller-scale testing, and working fluid evaluations confirmed the technical viability of the overall approach. In aggregate, this project met its core objectives by establishing validated design tools, de-risking key ORC technologies for CHP applications, and defining a credible pathway toward commercialization of flexible, high-efficiency CHP systems. The results form a strong foundation for continued development and deployment beyond the conclusion of the DOE-funded effort.

20 FOSSIL-FUELED POWER PLANTS↗

Department of Energy - Oak Ridge Operations and URS - CH2M Oak Ridge LLC. Partnering Framework for the Cleanup of the East Tennessee Technology Park, Oak Ridge, Tennessee, USA - 12348

The cleanup and re-industrialization of the East Tennessee Technology Park (ETTP) hinges on a collaborative working relationship between the cleanup contractor and the U.S. Department of Energy's (DOE)-Oak Ridge Office (ORO). A Partnering Framework document was signed on June 30, 2011, with an ultimate goal of completing the contract scope of work ahead of schedule and under budget. This partnering process was the first time that DOE and its contractor, jointly developed and signed such an agreement before the contractor assumed management responsibilities of the Site. A strong desire of both parties to utilize a partnering approach in the performance of their respective responsibilities is evident. The Partnering Framework was modeled after a partnering process employed by the California Department of Transportation, Division of Construction. This partnering process has been used successfully by the California Department of Transportation and its major contractors for many years with great success. The partnering process used at ETTP was a phased approach. First, a Partnering Framework document was developed and signed June 30, 2011, by the Partnering Sponsors, the two leaders of the ETTP cleanup and re-industrialization project, the DOE-ORO Assistant Manager for Environmental Management and the contractor's President and Program Manager. In this way the partnering process could begin when the contactor assumed ETTP Site management responsibilities on August 1, 2011. The Partnering Framework then set the stage for the second phase of the partnering process which would be development of the Partnering Agreement and the kick-off of the first of a number of facilitated Partnering Workshops. Key elements of the Partnering Framework document include: (1) a statement of commitment which affirms the desire of both parties to work collaboratively toward the cleanup and re-industrialization of the ETTP Site; (2) a vision which describes both parties ultimate goal of safe, efficient cleanup, and (3) an implementation section which describes how the partnering process will be conducted, as well as how disputes will be managed. The signed Partnering Framework and Partnering Agreement provide the needed foundation of the safe and cost-effective cleanup and re-industrialization of the ETTP Site. The benefits of partnering have already been observed as the Partnering Teams effectively addressed a number of early contract and project challenges such as funding reductions and progress in resolving Material Differences. Based, in part of the successes achieved as a result of the partnering between UCOR and DOE-ORO, UCOR and DOE-ORO are extending this partnering approach to a number of the ETTP Site stakeholders. For example, DOE-ORO, UCOR and CROET signed a Partnering Agreement on November 3, 2011. This Partnering Agreement affirms the parties' commitment to work collaboratively to re-industrialize the ETTP Site. Both DOE-ORO and UCOR are looking to extend this partnering approach with other Site stakeholders such as its employees, its subcontractors, the Oak Ridge National Laboratory and the Y-12 Security Complex in the future. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Procuring Stationary Fuel Cells For CHP: A Guide for Federal Facility Decision Makers

Federal agency leaders are expressing growing interest in using innovative fuel cell combined heat and power (CHP) technology at their sites, motivated by both executive branch sustainability targets and a desire to lead by example in the transition to a clean energy economy. Fuel cell CHP can deliver reliable electricity and heat with 70% to 85% efficiency. Implementing this technology can be a high efficiency, clean energy solution for agencies striving to meet ambitious sustainability requirements with limited budgets. Fuel cell CHP systems can use natural gas or renewable fuels, such as biogas. Procuring Stationary Fuel Cells for CHP: A Guide for Federal Facility Decision Makers presents an overview of the process for planning and implementing a fuel cell CHP project in a concise, step-by-step format. This guide is designed to help agency leaders turn their interest in fuel cell technology into successful installations. This guide concentrates on larger (100 kW and greater) fuel cell CHP systems and does not consider other fuel cell applications such as cars, forklifts, backup power supplies or small generators (<100 kW). Because fuel cell technologies are rapidly evolving and have high up front costs, their deployment poses unique challenges. The electrical and thermal output of the CHP system must be integrated with the building s energy systems. Innovative financing mechanisms allow agencies to make a make versus buy decision to maximize savings. This guide outlines methods that federal agencies may use to procure fuel cell CHP systems with little or no capital investment. Each agency and division, however, has its own set of procurement procedures. This guide was written as a starting point, and it defers to the reader s set of rules if differences exist. The fuel cell industry is maturing, and project developers are gaining experience in working with federal agencies. Technology improvements, cost reductions, and experienced project developers are making fuel cell projects easier to put into service. In this environment, federal decision makers can focus on being smart buyers of fuel cell energy instead of attempting to become experts in fuel cell technology. For agencies that want to pursue a fuel cell CHP this guide presents a four step process for a successful project. 1. Perform a preliminary screening of the energy needs energy costs and incentives. 2. Compare a detailed project plan. 3. Make a financing and contracting decision. 4. Execute the project plan including financing, installation, and operation. The simplest procurement method is designated funding for the outright purchase of the fuel cell CHP system, although this is usually not the most cost-effective option. This guide describes the following financing options: Power purchase agreement Energy savings performance contract Utility energy services contract Enhanced use lease Fuel cell CHP technology can help federal facility managers comply with agency objectives for reducing energy consumption and air pollution emissions. Fuel cells do not generate particulate pollutants, unburned hydrocarbons or the gases that produce acid rain. Fuel cells emit less carbon dioxide (CO 2 ) than other, less efficient technologies and use of renewable fuels can make them carbon neutral. Fuel cell CHP technology can deliver reliable electricity and heat with high efficiency (70% to 85%) in a small physical footprint with little noise, making it a cost-effective option for federal facilities.

03 NATURAL GAS↗

Energy Production Through Anaerobic Digestion in the Food-Waste-Energy Nexus

The addition of a second anaerobic digestion process at Landis Sewerage Authority (LSA) in Vineland, N.J., was a project designed to accomplish several major objectives. First, it would replace an inactive digester that Landis had been “cannibalizing” for parts to keep its primary digester operating. Second, and more importantly to the New Jersey Department of Agriculture, this project provided an opportunity to create a tangible, working apparatus to demonstrate whether food waste and manure (provided by food processors and farmers) could be used efficiently and effectively to create gas used to power a co-generation unit that supplies electrical power to run the Authority’s sewage-treatment operations. Additionally, the project would further test an additive (BAE) for its effects on overall gas production. NJDA specifically sought to avoid using the grant funds for a feasibility study that did not result in a working demonstration project, and that goal was met by producing an actual second digestion process at Landis. Finally, this project provided the opportunity to demonstrate how the re-use and re-purposing of existing infrastructure could help lower the costs of providing an energy-production unit without having to build it from the ground up. A key to achieving those goals was limiting the use of outside contractors to build the digestion process. Instead, LSA employed the engineering services of its executive director and another employee to design the project, and the talents of its in-house employees to construct and install components of the digestion process. This minimized expenditures for outside providers while also enabling LSA to have greater control over both the design and construction. Those controls on costs enabled a full fact-finding mission to similar operations in Ohio and Indiana in August 2015. The visits allowed comparisons that found the Midwest operations (at least at two of the three locations) were less constrained by odor control issues than Landis is under New Jersey environmental regulations, and that the Fair Oaks Dairy Farm in Indiana had successfully incorporated its digester operation into its wide-ranging and popular “farm experience” attraction that includes restaurants, stores selling products from the farm’s output, tours of massive robotic milking parlors and a visitors’ center featuring “4D movies” about dairy farming and the use of manure in creating energy. The visit to Fair Oaks allowed the NJDA/Landis team to also examine whether a Fair Oaks “farm experience” model could be replicated in the Mid-Atlantic region, with its higher density of population, given the need for additional odor-control components to account for the closer proximity to population centers, but also benefiting from a larger potential close-in visitor base. Again, by streamlining the fact-finding process and using ground transportation instead of airfare, the travel line-item of the project budget was essentially halved. That enabled the creation of a video about the Landis project, which can be sent electronically – “e-travel,” so to speak – to other states and agencies that want to learn more about what was created in Vineland.

09 BIOMASS FUELS↗

HIGH EFFICIENCY HIGH DENSITY GAN BASED 6.6KW BI-DIRECTIONAL ON-BOARD CHARGER FOR PEVS

Executive Summary: In the 4th quarter of 2014, a program was formally initiated at Delta Products to develop and commercialize a lightweight, compact and high efficiency bi-directional on-board Charger (OBC) for plug-in electric vehicle use. The project was funded in part by the U.S. Department of Energy (DOE), under award DE- EE0006834. Delta products was the prime contractor to DOE during the three-year duration of the project. In addition to Delta Products, several additional supplier-partners were engaged in this research and development (R&D) program, including Transphorm, Inc., The Center for Power Electronics Systems (CPES) at Virginia Tech, and Fiat Chrysler Automobiles. The OBC uses novel control schemes enabled by Gallium Nitride (GaN) switches to obtain charger efficiency of 95% and reduce volume and mass by 50% of the existing state-of-the-art silicon (Si) based chargers and inverters. A Si-based bidirectional OBC is typically implemented with two separate modules: a charger and an inverter. A GaN-based bidirectional OBC can integrate both functions into a single module. It will result in substantial reductions in size, weight and cost. This enables the introduction of WBG devices in automotive production programs. The inverter function integrated with PHEV can act as emergency power source in case of power interruption. This increases the power security when the electric infrastructure is damaged by extreme weather conditions. This report summarizes the program and describes the key research outcomes of the program. A technical history of the project activities is provided, which describes the key steps taken in the research and the findings made at successive stages in the multi-stage work. The evolution of OBC prototypes is described in detail. After the program history is reviewed, the key attributes of the resulting OBC are described in terms of functionality, performance, and cost. The results clearly demonstrate the ability of this OBC to meet or exceed DOE's targets for this program, including: • Construction of a working product-intent prototype of a bi-directional on-board Charger (OBC); • Peak efficiency of 95% and volume reduction of 50% compared to a recent production modules of similar ratings. • Bi-directional operation at 120Vac and 240Vac in vehicle. In addition to meeting all the program goals, the program was completed within the original budget and timeline established at the time of the award. The summary program budget and timeline, comparing plan versus actual values, is provided for reference, along with several supporting explanatory notes. Technical information relating to the product design and test results are contained in the appendices to this report.

30 DIRECT ENERGY CONVERSION↗

Medium and Heavy Duty Vehicle Powertrain Electrification and Fleet Demonstration

The Contract Award Grant # EE0007513 dated 2 June, 2016 is for the design, development and demonstration of medium duty package delivery vehicles that will result in a 100% increase in fuel economy as measured in miles per gallon. The project was proposed in 3 phases over two budget periods. The Phases were: 1. Modeling and Simulation – This phase was completed and formed the basis of the specifications for the design and build of the physical systems. The modeling and simulation was conducted by AVL and used real world package delivery routes that AVL mapped. The motors, battery pack, range extender and balance of plant support systems were modeled and iterated until a system with the desired fuel economy improvement was realized. Early design of the major subsystems using the actual vehicle space constraints was also completed. This phase was successfully completed in May of 2017. 2. 1st Build and FE Confirmation - This phase was completed and resulted in the final design, release, procurement and build of all major vehicle systems for commissioning into the first vehicle. The work was a partnered effort between McLaren and AVL. McLaren built the eAxle system while AVL built the range extender and integrated the range extender, battery and balance of plant sub-systems into the first vehicle with a control system to make it operate. Prior to the end of this phase a real world HIL system test gave evidence that the fuel economy improvement would be achieved in the real world. This phase was exited with a 7 month delay due mostly to procurement and supply base issues and ended in May, 2018. 3. Final Build and Demonstration - This phase included the final build and commissioning of the four program vehicles and the operation of a demonstration on a set of routes near San Diego California. During this phase, a multitude of issues arose in different systems in the vehicle. These issue resolution exercises were quite complex and caused repeated delays but were all successfully completed. It should also be noted that an early commercialization analysis resulted in the conclusion that the complexity of the system would not make it cost effective, leading to the start of a follow-on design that used newly available component technologies to specify a more cost effective system. This design will be repurposed and put into demonstration on a separately (non-DOE) funded program. It was decided and agreed with DOE that this phase should be considered completed. The knowledge and know-how gained on this program has been incorporated into and transferred to the new program. This phase and the entire program was considered closed on June 1, 2021.

33 ADVANCED PROPULSION SYSTEMS↗

Criticality Accident Alarm System Shielding Benchmark: Integral Experiment Request 498, Critical Engineering Decision 1 Report

This report supports Critical/Subcritical Experiment Decision 1 (CED-1) for Integral Experiment Request (IER) 498, a shielding benchmark produced using the Godiva IV critical assembly at the National Critical Experiments Research Center (NCERC). Shielding benchmarks are datasets collected to provide a comparison for computer models that simulate the effect of shielding on radiation transmission from a source to a detector. The purpose of a CED-1 report is to produce a conceptual design for an integral experiment and to identify the long lead-time items. The design presented in this report favors certain detailed design options such as material selections. However, alternative options can be selected as the project evolves. Dimensions are specified only as needed to evaluate feasibility and performance. Development of Criticality Accident Alarm System (CAAS) shielding benchmarks supports two main programmatic needs. The first need is to improve confidence in models of facilities that house nuclear material handling operations. Better models can support effective CAAS detector placement when criticality may result in dose, and it enables more accurate analysis of criticality accident impacts at various locations in a facility. A key quantity that can be verified is the secondary gamma production caused by neutron interactions with various materials. The second programmatic need supported by shielding benchmarks is the ongoing development of methods being integrated into nuclear simulation codes such as the Monte Carlo N-Particle (MCNP) transport code and the SCALE code system used in efforts funded by the Nuclear Criticality Safety Program (NCSP). Previous work performed under the International Criticality Safety Benchmark Experimental Program (ICSBEP) to produce shielding benchmark data is primarily limited to a set of measurements at the SILENE critical assembly at the Valduc facility in France. The experiment used an open configuration and a burst mode operation, which limited detector options to thermoluminescent dosimeters (TLDs) and activation foils. Because TLDs do not record gamma spectra, it was difficult to verify the gamma energy spectrum from the experiment. In this work, the Godiva IV assembly will be used because it is a fast system capable of producing a wide range of source strengths, including super-prompt critical bursts. The room return for the facility is expected to be substantial and challenging to characterize, so a more closed, shielded experimental configuration is considered. Furthermore, because the physics of radiation transport outside the assembly does not change between the burst mode and the delayed critical mode, it is anticipated that most measurements will be made with the Godiva IV assembly in delayed critical mode, operating within a range that will allow electronic counters to collect accurate data. Scoping calculations concluded that a workable room return shield is comprised of 40 cm of 5% borated polyethylene backed by 7 cm of lead. This configuration was shown to produce a ratio of signal–to–room return of over 100 for up to 2 mean free paths of shield sample material, and over 10 for up to 4 mean free paths of shield sample material, ensuring that useful results can be obtained. With no shielding sample in the room return shield, it was shown that the neutron and gamma spectra do not appreciably change with a change in room size. This scoping calculation does not preclude the use of tungsten powder in a binder, some other effective gamma shielding material, or a hybrid design. Dose rates for various source intensities at an unshielded detector are listed herein to inform detector selection during CED-2, and calibration chains are identified. Preliminary estimates of costs and schedules are outlined but remain to be verified. Values could double or triple as estimates become more accurate and are principally included here to demonstrate feasibility. Preliminary estimates indicate that the apparatus can be installed within a feasible schedule and budget. Two measurements per day are assumed. Producing a shielding benchmark at NCERC using the Godiva IV assembly has been shown to be feasible, with manageable uncertainties and risks. A clear, continuing need for shielding benchmark data remains present, and this report identifies and evaluates a method for creating integrated shielding benchmark datasets.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Advanced Hydrogen Fueling Station Supply: Tube Trailers

Air Products and Chemicals, Inc. (Air Products) is reporting on the results of a DOE-funded program to develop and validate Advanced Hydrogen Fueling Station hydrogen tube trailers to support hydrogen and fuel cell market applications. The project involved the engineering design and development of a new composite over-wrapped pressure vessel to increase the pressure capability of tube trailers to deliver hydrogen to greater than 8500 psi (586 bar). The new composite over-wrapped pressure vessel tube trailer was expected to provide improved delivery technology and reduce the cost of transporting hydrogen from central hydrogen production sources. The project aimed to meet or exceed DOE’s 2020 delivery targets for tube trailer hydrogen distribution. A gated approach was taken for the project, with early project Go/No-Go decision points. Specific goals for this four-stage product development project included: Preliminary Study, Modeling, and Analysis: Complete a preliminary design analysis and cost viability of a >8500 psi (586 bar) hydrogen storage vessel with an appropriate frame and chassis configuration for a complete trailer to US DOT requirements; Develop New Tube Size for >8500 psi (586 bar) Vessel: Fabricate tubes for test units, perform testing, and submit test results for a DOT Special Permit; Design, fabricate, and test a delivery trailer unit; Deploy the delivery trailer to hydrogen stations and collect data. Work conducted under DE-EE0006524 established costs for US DOT Type III vessels at 8500 psi (586 bar), 12500 psi (862 bar), and 14000 psi (965 bar) with manufactured water volumes up to 375 liters. Trailer module designs were established for the maximum US DOT design limits and for Air Products’ design limit of a 40-foot trailer length that addresses California hydrogen fueling station ingress and egress operating constraints. Conceptual trailer designs were not capable of achieving the DOE 2020 capacity and cost targets, but they did exceed the DOE pressure target of 500 bar. Based on new trailer cost and simulated operating performance, the 8500 psi (586 bar) new trailer design is not feasible in comparison to Air Products’ DOT-approved 7500 psi (520 bar) trailer design in operation today. Also, the project was expected to incur significantly higher product development costs associated with new US DOT vessel development and approval. Alternative trailer design concepts were explored that included 700 bar compression-less mobile fueling that could be promising for early-market hydrogen infrastructure fueling station placement and development and niche military applications. Due to the economic and budget challenges identified in the feasibility phase of the program, Air Products, in agreement with the Department of Energy, decided to terminate this development program.

08 HYDROGEN↗

A Notional Artemis Lunar Surface Exploration Package (ArLSEP) based on the Gandalf Staff Platform

Introduction: The Artemis program is planning to deliver crew and cargo to the lunar surface, but there is no current package for supporting lunar in-struments and experiments similar to the Apollo Lunar Surface Exploration Package (ALSEP). This abstract provides a possible concept for such a package using the Gandalf Staff Platform as a common core. Gandalf Staff: The Gandalf Staff is an early prototype system developed over FY’21/FY’22 using NASA Science Technology Mission Directorate (STMD) Center Information Fund (CIF) grants to de-sign, build and test “proof-of-concept” components. These components include a 24v battery powered monopole that powers a suite of subsystems, including a Graphical User Interface (GUI) for crew, surface voice and data communications, Lunar Search and Rescue (LunaSAR) navigation and communications, LiDAR, field site external lighting, 360-degree camera, and a geothermal instrument for measuring sub-surface temperature gradient. The staff can be carried independently by an Extra-Vehicular Activity (EVA) astronaut, or can be mounted into a tripod for “hands free” support at a surface site being investigated. The staff can be attached to an external solar array and power storage system for long-duration operations. [1,2] ALSEP: An ASLEP flew on each mission Apollo 12 to Apollo 17. For Apollo 11, a simplified packaged called the Early Apollo Scientific Experiments Pack-age (EASEP) was flown. Each package included a “Central Station” that provided the power and communications connected to a variety of instruments and sensors. The power was provided by a Radioisotope Thermoelectric Generator (RTG) fueled by Plutoni-um-238 generating 70 watts of power (initially, decayed over time) [3]. The communications system provide for direct to Earth data transfer from the lunar surface. Each pack-age was stowed externally in the Lunar Module (LM) Scientific Equipment (SEQ) bay with a mass up to 163 kg (Apollo 17). The crew unloaded the ALSEP from the LM and deployed the instruments on the lunar surface. Although designed to operate for only 1 year, many sites operated for up to 8 years successfully [4]. The Active Seismic Experiment (ASE) included 3 geophones for detecting seismic waves created by mortars and thumpers deployed by the crew. Other active experiments measured the lunar atmosphere, the heat flow in the subsurface, the lunar gravity and potential gravity waves, the lunar magnetic field, the solar wind and plasma interactions in cislunar space. Passive experiments included collectors for dust and cosmic rays, and retroreflectors for precise measurements of distance using a laser from Earth. The ALSEP program continues to generate insights into lunar formation and evolution. ArLSEP Concepts: The lunar surface science package for the Artemis program will hopefully exceed the capability of the ALSEP. There are multiple issues for discussion leading to the design of a new ArLSEP, needing requirements definition from the science community, NASA mission architecture, and NASA budget planners. 1. Delivery Mechanism Two possible projects currently provide capability to deliver scientific cargo to the lunar surface: 1) the Commercial Lunar Payload Services (CLPS) [5] and the Human Landing System (HLS) [6, 7]. Each project is controlled by a different organization within NASA and budgeted with different criteria although both support lunar exploration. The HLS system delivers crew (and potentially cargo) to human landing sites. If an ArLSEP is “predeployed” to such a site, the design must include power (either from the vehicle or independently) to keep the electronics functioning until deployed by the crew. If an ArLSEP is delivered on a vehicle after the crew is present on the lunar surface, safety protocols require adequate distance from the humans for impact from descent propelled sur-face regolith ejecta. This distance can not exceed the capability of the crew to walk (if no rover) to the vehicle for ArLSEP deployment. 2. Overall Guidelines The general design of ArLSEP will likely follow the ALSEP with a common system for communications and power; however, significant architecture differences between Apollo and Artemis exist. Power: The RTG will not be available for early Artemis missions nor likely follow-on Lunar Exploration Transportation Services (LETS) missions [8]. Thus, ArLSEP power must be supplied by solar arrays with sufficient battery capability to “keep alive” necessary electronics during any lunar surface eclipse period. Communication: The Artemis program is developing a series of communications satellites for lunar orbit to provide surface transmission of data and voice to Earth. Called “LunaNET”, this network is component useful for ArLSEP since south polar locations may not always have direct “line-of-sight” to Earth [9]. 3. Concept of Operations (ConOps) The general ConOps for ArLSEP is to deliver the package to lunar surface before the crew arrives, and then have the crew deploy the package after some period of time. This requires coordinated design (for power systems) and launch window (for schedule) on both the cargo and crew missions. Once the ArLSEP is deployed, it will operate autonomously for a number of years. It should be designed to be EVA compatible for crew maintenance and upgrade. 4. Notional Design (for discussion purpose only) The landing site near the South Pole is expected to have no eclipse cycle exceeding 5 days, so the “keep alive” power is 144 hours (6 days to include margin). A 12v ArLSEP will use rechargeable LiFePO4 cells, which are common in the Electric Vehicle (EV) industry. With a current of 5 amps and a 125 watt system, the mass is about 90kg. The comm. system and structure adds another 10kg, thus the “Central Station” is approximately 100kg. The solar power is collected on four arrays (each 2m above the surface), and the entire ArLSEP is designed to stow in a 2m x 1m x 1m volume. The experiment and instrument design will vary for each installation and add mass to the total (although they are expected to fit within the 2m3 volume). Seismic wave generation will likely not be provided with mortars, thus an electric “thumper” will be required. Active instruments such as imaging systems and sensing instruments will benefit from the additional power and communication capability provided by ArLSEP. Passive systems such as retroreflectors, witness plates, and cosmic dust collectors can be added to either the landing vehicle and/or the ArLSEP. With repeated HLS missions to the same human site, the ArLSEP can be expanded and easily maintained for long duration science collection on the lunar surface.

ALSEP↗