Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Accelerator Design, Technology, Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

The story of the Tevatron accelerators: Accelerator science and technology breakthroughs, achievements and lessons

For almost a quarter of a century, the Tevatron proton-antiproton collider was the centerpiece of the world's high energy physics program - since it began operation in December of 1985, until it was overtaken by LHC in 2011. The aim of this unique scientific instrument was to explore the elementary particle physics reactions with center of mass collision energies of up to 1.96 TeV. The initial design luminosity of the Tevatron was 10{sup 30} cm{sup -2} s{sup -1}, however as a result of two decades of upgrades, the accelerator has been able to deliver 430 times higher luminosities to each of two high luminosity experiments, CDF and D0. The Tevatron has been shut off since September 30, 2011. The collider was arguably one of the most complex research instruments ever to reach the operation stage and is widely recognized for many technological breakthroughs and numerous physics discoveries. In this paper, we briefly present the history of the Tevatron, major advances in accelerator physics, technology implemented during the long quest for better and better performance, and the lessons learned from our experience.

43 PARTICLE ACCELERATORS↗

High voltage studies of inverted-geometry ceramic insulators for a 350 kV DC polarized electron gun

Jefferson Lab is constructing a 350 kV direct current high voltage photoemission gun employing a compact inverted-geometry insulator. This photogun will produce polarized electron beams at an injector test facility intended for low energy nuclear physics experiments, and to assist the development of new technology for the Continuous Electron Beam Accelerator Facility. A photogun operating at 350kV bias voltage reduces the complexity of the injector design, by eliminating the need for a graded-beta radio frequency “capture” section employed to boost lower voltage beams to relativistic speed. However, reliable photogun operation at 350 kV necessitates solving serious high voltage problems related to breakdown and field emission. This study focuses on developing effective methods to avoid breakdown at the interface between the insulator and the commercial high voltage cable that connects the photogun to the high voltage power supply. Three types of inverted insulators were tested, in combination with two electrode configurations. Our results indicate that tailoring the conductivity of the insulator material, and/or adding a cathode triple-junction screening electrode, effectively serves to increase the hold-off voltage from 300kV to more than 375kV. In conclusion, electrostatic field maps suggest these configurations serve to produce a more uniform potential gradient across the insulator.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Status and future plans for C 3 R&D

C 3 is an opportunity to realize an e + e - collider for the study of the Higgs boson at √s = 250 GeV, with a well defined upgrade path to 550 GeV while staying on the same short facility footprint. C 3 is based on a fundamentally new approach to normal conducting linear accelerators that achieves both high gradient and high efficiency at relatively low cost. Given the advanced state of linear collider designs, the key system that requires technical maturation for C 3 is the main linac. This paper presents the staged approach towards a facility to demonstrate C 3 technology with both Direct (source and main linac) and Parallel (beam delivery, damping ring, ancillary component) R&D. The primary goal of the C 3 Demonstration R&D Plan is to reduce technical and cost risk by building and operating the key components of C 3 at an adequate scale. This R&D plan starts with the engineering design, and demonstration of one cryomodule and will culminate in the construction of a 3 cryomodule linac with pre-production prototypes. This R&D program would also demonstrate the linac rf fundamentals including achievable gradient and gradient stability over a full electron bunch train and breakdown rates. It will also investigate beam dynamics including energy spread, wakefields, and emittance growth. This work will be critical to confirm the suitability of the C 3 beam parameters for the physics reach and detector performance in preparation for a Conceptual Design Report (CDR), as well as for follow-on technology development and industrialization. The C 3 Demonstration R&D Plan will open up significant new scientific and technical opportunities based on development of high-gradient and high-efficiency accelerator technology. It will push this technology to operate both at the GeV scale and mature the technology to be reliable and provide high-brightness electron beams. The timeline for progressing with C 3 technology development will be governed by practical limitations on both the technical progress and resource availability. It consists of four stages: Stage 0) Ongoing fundamental R&D on structure prototypes, damping and vibrations. Stage 1) Advancing the engineering maturity of the design and developing start-to-end simulations including space-charge and wakefield effects. This stage will include testing of strucutres operating at cryogenic temperatures. Beam tests would be performed with high beam current to test full beam loading. Stage 2) Production and testing of the first cryomodule at cryogenic temperatures. This would provide sufficient experimental data to compile a CDR and it is anticipated for Stage 2 to last 3 years and to culminate with the transport of photo-electrons through the first cryomodule. Stage 3) Updates to the engineering design of the cryomodules, production of the second and third cryomodule and their installation. Lower charge and lower emittance beams will be used to investigate emittance growth. The successful full demonstration of the 3 cryomodules to deliver up to a 3 GeV beam and achieve the C 3 five gradient will allow a comprehensive and robust evaluation of the technical design of C 3 as well as mitigate technical, schedule, and cost risks required to proceed with a Technical Design Report (TDR).

radiation hardened magnets↗

Compact Low-Voltage, High-Power, Multi-beam Klystron for ILC: Initial Test Results

Initial test results of an L-band multi-beam klystron with parameters relevant for ILC are presented. The chief distinction of this tube from MBKs already developed for ILC is its low operating voltage of 60 kV, a virtue that implies considerable technological simplifications in the accelerator complex. To demonstrate the concept underlying the tubes design, a six-beamlet quadrant (a 54 inch high one-quarter portion of the full 1.3 GHz tube) was built and recently underwent initial tests, with main goals of demonstrating rated gun perveance, rated gain, and at least one-quarter of the full 10-MW rated power. Our initial three-day conditioning campaign without RF drive (140 microsec pulses @ 60 Hz) was stopped at 53% of full rated duty because of time-limits at the test-site; no signs appeared that would seem to prevent achieving full duty operation (i.e., 1.6 msec pulses @ 10 Hz). The subsequent tests with 10-15 microsec RF pulses confirmed the rated gain, produced output powers of up to 2.86 MW at 60 kV with high efficiency and 56 dB gain, and showed acceptable beam interception. These results suggest that a full version of the tube should be able to produce up to 11.5 MW. Follow-on tests are planned for later in 2015.

43 PARTICLE ACCELERATORS↗

R&D for a Soft X-Ray Free Electron Laser Facility

Several recent reports have identified the scientific requirements for a future soft x-ray light source, and a high-repetition-rate free-electron laser (FEL) facility that is responsive to these requirements is now on the horizon. R&D in some critical areas is needed, however, to demonstrate technical performance, thus reducing technical risks and construction costs. Such a facility most likely will be based on a CW superconducting linear accelerator with beam supplied by a high-brightness, high-repetition-rate photocathode electron gun operating in CW mode, and on an array of FELs to which the accelerated beam is distributed, each operating at high repetition rate and with even pulse spacing. Dependent on experimental requirements, the individual FELs can be configured for either self-amplified spontaneous emission (SASE), seeded, or oscillator mode of operation, including the use of high-gain harmonic generation (HGHG), echo-enhanced harmonic generation (EEHG), harmonic cascade, or other configurations. In this White Paper we identify the overall accelerator R&D needs, and highlight the most important pre-construction R&D tasks required to value-engineer the design configuration and deliverables for such a facility. In Section 1.4 we identify the comprehensive R&D ultimately needed. We identify below the highest-priority requirements for understanding machine performance and reduce risk and costs at this pre-conceptual design stage. Details of implementing the required tasks will be the subject of future evaluation. Our highest-priority R&D program is the injector, which must be capable of delivering a beam with bunches up to a nanocoulomb at MHz repetition rate and with normalized emittance {le} 1 mm {center_dot} mrad. This will require integrated accelerating structure, cathode, and laser systems development. Cathode materials will impact the choice of laser technology in wavelength and energy per pulse, as well as vacuum requirements in the accelerating structure. Demonstration experiments in advanced seeding techniques, such as EEHG, and other optical manipulations to enhance the FEL process are required to reduce technical risk in producing temporally coherent and ultrashort x-ray output using optical seed lasers. Success of EEHG in particular would result in reduced development and cost of laser systems and accelerator hardware for seeded FELs. With a 1.5-2.5 GeV linac, FELs could operate in the VUV-soft x-ray range, where the actual beam energy will be determined by undulator technology; for example, to use the lower energy would require the use of advanced designs for which undulator R&D is needed. Significant reductions in both unit costs and accelerator costs resulting from the lower electron beam energy required to achieve lasing at a particular wavelength could be obtained with undulator development. Characterization of the wakefields of the vacuum chambers in narrow-gap undulators will be needed to minimize risk in ability to deliver close to transform limited pulses. CW superconducting RF technology for an FEL facility with short bunches at MHz rate and up to mA average current will require selection of design choices in cavity frequency and geometry, higher order mode suppression and power dissipation, RF power supply and distribution, accelerating gradient, and cryogenics systems. R&D is needed to define a cost and performance optimum. Developments in laser technology are proceeding at rapid pace, and progress in high-power lasers, harmonic generation, and tunable sources will need to be tracked.

43 PARTICLE ACCELERATORS↗

Modal response of 4-rod type radio frequency quadrupole linac

This paper deals with the analysis and experimental study of natural frequencies of vibration of a 4-rod type radio frequency quadrupole (RFQ) linear accelerator. The eigenvalue analysis of the structure has been done both analytically (multispan beam concept) as well as using blocked Lanczos eigenvalue finite element solver with an ability to extract the rigid body modes. This has been done in the mechanical design phase to find the level of agreement between the output of simplified analytical analysis results and the output of a commercial finite element method (FEM) solver, since a full scale RFQ structure is too complex to handle analytically. Experimental validation of the analysis results has been done on the physical 1.7 m RFQ at the installation site. The experimental data obtained were later analyzed and found to be in close agreement with the predicted frequencies in the lower frequency ranges. It gets more and more deviated in the higher frequency ranges. Also some frequencies were observed during experimentation, which were not found in the finite element analysis results. The source of those frequencies are to be further investigated as it may play a predominant role in the design high quality factor beam line cavities for higher operational efficiency.

43 PARTICLE ACCELERATORS↗

Ultra-High Gradient Compact S-Band Linac for Laboratory and Industrial Applications

There is growing demand from the industrial and research communities for high gradient, compact RF accelerating structures. The commonly used S-band SLAC-type structure has an operating gradient of only about 20 MV/m; while much higher operating gradients (up to 70 MV/m) have been recently achieved in X-band, as a consequence of the substantial efforts by the Next Linear Collider (NLC) collaboration to push the performance envelope of RF structures towards higher accelerating gradients. Currently however, high power X-band RF sources are not readily available for industrial applications. Therefore, RadiaBeam Technologies is developing a short, standing wave S-band structure which uses frequency scaled NLC design concepts to achieve up to a 50 MV/m operating gradient at 2856 MHz. The design and prototype commissioning plans are presented.

43 PARTICLE ACCELERATORS↗

Accelerating the Design of Space Vehicles

One of NASA's key goals is to increase the safety and reduce the cost of space transportation. Thus, a key element of NASA's new Integrated Space Transportation Plan is to develop new propulsion, structures, and operations for future generations of reusable launch vehicles (RLVs). As part of this effort to develop the next RLV, the ClCT Program's Computing, Networking, and Information Systems (CNIS) Project is developing and demonstrating collaborative software technologies that use the collective power of the NASA Grid to accelerate spacecraft design. One of these technologies, called AeroDB, automates the execution and monitoring of computational fluid dynamics (CFD) parameter studies on the NASA Grid. About the NASA Grid The NASA Grid, or Information Power Grid,. is being developed to leverage the distributed resources of NASA's many computers. instruments, simulators, and data storage systems. The goal is to use these combined resources to sdve difficult NASA challenges, such as iimulating the entire flight of a space vehicle from ascent to descent.To realize the vision of the NASA Grid, the CNIS Project is developing the software framework and protocols for building domain-specific environments and interfaces, new Grid services based on emerging industry standards, and advanced networking and computing testbeds to support new Grid-based applications such as AeroDB.

Laufenberg, Larry↗

High-gradient performance of a prototype accelerator cavity for a 3 GeV proton radiography booster

This paper reports the design, fabrication, and results of the high-gradient conditioning and testing for a two-cell, π -mode, standing wave normal-conducting prototype booster cavity for the proposed 3 GeV proton linac upgrade at Los Alamos Neutron Science Center. Increasing the energy of proton beam from the existing 800 MeV to 3 GeV will improve resolution of the proton radiography by up to 10 times. The proposed energy boost can be achieved with a compact normal-conducting high-gradient radio-frequency (rf) linac section. The C-band section of the booster linac was designed with optimized-shaped copper accelerator cavities with distributed rf coupling. A short two-cell test prototype structure was designed for the frequency of 5.712 GHz, fabricated, and tested at the C-band Engineering Research Test Facility in New Mexico (CERF-NM) at Los Alamos National Laboratory. The maximum klystron power coupled into the test structure was 8.3 MW with 1 μ s pulse length and 100 Hz repetition rate. The breakdown probabilities were recorded as functions of the accelerating gradient and peak surface fields. Operation of the test cavity at accelerating gradients of up to 100 MV / m was demonstrated. Published by the American Physical Society 2024

43 PARTICLE ACCELERATORS↗

Theory-guided Design of Refractory MPEAs for High-Temperature, Harsh-Service Conditions

Focusing on novel materials for harsh-service environments (oxidation, corrosion, and load), durability, higher operational temperature, and direct impact on power-generation technology, the goal was, using a quantitative theory-guided design approach integrated with high-throughput synthesis and characterization for validation, to accelerate by 50% the development of high temperature, refractory-based multi-principal element alloys (MPEAs) materials platforms (with co-designed oxidation-resistant, self-healing coatings) that demonstrate phase-stable operation with desired properties at 10-20% higher temperatures in oxidizing environments over state-ofthe- art systems (like Ni-stainless steels, i.e., Haynes 282 – used in critical gas turbine applications, and refractory TZM, i.e., molybdenum-rich Mo99.4-Ti0.5-Zr0.08-C0.02 in wt%). Notably, refractory MPEAs may achieve higher operational temperatures with superior creep strength and offer 50-100% larger thermal conductivity (140-170 W/m-K) than Ni-based systems, potentially eliminating active cooling, reducing system weight, complexity, and cost. Achieving this goal addresses DOE material challenges in energy generation and efficiency (higher-temperature operation), reduced lifecycle energy (waste-heat recovery), and accelerating materials development in support of AMO’s Strategic Plan and QTR goals. DOE’s Advanced Manufacturing Office (AMO) goal of reducing industrial energy intensity and GHG emissions is addressed by development of coated refractory MPEAs exhibiting 20%+ higher operational temperature (direct increase of Carnot efficiency), higher melting temperatures (better phase stability), superior creep strength (better lifetime with creep rate lower by factor of 10), larger (50-100%) thermal conductivity (improved cooling without active cooling), reduced complexity (single-phase alloys), self-healing coating (reliable oxidation-resistance) and cost.

36 MATERIALS SCIENCE↗

Upgrading Fermilab’s accelerator control system with ACORN

The Fermilab Accelerator Complex is the largest national user facility in the Office of High Energy Physics (DOE/HEP) program and the only national user facility operating at Fermilab. Fermilab serves as the host to the Long Baseline Neutrino Facility/Deep Underground Neutrino Experiment (LBNF/DUNE), the laboratory’s flagship project for neutrino science that is under construction. LBNF/DUNE will be powered by megawatt beams from an upgraded accelerator, the Proton Improvement Plan II (PIP-II) that will replace the laboratory’s aging linear accelerator with a new one based on superconducting radio-frequency cavities. The Accelerator Controls Operations Research Network (ACORN) Project will support LBNF/DUNE and PIP-II by modernizing the accelerator control system. The project is at the conceptual design phase and looking to achieve Critical Decision 1 (CD-1) later this year. The scope and structure of the project will be presented, along with an overview of how that has changed in the past year. Current design and technology choices will be shared. Specific challenges facing the project will be addressed, along with current thinking on solutions.

Roehrig, Christian [Fermilab]↗

An intelligent scanning algorithm for lost fuel rod recovery in the MYRRHA lower plenum

This paper presents a system for visualizing the interior structure of a vessel filled with a liquid metal. Due to the opaque and conductive nature of the medium, regular visualization systems based on cameras, electromagnetic or laser based techniques can't be used. The operation, strengths and weaknesses of an existing set-up are investigated by creating a scenario to find and extract a rectangular object inside the vessel in the shortest possible time. The main focus of this paper is not on designing a new system but to investigate the bottlenecks that are faced and need to be kept in mind in future designs. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Application of extremum seeking for time-varying systems to resonance control of RF cavities

A recently developed form of extremum seeking for time-varying systems is implemented in hardware for the resonance control of radio-frequency cavities without phase measurements. Normal conducting RF cavity resonance control is performed via a slug tuner, while superconducting TESLA-type cavity resonance control is performed via piezo actuators. The controller maintains resonance by minimizing reflected power by utilizing model-independent adaptive feedback. Unlike standard phase-measurement-based resonance control, the presented approach is not sensitive to arbitrary phase shifts of the RF signals due to temperature-dependent cable length or phasemeasurement hardware changes. The phase independence of this method removes common slowly varying drifts and required periodic recalibration of phase-based methods. A general overview of the adaptive controller is presented along with the proof of principle experimental results at room temperature. Lastly, this method allows us to both maintain a cavity at a desired resonance frequency and also to dynamically modify its resonance frequency to track the unknown time-varying frequency of an RF source, thereby maintaining maximal cavity field strength, based only on power-level measurements.

47 OTHER INSTRUMENTATION↗

IPF Beam Line Photos

Photographs of LANSCE IPF beam line for peers at SNS, ORNL.

43 PARTICLE ACCELERATORS↗

LAMP DTL Scoping Studies (Technical Report)

The present studies are based on the preliminary design efforts, and on the Scoping Studies of the “Strawman” design of LAMP front-end upgrade, referred in the text below to as “Feb.2024 Iteration”, presented in. The main accomplishment of present studies was substantial increase of the fidelity of the beam dynamics simulations in the proposed drift tube linac (DTL). The main accent was on development of the methodology for calculation of the longitudinal (synchrotron) and transverse (betatron) oscillations frequencies (phase advance per focusing period) values and providing the accelerating structure focusing lattice that has safe parameters of such oscillations to avoid unwanted emittance growth and possible beam halo formation. The resulting values of the oscillations phase advances are presented in Table 1, and in Figure 5 in the main body of the report. Special efforts were made to achieve the RF power consumption within limits of the existing RF power system and make sure that DTL fits in the existing tunnel. The LAMP scope does not suggest any additional building and/or tunnel construction. Table 1 summarizes some of these results, as well as Table 3 in the main body of the report.

43 PARTICLE ACCELERATORS↗

TidGen Power System Commercialization Project

ORPC Maine, LLC, a wholly-owned subsidiary of Ocean Renewable Power Company, LLC (collectively ORPC), submits this Final Technical Report for the TidGen® Power System Commercialization Project (Project), partially funded by the U.S. Department of Energy (DE-EE0003647). The Project was built and operated in compliance with the Federal Energy Regulatory Commission (FERC) pilot project license (P-12711) and other permits and approvals needed for the Project. This report documents the methodologies, activities and results of the various phases of the Project, including design, engineering, procurement, assembly, installation, operation, licensing, environmental monitoring, retrieval, maintenance and repair. The Project represents a significant achievement for the renewable energy portfolio of the U.S. in general, and for the U.S. marine hydrokinetic (MHK) industry in particular. The stated Project goal was to advance, demonstrate and accelerate deployment and commercialization of ORPC’s tidal-current based hydrokinetic power generation system, including the energy extraction and conversion technology, associated power electronics, and interconnection equipment capable of reliably delivering electricity to the domestic power grid. ORPC achieved this goal by designing, building and operating the TidGen® Power System in 2012 and becoming the first federally licensed hydrokinetic tidal energy project to deliver electricity to a power grid under a power purchase agreement in North America. Located in Cobscook Bay between Eastport and Lubec, Maine, the TidGen® Power System was connected to the Bangor Hydro Electric utility grid at an on-shore station in North Lubec on September 13, 2012. ORPC obtained a FERC pilot project license for the Project on February 12, 2012 and the first Maine Department of Environmental Protection General Permit issued for a tidal energy project on January 31, 2012. In addition, ORPC entered into a 20-year agreement with Bangor Hydro Electric Company on January 1, 2013 for up to 5 megawatts at a price of $215/MWh, escalating at 2.0% per year.

16 TIDAL AND WAVE POWER↗

High intensity high charge state ion beam production with an evaporative cooling magnet ECRIS

LECR4 (Lanzhou ECR ion source No. 4) is a room temperature electron cyclotron resonance ion source, designed to produce high current, high charge state ion beams for the SSC-LINAC injector (a new injector for sector separated cyclotron) at the Institute of Modern Physics. LECR4 also serves as a PoP machine for the application of evaporative cooling technology in accelerator field. To achieve those goals, LECR4 ECR ion source has been optimized for the operation at 18 GHz. During 2014, LECR4 ion source was commissioned at 18 GHz microwave of 1.6 kW. To further study the influence of injection stage to the production of medium and high charge state ion beams, in March 2015, the injection stage with pumping system was installed, and some optimum results were produced, such as 560 eμA of O{sup 7+}, 620 eμA of Ar{sup 11+}, 430 eμA of Ar{sup 12+}, 430 eμA of Xe{sup 20+}, and so on. The comparison will be discussed in the paper.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗