Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “well”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Well Integrity for Natural Gas Storage in Depleted Reservoirs and Aquifers

Introduction Motivation The 2015-2016 Aliso Canyon/Porter Ranch natural gas well blowout emitted approximately 100,000 tonnes of natural gas (mostly methane, CH 4 ) over four months. The blowout impacted thousands of nearby residents, who were displaced from their homes. The high visibility of the event has led to increased scrutiny of the safety of natural gas storage at the Aliso Canyon facility, as well as broader concern for natural gas storage integrity throughout the country. Federal Review of Well Integrity In April of 2016, the U.S. Department of Energy (DOE), in conjunction with the U.S. Department of Transportation (DOT) through the Pipeline and Hazardous Materials Safety Administration (PHMSA), announced the formation of a new Interagency Task Force on Natural Gas Storage Safety. The Task Force enlisted a group of scientists and engineers at the DOE National Laboratories to review the state of well integrity in natural gas storage in the U.S. The overarching objective of the review is to gather, analyze, catalogue, and disseminate information and findings that can lead to improved natural gas storage safety and security and thus reduce the risk of future events. The “Protecting our Infrastructure of Pipelines and Enhancing Safety Act of 2016’’ or the ‘‘PIPES Act of 2016,’’which was signed into law on June 22, 2016, created an Aliso Canyon Natural Gas Leak Task Force led by the Secretary of Energy and consisting of representatives from the DOT, Environmental Protection Agency (EPA), Department of Health and Human Services, Federal Energy Regulatory Commission (FERC), Department of Commerce and the Department of Interior. The Task Force was asked to perform an analysis of the Aliso Canyon event and make recommendations on preventing similar incidents in the future. The PIPES Act also required that DOT/PHMSA promulgate minimum safety standards for underground storage that would take effect within two years. Background on the DOE National Laboratories Well Integrity Work Group One of the primary areas that the Task Force is studying is integrity of natural gas wells at storage facilities. The DOE Office of Fossil Energy (FE) took the lead in this area and asked scientists and engineers from the National Energy Technology Laboratory (NETL), Lawrence Livermore National Laboratory (LLNL), Sandia National Laboratories (SNL), and Lawrence Berkeley National Laboratory (LBNL)) to form a Work Group to address this area. This Work Group is an expansion of the original “Lab Team” comprising scientists and engineers from SNL, LLNL, and LBNL which was formed to support the State of California’s response to the Aliso Canyon incident and operated under the Governor of California’s Aliso Canyon Emergency Order (1/6/2016). The Lab Team played a key role in advising the State of California’s Department of Conservation (DOC) in its oversight of SoCalGas during and after the incident.

03 NATURAL GAS↗

Well Casing Baseline Analysis for the Big Hill Strategic Petroleum Reserve Site

This report analyzes data from multi-arm caliper (MAC) surveys taken at the Big Hill SPR site to determine the most likely casing weights within each well. Radial arm data from MAC surveys were used to calculate the approximate wall thickness of each well. Results from this study indicate that (1) most wells at the site have thinner wall thicknesses than expected, (2) most wells experienced an acute increase in diameter near the salt/caprock interface, and (3) there were isolated instances of well sections being the wrong casing weight. All three findings could have a negative impact on well integrity.

02 PETROLEUM↗

Selection of Well Locations for Saturated Zone Monitoring at the E-Area Low Level Waste Facility

Savannah River Site (SRS) has adopted a revised approach to performance monitoring of the E- Area Low Level Waste Facility (ELLWF) that adds a saturated zone component to the existing vadose zone monitoring program (Kubilius, 2019). The revised monitoring approach specifies that eight additional water table wells be installed near Slit Trench 1 (ST1) and Engineered Trench 2 (ET2). Six wells will be installed at locations characterized in 2017 and 2018. These include four wells near ET2 (ELF001D, ELF002D, ELF003D, and ELF004D) at locations identified by Kubilius (2019) and two wells north of ST1 (ELF005D and ELF006D) at locations finalized in this report. Additionally, two wells (ELF007D and ELF008D) are to be installed at locations south of ST1 based on characterization work completed in 2020 and documented in this report. This area is near well cluster BGX-2 between the Mixed Waste Management Facility (MWMF) and the ELLWF. The area is upgradient of ELLWF and, contamination in the water table aquifer is sourced from MWMF.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Permit Injectors and New Observation Wells at Early Test Site (SECARB Phase III (Early) Project at Cranfield)

At Cranfield field well permitting was part of a routine operation that Denbury conducted on behalf of the University of Texas and the SECARB Project. Denbury permits injection and production wills through the Mississippi Oil and Gas Board (MO&GB). The MO&GB permitted the two observation wells as production wells, although they are not in the oil-productive part of the field (being deliberately located down-dip of the oil-water contact). The well permits issues April 15, 2009 for the observation wells are attached in appendix A. Denbury also permitted 8 injection wells to support the High Volume Injection Test (HiVIT); four of these are drilled unusually far downdip to support the sequestration experiment. These permits are held by Denbury as part of their normal operations.

54 ENVIRONMENTAL SCIENCES↗

Drill and Complete CO 2 Observation Wells (SECARB Work Product 5.2.2.b)

The following report contains details on the drilling and completion of the new wells D-9-8#2 and D-9-9#2, as well as the recompletion work for the previously temporarily abandoned D-4-13 and D-4-14 wells. Each of the four wells will be used for observation activities for the SECARB Phase III Anthropogenic Test. A drilling and completion narrative and an as built description of the well including drawings and material specifications for the D-9- 8#2 and D-9-9#2 are outlined in this report. An outline of the recompletion procedure for the D-4-13 and D-4-14 wells is also included.

01 COAL, LIGNITE, AND PEAT↗

Wabash CarbonSAFE. Geologic Analysis of the Potosi Dolomite Reservoir Interval and Potential Confining Units, at the Wabash #1 Well, Vigo Co., Indiana, Subtask 7.2, Technical Report

The Wabash CarbonSAFE project drilled the Wabash #1 stratigraphic test well (ID# 168045) at the Wabash Valley Resources (WVR) IGCC facility in Vigo County, Indiana, to evaluate the feasibility of commercial-scale CO 2 storage near the site. The Mt. Simon Sandstone was the initial target for storage evaluation and was found to have generally poor reservoir qualities in the Wabash #1 well. Focus was then placed on the secondary target, the Potosi Dolomite. For storage and containment evaluation an extensive suite of geophysical logs was collected throughout the borehole, and whole cores were obtained from the Mt. Simon Sandstone, Eau Claire Formation, and Maquoketa Group. The Maquoketa Group is identified as a regionally extensive secondary sealing interval above the Mt. Simon Sandstone and as a primary seal for the Potosi Dolomite storage complex. Due to concerns over potential lost circulation zones in the Potosi Dolomite during drilling, no core samples or Formation Micro Imager (FMI) logs were acquired in the Potosi Dolomite. However, cased hole well testing was performed over a 20 feet (6 m) interval within the Potosi Dolomite during which a fluid swab sample was obtained. Approximately 35 miles of 2D seismic information was acquired in the project area near Wabash #1 to aid in reservoir and caprock characterization. The highly porous and permeable zones in the Potosi Dolomite and lower Oneota Dolomite observed within the Wabash #1 well are, for the purpose of this report, considered the same reservoir package and referred to as the Potosi reservoir interval. This report presents a regional depositional context for the Potosi reservoir interval, the overlying confining zones in the Knox Group, and Maquoketa Group primary seal. This context is developed through detailed information obtained from the Wabash #1 well such as lithologic data collected from cuttings and core, geophysical logging, geomechanical analysis of core samples, and well testing and fluid sampling within the Potosi reservoir interval. Information discussed in this report was compiled as a basis for the development of static and dynamic geologic models of the Potosi Dolomite storage complex. The static and dynamic modeling of CO 2 injection in the Potosi reservoir interval are discussed in a separate report (Dessenberger et al., 2022) under the Wabash CarbonSAFE project.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Technology Roadmap for Advanced Geothermal Well Construction

Recent analysis has shown that by 2050, geothermal energy can supply up to 90 GW of power to the U.S. electrical grid. Reducing the lifecycle cost of geothermal wells is critical to achieving this level of adoption. While time-related costs of drilling remain an important issue, there is also a need to focus on the costs associated with casing and cementing of geothermal wells. This report provides a roadmap of R&D activities needed to reduce the life cycle cost of casing and cementing while improving life-of-well performance. The purpose of the roadmap is to develop priorities for R&D in the areas of (1) high-performance and cost-effective materials for target geothermal well conditions, (2) well construction methods and techniques to reduce construction costs, and (3) methods and techniques to decrease to decrease long-term operating costs. The roadmap sets targets for the next 10-year period and purposely excludes R&D efforts into improved rock reduction. The roadmap was developed by a joint working group of experts from Oak Ridge National Laboratory, Brookhaven National Laboratory, and Sandia National Laboratories as well as 35 experts from industry and academia. Input from a series of information gathering sessions was used to inform and guide the development of the roadmap.

15 GEOTHERMAL ENERGY↗

Scoping Study of Integrated Geothermal CO 2 Heat Pump and Water Well System in Cold Climate Region (CRADA Final Report)

This study evaluates the feasibility of using ground-source heat pumps (GSHPs) integrated with water wells for residential heating demands in cold regions of the United States. Four different heat pump systems were evaluated and compared: a CO 2 air-source heat pump (ASHP), a R-410A ASHP, a CO 2 GSHP integrated with well water, and a R-410A GSHP integrated with well water. Simulations were conducted at both equipment and building integration levels, followed by a nationwide analysis across 10 selected cities. Results indicate that integrating GSHP technology with existing water wells (e.g., artesian, bedrock, drilled, and collector wells) is a feasible heating solution because of their high flow rates, good water quality, stable temperatures, and low environmental impact. Although R-410A systems demonstrate higher efficiency, CO 2 systems are more suitable for heating from contamination-free and energy security perspective. The CO 2 GSHPs maintain better performance in colder climates compared with that of ASHPs, providing higher coefficient of performance and environmental benefits because CO 2 refrigerant leakage would not contaminate well water. A national analysis confirms that CO 2 GSHPs outperform furnaces, especially in cold climates, making them a promising solution for residential heating.

15 GEOTHERMAL ENERGY↗

High-Throughput Microfluidic Electroporation (HTME): A Scalable, 384-Well Platform for Multiplexed Cell Engineering

Electroporation-mediated gene delivery is a cornerstone of synthetic biology, offering several advantages over other methods: higher efficiencies, broader applicability, and simpler sample preparation. Yet, electroporation protocols are often challenging to integrate into highly multiplexed workflows, owing to limitations in their scalability and tunability. These challenges ultimately increase the time and cost per transformation. As a result, rapidly screening genetic libraries, exploring combinatorial designs, or optimizing electroporation parameters requires extensive iterations, consuming large quantities of expensive custom-made DNA and cell lines or primary cells. To address these limitations, we have developed a High-Throughput Microfluidic Electroporation (HTME) platform that includes a 384-well electroporation plate (E-Plate) and control electronics capable of rapidly electroporating all wells in under a minute with individual control of each well. Fabricated using scalable and cost-effective printed-circuit-board (PCB) technology, the E-Plate significantly reduces consumable costs and reagent consumption by operating on nano to microliter volumes. Furthermore, individually addressable wells facilitate rapid exploration of large sets of experimental conditions to optimize electroporation for different cell types and plasmid concentrations/types. Use of the standard 384-well footprint makes the platform easily integrable into automated workflows, thereby enabling end-to-end automation. We demonstrate transformation of E. coli with pUC19 to validate the HTME's core functionality, achieving at least a single colony forming unit in more than 99% of wells and confirming the platform's ability to rapidly perform hundreds of electroporations with customizable conditions. This work highlights the HTME's potential to significantly accelerate synthetic biology Design-Build-Test-Learn (DBTL) cycles by mitigating the transformation/transfection bottleneck.

Gaillard, William R↗

Vectorization of a penalty function algorithm for well scheduling

In petroleum engineering, the oil production profiles of a reservoir can be simulated by using a finite gridded model. This profile is affected by the number and choice of wells which in turn is a result of various production limits and constraints including, for example, the economic minimum well spacing, the number of drilling rigs available and the time required to drill and complete a well. After a well is available it may be shut in because of excessive water or gas productions. In order to optimize the field performance a penalty function algorithm was developed for scheduling wells. For an example with some 343 wells and 15 different constraints, the scheduling routine vectorized for the CYBER 205 averaged 560 times faster performance than the scalar version.

Absar, I.↗

Characteristics of AlGaAs/GaAs multiple quantum well infrared detectors

Researchers fabricated and characterized several AlGaAs/GaAs multiple quantum well infrared detectors to evaluate the ultimate performance of these devices for low infrared background applications. The detectors were designed to have a single bound state in the quantum well and the first excited state in the continuum above the AlGaAs conduction band edge. The difference in energy between the two levels, as determined by the quantum well width and aluminum mole fraction in the barrier, was chosen such that peak absorption would occur near 8 microns. The initial structures studied comprised 50 periods with 40 A well widths and 300 A Al(0.28)Ga(0.72)As barriers. The performance of these detectors are summarized. To better interpret these results and design optimized detectors, researchers modeled both the detector noise and tunneling currents. The noise model correctly predicts that multiple quantum well detectors will, indeed, exhibit noise lower than full shot noise. The tunneling current model predicts the dark current versus bias for any choice of design parameters in a multiple quantum well detector. This model predicts a substantially reduced dark current (x 10(exp 04)) for samples with 400 A barriers. To evaluate structures with thicker barriers, researchers fabricated and characterized detectors with 400 A and 500 A barriers; a comparison of detector dark currents is shown. These results are consistent with the predictions of the dark current model.

Janousek, Bruce K.↗

Photoexcited escape probability, optical gain, and noise in quantum well infrared photodetectors

We present a detailed and thorough study of a wide variety of quantum well infrared photodetectors (QWIPs), which were chosen to have large differences in their optical and transport properties. Both n- and p-doped QWIPs, as well as intersubband transitions based on photoexcitation from bound-to-bound, bound-to-quasi-continuum, and bound-to-continuum quantum well states were investigated. The measurements and theoretical analysis included optical absorption, responsivity, dark current, current noise, optical gain, hot carrier mean free path; net quantum efficiency, quantum well escape probability, quantum well escape time, as well as detectivity. These results allow a better understanding of the optical and transport physics and thus a better optimization of the QWIP performance.

Levine, B. F.↗

Multi-well sample plate cover penetration system

An apparatus for penetrating a cover over a multi-well sample plate containing at least one individual sample well includes a cutting head, a cutter extending from the cutting head, and a robot. The cutting head is connected to the robot wherein the robot moves the cutting head and cutter so that the cutter penetrates the cover over the multi-well sample plate providing access to the individual sample well. When the cutting head is moved downward the foil is pierced by the cutter that splits, opens, and folds the foil inward toward the well. The well is then open for sample aspiration but has been protected from cross contamination.

47 OTHER INSTRUMENTATION↗

Optimization of Well Configuration for a Sedimentary Enhanced Geothermal Reservoir

The extraction of geothermal energy in the form of hot water from sedimentary rock formations could expand the current geothermal energy resources toward new regions. From previous work, we observed that sedimentary geothermal reservoirs with relatively low permeability would require the application of enhancement techniques (e.g., well hydraulic stimulation) to achieve commercial production/injection rates. In this paper we extend our previous work to develop a methodology to determine the optimum well configuration that maximizes the hydraulic performance of the geothermal system. The geothermal systems considered consist of one vertical well doublet system with hydraulic fractures, and three horizontal well configurations with open-hole completion, longitudinal fractures and transverse fractures, respectively. A commercial thermal reservoir simulation is used to evaluate the geothermal reservoir performance using as design parameters the well spacing and the length of the horizontal wells. The results obtained from the numerical simulations are used to build a response surface model based on the multiple linear regression method. The optimum configuration of the sedimentary geothermal systems is obtained from the analysis of the response surface model. The proposed methodology is applied to a case study based on a reservoir model of the Lyons sandstone formation, located in the Wattenberg field, Denver-Julesburg basin, Colorado.

15 GEOTHERMAL ENERGY↗

Developing a Drilling Optimization System for Improved Overall Rate of Penetration in Geothermal Wells

Geothermal energy is renewable, reliable and environmentally friendly source of energy. The major cost in the development of geothermal wells is the actual drilling of the wells. The main objective of this paper is to introduce a new real-time drilling optimization system designed for granite formation to reduce the overall drilling cost. In this study, a drilling optimization system is verified using drilling data from Utah-Forge well 58-32. The drilling optimization system used the Utah-Forge well 58-32 data to achieve real-time unconfined compressive strength (UCS). Based on the UCS value from the previous feet, the system simulates the ROP for the next drilling feet. The drilling optimization system utilizes the Differential Evolution Algorithm (DEA), which is a metaheuristic method to search the space of solution, to find the best operating parameters (i.e. WOB and RPM) for the next drilling foot. The optimization algorithm takes a maximum cutter temperature into account as a constraint and avoids the accelerated wear. The developed drilling optimization system improves ROP responses and reduces the drilling cost of geothermal wells. The simulated ROP results from the system show a good agreement with the ROP from Utah-Forge well 58-32 drilling data. The drilling time before and after optimization for both intervals were presented.

15 GEOTHERMAL ENERGY↗

High Order Well-Balanced Schemes and Applications to Non-Equilibrium Flow with Stiff Source Terms

The stiffness of the source terms in modeling non-equilibrium flow problems containing finite-rate chemistry or combustion poses additional numerical difficulties beyond that for solving non-reacting flows. A well-balanced scheme, which can preserve certain non-trivial steady state solutions exactly, may help to resolve some of these difficulties. In this paper, a simple one dimensional non-equilibrium model with one temperature is considered. We first describe a general strategy to design high order well-balanced finite difference schemes and then study the well-balanced properties of high order finite difference weighted essentially non-oscillatory (WENO) scheme, modified balanced WENO schemes and various TVD schemes. The advantages of using a well-balanced scheme in preserving steady states and in resolving small perturbations of such states will be shown. Additional numerical examples are provided to verify the good resolution, in addition to the well-balancedness, for both smooth and discontinuous solutions as well.

99 GENERAL AND MISCELLANEOUS↗

Drilling and abandonment preparation of CO₂ storage wells – Experience from the Ketzin pilot site

At Ketzin, located west of Berlin, the GFZ German Centre for Geosciences is operating Europe's largest CO₂ research storage site. This pilot site has been developed since 2004 and is comprised of one combined injection/observation well and four monitoring wells. From June 2008 to August 2013, a total of 67 kilotons of CO₂ were safely injected into the sandstone units of the Upper Triassic Stuttgart Formation in a depth between 630 to 650 m. The paper discusses the well designs and lessons learned in drilling engineering and operations. The abandonment phase started in Ketzin with the first plug cementation of the observation well Ktzi 202 shortly after shut-in of CO₂ injection. The experience with the first CO₂ well killing operation will be reviewed.

54 ENVIRONMENTAL SCIENCES↗

Newberry Volcano EGS Demonstration Well 55-29 Stimulation Data

The Newberry Volcano EGS Demonstration in central Oregon, a 3 year project started in 2010, tests recent technological advances designed to reduce the cost of power generated by EGS in a hot, dry well (NWG 55-29) drilled in 2008. First, the stimulation pumps used were designed to run for weeks and deliver large volumes of water at moderate well-head pressure. Second, to stimulate multiple zones, AltaRock developed thermo-degradable zonal isolation materials (TZIMs) to seal off fractures in a geothermal well to stimulate secondary and tertiary fracture zones. The TZIMs degrade within weeks, resulting in an optimized injection/ production profile of the entire well. Third, the project followed a project-specific Induced Seismicity Mitigation Plan (ISMP) to evaluate, monitor for, and mitigate felt induced seismicity. Stimulation started October 17, 2012 and continued for 7 weeks, with over 41,000 m3 of water injected. Two TZIM treatments successfully shifted the depth of stimulation. Injectivity, DTS, and seismic analysis indicate that fracture permeability in well NWG 55-29 was enhanced by two orders of magnitude. This submission includes all of the files and reports associated with the geophysical exploration, stimulation, and monitoring included in the scope of the project.

15 GEOTHERMAL ENERGY↗