Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “technological innovation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

ORBIT: Offshore Renewables Balance-of-System and Installation Tool

This report describes the Offshore Renewables Balance-of-system Installation Tool ("ORBIT"), a new model developed by the National Renewable Energy Laboratory (NREL) to evaluate the balance-of-system (BOS) costs associated with offshore wind projects. In the context of wind energy projects BOS costs encompass all expenses required to construct a project other than the capital expenditures (CapEx) of the turbines and towers, including the procurement costs for all other components (such as substructures, cables, and electrical infrastructure), offshore and land-based construction costs, port costs, site surveying fees, permitting fees, and leasing fees are all categorized as BOS costs. BOS costs significantly contribute to the levelized cost of energy (LCOE) for offshore wind, typically comprising over 50\% of the CapEx for a fixed-bottom offshore wind project and 60\% for a floating project. In addition, technology solutions and installation methods vary drastically between projects as they are impacted by factors such as vessel availability, geographic considerations and site geotechnical conditions. These effects require a model with appropriate fidelity to understand how these costs scale as turbine rating increases and the offshore wind supply chain, particularly offshore construction vessels, is expanded. For offshore wind, cost savings attributed to increased turbine rating are primarily realized through BOS procurement and project installation as fewer substructures and less cable are required. BOS costs represent both a modeling challenge, as well as an opportunity, for project developers to optimize solutions to reduce costs. It is critical to understand how these costs are affected by novel technologies, innovative installation processes, and operational constraints in order identify meaningful cost reductions for offshore wind energy.

17 WIND ENERGY↗

Empowering Energy Efficiency in Existing Big-Box Retail/Grocery Stores (Final Optimization Report)

The Center for Sustainable Energy (CSE), in partnership with the National Renewable Energy Laboratory (NREL), TRC Energy Services, P2S Engineering Inc, Walmart, and five innovative technology providers, are to demonstrate the impact of an integrated suite of pre-commercial energy efficiency (EE) technologies in a large, existing, retail building located within an inland disadvantaged community. Proposed technology packages include three categories of advanced EE solutions: heating, ventilating, air-conditioning, and refrigerating (HVAC/R); lighting; and integrated system and building level controls. The project is designed to impact Walmart’s future store specifications, which can be replicated and deployed in other buildings across California with similar end-use and system characteristics. The following lists the technologies considered for this project: DualCool (HVAC evaporative cooling); Software Motor Company (SMC) (HVAC and refrigeration fan motor); I2S: DC LED lighting; LocBit: building energy management and optimization; Saya: water monitoring.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

About the Complex Natural and Engineered Systems Pillar

Los Alamos National Laboratory is a world leader in applying multi-disciplinary science to complex systems within the Complex Natural and Engineered Systems (CNES) challenge areas. Our search for solutions requires science and technology innovation, as well as an integrated experiment, theory, and modeling and simulation approach. Our research and development spans from improving engineered systems such as nuclear weapons and the power grid, to understanding the interface of human and engineered systems from the subsurface to space, to studying how complex natural systems such as disease and climate impact humanity.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Knowledge Spillovers and Cost Reductions in Solar Soft Costs

Despite the commonly acknowledged importance of knowledge spillovers in reducing solar soft costs, we are only beginning to answer a fundamental question: who learns what (knowledge acquisition), from whom (knowledge production), and how (spillover mechanisms)? Until recently, this important topic has been largely unexplored in the case of solar soft costs. Thus, this project set out to identify how knowledge spillovers affect soft costs in the U.S. photovoltaic (PV) installation industry, specifically how important spillovers are, what types of knowledge are most likely to spillover, and how networks of actors affect spillovers. Our findings offer insights for designing solutions that address problems associated with knowledge spillovers and that leverage spillovers to reduce solar soft costs. Recognizing the ambiguity in the definition of soft costs, i.e., “non-hardware costs,” and variability in soft cost categories, we developed the Solar Soft Cost Ontology (SSCO) to systematically identify key concepts related to soft costs, network actors, learning processes, and the relationships between them. This ontology served as a foundational organizational structure for the methodology of the remaining tasks: case studies, surveys, pricing analysis, patent analysis, network analysis, and project integration across tasks. While there is substantial learning among installers that is reducing the soft costs for PV installations, most of that learning is retained by firms rather than spread across the industry. The positive relationship between experience accumulation and cost reductions is typically explained as learning by doing (LBD), but we find that LBD effects are mediated by other learning mechanisms, including learning by searching and learning by interacting. Knowledge spillovers have significant potential to reduce solar PV soft costs, but successful knowledge spillover pathways are complex and non-trivial. There are a wide variety of ways to construct an installation business, thus categories of firms that can effectively cross-learn directly are small and what knowledge is relevant to whom is challenging and costly for firms to assess. This fragmentation limits the critical mass needed for spillover related soft cost reductions. Knowledge does not flow directly between installers. Indirect knowledge transfer pathways are critical: distributors, software providers, collaboratives, and hiring. Furthermore, diverse, more integrated knowledge networks tend to promote successful learning by organizations and across the system as a whole. Accordingly, we find the need to supporting the whole ecosystem using an integrated policy and programmatic approach to support installers, distributors, complementary sector, and facilitators. Overall, a deliberate policy-mix design is needed to reduce the solar PV deployment barrier in terms of installation cost reductions, because deployment policies could potentially interact with policies that facilitate network-building and technological innovation. A combination of deployment policies, innovation-support policies, and network-facilitating policies could potentially lead to a more desired market outcome through achieving higher joint learning rates from firms’ cumulative experiences developed in a more integrated production and deployment ecosystem.

14 SOLAR ENERGY↗

New High-Energy & Safe Battery Technology with Extreme Fast Charging Capability for Automotive Applications (Final Technical Report)

Being able to refill a cars gas tank when low on fuel is incredibly convenient and is a lacking feature for battery elective vehicles. New High-Energy & Safe Battery Technology with Extreme Fast Charging Capability for Automotive Applications was a research project designed to help correct this lacking feature by developing automotive sized Li-ion battery cells and demonstrating their ability to charge in under 10-minutes. To address the technical challenges Microvast, a cell manufacturer, was joined by Argonne National Labs, battery technology innovator, and BMW, a renown OEM, worked together to define and validate materials and cells for this project. By projects end, Microvast had successfully built and demonstrated a 240 Wh/kg, 35 Ah pouch cell that was capable of over 800 10-minute charge, full discharge cycles. From the outset of the project the plan was to use large amp-hour cells (ie automotive relevant sizes) to ensure the project findings and outcomes were most relevant for electric vehicle applications. The manufacture of cells was done using test manufacturing lines at Microvast and BMW that closely resemble the procedures of a Li-ion battery cell factory.

25 ENERGY STORAGE↗

Hamilton: Flexible, Open Source $10 Wireless Sensor System for Energy Efficient Building Operation

Sensors for improving building performance are rapidly populating the market, driven in part by the drive to reduce greenhouse gas emissions resulting from energy production as well as improve the interior environment for healthy and more productive spaces. UC Berkeley has led wireless sensor development over the past 25 years (e.g., Telos mote), with the Hamilton (named after Alexander Hamilton on the US $10 bill) as the most recent. The Hamilton sensor was designed as a low-cost high-performance sensor that is modular and interoperable. The objective of the Hamilton project was to create, evaluate and establish the technological foundations for secure and easy to deploy building energy efficiency applications utilizing pervasive, low-cost wireless sensors integrated with traditional Building Management Systems (BMS), consumer-sector building components, and powerful data analytics. The project included iterative hardware design, incorporating a high-performance database (BTrDb, http://btrdb.io/), creating and iterating the development of secure data middleware (BOSSwave, WAVE/WAVEMQ), working with and pushing the development of an open-source tiny operating system RiotOS, and implementing and improving protocols such as Thread/OpenThread and TCP/IP. The hardware benefited from careful design to drive down the cost; the design included a System-on-a-Chip (SoC), chip antenna, single crystal and five passive components. Careful design of the operating system created a low-power design to enable a long life with small batteries. The hardware included several sensors: temperature, radiant temperature, relative humidity, magnetometer, accelerometer, and light, with an optional occupancy (Passive InfraRed) sensor. The project was the basis of several applications, both internal to the research team and other researchers and professionals at other institutions. Several applications used the sensor hardware as the basis for other complex devices. Other applications used the sensors to improve building performance through interoperating with the building Heating Ventilation and Air-Conditioning (HVAC) system, such as using occupancy and/or distributed temperature sensing to reduce HVAC zone energy while still providing thermal comfort and to reduce peak loads in small commercial buildings. We demonstrated cloud-based energy analytics, implemented a schedule and a Model Predictive Controller in a small commercial building to optimize HVAC energy, occupancy and electricity price. Initial integration of these technological innovations was performed through the creation of execution containers containing the WAVE agent and various driver, proxy, or building system function logic. The research added to the understanding of efficient sensor hardware, secure middleware, time-series data management (high performance database), efficient communication protocols, and interoperating with applications and building systems. The project showed the technical effectiveness and economic feasibility of creating a low-cost, modular, and easy-to-deploy sensor. Through conversations with multiple end users, the research team discovered that many customers wanted data management and services in addition to the sensors. HamiltonIOT developed packages of sensors, border router, and data services to provide a seamless “plug-and-play” sensor deployment. Some customers were willing to pay for higher quality sensors (such as light); some customers wanted a robust enclosure (waterproof).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Advanced Physics-Based Fluid System Performance Monitoring to Support Nuclear Power Plant Operations. Final CRADA report

This project targeted performance monitoring requirements for nuclear power plants with the goal of improving plant economics. We introduced a new and innovative technology to the industry that can reduce operations staffing levels by automating surveillance and can reduce maintenance staffing levels by providing early detection of degrading equipment. A beta-stage release of the PRO-AID power plant equipment fault diagnostic software ready for deployment in nuclear power plants will be delivered and demonstrated in a utility pilot project. To provide for efficient use of DOE funds the aim is to generate a minimum viable product for which we can prove the value of the product. The end state product will be serviceable for use in either a simulator environment or plant environment. The former provides a means for demonstration of the diagnostic capability for faults unlikely to be encountered in day-to-day operations.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Primer on the Cost of Marine Fuels Compliant with IMO 2020 Rule

This report aims to provide information for owners and operators of U.S. ocean-going marine cargo vessels on the cost of different approaches to compliance with the IMO mandate to reduce the sulfur content of marine fuels (outside emission control areas) to no more than 0.5%. The IMO 2020 rule came into effect on January 1, 2020. The report discusses a suite of options for compliance including low-sulfur petroleum-based fuels and alternative fuels. Since fuel prices are a primary factor in determining the cost of the various alternatives, the document also includes a discussion of the main drivers of marine fuel prices. The cost analysis compares the average annual costs (capital and fuel) out to 2050 of each compliance approach under alternative scenarios regarding fuel prices, policy, and technology innovation. The cost calculations focus on representative U.S. fleet vessels for containership and tanker types. Even though the analysis focuses on average cost of approaches to comply with IMO 2020, the comparison of approaches also acknowledges other benefits or risks including fuel price risk and the contribution of the approach to achieving other potential environmental performance objectives or regulations.

02 PETROLEUM↗

Cross Section Measurements of Photonuclear Reaction Pathways Towards Promising Medical Radioisotopes

Project Objectives: The goal of this project was to generate data relevant to radioisotope production while developing innovative technologies that foster and enhance novel production of radioisotopes, and, also, while providing opportunities for cultivating and training future generations of scientists. This work has provided the foundation for methodologies for determination of photonuclear cross sections over multiple energies in a single irradiation. Simultaneously, the feasibility of electron LINAC production of several in-demand radioisotopes such as 47 Sc, 67 Cu, 77 As, and 186 Re has been demonstrated. To accomplish these objectives a collaboration was formed between two complimentary facilities, the Low Energy Accelerator Facility (LEAF) at Argonne National Laboratory and the High Intensity Gamma-ray Source (HIGS) at Triangular Universities Nuclear Laboratory (TUNL). The involvement of the research group from North Carolina Central University gave students at this Historically Black University experience in forefront nuclear-physics research relevant to addressing a high-priority interdisciplinary issue. Project Description: HIGS provides a nearly monoenergetic gamma-ray beam by intra-cavity Compton backscattering of free-electron photons from electrons circulating in a storage ring. This beam can be collimated to produce a very precise energy beam. If the beam is un-collimated a calculated and precise energy spread of the beam occurs radially. The γ-flux can be evenly distributed over the radial distribution of energy and used to perform activation experiments on concentric ring targets. Thus providing multiple energy ranges in a single irradiation. Each concentric ring target can be counted separately in order to determine activation at the given energy and successively be correlated to the activation cross section. Targets were activated to determine production feasibility using electron beams at LEAF. Potential Impact: The Nuclear Science Advisory Committee recently named production of radioisotopes with electron LINACs as one of the most compelling and largest-impact opportunities for the production of high specific activity radioisotopes. Improving the photonuclear cross sectional data base with experimentally verified results will greatly enhance a researcher’s ability to rationalize electron LINAC production routes towards desired radioisotopes. This work will provide the foundation for methodologies for determination of photonuclear cross sections over multiple energies and multiple targets in a single irradiation. The techniques developed in this project will enable future studies to continue verifying theoretically predicted photonuclear cross section with experimental results. These data will also enable adaptation of models and support more precise theoretical calculation of photonuclear cross sections. This research will involve undergraduates, graduate students, and post-docs to give them a valuable research experience leading towards the next generation of scientists in the field of medical isotopes.

07 ISOTOPE AND RADIATION SOURCES↗

Improving Cost and Safety with Cathode-Healing and Whole Battery Deactivation

Lithium-ion recycling is challenged by cost and safety related to reactivity of lithium and electrolytes. OnTo’s deactivation eliminates flammability and residual reactivity enabling a roadmap for safe, low-cost end-of-life battery services essential to the industry. Deactivation coupled with Cathode-healing provides safety and efficiency in material recycling that can be applied all along the manufacturing value chain. Dr. Sloop will present recent developments in application and scale of these innovative technologies.

25 ENERGY STORAGE↗

Deactivation and Cathode-Healing™ to support the Low-Cost US Supply Chain

Lithium-ion recycling is challenged by cost and safety related to reactivity of lithium and electrolytes. OnTo’s deactivation eliminates flammability and residual reactivity enabling a roadmap for safe, low-cost end-of-life battery services essential to the industry. Deactivation coupled with Cathode-healing provides safety and efficiency in material recycling that can be applied all along the manufacturing value chain. Dr. Sloop will present recent developments in application and scale of these innovative technologies.

25 ENERGY STORAGE↗

Multiple Stream Low-Cost Recycling Method

The global composite industry generates large quantities of waste and which mostly end as landfill due to lack of meaningful end-use applications for the multiple waste streams. In a recent report by the Electric Power Research Institute (EPRI), waste generated by the wind industry could reach 370,000 tons a year of composite wind energy blades being decommissioned and scrapped. Wind energy is just one major industry utilizing composite materials. The waste generated by industry includes End-of-Life (EoL) materials and manufacturing process scrap. GreenTex Solutions has developed a unique and innovative technology to recycle the composite waste streams in a range of forms made from production waste and EoL materials. This includes manufacturing waste materials such as dry chopped fiber tow, loose fibers, shredded fibers from reinforcement fabrics, cured/semi-cured prepregs, and it also includes fully-cured composite structure waste (such as edge trims from cured parts) from manufacturing aircraft, automobiles, wind blades, boats, and composite cylinders (tanks). Current recycling methods involve recovering the structural fiber by removing the matrix resin through methods such as pyrolysis. The resulting fibers are used in injection molding or wet laid nonwoven mats and other usable forms. The GreenTex technology bypasses these intermediate steps to create the lowest possible recycling processing costs and the lowest embodied energy/CO2 emissions. The end-product from the GreenTex technology is a finished industrial composite part/application versus intermediate fibers or fabrics. The GreenTex manufacturing process enables cross-industry reuse of recycled feedstock by taking waste from multiple industries (wind energy, aerospace, marine, etc.) and recycles the waste into a product used in other industries. The initial target market application is structural flooring for intermodal shipping containers and truck bodies. One of the team’s key partners is Wabash National which produced 29,000 truck bodies in 2019. The current flooring system is comprised of solid oak “butcher board” laminated panels. Additionally, Mediterranean Shipping Containers (MSC) transports over 1.8 million twenty-foot equivalent units per year in intermodal shipping containers. The current container floor is laminated hardwood that is harvested from the rain forests of Central and South America. The project is to develop a flooring system made from recycled composites that can be qualified for both companies (Wabash and MSC). Initial prototypes validated that the recycled composites panels are lighter and thinner with much higher mechanical strength. These results suggest a typical truck trailer would have 20% lower tare weight. The GreenTex technology is not limited to flooring and is widely applicable to other transportation elements such as walls, roof elements, cab areas and related structural components. Under this project different composite waste streams were evaluated and then combined to develop a formulation that would meet the targeted performance criteria for a flooring system. Wet compression molding was used to fabricate plaques at different tonnage using various composite waste streams. The plaques were tested for flexure and impact.

36 MATERIALS SCIENCE↗

AI@DOE Interim Executive Report

Interim executive report for DOE’s Office of Science, NNSA, and Applied Energy Offices, in collaboration with the Artificial Intelligence and Technology Office, DOE AI roundtable workshops (December 2021 through February 2022) (“AI@DOE”). These workshops were used to help identify AI research requirements and priorities for the next decade for Department of Energy in developing machine-learning-based prediction and decision-support capabilities that address and anticipate DOE mission challenges. These missions’ challenges for AI include: AI to advance scientific discovery and technological innovation AI to support high consequence decisions while managing risk AI to improve DOE’s responsiveness to national & global issues AI to assist stewardship of the environment and national critical infrastructure These will be addressed in large part through the development and application of new and powerful artificial intelligence and/or machine learning algorithms and strategies. https://web.cvent.com/event/fc3922f8-fc75-4041-a317-f13a1da44f7c/summary?locale=en-US&i=2Wx2tjbStkydRFq_N2whPw

97 MATHEMATICS AND COMPUTING↗

Windfarm Operations and Maintenance cost-Benefit Analysis Tool (WOMBAT)

This report provides technical documentation and background on the newly-developed Wind Operations and Maintenance cost-Benefit Analysis Tool (WOMBAT) software. WOMBAT is an open-source model that can be used to obtain cost estimates for operations and maintenance of land-based or offshore wind power plants. The software was designed to be flexible and modular to allow for implementation of new strategies and technological innovations for wind plant maintenance. WOMBAT uses a process-based simulation approach to model day-to-day operations, repairs, and weather conditions. High-level outputs from WOMBAT, including time-based availability and annual operating costs, are found to agree with published results from other models.

17 WIND ENERGY↗

Inferring Water Content from Neutron Die-away Curves for Planetary Science Applications

Signatures of liquid water on planetary bodies may provide evidence for past, present, or future life elsewhere in the solar system. Multiple current and upcoming planetary science missions are prioritizing the search for water, using innovative technologies and creative algorithms. For this project, we explore the capabilities of an instrument similar to the Dragonfly spacecraft to map water content on the surface of Titan, the largest moon of Saturn. We simulate Dragonfly’s neutron observations for a variety of soil compositions and develop multiple techniques to extract water content from the resultant neutron data. Additionally, we supplement neutron observations with gamma spectroscopy in an attempt to further refine water content estimates. This work is part of a larger study to employ Gaussian process regression to estimate a map of water content along the surface of Titan. Using the estimated map, an algorithm based on prediction difference mapping is employed to optimally move multiple Dragonfly detectors around the surface of Titan, fully autonomously.

79 ASTRONOMY AND ASTROPHYSICS↗

PipeSight: A High-Performance Computing Platform for Pipeline Integrity Management

The Phase I feasibility study completed as part of this project has led to a number of innovative technologies being developed and has laid the foundation for a successful Phase II effort to commercialize a platform for managing the integrity of pipelines for the damage mechanisms of the new, hybrid-energy based economy. To ground the development efforts and direction of the project, an extensive market research and customer discovery effort was undertaken early in Phase I. Through this effort, a number of pipeline owners and operators were interviewed, and the following key findings were discovered about the pipeline industry: • Small pipeline operators do not have the central engineering groups necessary to perform their own independent analysis of inspection data, but instead rely on summarized tally sheets provided to them by inspection service providers. • The time it takes to go from an inspection to a completed engineering assessment, even for small segments of pipeline, can take anywhere from 30-120 days. During this delay, critical threats can (and have been known to) cause failures. • Uncertainty is often not accounted for in the assessment of pipeline integrity. The tally sheets provided by third-party service providers are almost always deterministic in nature, identifying threats that present a concern only to the current (not the future) integrity of the pipeline. • It is uncommon to apply the latest technologies to perform advanced assessments of damaged pipelines. There is a desire to use more advanced analysis capabilities to assess threats. Many pipeline operators indicated that they would often excavate a pipeline to perform an inspection and find that the damage was not as bad as they anticipated, thus using limited resources unnecessarily. Companies are not consistent in their use of inspection data to determine corrosion rates, and those that do only calculate deterministic corrosion rates. • The industry has prominently relied on time-based inspections but has recently started to transition to risk-based inspections. However, there appears to be no uniform guidance on how to do so while properly accounting for all sources of uncertainty. • Companies are not storing inspection data in a manner that allows for the ready determination of temporal trends. • Predictive maintenance principles and practices are beginning to be used by early adopters • Some pipelines are being re-purposed to transport different process fluids than they were designed for, e.g., H 2 and CO 2 rich process streams to serve the new hybrid-energy based economy, which are presenting new integrity concerns for the existing pipeline network that crisscrosses the United States. As a result of these discoveries, we were able to target the development efforts in Phase I to best serve the needs of the industry. In Phase I, we developed a way to correlate multiple large-scale scans of the pipeline to determine a probabilistic corrosion rate that accounts for all sources of error and uncertainty in the inspection process. This probabilistic corrosion rate can be used to predict the future thickness distribution of the pipe wall. We demonstrate how this analysis may be performed in an analytical fashion and has been implemented in such a manner that it can be readily distributed using GPU computing through integration of the Kokkos programming model. We also make a very novel extension of the analytical corrosion rate model to Bayesian Networks (an explainable AI technique) that can account for non-parametric distributions of corrosion rates. With the predictions made above for the probabilistic corrosion rate and corresponding future distribution of the pipe wall thickness, we can assess the integrity of the pipeline through the use of a probabilistic engineering assessment. We developed a novel screening data analysis approach that can rapidly identify ‘hotspots’ (local thin areas) where the integrity of the pipeline is a concern. Once more, we implemented this screening approach in C++ to leverage GPU computing via the Kokkos programming model. After the critical hotspots are identified, we developed a program that can automatically generate an advanced finite element model of the damaged regions. Since the number of damaged regions that require advanced analysis can number in the thousands, we integrated an open-source container-native workflow engine for orchestrating parallel jobs on the cloud. Initially, these advanced numerical models were only designed to account for loading due to internal pressure. However, in a slight pivot from the initial Phase I proposal, we developed a complete pipe stress analysis program (called Simflex) which can simulate the complete pipeline and its response to thermal expansion, pressure, thermal bowing, weight, wind, earthquake, support displacement, support friction and external forces. This pipe stress analysis program was written generically, to handle any piping system, but contains the features needed to model long pipelines (i.e., it incorporates a model for soil mechanics and can account for the nonlinear boundary conditions necessary to simulate long underground pipelines). This pipe stress analysis program can simulate any segment of the pipeline (simple or complex) under any set of conditions and loads, to determine the supplemental loads (axial forces and bending moments) at the location of damage. This enables the most accurate state of stress to be accounted for in the pipeline, which can prove critical when evaluating the integrity of a damaged region. In the process of developing the technologies to perform the integrity assessment of the pipeline, we also extended one of the industry standard approaches for performing the assessment of local thin areas that extend more in the circumferential direction than the longitudinal direction of the pipeline. This approach was presented to the API 579-1/AS ME FFS-1 steering committee in November 2021 for consideration in the next edition of the industry standard for Fitness-For-Service (expected to be released in 2023). To help pipeline operators make decisions with the results on any integrity assessment, we developed a new approach to the life-cycle management of pipelines which uses a Bayesian Decision Network. The network is designed to help pipeline operators plan and prioritize inspection activities and ultimately make smarter, more cost-effective decisions. The Bayesian approach accounts for all sources of uncertainty and carries them through to the final optimal decisions, providing a probabilistic framework for optimizing inspection intervals. The proof-of-concept networks developed in the feasibility study are complete, verified, and are focused on a subset of the pipeline. To expand this novel approach to the scale necessary for an entire network of pipelines in Phase II, we will leverage the DOE-funded Bengi solver for industrial-scale decision making with Bayesian Networks [22]. Once implemented, we will be able to provide the pipeline industry with a much-needed tool for optimal inspection planning using truly explainable artificial intelligence (XAI). To handle all of these advanced capabilities into a cloud-based platform, the architecture of the Equity Engineering Cloud (EEC) was extended to include Argo Workflows, a framework capable of distributing and managing a massive number of jobs that consume their own resources, such that thousands of serial finite element simulations can be run in parallel. As part of this substantial undertaking, we also integrated Argo Continuous Delivery (CD) into the EEC, to aid with the rapid prototyping and iterations that will be imperative to the success of the PipeSight platform’s Agile development process in Phase II. As part of the pipe stress analysis program, we also developed a custom visualizer that leverages the DOE-funded VTK visualization library. We added custom contouring capabilities and a means for interacting visually with both the inputs and outputs of the pipe stress analysis program. We also developed routines for automating the post-processing of the finite element simulations to determine if any failure criteria are met and to visualize the deformations, stresses and strains in ParaView using the exodus II file format (a subset of netCDF).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Demonstration of Scaled-Production of Rare Earth Oxides and Critical Materials from U. S. Coal-Based Sources (Final Report)

The project objective was to demonstrate scaled production of high purity rare earth oxides (REO), nominally exceeding 90% grade, from coal refuse sources using innovative technologies that reduce cost and improve environmental outcomes relative to traditional rare earth processing technologies. The project utilized a critical material pilot plant constructed and tested as part of a previous U.S. Department of Energy project. Target performance criteria was a 50% reduction in production cost based on previous optimum values, 150% increase in recovery and greater than 2% concentrates of rare earth oxides, cobalt and manganese. Concentrate production goals were to produce a rare earth mix oxide product at a rate of 200 grams per day having a minimum purity of 50% as well as products of cobalt and manganese having a minimum purity of 2%. A previous pilot plant investigation identified acid cost as the major contributor to an operating cost that made the recovery of rare earth and other critical metals from bituminous coal sources economically challenging. As such, acid cost reduction was a major target using bio-oxidation reactors to produce sulfuric acid from naturally occurring coal pyrite. Based on laboratory data, a bio-oxidation circuit was designed for the pilot plant to produce 7.5 l/min of acid using two 11-m3 (3000 gallon) reactors equipped with 40 hp aerators for air dispersion. The pilot-scale tests revealed that acid concentration equivalent to as high as 1.0 M sulfuric acid could be continuously produced. However, the bio-acid contained exceptionally high iron concentrations, which complicated downstream processing of the pregnant leach solution (PLS). A TEA of the bio-oxidation circuit showed that production cost was approximately $0.13 per kg acid equivalent if produced using a four-day retention time in the reactors. This value represents a 48% reduction from that of purchased bulk sulfuric acid. Calcination (or roasting) studies were conducted on coarse refuse from West Kentucky No. 13 and Fire Clay coal seam sources. The test results revealed the potential to increase recovery by nearly 100% using temperatures between 500°C to 700°C with light REE recovery value being the most improved. Acid baking of the calcined products using sulfuric acid at 250°C increased heavy rare earth recovery from around 40% to 80% while decreasing the acid requirements by over 50%. The existing pilot plant was upgraded for the pilot scale demonstration of REE and CM recovery. The primary feedstocks were West Kentucky No.13 and heap leach pregnant leach solution (PLS) while a secondary feedstock was a lignite waste material from a construction sand operation. The pilot scale operation started with PLS generation through leaching followed by iron and aluminum removal, nominally at 3.3 and 4.5 pH, respectively. Leaching lixiviants used for the test were industrial grade sulfuric acid or bio-acid generated at the pilot scale facility. For most of the tests, the solid feed rate was 200 lb/hr whereas lixiviant was added at 2 gpm to provide an optimal residence time of 45 minutes. Following the contaminant removal step, several different process schematics were tested with the goal of maximizing REE recovery and purity. In the first test, direct processing of aluminum precipitation raffinate for REE recovery using oxalic acid at pH 1.5 was investigated. Overall REE recovery was approximately 45%. Unfortunately, elevated calcium content in the PLS significantly impacted the RE-Oxide product grade. Similarly, high calcium content decreased both the product purity and grades of CM products. As such, a new flowsheet was tested with the same initial process schematic but different precipitation stages for REEs and CMs at pH 6.0 and 9.0, respectively. It was noted that the overlapping precipitation behavior of Co, Ni and Zn with REEs limited the applicability of this process schematic. While this change increased the RE-Oxide grade from 36% in the first test to 87%, the loss of critical metals to the REE cake and bypass of the REEs to the CM cake significantly impacted the recovery of both REEs and CMs. Therefore, the modified process flowsheet combined oxalic acid precipitation stage raffinate and redissolved CM cake filtrate to maximize both the recovery and purity of the products. Consequently, a RE-Oxide product with 85% purity and CM cakes with over 19% Co, 38% Ni, 14% Zn and 9% Mn content were generated with significantly higher recoveries. While the modified process flowsheet improved recoveries and grades, elemental losses observed in separate precipitation and redissolution losses inspired the adaptation of a single precipitation stage at pH 9.0 for both REEs and CMs. This change was anticipated to maximize the REE recovery while minimizing the costs associated with separated redissolution and processing stages. As expected, REE recovery in this new circuit arrangement was over 56% with a product grade of over 87% RE-Oxide content. Similarly, Co, Ni, Mn, and Zn recoveries of 54%, 40%, 67%, and 66%, respectively, were achieved. Unfortunately, the elevated calcium content present in the solution due to its precipitation at pH 9.0 caused a decrease in the CM cake quality. Therefore, the final process flowsheet involved the addition of calcium oxalate precipitation following the oxalic acid precipitation stage, which effectively eliminated calcium contamination of the CM products. Finally, the pilot scale experiments conducted using bio-acid achieved comparable REE leaching recoveries to the conventional sulfuric acid leaching. Elevated iron concentration in the solution caused the co-precipitation of REEs with the iron and aluminum cake, resulting in the REE losses. Furthermore, elevated iron content bypassing the iron and aluminum precipitation stages contaminated the metal sulfide and manganese cake, respectively. A techno-economic analysis was performed based on a commercial facility capable of treating 500 tph of coal-based material. The production cost for West Kentucky No. 13 coarse refuse material ranged from approximately $500-$700/kg of total rare earth oxide whereas the lignite source had significantly lower production cost of $100-$300/kg. The significant difference in cost was due to the easier leaching characteristics of the lignite material and the higher feed concentrations. All process scenarios resulted in a negative net present value (NPV). For the lignite feedstock, laboratory REE leach recovery values were about 30% higher than the pilot plant data. Using the lab leach results, a positive net present value was achieved and the production cost decreased from $100-$300 $/kg to less than $150/kg of total REO.

01 COAL, LIGNITE, AND PEAT↗