Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “scope”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

SR19021 Tritium Aging of Regenerated LANA.75 (Final Project Report)

The Savannah River Tritium Enterprise (SRTE) has used the metal hydride LaNi 4.25 Al 0.75 (LANA.75) in the Tritium Facilities for over two decades. LANA.75 beds store significant quantities of tritium but have a limited service life due to the radiolytic decay of tritium to He-3 within the metal matrix. It has been shown that heating tritium-aged LANA.75 under vacuum can reverse tritium aging effects, eliminating the heel of trapped hydrogen, and restoring the reversible capacity. Additional investigation is needed to ensure there are no unexpected changes to the hydride before this restoration technique is employed in full scale beds in the Tritium Facilities. This project was to be comprised of three distinct scopes: obtain tritium aging data on the sample regenerated in 2018, regenerate a tritium-aged sample at 600 °C, and perform thermal stability testing on a non-tritiated sample. Isotherms were collected on the previously regenerated sample after approximately two years of tritium aging. Isotherms were collected at 80, 100, and 120 °C. As expected, there was a decrease in the plateau pressure, an increase in plateau slope, and a portion of the “heel” of tritium trapped in the metal had been reestablished. Unexpectedly, it appeared that the plateau had shortened at the higher tritium to metal ratios as well. This is typically seen in older samples. The second scope, to regenerate a second tritium-aged LANA.75 sample, was not completed. A Task Technical and Quality Assurance Plan was written and approved, a high temperature test cell was fabricated, several pre-job briefs were held, and the hydride sample was passivated with air. Despite these successes, the hydride sample was not recovered from the legacy test cell. The third scope was to perform thermal stability testing on a “cold” LANA.75 sample. A non-tritiated sample of LANA.75 was held at 750 °C under vacuum for 200 hours to simulate exposure to multiple regeneration evolutions. Hydride isotherm performance, chemical composition, crystallinity, particle size, and morphology are compared between the pre- and post-regeneration samples. No significant changes were observed in composition, crystallinity, or particle size. Comparison of before and after isotherms showed that performance improved rather than deteriorated during the evolution. Scanning Electron Microscopy (SEM) analysis showed small growths on the particle surface after exposure to regeneration conditions. Additional testing will be required to determine the cause of these growths.

07 ISOTOPE AND RADIATION SOURCES↗

Production Agency Quality Assurance Management Execution Strategy [Thesis]

There are multiple federal directives that Los Alamos National Laboratory (LANL) must follow for the proper implementation of quality assurance, strategic planning, and execution of manufacturing and surveillance operations. Recent assessments identified that manufacturing in all processing areas is dynamic due to influencing scope changes, design modifications, funding adjustments, and staff attrition. In response, this project was started to develop a comprehensive PAQ execution strategy to support the success of LANL’s manufacturing mission. This project’s method for developing an updated architecture was to create an integrated, flexible, reliable, and agile strategic process. The execution plan has five deliverables: 1) an integrated schedule view of PAQ work scope, 2) a resource management plan that aligns with the required scope, 3) a metrics monitoring dashboard, 4) a project management plan for sustaining NAP 401.1A implementation, and 5) a risk management plan. The research design is a mixed-method approach focused on data collection for each deliverable. The methodology entails qualitative and quantitative research, metrics monitoring, data analysis, and the creation of a dashboard. The qualitative methods used include literature reviews and interviews. The quantitative methods include resource, financial, schedule and survey data analysis. Preliminary and final results were peer reviewed by subject matter experts both within the ALDWP organization and deployed support.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

INL Site ARG-US Implementation – FY22 Activities and FY23 Plans

The Packaging Certification and Life Cycle Management program at Argonne National Laboratory (ANL) developed a suite of monitoring systems collectively referred to here as ARG-US. ARG-US provides necessary data for nuclear facility and system operation and maintenance, and has been previously demonstrated in hot cells, radioactive material (RAM) storage areas, and RAM shipment trucks. It has also been installed directly on RAM storage and shipment containers. ARG-US offers some unique advantages over other commercially available systems by using wireless data connections, battery power supplies, and customizable monitoring methods. Idaho National Laboratory (INL) has been tasked with investigating applications for ARG-US at INL site facilities, which are operated by several different contractors. The initial investigation scope centered on CPP-603 Irradiated Fuel Storage Facility in relation to the upcoming Department of Energy (DOE) Spent Nuclear Fuel (SNF) Packaging Demonstration. The investigation has been led by the Used Fuel Management Department in INL’s Nuclear Science and Technology (NS&T) directorate. This investigation is expected to recommend INL site processes or facilities in which to implement ARG-US systems. INL has engaged local site technical and oversight representatives, security, nuclear safeguards, and program management personnel to identify good candidates for ARG-US test implementations. INL has identified the following high-level goals for any INL site implementation of ARG-US: provide unique testing environments, prompt development of new monitoring methods/techniques for the ARG-US suite, and acquire useful monitoring for the user facility. As a result, INL suggests three program areas for further investigation: CPP-603 Fuel Handling Cave (FHC), legacy mixed waste storage systems at Idaho Nuclear Technology & Engineering Center (INTEC) known as the “Tank Farm,” and periodic and emergency environmental monitoring. This progress report relates activities undertaken in this investigation, describes the preliminary areas of interest for limited scope ARG-US testing or implementation, and relays expected actions for completing the task scope. This report offers an opportunity to the program sponsor, technical leads at ANL, and INL site representatives to give feedback on the initial assessment and make recommendations on the forthcoming activities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modeling and Simulation Development Pathways to Accelerating KP-FHR Licensing (Final Report)

This project assembles a strong U.S. industry and national laboratory team to complete scope of work. Kairos Power (KP), headquartered in Alameda, CA, is the leader of this effort and has built an internal team of highly competent engineers and managers with extensive combined experience in nuclear power, conventional power, product development, and licensing. INL, ANL, and LANL bring unique capabilities in advanced reactor R&D and licensing. The project funding source is the result of FOA No. 0001817, U. S. Industry Opportunities for Advanced Nuclear Technology Development. There has been on-going work and this Access Cooperative Research and Development Agreement (CRADA) will cover the remaining work scope of FOA 0001817. KP is implementing innovative strategies that can reduce the cost and accelerate the initial demonstration of the Kairos Power Fluoride-salt-cooled, High-temperature Reactor (KP-FHR) to meet the needs of the U.S. electricity market by 2030. Licensing of the KP-FHR could be significantly accelerated using advanced computing methods with sufficient predictive capabilities to be able to extrapolate potential response of the structure in different scenarios. However, currently used computational methods heavily rely on empirical fits and cannot be used for extrapolation. The scope focuses on improving the modeling capability in the NEAMS Grizzly structural mechanics code and the NEAMS BISON fuel performance code and the NEAMS SAM systems analysis code. This work leverages the expertise and know-how gathered in three DOE National Laboratories – INL, ANL, and LANL.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Pioneer WEC concept design report

The "Pioneer WEC" project is targeted at developing a wave energy generator for the Coastal Surface Mooring (CSM) system within the Ocean Observatories Initiative (OOI) Pioneer Array. The CSM utilizes solar photovoltaic and wind generation systems, along with rechargeable batteries, to power multiple sensors on the buoy and along the mooring line. This approach provides continuous power for essential controller functions and a subset of instruments, and meets the full power demand roughly 70% of the time. Sandia has been tasked with designing a wave energy system to provide additional electrical power and bring the CSM up-time for satisfying the full-power demand to 100%. This project is a collaboration between Sandia and Woods Hole Oceanographic Institution (WHOI), along with Evergreen Innovations, Monterey Bay Aquarium Research Institute (MBARI), Eastern Carolina University (ECU), Johns Hopkins University (JHU), and the National Renewable Energy Laboratory (NREL). This report captures Phase I of an expected two phase project and presents project scoping and concept design results.

16 TIDAL AND WAVE POWER↗

Robust Combined Heat and Hybrid Power (CHHP) for High Electrical Efficiency Cogeneration

Georgia Tech (Prime Recipient), the University of Texas at El Paso (UTEP) and the National Energy Technology Laboratory (NETL) investigated a hybrid fuel cell/ gas turbine system concept as a combined heat and hybrid power (CHHP) system for both robust and high power-to-process heat ratio cogeneration. The novelty of the proposed system entailed the distinct, elevated electrical efficiencies it maintains while simultaneously supporting a broad span of heating needs (e.g., supply temperatures) demanded across variable heat loads. The scope included: 1) leveraging a pioneering national lab facility configured for dynamic system operability development of hybrid fuel cell/gas turbine cycles; 2) enabling technology development to adjust and modulate the quality and quantity of thermal supply to bottoming heat loads via novel extreme temperature gas bypass valves. Hybrid fuel cell/gas turbine systems have primarily been reduced-to-practice in a constrained (e.g., initial proof-of-concept) manner and have still demonstrated considerable electrical efficiencies. However, these pre-pilot systems have focused upon electrical efficiencies and electrical power generation as the exclusive energy demand. Such hybrid systems had not been extensively researched or developed for flexible and variable operation consisting of both power and heat demands; however, these variable combined power and heat demands are characteristic of many types of manufacturers such as animal/poultry processing, bakeries and milk/flour/pastry manufacturing, textile mills, and electrochemical processing. Commercially, developing the system into a working combined heat and power system benefits these types of manufacturers by allowing them to meet their power and heat demands at a lower cost, higher efficiency, and/or through onsite generation. Therefore, the technical scope of this project was largely to study and facilitate these hybrid systems as combined heat and hybrid power (CHHP) systems that include dynamic operability for variable heat and power loads and/or grid dynamics for various types of manufacturers. Simulation results were used to predict the performance of the CHHP system and conceptually develop it to achieve desired dynamic operability. Experimentally, the primary goal was to design, manufacture, and experiment upon a high-temperature bypass valve. Experimental data included air mass flow rates through the valve orifice when the valve was changed to variable extent between fully closed and fully open. The experimental data was then used to create a semi-empirical computational model of the bypass valve. Concluded simulation goals for the research included developing computational heat exchanger models for the hybrid system inclusive of the bottoming heat exchanger and the recuperative heat exchanger, and then combining the computational recuperator model with the computational valve model. Afterwards, the computational models were then integrated to predict the dynamic operation of hybrid fuel cell/gas turbine cycles throughout a design space and reporting such. The scope stated in the preceding paragraph was packaged into five specific goals: 1) enabling the simulation of dynamic combined heat and power through the creation of computational, modular heat exchanger models; 2) simulation and exploration of the CHHP system’s performance by integrating the heat exchanger models with the national lab’s pre-existing hybrid system (computational) simulation, but without the recuperator bypass valve concept in order to initially determine how the (baseline) system behaves and can be controlled in order to meet variable heat and power demands; 3) development and initial deployment of the high-temperature recuperator bypass valve technology in order to confirm and characterize the approach; 4) usage of the experimental data for the valve to create a semi-empirical computational model for the bypass valve which could then be combined with the heat exchanger computational models; 5) repeat of the second task of simulating and exploring the system’s performance, but this time including the bypass valve to resolve its efficacy. Tasks were successfully completed, and the general notion of flexibly operating, high electrical efficiency CHHP was further corroborated. Supportive details are provided in the report.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

T-1073: 2016 Precision Beam Timing Monitor

This is a technical scope of work (TSW) between the Fermi National Accelerator Laboratory (Fermilab) and the experimenters of Fermilab, Northern Illinois University (NIU), Lewis University, and Purdue University, who have committed to participate in beam tests to be carried out during the 2015-2016 Fermilab Test Beam Facility program. The TSW is intended primarily for the purpose of recording expectations for budget estimates and work allocations for Fermilab, the funding agencies and the participating institutions. It reflects an arrangement that currently is satisfactory to the parties; however, it is recognized and anticipated that changing circumstances of the evolving research program will necessitate revisions. The parties agree to modify this scope of work to reflect such required adjustments. Actual contractual obligations will be set forth in separate documents. This TSW fulfills Article 1 (facilities and scope of work) of the User Agreements signed (or still to be signed) by an authorized representative of each institution collaborating on this experiment.

43 PARTICLE ACCELERATORS↗

T-1068: The Beam Test for the SVX4 Telescope

This is a technical scope of work (TSW) between the Fermi National Accelerator Laboratory (Fermilab) and the experimenters of KEK and Osaka University who have committed to participate in beam tests to be carried out during the 2016 Fermilab Test Beam Facility program. The TSW is intended primarily for the purpose of recording expectations for budget estimates and work allocations for Fermilab, the funding agencies and the participating institutions. It reflects an arrangement that currently is satisfactory to the parties; however, it is recognized and anticipated that changing circumstances of the evolving research program will necessitate revisions. The parties agree to modify this scope of work to reflect such required adjustments. Actual contractual obligations will be set forth in separate documents. This TSW fulfills Article 1 (facilities and scope of work) of the User Agreements signed (or still to be signed) by an authorized representative of each institution collaborating on this experiment.

43 PARTICLE ACCELERATORS↗

Microchannel-based Membrane-less Extraction of Li from Unconventional Lithium Sources & the Separation of REE

This final report provides an overview of the Project's entire duration, covering July 1, 2021 to December 31, 2023. It primarily focuses on the achievements, technological developments, and unique challenges the team faced while working on separating and extracting Lithium from produced waters. The project's primary aim was to create an integrated, high-throughput, membrane-less, and modular microfluidic platform that could extract Lithium from unconventional sources. We have successfully met all goals and milestones envisioned in the SOPO document. The most critical primary milestones, including the Go-No-Go milestone (refer to the Gantt chart in the Appendices), were successfully accomplished. We demonstrated phase separation (>90%) and extraction (>85%) performance in the MPSE using synthetic, and representative produced water composition feed at 50 ml/min total flow through MPSE 36. We have also performed a parametric study of the MPSE operations, beyond the scope of SOPO, exploring operating conditions of current and broader interest. The extended investigation of operational parameters is concurrent with our efforts to seek further development of the MPSE technology beyond the scope of the Project. Along these lines of development, we have made efforts to be responsive to DOE calls for technological developments of other types of resources (beyond PW) for the recovery of Critical Materials and higher TRL development (beyond TRL 4). During the work on this Project, we developed and implemented three innovative technical approaches that emerged from our efforts to successfully meet the Project milestones. The innovative & original technical approaches developed and implemented in this Project are now the contributions to process engineering that could be clearly credited to the Project. First, Convergent Design Approach is a comprehensive feedforward & feedback loop of four design phases: i) design for functionality, ii) design for manufacturing, iii) design for sustainability, and iv) design for market. Next was Process Intensification. A major aim of this Project was to create an innovative phase separation & extraction microscale-based technology for Li separation – thus the words microchannel-based in the Project title. A microscale-based technology is intrinsically in the center of the Process Intensification domain as defined by its unique principles. Therefore, Process Intensification was implicitly envisioned in the Project’s SOPO. Lastly, Time Scale Analysis is a novel tool for discovering the needs and directions of Process Intensification implementations in any process technology. This Project is fully credited for developing and implementing the three novel technical approaches mentioned above. These are general contributions to process engineering that emerged from this Project. Beyond the original SOPO scope, the OSU-U.Pitt research group utilized a Convergent Design methodology, integrating first-principles mathematical modeling with experimental validation on the Minimum Development Vehicle. By creating these Digital Twins, the team rapidly assessed manufacturing iterations to support TEA analysis. This framework further enabled the development of advanced Surface Modification Techniques, where hydrophobic and oleophobic coating strategies were optimized via Digital Twin tools and validated through rigorous 100-hour longevity testing. TEA Analysis: The closing efforts of this Project were focused on the TEA analysis. TEA analysis had two primary functions: i) enabling critical assessments of design variations withing 10 the Concurrent Design Approach, thus enabling evolution of the MPSE design to reach faster- better-cheaper alternatives; and ii) to create a bridge between the accomplishments of this Project and future projects of higher TRL, beyond TRL 6 level. It is important to note that the TEA model created in the Project stirred the technological solutions for the recovery of critical materials toward a vision of a very profitable modular plant that has unique zero-waste water discharge signature. More importantly, thanks to our experimental performance data and conservative assumptions, the TEA model predicts minimal technological and investment risks. Low cost of a modular unit of a nominal capacity of [1000 tons of Li 2 CO 3 /year] positions the MPSE based technology within the reach of community investors, thus offering a paradigm shift in the development of critical technologies. The project successfully navigated two primary challenges: solvent selection and manufacturing adaptation. Restricted by the SOPO to existing literature for lithium recovery, the team identified a critical need for a "material excellence program" to develop next-generation solvents, eventually concluding with a preliminary investigation into promising Ionic Liquids (ILs). Simultaneously, COVID-19 supply chain disruptions forced a pivot from traditional manufacturing to advanced additive methods at ATAMI-OSU. By transitioning from stainless steel to 3D-printed polymer substrates, the team achieved a transformative three-order-of- magnitude reduction in manufacturing costs and compressed prototyping timelines from several months to just two days. The MPSE technology offers significant energy, environmental, and economic advantages by overcoming the traditional bottlenecks of phase-separation hardware and contactor size. Unlike conventional mixer-settlers or membrane-based systems, MPSE operates without moving parts or fouling-prone membranes, achieving robust performance even with challenging, viscous, or particulate-heavy feeds. Key performance metrics include an energy intensity reduction of 5–50x (3–40 kJ/m 3 ) compared to incumbent technologies and a dramatic reduction of processing time to under 60 seconds, which drastically reduces the physical plant footprint. These technical efficiencies translate into superior economic outcomes; for a 100 t/year Li 2 CO 3 facility, implementing MPSE is projected to nearly halve contactor CAPEX (from $\$$6.08M to $\$$3.01M) and significantly increase the project's Net Present Value (NPV), derisking new investment and enabling distributed critical-mineral processing configurations. The commercialization of MPSE technology is being spearheaded by Vigsur Dynamics Inc., which has adopted a structured, parallel approach to technical and business development since its formation in January 2026. Following extensive customer discovery and engagement with the Oregon State University accelerator, Vigsur Dynamics is working to establish a business model that transitions from pilot demonstrations to modular hardware sales, ultimately aiming for a "build-own-operate" service strategy. Current technical milestones—including 100 hours of continuous operation, superior energy efficiency, and successful 6-unit modular scale-up— provide a foundation for this transition. Backed by ongoing IP licensing and a growing network of industrial and venture advisors, the company is actively de-risking the platform to replace conventional mixer-settler systems in the critical minerals market.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Preliminary Neutronics Design Studies for a Molten Salt Blanket LIFE Engine

The Laser Inertial Confinement Fusion Fission Energy (LIFE) Program being developed at Lawrence Livermore National Laboratory (LLNL) aims to design a hybrid fission-fusion subcritical nuclear engine that uses a laser-driven Inertial Confinement Fusion (ICF) system to drive a subcritical fission blanket. This combined fusion-fission hybrid system could be used for generating electricity, material transmutation or incineration, or other applications. LIFE does not require enriched fuel since it is a sub-critical system and LIFE can sustain power operation beyond the burnup levels at which typical fission reactors need to be refueled. In light of these factors, numerous options have been suggested and are being investigated. Options being investigated include fueling LIFE engines with spent nuclear fuel to aid in disposal/incineration of commercial spent nuclear fuel or using depleted uranium or thorium fueled options to enhance proliferation resistance and utilize non-fissile materials [1]. LIFE engine blanket designs using a molten salt fuel system represent one area of investigation. Possible applications of a LIFE engine with a molten salt blanket include uses as a spent nuclear fuel burner, fissile fuel breeding platform, and providing a backup alternative to other LIFE engine blanket designs using TRISO fuel particles in case the TRISO particles are found to be unable to withstand the irradiation they will be subjected to. These molten salts consist of a mixture of LiF with UF{sub 4} or ThF{sub 4} or some combination thereof. Future systems could look at using PuF{sub 3} or PuF{sub 4} as well, though no work on such system with initial plutonium loadings has been performed for studies documented in this report. The purpose of this report is to document preliminary neutronics design studies performed to support the development of a molten salt blanket LIFE engine option, as part of the LIFE Program being performed at Lawrence Livermore National laboratory. Preliminary design studies looking at fast ignition and hot spot ignition fusion options are documented, along with limited scoping studies performed to investigate other options of interest that surfaced during the main design effort. Lastly, side studies that were not part of the main design effort but may alter future work performed on LIFE engine designs are shown. The majority of all work reported in this document was performed during the Molten Salt Fast Ignition Moderator Study (MSFIMS) which sought to optimize the amount of moderator mixed into the molten salt region in order to produce the most compelling design. The studies in this report are of a limited scope and are intended to provide a preliminary neutronics analysis of the design concepts described herein to help guide decision processes and explore various options that a LIFE engine with a molten salt blanket might enable. None of the designs shown in this report, even reference cases selected for detailed description and analysis, have been fully optimized. The analyses were performed primarily as a neutronics study, though some consultation was made regarding thermal-hydraulic and structural concerns during both scoping out an initial model and subsequent to identifying a neutronics-based reference case to ensure that the design work contained no glaring mechanical or thermal issues that would preclude its feasibility. Any analyses and recommendations made in this report are either primarily or solely from the point of view of LIFE neutronics and ignore other fundamental issues related to molten salt fuel blankets such as chemical processing feasibility and political feasibility of a molten salt system.

42 ENGINEERING↗

Fiscal Year 2007 Phased Construction Completion Report for the Zone 2 Soils, Slabs, and Subsurface Structures at East Tennessee Technology Park, Oak Ridge, Tennessee

The purpose of this Phased Construction Completion Report (PCCR) is to present the fiscal year (FY) 2007 results of characterization activities and recommended remedial actions (RAs) for 11 exposure units (EUs) in Zone 2 (Z2-01, Z2-03, Z2-08, Z2-23, Z2-24, Z2-28, Z2-34, Z2-37, Z2-41, Z2-43, and Z2-44) at the East Tennessee Technology Park (ETTP), which is located in the northwest corner of the U.S. Department of Energy (DOE) Oak Ridge Reservation in Oak Ridge, Tennessee (Fig. 1). ETTP encompasses a total land area of approximately 5000 acres that has been subdivided into three zones--Zone 1 ({approx}1400 acres), Zone 2 ({approx}800 acres), and the Boundary Area ({approx}2800 acres). Zone 2, which encompasses the highly industrialized portion of ETTP shown in Fig. 1, consists of all formerly secured areas of the facility, including the large processing buildings and direct support facilities; experimental laboratories and chemical and materials handling facilities; materials storage and waste disposal facilities; secure document records libraries; and shipping and receiving warehouses. The Zone 2 Record of Decision for Soil, Buried Waste, and Subsurface Structure Actions in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2005) (Zone 2 ROD) specifies the future end use for Zone 2 acreage as uncontrolled industrial for the upper 10 ft of soils. Characterization activities in these areas were conducted in compliance with the Zone 2 ROD and the Dynamic Verification Strategy (DVS) and data quality objectives (DQOs) presented in the Remedial Design Report/Remedial Action Work Plan for Zone 2 Soils, Slabs, and Subsurface Structures, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2007) (Zone 2 RDR/RAWP). The purpose of this PCCR is to address the following: (1) Document DVS characterization results for the accessible EUs in FY 2007; (2) Describe and document the risk evaluation for each EU, and determine if the EU met the Zone 2 ROD requirements for unrestricted industrial use to 10 ft bgs; (3) Identify additional areas not defined in the Zone 2 ROD that require remediation based on the DVS evaluation results; and (4) Describe the RAs performed in Zone 2. The Zone 2 ROD divided the Zone 2 area into 7 geographic areas and 44 EUs. To facilitate the DQOs of the DVS process, the Zone 2 RDR/RAWP regrouped the 44 EUs into 12 DQO scoping EU groups. These groups facilitated the DQO process by placing similar facilities and their support facilities together and allowed identification of data gaps. The EU groups were no longer pertinent after DQO planning was completed, and characterization was conducted as areas became accessible. As the opportunity to complete characterization became available, the planned DVS program was executed and completed in FY 2007 for the 11 EUs addressed in this document. The main body of this report describes both the DVS process and scope of work performed and the RAs completed. The scope and approach for performing DVS activities performed in FY 2007 that lead to action/no further action decisions are presented in Sects. 2 through 4. RAs performed in FY 2007 are presented in Sects. 5 through 10. Future land use is described in Sect. 11, and the status of all Zone 2 EUs as of this PCCR is presented in Sect. 12.

54 ENVIRONMENTAL SCIENCES↗

Executive summary of major NuMI lessons learned: a review of relevant meetings of Fermilab's DUSEL Beamline Working Group

We have gained tremendous experience with the NuMI Project on what was a new level of neutrino beams from a high power proton source. We expect to build on that experience for any new long baseline neutrino beam. In particular, we have learned about some things which have worked well and/or where the experience is fairly directly applicable to the next project (e.g., similar civil construction issues including: tunneling, service buildings, outfitting, and potential claims/legal issues). Some things might be done very differently (e.g., decay pipe, windows, target, beam dump, and precision of power supply control/monitoring). The NuMI experience does lead to identification of critical items for any future such project, and what issues it will be important to address. The DUSEL Beamline Working Group established at Fermilab has been meeting weekly to collect and discuss information from that NuMI experience. This document attempts to assemble much of that information in one place. In this Executive Summary, we group relevant discussion of some of the major issues and lessons learned under seven categories: (1) Differences Between the NuMI Project and Any Next Project; (2) The Process of Starting Up the Project; (3) Decision and Review Processes; (4) ES&H: Environment, Safety, and Health; (5) Local Community Buy-In; (6) Transition from Project Status to Operation; and (7) Some Lessons on Technical Elements. We concentrate here on internal project management issues, including technical areas that require special attention. We cannot ignore, however, two major external management problems that plagued the NuMI project. The first problem was the top-down imposition of an unrealistic combination of scope, cost, and schedule. This situation was partially corrected by a rebaselining. However, the full, desirable scope was never achievable. The second problem was a crippling shortage of resources. Critical early design work could not be done in a timely fashion, leading to schedule delays, inefficiencies, and corrective actions. The Working Group discussions emphasized that early planning and up-front appreciation of the problems ahead are very important for minimizing the cost and for the greatest success of any such project. Perhaps part of the project approval process should re-enforce this need. The cost of all this up-front work is now reflected in the DOE cost of any project we do. If we are being held to an upper limit on the project cost, the only thing available for compromise is the eventual project scope.

43 PARTICLE ACCELERATORS↗

FY-09 Summary Report to the Office of Petroleum Reserves on the Western Energy Corridor Initiative Activities and Accomplishments

To meet its programmatic obligations under the Energy Policy Act of 2005, the Office of Naval Petroleum and Shale Oil Reserves (NPSOR) has initiated the Western Energy Corridor Initiative (WECI). The WECI will implement the Unconventional Strategic Fuels Task Force recommendations for accelerating and promoting the development of domestic unconventional fuels to help meet the nations’ energy needs. The mission of the WECI is to bolster America’s future fuel security by facilitating socially and environmentally responsible development of unconventional fuels resources in the Western Energy Corridor, using sound engineering principles and science-based methods to define and assess benefits, impacts, uncertainties, and mitigation options and to resolve impediments. The Task Force proposed a three-year program in its commercialization plan. The work described herein represents work performed by Idaho National Laboratory (INL) in support of the DOE’s WECI. This effort represents an interim phase of work, designed to initiate only select portions of the initiative, limited by available funding resources within NPOSR. Specifically, the work presented here addresses what was accomplished in FY-09 with the remaining carryover (~$420K) from NPOSR FY-08 funds. It was the intent of the NPOSR program to seek additional funding for full implementation of the full scope of work; however, the original tasks were reduced in scope, terminated, or eliminated (as noted below). An effort is ongoing to obtain funding to continue the tasks initiated under this project. This study will focus on the integrated development of multiple energy resources in a carbon-neutral and environmentally acceptable manner. Emphasis will be placed on analyses of the interrelationships of various energy-resource development plans and the infrastructure, employment, training, fiscal, and economic demands placed on the region as a result of various development scenarios. The interactions at build-out during the design, permitting, and construction of individual and multiple energy developments are not fully considered at the local, state, regional, or national levels. The net impacts to the Western Energy Corridor cannot be understood and the design optimized under the current approach. A regional development plan is needed to model cumulative impacts, determine the carrying capacity of the basin, and provide valuable technically based information to both skeptics and advocates. The INL scope of work for FY-09 involved six tasks: 1. Evaluation of the ASPEN Code as a dynamic systems model for application and use under the WECI and communications with Alberta Oil Sands Research Institutions as an “analog” resource development in the Western Energy Corridor 2. Application of the Aspen Plus computer model to several oil shale processes to consider energy balances and inputs and outputs (e.g. water consumption, CO2 production, etc.) 3. Development of a regulatory roadmap for oil shale developments 4. Defining of the physiographic extent of the natural resource reserves that comprise the Western Energy Corridor 5. A review of the Unconventional Fuels Task Force Report to Congress for ideas, concepts and recommendations that crosscutting plans 6. Program development with stakeholders, including industry, academics, state and federal agencies, and non government organizations. This task also includes project management, strategic development and reporting.

04 OIL SHALES AND TAR SANDS↗

Adagio 4.14 user s guide.

This document is a user's guide for the code Adagio. Adagio is a three-dimensional, implicit solid mechanics code with a versatile element library, nonlinear material models, and capabilities for modeling large deformation and contact. Adagio is a parallel code, and its nonlinear solver and contact capabilities enable scalable solutions of large problems. It is built on the SIERRA Framework [1, 2]. SIERRA provides a data management framework in a parallel computing environment that allows the addition of capabilities in a modular fashion. The Adagio 4.14 User's Guide provides information about the functionality in Adagio and the command structure required to access this functionality in a user input file. This document is divided into chapters based primarily on functionality. For example, the command structure related to the use of various element types is grouped in one chapter; descriptions of material models are grouped in another chapter. The input and usage of Adagio is similar to that of the code Presto [3]. Presto, like Adagio, is a solid mechanics code built on the SIERRA Framework. The primary difference between the two codes is that Presto uses explicit time integration for transient dynamics analysis, whereas Adagio is an implicit code. Because of the similarities in input and usage between Adagio and Presto, the user's guides for the two codes are structured in the same manner and share common material. (Once you have mastered the input structure for one code, it will be easy to master the syntax structure for the other code.) To maintain the commonality between the two user's guides, we have used a variety of techniques. For example, references to Presto may be found in the Adagio user's guide and vice versa, and the chapter order across the two guides is the same. On the other hand, each of the two user's guides is expressly tailored to the features of the specific code and documents the particular functionality for that code. For example, though both Presto and Adagio have contact functionality, the content of the chapter on contact in the two guides differs. Important references for both Adagio and Presto are given in the references section at the end of this chapter. Adagio was preceded by the codes JAC and JAS3D; JAC is described in Reference 4; JAS3D is described in Reference 5. Presto was preceded by the code Pronto3D. Pronto3D is described in References 6 and 7. Some of the fundamental nonlinear technology used by both Presto and Adagio are described in References 8, 9, and 10. Currently, both Presto and Adagio use the Exodus II database and the XDMF database; Exodus II is more commonly used than XDMF. (Other options may be added in the future.) The Exodus II database format is described in Reference 11, and the XDMF database format is described in Reference 12. Important information about contact is provided in the reference document for ACME [13]. ACME is a third-party library for contact. One of the key concepts for the command structure in the input file is a concept referred to as scope. A detailed explanation of scope is provided in Section 1.2. Most of the command lines in Chapter 2 are related to a certain scope rather than to some particular functionality.

97 MATHEMATICS AND COMPUTING↗

Presto 4.14 user s guide.

Presto is a three-dimensional transient dynamics code with a versatile element library, nonlinear material models, large deformation capabilities, and contact. It is built on the SIERRA Framework [1, 2]. SIERRA provides a data management framework in a parallel computing environment that allows the addition of capabilities in a modular fashion. Contact capabilities are parallel and scalable. The Presto 4.14 User's Guide provides information about the functionality in Presto and the command structure required to access this functionality in a user input file. This document is divided into chapters based primarily on functionality. For example, the command structure related to the use of various element types is grouped in one chapter; descriptions of material models are grouped in another chapter. The input and usage of Presto is similar to that of the code Adagio [3]. Adagio is a three-dimensional quasi-static code with a versatile element library, nonlinear material models, large deformation capabilities, and contact. Adagio, like Presto, is built on the SIERRA Framework [1]. Contact capabilities for Adagio are also parallel and scalable. A significant feature of Adagio is that it offers a multilevel, nonlinear iterative solver. Because of the similarities in input and usage between Presto and Adagio, the user's guides for the two codes are structured in the same manner and share common material. (Once you have mastered the input structure for one code, it will be easy to master the syntax structure for the other code.) To maintain the commonality between the two user's guides, we have used a variety of techniques. For example, references to Adagio may be found in the Presto user's guide and vice versa, and the chapter order across the two guides is the same. On the other hand, each of the two user's guides is expressly tailored to the features of the specific code and documents the particular functionality for that code. For example, though both Presto and Adagio have contact functionality, the content of the chapter on contact in the two guides differs. Important references for both Adagio and Presto are given in the references section at the end of this chapter. Adagio was preceded by the codes JAC and JAS3D; JAC is described in Reference 4; JAS3D is described in Reference 5. Presto was preceded by the code Pronto3D. Pronto3D is described in References 6 and 7. Some of the fundamental nonlinear technology used by both Presto and Adagio are described in References 8, 9, and 10. Currently, both Presto and Adagio use the Exodus II database and the XDMF database; Exodus II is more commonly used than XDMF. (Other options may be added in the future.) The Exodus II database format is described in Reference 11, and the XDMF database format is described in Reference 12. Important information about contact is provided in the reference document for ACME [13]. ACME is a third-party library for contact. One of the key concepts for the command structure in the input file is a concept referred to as scope. A detailed explanation of scope is provided in Section 1.2. Most of the command lines in Chapter 2 are related to a certain scope rather than to some particular functionality.

97 MATHEMATICS AND COMPUTING↗

Presto 4.16 user s guide.

Presto is a three-dimensional transient dynamics code with a versatile element library, nonlinear material models, large deformation capabilities, and contact. It is built on the SIERRA Framework [1, 2]. SIERRA provides a data management framework in a parallel computing environment that allows the addition of capabilities in a modular fashion. Contact capabilities are parallel and scalable. The Presto 4.16 User's Guide provides information about the functionality in Presto and the command structure required to access this functionality in a user input file. This document is divided into chapters based primarily on functionality. For example, the command structure related to the use of various element types is grouped in one chapter; descriptions of material models are grouped in another chapter. The input and usage of Presto is similar to that of the code Adagio [3]. Adagio is a three-dimensional quasi-static code with a versatile element library, nonlinear material models, large deformation capabilities, and contact. Adagio, like Presto, is built on the SIERRA Framework [1]. Contact capabilities for Adagio are also parallel and scalable. A significant feature of Adagio is that it offers a multilevel, nonlinear iterative solver. Because of the similarities in input and usage between Presto and Adagio, the user's guides for the two codes are structured in the same manner and share common material. (Once you have mastered the input structure for one code, it will be easy to master the syntax structure for the other code.) To maintain the commonality between the two user's guides, we have used a variety of techniques. For example, references to Adagio may be found in the Presto user's guide and vice versa, and the chapter order across the two guides is the same. On the other hand, each of the two user's guides is expressly tailored to the features of the specific code and documents the particular functionality for that code. For example, though both Presto and Adagio have contact functionality, the content of the chapter on contact in the two guides differs. Important references for both Adagio and Presto are given in the references section at the end of this chapter. Adagio was preceded by the codes JAC and JAS3D; JAC is described in Reference 4; JAS3D is described in Reference 5. Presto was preceded by the code Pronto3D. Pronto3D is described in References 6 and 7. Some of the fundamental nonlinear technology used by both Presto and Adagio are described in References 8, 9, and 10. Currently, both Presto and Adagio use the Exodus II database and the XDMF database; Exodus II is more commonly used than XDMF. (Other options may be added in the future.) The Exodus II database format is described in Reference 11, and the XDMF database format is described in Reference 12. Important information about contact is provided in the reference document for ACME [13]. ACME is a third-party library for contact. One of the key concepts for the command structure in the input file is a concept referred to as scope. A detailed explanation of scope is provided in Section 1.2. Most of the command lines in Chapter 2 are related to a certain scope rather than to some particular functionality.

97 MATHEMATICS AND COMPUTING↗

Adagio 4.16 user s guide.

Adagio is a three-dimensional, implicit solid mechanics code with a versatile element library, nonlinear material models, and capabilities for modeling large deformation and contact. Adagio is a parallel code, and its nonlinear solver and contact capabilities enable scalable solutions of large problems. It is built on the SIERRA Framework [1, 2]. SIERRA provides a data management framework in a parallel computing environment that allows the addition of capabilities in a modular fashion. The Adagio 4.16 User's Guide provides information about the functionality in Adagio and the command structure required to access this functionality in a user input file. This document is divided into chapters based primarily on functionality. For example, the command structure related to the use of various element types is grouped in one chapter; descriptions of material models are grouped in another chapter. The input and usage of Adagio is similar to that of the code Presto [3]. Presto, like Adagio, is a solid mechanics code built on the SIERRA Framework. The primary difference between the two codes is that Presto uses explicit time integration for transient dynamics analysis, whereas Adagio is an implicit code. Because of the similarities in input and usage between Adagio and Presto, the user's guides for the two codes are structured in the same manner and share common material. (Once you have mastered the input structure for one code, it will be easy to master the syntax structure for the other code.) To maintain the commonality between the two user's guides, we have used a variety of techniques. For example, references to Presto may be found in the Adagio user's guide and vice versa, and the chapter order across the two guides is the same. On the other hand, each of the two user's guides is expressly tailored to the features of the specific code and documents the particular functionality for that code. For example, though both Presto and Adagio have contact functionality, the content of the chapter on contact in the two guides differs. Important references for both Adagio and Presto are given in the references section at the end of this chapter. Adagio was preceded by the codes JAC and JAS3D; JAC is described in Reference 4; JAS3D is described in Reference 5. Presto was preceded by the code Pronto3D. Pronto3D is described in References 6 and 7. Some of the fundamental nonlinear technology used by both Presto and Adagio are described in References 8, 9, and 10. Currently, both Presto and Adagio use the Exodus II database and the XDMF database; Exodus II is more commonly used than XDMF. (Other options may be added in the future.) The Exodus II database format is described in Reference 11, and the XDMF database format is described in Reference 12. Important information about contact is provided in the reference document for ACME [13]. ACME is a third-party library for contact. One of the key concepts for the command structure in the input file is a concept referred to as scope. A detailed explanation of scope is provided in Section 1.2. Most of the command lines in Chapter 2 are related to a certain scope rather than to some particular functionality.

97 MATHEMATICS AND COMPUTING↗

DMTN-107: Options for Alert Production in LSST Operations Year 1

This document reviews five options for alert production in LSST Operations Year 1 (LOY1), taking into account any implications on LSST formal requirements including up-scopes, down-scopes or explicit violations. The Data Management System Science Team's preferred option for maximizing LSST science is to generate template images from as much of the data from the commissioning and/or science verification phases as possible and use them to run Difference Image Analysis and alert production during LOY1. A proposal to increase the sky area covered during commissioning via a "filler" scheduler program is also presented. As a potential moderate up-scope, this study presents an option to build interim templates on a $\sim$monthly basis during LOY1, which could increase the accessible sky area by ~1000-2000 deg**2 per month, and should be reconsidered closer to the start of Operations.

79 ASTRONOMY AND ASTROPHYSICS↗