Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “safety engineering”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

NASA Aerospace Flight Battery Program: Generic Safety, Handling and Qualification Guidelines for Lithium-Ion (Li-Ion) Batteries; Availability of Source Materials for Lithium-Ion (Li-Ion) Batteries; Maintaining Technical Communications Related to Aerospace Batteries (NASA Aerospace Battery Workshop)

This NASA Aerospace Flight Battery Systems Working Group was chartered within the NASA Engineering and Safety Center (NESC). The Battery Working Group was tasked to complete tasks and to propose proactive work to address battery related, agency-wide issues on an annual basis. In its first year of operation, this proactive program addressed various aspects of the validation and verification of aerospace battery systems for NASA missions. Studies were performed, issues were discussed and in many cases, test programs were executed to generate recommendations and guidelines to reduce risk associated with various aspects of implementing battery technology in the aerospace industry. This report contains the Appendices to the findings from the first year of the program's operations.

Manzo, Michelle A.↗

Liquefied natural gas (LNG) safety

Bibliography, assembled from computer search of NASA Aerospace Safety Data Bank, including title of report, author, abstract, source, description of figures, key references, and key words or subject terms. Publication is indexed by key subjects and by authors. Items are relevant to design engineers and safety specialists.

Ordin, P. M.↗

Chemical research projects office: An overview and bibliography, 1975-1980

The activities of the Chemical Research Projects Office at Ames Research Center, Moffett Field, California are reported. The office conducts basic and applied research in the fields of polymer chemistry, computational chemistry, polymer physics, and physical and organic chemistry. It works to identify the chemical research and technology required for solutions to problems of national urgency, synchronous with the aeronautic and space effort. It conducts interdisciplinary research on chemical problems, mainly in areas of macromolecular science and fire research. The office also acts as liaison with the engineering community and assures that relevant technology is made available to other NASA centers, agencies, and industry. Recent accomplishments are listed in this report. Activities of the three research groups, Polymer Research, Aircraft Operating and Safety, and Engineering Testing, are summarized. A complete bibliography which lists all Chemical Research Projects Office publications, contracts, grants, patents, and presentations from 1975 to 1980 is included.

Kourtides, D. A.↗

Colossal Tooling Design: 3D Simulation for Ergonomic Analysis

The application of high-level 3D simulation software to the design phase of colossal mandrel tooling for composite aerospace fuel tanks was accomplished to discover and resolve safety and human engineering problems. The analyses were conducted to determine safety, ergonomic and human engineering aspects of the disassembly process of the fuel tank composite shell mandrel. Three-dimensional graphics high-level software, incorporating various ergonomic analysis algorithms, was utilized to determine if the process was within safety and health boundaries for the workers carrying out these tasks. In addition, the graphical software was extremely helpful in the identification of material handling equipment and devices for the mandrel tooling assembly/disassembly process.

Hunter, Steve L.↗

Space Shuttle Program Update News Conference with Wayne Hale

Jessica Rye from NASA Public Affairs introduces: Wayne Hale, Space Shuttle Deputy Program Manager; Mike Leinbach, NASA Launch Director; and Tim Wilson, from the NASA Engineering and Safety Center. Hale begins the discussion with a video showing the following processes: 1) Changing of gap fillers at Orbiter Processing Facility; 2) The Orbiter Boom Sensor System (OBSS) being loaded into Discovery payload bay; 3) Engine installation; 4) Spacecrew at Michoud Assembly observing the area where the PAL ramps were removed; 5) Test being performed to mitigate liquid air forming underneath foam; and 6) Roll out of ET119 from New Orleans. Hale also presents a slide of the ET debris Mitigation Activities and ET Ice/Frost Ramps. Mike Leinbach says that Kennedy Space Center is ready to receive the tank and that he is ready to get on with the mission. Tim Wilson heads the team to resolve foam loss issues which is his primary goal before this flight. A question and answer period follows.

Source record↗

Space Shuttle Program (SSP) Orbiter Main Propulsion System (MPS) Gaseous Hydrogen (GH2) Flow Control Valve (FCV) Poppet Eddy Current (EC) Inspection Probability of Detection (POD) Study

The Director of the NASA Engineering and Safety Center (NESC), requested an independent assessment of the anomalous gaseous hydrogen (GH2) flow incident on the Space Shuttle Program (SSP) Orbiter Vehicle (OV)-105 during the Space Transportation System (STS)-126 mission. The main propulsion system (MPS) engine #2 GH2 flow control valve (FCV) LV-57 transition from low towards high flow position without being commanded. Post-flight examination revealed that the FCV LV-57 poppet had experienced a fatigue failure that liberated a section of the poppet flange. The NESC assessment provided a peer review of the computational fluid dynamics (CFD), stress analysis, and impact testing. A probability of detection (POD) study was requested by the SSP Orbiter Project for the eddy current (EC) nondestructive evaluation (NDE) techniques that were developed to inspect the flight FCV poppets. This report contains the findings and recommendations from the NESC assessment.

Piascik, Robert S.↗

Space Shuttle Program (SSP) Orbiter Main Propulsion System (MPS) Gaseous Hydrogen (GH2) Flow Control Valve (FCV) Poppet Eddy Current (EC) Inspection Probability of Detection (POD) Study: Appendices - Volume 2

The Director of the NASA Engineering and Safety Center (NESC), requested an independent assessment of the anomalous gaseous hydrogen (GH2) flow incident on the Space Shuttle Program (SSP) Orbiter Vehicle (OV)-105 during the Space Transportation System (STS)-126 mission. The main propulsion system (MPS) engine #2 GH2 flow control valve (FCV) LV-57 transition from low towards high flow position without being commanded. Post-flight examination revealed that the FCV LV-57 poppet had experienced a fatigue failure that liberated a section of the poppet flange. The NESC assessment provided a peer review of the computational fluid dynamics (CFD), stress analysis, and impact testing. A probability of detection (POD) study was requested by the SSP Orbiter Project for the eddy current (EC) nondestructive evaluation (NDE) techniques that were developed to inspect the flight FCV poppets. This report contains the Appendices to the main report.

Piascik, Robert S.↗

FY16 Summary Report: Participation in the KOSINA Project

Salt formations represent a promising host for disposal of nuclear waste in the United States and Germany. Together, these countries provided fully developed safety cases for bedded salt and domal salt, respectively. Today, Germany and the United States find themselves in similar positions with respect to salt formations serving as repositories for heat-generating nuclear waste. German research centers are evaluating bedded and pillow salt formations to contrast with their previous safety case made for the Gorleben dome. Sandia National Laboratories is collaborating on this effort as an Associate Partner, and this report summarizes that teamwork. Sandia and German research groups have a long-standing cooperative approach to repository science, engineering, operations, safety assessment, testing, modeling and other elements comprising the basis for salt disposal. Germany and the United States hold annual bilateral workshops, which cover a spectrum of issues surrounding the viability of salt formations. Notably, recent efforts include development of a database for features, events, and processes applying broadly and generically to bedded and domal salt. Another international teaming activity evaluates salt constitutive models, including hundreds of new experiments conducted on bedded salt from the Waste Isolation Pilot Plant. These extensive collaborations continue to build the scientific basis for salt disposal. Repository deliberations in the United States are revisiting bedded and domal salt for housing a nuclear waste repository. By agreeing to collaborate with German peers, our nation stands to benefit by assurance of scientific position, exchange of operational concepts, and approach to elements of the safety case, all reflecting cost and time efficiency.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Probabilistic Fracture Mechanics Analysis of the Orbiter's LH2 Feedline Flowliner

Work performed by Southwest Research Institute (SwRI) as part of an Independent Technical Assessment (ITA) for the NASA Engineering and Safety Center (NESC) is summarized. The ITA goal was to establish a flight rationale in light of a history of fatigue cracking due to flow induced vibrations in the feedline flowliners that supply liquid hydrogen to the space shuttle main engines. Prior deterministic analyses using worst-case assumptions predicted failure in a single flight. The current work formulated statistical models for dynamic loading and cryogenic fatigue crack growth properties, instead of using worst-case assumptions. Weight function solutions for bivariant stressing were developed to determine accurate crack "driving-forces". Monte Carlo simulations showed that low flowliner probabilities of failure (POF = 0.001 to 0.0001) are achievable, provided pre-flight inspections for cracks are performed with adequate probability of detection (POD)-specifically, 20/75 mils with 50%/99% POD. Measurements to confirm assumed POD curves are recommended. Since the computed POFs are very sensitive to the cyclic loads/stresses and the analysis of strain gage data revealed inconsistencies with the previous assumption of a single dominant vibrant mode, further work to reconcile this difference is recommended. It is possible that the unaccounted vibrational modes in the flight spectra could increase the computed POFs.

Bonacuse, Peter J.↗

Application of the Event Tree/Fault Tree Modeling Approach to the Evaluation of Proliferation Resistance

As the popularity of nuclear energy increases as a means to counteract dwindling fossil resources and generation of greenhouse gases, the concern over the potential for increased proliferation of nuclear materials also increases. Newly proposed processes and facilities will need to be thoroughly and systematically assessed against the potential for proliferation to support decisions about optimum solutions to competing concerns. Until now, evaluation of proliferation resistance has mostly been performed by experts in relatively informal and unstructured settings. As a result these evaluations have not always been repeatable or even supportable. In 2002 an expert group was formed by The Generation IV International Forum (GIF) to develop an internationally accepted methodology for assessing the proliferation resistance of a nuclear energy system (NES) and its individual elements. (The GIF was established in January 2000 to investigate innovative nuclear energy system concepts for meeting future energy challenges. GIF members include Argentina, Brazil, Canada, Euratom, France, Japan, South Africa, South Korea, Switzerland, United Kingdom, and United States, with the OECD-Nuclear Energy Agency and the International Atomic Energy Agency as permanent observers.) A pilot study was performed to test the methodologies being developed. The pilot study consisted of assessing the proliferation resistance of a specific NES example. The proliferation resistance assessments evaluate proliferation in three stages: • Acquisition: Activities carried out to acquire nuclear material in any form, starting with the decision to acquire the material and ending with the availability of the material. • Processing: Activities carried out to convert the nuclear material obtained in the Acquisition stage into material ready for use in a nuclear weapon. Processing may include such activities as irradiation of targets, plutonium separation, uranium enrichment, and conversion of oxides or fluorides to metal. • Fabrication: Activities carried out to manufacture and assemble one or more nuclear explosive devices. The example NES chosen was called the Example Sodium Fast Reactor which was designed to accept spent sodium-bonded, metallic fuel from four advanced fast reactors and to convert it into new fuel assemblies. A number of different approaches were taken to evaluate the diversion of material from the facility to assess their applicability and usefulness. This paper describes a Decision/Event Tree and Fault Tree Analysis approach.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

The conduct of the united states department of energy nuclear criticality safety program hands-on training and education courses - 14621

The United States Department of Energy (DOE) Nuclear Criticality Safety Program (NCSP), funded and managed by the National Nuclear Security Administration (NNSA), offers courses to educate nuclear criticality safety (NCS) engineers, process supervisors, and others, and to provide experimental, hands-on training addressing important characteristics of neutron multiplying systems. This training satisfies the American National Standard Institute/American Nuclear Society (ANSI/ANS)-8.26-2007 requirement for participating in hands-on experiments with fissionable materials and provides awareness and understanding of DOE Orders, Guides and Rules, ANS standards, and hazard identification techniques, as well as control design, implementation, and maintenance in criticality safety evaluations. Since the pilot course was developed in 2011, a variety of courses have been developed for NCS practitioners and process supervisors. Attendees have come from several US and international sites. Through NCSP international collaborations and relationships, students from the Atomic Weapons Establishment (AWE) in the United Kingdom, Atomic Energy of Canada, and the Institute for Radiation Protection and Nuclear Safety in France have participated in these courses in the US. Manager courses are available for process supervisors and operations managers with NCS responsibilities in their daily jobs. Manager courses are taught at Sandia National Laboratory (SNL) and the National Criticality Experiments Research Center (NCERC); they offer a combination of hands-on experiments and classroom discussions. A two-week course is also offered for NCS practitioners, with a week of classroom instruction at Los Alamos National Laboratory (LANL) focused on generation of NCS evaluations, and a week of hands-on training utilizing the critical assemblies at either SNL or NCERC. Cleared students can attend the hands-on training at either SNL or NCERC, and uncleared students can attend at SNL. Courses continue to evolve and continuously improve as important elements of NCS evaluations (e.g., human factors, non-destructive assay (NDA) techniques, process criticality accident lessons-learned, and hand calculation methods) are integrated with criticality safety evaluation exercises. Courses include tours of process operations at SNL, NCERC, and LANL, and interaction with instructors experienced in conducting critical experiments and working in NCS. The NNSA NCSP provides management, funding, and technical direction for these courses and makes them available with no tuition cost to NCS practitioners. This paper provides a status report to the NCS community on the conduct of these courses and how they will likely evolve in the future. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Introduction to Flight Test Engineering [Introduction Aux Techniques Des Essais En Vol]

Flight test is at the core of what organizations must do in order to validate the operation and systems on an aircraft. While the AGARDograph series 300 and 160 series deal with aspects of this testing, this volume pulls it all together as an introduction to the process required to do effective flight test engineering. This volume was originally published in 1995. Its utility has been proven in that many flight test organizations and universities have requested copies for their engineers and students. It was felt that re-issuing it in a new format designed for electronic publication would be valuable to the community. This second printing changes none of the text, but rather reformats it. All the original references to AGARD (instead of RTO) are left in place so that none of the flavor of the original publication is lost. This is the Introductory Volume to the Flight Test Techniques Series. It is a general introduction to the various activities and aspects of Flight Test Engineering that must be considered when planning, conducting, and reporting a flight test program. Its main intent is to provide a broad overview to the novice engineer or to other people who have a need to interface with specialists within the flight test community. The first two Sections provide some insight into the question of why flight test and give a short history of flight test engineering. Sections 3 through 10 deal with the preparation for flight testing. They provide guidance on the preliminary factors that must be considered; the composition of the test team; the logistic support requirements; the instrumentation and data processing requirements; the flight test plan; the associated preliminary ground tests; and last, but by no means least, discuss safety aspects. Sections 11 through 27 describe the various types of flight tests that are usually conducted during the development and certification of a new or modified aircraft type. Each Section offers a brief introduction to the topic under consideration, and the nature and the objectives of the tests to be conducted. It lists the test instrumentation (and, where appropriate, other test equipment and facilities) required, describes the test maneuvers to be executed, and indicates the way in which the test data is selected, analyzed, and presented. The various activities that should take place between test flights are presented next. Items that are covered are: who to debrief; what type of reports to send where: types of data analysis required for next flight; review of test data to make a comparison to predicted data and some courses of action if there is not good agreement; and comments on selecting the next test flight. The activities that must take place upon completion of the test program are presented. The types of reports and briefings that should take place and a discussion of some of the uses of the flight test data are covered. A brief forecast is presented of where present trends may be leading.

Test facilities↗

10 CFR 830 Major Modification Determination for the ATR Diesel Bus (E-3) and Switchgear Replacement

Near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent subprojects. The first project, subject of this determination, will replace the existent diesel-electrical bus (E-3) and associated switchgear. More specifically, INL proposes transitioning ATR to 100% commercial power with appropriate emergency backup to include: • Provide commercial power as the normal source of power to the ATR loads currently supplied by diesel-electric power. • Provide backup power to the critical ATR loads in the event of a loss of commercial power. • Replace obsolescent critical ATR power distribution equipment, e.g., switchgear, transformers, motor control centers, distribution panels. Completion of this and two other age-related projects (primary coolant pump and motor replacement and emergency firewater injection system replacement) will resolve major age related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues make the project a major modification: 1. Evaluation Criteria #2 (Footprint change). The addition of a new PC-4 structure to the ATR Facility to house safety-related SSCs requires careful attention to maintaining adherence to applicable engineering and nuclear safety design criteria (e.g., structural qualification, fire suppression) to ensure no adverse impacts to the safety-related functions of the housed equipment. 2. Evaluation Criteria #3 (Change of existing process). The change to the strategy for providing continuous reliable power to the safety-related emergency coolant pumps requires careful attention and analysis to ensure it meets a project primary object to maintain or reduce CDF and does not negatively affect the efficacy of the currently approved strategy. 3. Evaluation Criteria #5 (Create the need for new or revised safety SSCs). The change to the strategy for providing continuous reliable power to the safety-related emergency coolant pumps, based on the pre-conceptual design, will require the addition of two quick start diesel generators, their associated power coordination/distribution controls, and a UPS to the list of safety-related SSCs. Similarly to item 1 above, the addition of these active SSCs to the list of safety-related SSCs and replacement of the E-3 bus requires careful attention to maintaining adherence to applicable engineering and nuclear safety design criteria (e.g., seismic qualification, isolation of redundant trains from common fault failures) to ensure no adverse impacts to the safety-related functions.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Timing of Formal Phase Safety Reviews for Large-Scale Integrated Hazard Analysis

Integrated hazard analysis (IHA) is a process used to identify and control unacceptable risk. As such, it does not occur in a vacuum. IHA approaches must be tailored to fit the system being analyzed. Physical, resource, organizational and temporal constraints on large-scale integrated systems impose additional direct or derived requirements on the IHA. The timing and interaction between engineering and safety organizations can provide either benefits or hindrances to the overall end product. The traditional approach for formal phase safety review timing and content, which generally works well for small- to moderate-scale systems, does not work well for very large-scale integrated systems. This paper proposes a modified approach to timing and content of formal phase safety reviews for IHA. Details of the tailoring process for IHA will describe how to avoid temporary disconnects in major milestone reviews and how to maintain a cohesive end-to-end integration story particularly for systems where the integrator inherently has little to no insight into lower level systems. The proposal has the advantage of allowing the hazard analysis development process to occur as technical data normally matures.

Massie, Michael J.↗

Nuclear Safety [Vol. 29, No. 3, July-September 1988]

Nuclear Safety is a review journal that covers significant developments in the field of nuclear safety. Its scope includes the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated. Table of Contents for this issue follows. GENERAL SAFETY CONSIDERATIONS: 259 Fifteenth Water Reactor Safety Information Meeting by E. G. Silver; CONTROL AND INSTRUMENTATION: 284 Reliability Technology to Improve and/or Maintain Emergency Diesel Generator Performance by S. Karimian and J. H. Taylor, 293 A Noise Diagnostics System for Operator Advice by G. Hessel, P. Liewers, P. Schumann, W. Schmitt, and F.-P. Weiss; PLANT SAFETY FEATURES: 307 A Passive Containment System for Advanced Light-Water Reactors by O. B. Falls, Jr., and F. W. Kleimola; ENVIRONMENTAL EFFECTS: 318 Data Base Construction for a Computerized Radiological Risk Investigation System by L. M. Hively, J. E. Nyquist, J. L. Bledsoe, and A. L. Sjoreen, 326 Erratum to "Radiation Hormesis and Nuclear Safety," Vol. 29, No. 1; OPERATING EXPERIENCES: 327 Operational Safety Experience and Passive Safety Testing at the Fast Flux Text Facility by Q. L. Baird, J. L. Rathbun, D. D. Stepnewski, R. L. Stover, and A. E. Waltar, 344 Backfilling of Independent Residual Heat Removal Systems in West Germany and Switzerland by G. Eckert and Y. Salomon, 353 Reactor Shutdown Experience Compiled by J. W. Cletcher, 356 Selected Safety-Related Events Compiled by G. A. Murphy, 363 Operating U.S. Power Reactors Compiled by E. G. Silver; RECENT DEVELOPMENTS: 384 General Administrative Activities Compiled by E. G. Silver, 390 Reports, Standards, and Safety Guides by D. S. Queener, 395 Status of Power-Reactor Projects Undergoing Licensing Review Compiled by E. G. Silver, 400 Proposed Rule Changes as of Mar. 31,1988; ANNOUNCEMENTS: 283 International ENS/ANS Conference on Thermal Reactor Safety "NUCSAFE 88", 317 Northwestern University Short Course on Radiation Safety, 407 Second International Seminar on Small- and Medium-Sized Nuclear Reactors, 407 International Workshop on New Developments in Occupational Dose Control and ALARA Implementation at Nuclear Power Plants and Similar Facilities, 408 Fourth International Topical Meeting on Nuclear Reactor Thermal Hydraulics (NURETH-4), 404 The Authors.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Applicability of a Crack-Detection System for Use in Rotor Disk Spin Test Experiments Being Evaluated

Engine makers and aviation safety government institutions continue to have a strong interest in monitoring the health of rotating components in aircraft engines to improve safety and to lower maintenance costs. To prevent catastrophic failure (burst) of the engine, they use nondestructive evaluation (NDE) and major overhauls for periodic inspections to discover any cracks that might have formed. The lowest cost fluorescent penetrant inspection NDE technique can fail to disclose cracks that are tightly closed during rest or that are below the surface. The NDE eddy current system is more effective at detecting both crack types, but it requires careful setup and operation and only a small portion of the disk can be practically inspected. So that sensor systems can sustain normal function in a severe environment, health-monitoring systems require the sensor system to transmit a signal if a crack detected in the component is above a predetermined length (but below the length that would lead to failure) and lastly to act neutrally upon the overall performance of the engine system and not interfere with engine maintenance operations. Therefore, more reliable diagnostic tools and high-level techniques for detecting damage and monitoring the health of rotating components are very essential in maintaining engine safety and reliability and in assessing life.

Abdul-Aziz, Ali↗

KERENA safety concept in the context of the Fukushima accident

Within the last three years AREVA NP and E.On KK finalized the basic design of KERENA which is a medium sized innovative boiling water reactor, based on the operational experience of German BWR nuclear power plants (NPPs). It is a generation III reactor design with a net electrical output of about 1250 MW. It combines active safety equipment of service-proven designs with new passive safety components, both safety classified. The passive systems utilize basic laws of physics, such as gravity and natural convection, enabling them to function without electric power. Even actuation of these systems is performed thanks to basic physic laws. The degree of diversity in component and system design, achieved by combining active and passive equipment, results in a very low core damage frequency. The Fukushima accident enhanced the world wide discussion about the safety of operating nuclear power plants. World wide stress tests for operating nuclear power plants are being performed embracing both natural and man made hazards. Beside the assessment of existing power plants, also new designs are analyzed regarding the system response to beyond design base accidents. KERENA's optimal combination of diversified cooling systems (active and passive) allows passing efficiently such tests, with a high level of confidence. This paper describes the passive safety components and the KERENA reactor behavior after a Fukushima like accident. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

International Space Station (ISS) Plasma Contactor Unit (PCU) Utilization Plan Assessment Update

The International Space Station (ISS) vehicle undergoes spacecraft charging as it interacts with Earth's ionosphere and magnetic field. The interaction can result in a large potential difference developing between the ISS metal chassis and the local ionosphere plasma environment. If an astronaut conducting extravehicular activities (EVA) is exposed to the potential difference, then a possible electrical shock hazard arises. The control of this hazard was addressed by a number of documents within the ISS Program (ISSP) including Catastrophic Safety Hazard for Astronauts on EVA (ISS-EVA-312-4A_revE). The safety hazard identified the risk for an astronaut to experience an electrical shock in the event an arc was generated on an extravehicular mobility unit (EMU) surface. A catastrophic safety hazard, by the ISS requirements, necessitates mitigation by a two-fault tolerant system of hazard controls. Traditionally, the plasma contactor units (PCUs) on the ISS have been used to limit the charging and serve as a "ground strap" between the ISS structure and the surrounding ionospheric plasma. In 2009, a previous NASA Engineering and Safety Center (NESC) team evaluated the PCU utilization plan (NESC Request #07-054-E) with the objective to assess whether leaving PCUs off during non-EVA time periods presented risk to the ISS through assembly completion. For this study, in situ measurements of ISS charging, covering the installation of three of the four photovoltaic arrays, and laboratory testing results provided key data to underpin the assessment. The conclusion stated, "there appears to be no significant risk of damage to critical equipment nor excessive ISS thermal coating damage as a result of eliminating PCU operations during non- EVA times." In 2013, the ISSP was presented with recommendations from Boeing Space Environments for the "Conditional" Marginalization of Plasma Hazard. These recommendations include a plan that would keep the PCUs off during EVAs when the space environment forecast input to the ISS charging model indicates floating potentials (FP) within specified limits. These recommendations were based on the persistence of conditions in the space environment due to the current low solar cycle and belief in the accuracy and completeness of the ISS charging model. Subsequently, a Noncompliance Report (NCR), ISS-NCR-232G, Lack of Two-fault Tolerance to EVA Crew Shock in the Low Earth Orbit Plasma Environment, was signed in September 2013 specifying new guidelines for the use of shock hazard controls based on a forecast of the space environment from ISS plasma measurements taken prior to the EVA [ISS-EVA-312-AC, 2012]. This NESC assessment re-evaluates EVA charging hazards through a process that is based on over 14 years of ISS operations, charging measurements, laboratory tests, EMU studies and modifications, and safety reports. The assessment seeks an objective review of the plasma charging hazards associated with EVA operations to determine if any of the present hazard controls can safely change the PCU utilization plan to allow more flexibility in ISS operations during EVA preparation and execution.

Hernandez-Pellerano, Amri↗