Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “resource modeling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

A proposal to conduct a Caribbean plate project involving the application of space technology to the study of Caribbean geology

The Caribbean plate project is designed to improve current understanding of geological resources and geological hazards within the Caribbean region. Models of mineral occurrence and genesis (including energy resources) on a regional scale, which contribute to nonrenewable resource investigations. Models of lithospheric stress and strain on a regional scale, which contribute to forecasting geological hazards such as earthquakes and major volcanic eruptions are developed. Geological information is synthesize, and research tools provided by space technology the study of the Earth's crust are used. The project was organized in a thematic fashion, to focus on specific geological aspects of the Caribbean plate which are considered to be key factors in developing the types of models described. The project adopts a synoptic perspective in seeking to characterize the three dimensional structure, composition, state of stress, and evolution of the entire Caribbean plate. Geological information derived from analysis of space acquired data is combined with information provided by conventional methods to obtain insight into the structure, composition, and evolution of the Earth's crust. In addition, very long baseline interferometry and laser ranging techniques, which are also based upon the use of space technology, obtain information concerning crustal motion that, in turn, provides insight into the distribution and localization of crustal stress.

Wadge, G.↗

Recent Upgrades to NASA SPoRT Initialization Datasets for the Environmental Modeling System

The NASA Short-term Prediction Research and Transition (SPoRT) Center has developed several products for its National Weather Service (NWS) partners that can initialize specific fields for local model runs within the NOAA/NWS Science and Training Resource Center (STRC) Environmental Modeling System (EMS). In last year's NWA abstract on this topic, the suite of SPoRT products supported in the STRC EMS was presented, which includes a Sea Surface Temperature (SST) composite, a Great Lakes sea-ice extent, a Green Vegetation Fraction (GVF) composite, and NASA Land Information System (LIS) gridded output. This abstract and companion presentation describes recent upgrades made to the SST and GVF composites, as well as the real-time LIS runs. The Great Lakes sea-ice product is unchanged from 2011. The SPoRT SST composite product has been expanded geographically and as a result, the resolution has been coarsened from 1 km to 2 km to accommodate the larger domain. The expanded domain covers much of the northern hemisphere from eastern Asia to western Europe (0 N to 80 N latitude and 150 E to 10 E longitude). In addition, the NESDIS POES-GOES product was added to fill in gaps caused by the Moderate Resolution Imaging Spectroradiometer (MODIS) being unable to sense in cloudy regions, replacing the recently-lost Advanced Microwave Scanning Radiometer for EOS with negligible change to product fidelity. The SST product now runs twice per day for Terra and Aqua combined data collections from 0000 to 1200 UTC and from 1200 to 0000 UTC, with valid analysis times at 0600 and 1800 UTC. The twice-daily compositing technique reduces the overall latency of the previous version while still representing the diurnal cycle characteristics. The SST composites are available at approximately four hours after the end of each collection period (i.e. 1600 UTC for the nighttime analysis and 0400 UTC for the daytime analysis). The real-time MODIS GVF composite has only received minor updates in the past year. The domain was expanded slightly to extend further west, north, and east to improve coverage over parts of southern Canada. Minor adjustments were also made to the manner in which GVF is calculated from the distribution of maximum Normalized Difference Vegetation Index from MODIS. The presentation will highlight some examples of the substantial inter-annual change in GVF that occurred from 2010 to 2011 in the U.S. Southern Plains as a result of the summer 2011 drought, and the early vegetation green up across the eastern U.S. due to the very warm conditions in March 2012. Finally, the SPoRT LIS runs the operational Noah land surface model (LSM) in real time over much of the eastern half of the CONUS. The Noah LSM is continually cycled in real time, uncoupled to any model, and driven by operational atmospheric analyses over a long-term, multi-year integration. The LIS-Noah provides the STRC EMS with high-resolution (3 km) LSM initialization data that are in equilibrium with the operational analysis forcing. The Noah LSM within the SPoRT LIS has been upgraded from version 2.7.1 to version 3.2, which has improved look-up table attributes for several land surface quantities. The surface albedo field is now being adjusted based on the input real-time MODIS GVF, thereby improving the net radiation. Also, the LIS-Noah now uses the newer MODIS-based land use classification scheme (i.e. the International Biosphere-Geosphere Programme [IGBP]) that has a better depiction of urban corridors in areas where urban sprawl has occurred. STRC EMS users interested in initializing their LSM fields with high-resolution SPoRT LIS data should set up their model domain with the MODIS-IGBP 20-class land use database and select Noah as the LSM.

Case, Jonathan L.↗

Enabling Assurance in the MBSE Environment

A number of specific benefits that fit within the hallmarks of effective development are realized with implementation of model-based approaches to systems and assurance. Model Based Systems Engineering (MBSE) enabled by standardized modeling languages (e.g., SysML®) is at the core. These benefits in the context of spaceflight system challenges can include [1]: • Improved management of complex development • Reduced risk in the development process • Improved cost management • Improved design decisions With appropriate modeling techniques the assurance community also can improve early oversight and insight into project development. NASA has shown the basic constructs of SysML in an MBSE environment offer several key advantages, within a Model Based Mission Assurance (MBMA) initiative [2, 3]. These include the following: • Model viewpoints that promote rapid and systematic assessment of requirements coverage, hazard tagging and risk management • Embedded safety assessments for launch vehicles • Deployment of model assisted development of reliability products - Failure Modes and Effects Analyses (FMEAs) and Fault Trees • Test Planning • Validation and Verification of complex functions • Support of Assurance Case development for complex systems In addition, while there are benefits to be harvested, there is a realization that these do not come without effort and cost. Enabling model-based approaches requires structure, not only in an organizational context, but in a modeling context as well. There can be a steep learning curve and costs associated to train skilled modelers. But, on the other hand, not all of the assurance community need to be modelers. Models themselves must conform to ontologies that enable assurance. This places constraints upon the models and modelers. Optimums have yet to be developed where resources and constraints on modeling must be traded off in the organization and modeling efforts for projects. A number of barriers need to be overcome, as well, which pose challenges to the developers of the software that supports MBSE/MBMA. Information and data must be made to flow seamlessly through the life cycle. Because there is a wide variety of tools used in the community, to avoid the problems of the past of silos, delays, and diverging interests, information should flow among these tools to support the “single source of truth” paradigm of MBSE. This will greatly facilitate MBMA and advancement of assurance functions.

Evans, John W.↗

Key Strategies in Industry for Circular Economy : Analysis of Remanufacturing and Beneficial Reuse

Manufacturing, in the effort to be more sustainable, is increasingly focusing on energy efficiency and waste reduction. DOE’s Better Buildings Better Plants Program has a Waste Reduction Network that works with 32 industrial partners to achieve higher material efficiency and reduce waste. United States generates 7.6 Billion Tons of industrial solid waste as estimated by EPA. In a linear economy as the economy grows, so does the waste – increasing strain on resources and the environment. The Circular Economy (CE) model keeps the available resources in circulation for longer period of time easing the burden on the environment. Remanufacturing and (Beneficial) re-use are widely accepted channels in 9R methodology and established pillars of CE. This paper reviews the two key strategies and their adoption in different industrial sectors. It reviews the key barriers faced by manufacturers in implementing these methodologies and discusses the possible solutions to those barriers. The paper also reviews impact of these CE strategies on sustainability, material efficiency and the economic and social benefits. Finally, this paper presents two case studies from DOE’s Better Plants partners – one on remanufacturing of components in heavy vehicles industry and one on beneficial reuse of spent foundry sand, a non-hazardous solid waste, and discusses the project impacts.

Chaudhari, Subodh↗

Discrete versus continuous: Enhancing battery optimization in capacity expansion models

This study compares two battery modeling approaches for capacity expansion models: discrete-duration and continuous-duration formulations. In the discrete approach, battery duration is fixed, and power capacity is optimized. In the continuous approach, both power and energy capacities are decision variables, allowing storage duration to be optimized endogenously. Although both discrete-duration and continuous-duration battery formulations are used in long-term power system planning models, the literature has provided limited direct, systematic comparisons of their implications within a common modeling framework. To address this gap, this study implements both approaches in the Regional Energy Deployment System (ReEDS TM ) capacity expansion model using two resource adequacy methods, across a range of future system conditions, and with varying battery cost projections. Results show continuous-duration and high-resolution discrete approaches produce similar capacity expansion outcomes. The continuous formulation achieves faster runtimes compared to discrete-duration runs with many discrete-duration options. However, the discrete-duration approach allows users to choose to have limited fidelity for storage duration options, which in some cases can outperform the continuous formulation. The continuous formulation has the lowest overall system costs, indicating its ability to fine-tune storage duration to better meet specific system needs. This study's findings provide a side-by-side evaluation of discrete and continuous battery modeling approaches and offer guidance for improving the representation of real-world systems, flexibility, and computational efficiency for representing energy storage in long-term power system planning models.

25 ENERGY STORAGE↗

Analytical Modeling of Planetary Excavation for in Situ Resource Utilization

The space-faring capabilities of humans are dependent on the ability to interact with plan-etary surfaces safely and efficiently and utilize local re-sources. Since planetary regolith will be the primary feedstock for in situ resource utilization (ISRU) and infrastructure development activities [1,2], the site-specific geomechanical properties must be understood to optimize excavation operations [3]. Excavating planetary regolith is challenging due to its unique geomechanical properties, 1/6th G reduced gravity extreme conditions, and limited energy resources. Therefore, it is critical to develop technologies that reduce excavation force requirements and minimize tool path inefficiencies to save time and energy during planetary re-source acquisition and infrastructure development [3]. There have been several experimental investigations of methods to optimize planetary excavations [4,5], but none developed predictive capabilities. This abstract presents a simple analytical method that will be used to model laboratory and mission excavation data. Future work will build on the simple analytical method here to include high-fidelity numerical simulations of planetary excavation mechanics.

Regolith↗

Scheduling algorithm for mission planning and logistics evaluation users' guide

The scheduling algorithm for mission planning and logistics evaluation (SAMPLE) program is a mission planning tool composed of three subsystems; the mission payloads subsystem (MPLS), which generates a list of feasible combinations from a payload model for a given calendar year; GREEDY, which is a heuristic model used to find the best traffic model; and the operations simulation and resources scheduling subsystem (OSARS), which determines traffic model feasibility for available resources. The SAMPLE provides the user with options to allow the execution of MPLS, GREEDY, GREEDY-OSARS, or MPLS-GREEDY-OSARS.

Chang, H.↗

The Application of Modeling and Simulation in Capacity Management within the ITIL Framework

Tightly integrating modeling and simulation techniques into Information Technology Infrastructure Library (ITIL) practices can be one of the driving factors behind a successful and cost-effective capacity management effort for any Information Technology (IT) system. ITIL is a best practices framework for managing IT infrastructure, development and operations. Translating ITIL theory into operational reality can be a challenge. This paper aims to highlight how to best integrate modeling and simulation into an ITIL implementation. For cases where the project team initially has difficulty gaining consensus on investing in modeling and simulation resources, a clear definition for M&S implementation into the ITIL framework, specifically its role in supporting Capacity Management, is critical to gaining the support required to garner these resources. This implementation should also help to clearly define M&S support to the overall system mission. This paper will describe the development of an integrated modeling approach and how best to tie M&S to definitive goals for evaluating system capacity and performance requirements. Specifically the paper will discuss best practices for implementing modeling and simulation into ITIL. These practices hinge on implementing integrated M&S methods that 1) encompass at least two or more predictive modeling techniques, 2) complement each one's respective strengths and weaknesses to support the validation of predicted results, and 3) are tied to the system's performance and workload monitoring efforts. How to structure two forms of modeling: statistical and simUlation in the development of "As Is" and "To Be" efforts will be used to exemplify the integrated M&S methods. The paper will show how these methods can better support the project's overall capacity management efforts.

Rahmani, Sonya↗

Validation of Reanalysis-Based Offshore Wind Resource Characterization Using Lidar Buoy Observations

The offshore wind industry in the U.S. is gaining strong momentum to achieve sustainable energy goals, and the need for observations to provide resource characterization and model validation is greater than ever. Pacific Northwest National Laboratory (PNNL) operates two lidar buoys for the U.S. Department of Energy (DOE) in order to collect hub height wind data and associated meteorological and oceanographic information near the surface in areas of interest for offshore wind development. This work evaluates the performance of commonly used reanalysis products and spatial approximation techniques using lidar buoy observations off the coast of New Jersey and Virginia, USA. Reanalysis products are essential tools in order to set performance expectations and quantify the wind resource variability at a given site. Long-term accurate observations at typical wind turbine hub-heights have been lacking at offshore locations. Using wind speed observations from both lidar buoy deployments, biases and degrees of correspondence for the Modern Era Retrospective Analysis for Research and Applications-2 (MERRA-2), the North American Regional Reanalysis (NARR), and the analysis system of the Rapid Refresh (RAP) are examined both at hub height and near surface. Results provide insights on the performance and uncertainty of using reanalysis products for long-term wind resource characterization.

lidar buoy, model validation, offshore wind energy↗

Model-based interface design for smart field-device integration

Operational complexity is ever-increasing for electric utilities that face challenges including integration of DERs, customer expectation of energy choices, the proliferation of non-utility-owned resources, new business models with energy service providers, and new technology with IT/OT convergence. To maintain and improve the quality of operations, planning, and decision-making in general, utilities need to manage and navigate the complexity. Managing complexity requires a modular, scalable, and flexible solution. Connecting large amounts of DERs and introducing new services requires increased grid control and evolving applications. In this paper, we show an approach utilizing model-based standardized interfaces that simplifies integration and deployment of new algorithms and smart field devices for interoperability across legacy or new systems. A modular design is presented for a reference implementation of widely used DNP3 and IEEE 2030.5 interfaces within an open-source, standards-based data integration platform for integration of smart field devices with independently developed, best-of-breed applications.

Model-driven development, system integration, smar↗

TERSSE: Definition of the Total Earth Resources System for the Shuttle Era. Volume 7: User Models: A System Assessment

User models defined as any explicit process or procedure used to transform information extracted from remotely sensed data into a form useful as a resource management information input are discussed. The role of the user models as information, technological, and operations interfaces between the TERSSE and the resource managers is emphasized. It is recommended that guidelines and management strategies be developed for a systems approach to user model development.

Source record↗

Automated ultrareliability models - A review

Analytic models are required to assess the reliability of systems designed to ultrareliability requirements. This paper reviews the capabilities and limitations of five currently available automated reliability models which are applicable to fault-tolerant flight control systems. 'System' includes sensors, computers, and actuators. A set of review criteria including validation, configuration adaptability, and resource requirements for model evaluation are described. Five models, ARIES, CARE II, CARE III, CARSRA, and CAST, are assessed against the criteria, thereby characterizing their capabilities and limitations. This review should be helpful to potential users of the models.

Bridgman, M. S.↗

Composite Overwrapped Pressure Vessels (COPV): Flight Rationale for the Space Shuttle Program

Each Orbiter Vehicle (Space Shuttle Program) contains up to 24 Kevlar49/Epoxy Composite Overwrapped Pressure Vessels (COPV) for storage of pressurized gases. In the wake of the Columbia accident and the ensuing Return To Flight (RTF) activities, Orbiter engineers reexamined COPV flight certification. The original COPV design calculations were updated to include recently declassified Kevlar COPV test data from Lawrence Livermore National Laboratory (LLNL) and to incorporate changes in how the Space Shuttle was operated as opposed to orinigially envisioned. 2005 estimates for the probability of a catastrophic failure over the life of the program (from STS-1 through STS-107) were one-in-five. To address this unacceptable risk, the Orbiter Project Office (OPO) initiated a comprehensive investigation to understand and mitigate this risk. First, the team considered and eventually deemed unfeasible procuring and replacing all existing flight COPVs. OPO replaced the two vessels with the highest risk with existing flight spare units. Second, OPO instituted operational improvements in ground procedures to signficiantly reduce risk, without adversely affecting Shuttle capability. Third, OPO developed a comprehensive model to quantify the likelihood of occurrance. A fully-instrumented burst test (recording a lower burst pressure than expected) on a flight-certified vessel provided critical understanding of the behavior of Orbiter COPVs. A more accurate model was based on a newly-compiled comprehensive database of Kevlar data from LLNL and elsewhere. Considering hardware changes, operational improvements and reliability model refinements, the mean reliability was determined to be 0.998 for the remainder of the Shuttle Program (from 2007, for STS- 118 thru STS-135). Since limited hardware resources precluded full model validation through multiple tests, additional model confidence was sought through the first-ever Accelerated Stress Rupture Test (ASRT) of a flown flight article. A Bayesian statistical approach was developed to interpret possible test results. Since the lifetime observed in the ASRT exceeded initial estimates by one to two orders of magnitude, the Space Shuttle Program deemed there was significant conservatism in the model and accepted continued operation with existing flight hardware. Given the variability in tank-to-tank original prooftest response, a non-destructive evaluation (NDE) technique utilizing Raman Spectroscopy was developed to directly measure COPV residual stress state. Preliminary results showed that patterns of low fiber elastic strains over the outside vessel surface, together with measured permanent volume growth during proof, could be directly correlated to increased fiber stress ratios on the inside fibers adjacent to the liner, and thus reduced reliability.

Kezirian, Michael T.↗

Offshore Wind Technology: Above the Water

WINDExchange will produce an Offshore Wind Technology: Above the Water Webinar. The webinar will explore the technology involved in offshore wind above the water including wind farm technology, turbine technology, and wind resource assessments and modeling to provide foundational technical information to communities and interested stakeholders.

above the water↗

What to Do Until the Money Runs Out: A Refinement Framework for Cognitive Engineering in the Real World

A case study is presented to illustrate some of the problems of applying cognitive science to complex human-machine systems. Disregard for facts about human cognition often undermines the safety, reliability, and cost-effectiveness of complex systems. Yet single-point methods (for example, better user-interface design), whether rooted in computer science or in experimental psychology, fall far short of addressing systems-level problems in a timely way using realistic resources. A model-based methodology is proposed for organizing and prioritizing the cognitive engineering effort, focusing appropriate expertise on major problems first, then moving to more sophisticated refinements if time and resources permit. This case study is based on a collaborative effort between the Human Factors Division at NASA-Ames and the Spaceborne Imaging Radar SIR-C/X-Band Synthetic Aperture Radar (SIR-C/X-SAR) Project at the Jet Propulsion Laboratory (JPL), California institute of Technology. The first SIR-C/X-SAR Shuttle mission flew successfully in April, 1994. A series of such missions is planned to provide radar data to study Earth's ecosystems, climatic and geological processes, hydrologic cycle, and ocean circulation. In addition to JPL and NASA personnel, the SIR-C/X-SAR operations team included Scientists and engineers from the German and Italian space agencies.

Shafto, Michael G.↗

Quantifying sensitivity in numerical weather prediction-modeled offshore wind speeds through an ensemble modeling approach

A decade of research has shown that numerical weather prediction (NWP)-modeled wind speeds can be highly sensitive to the inputs and setups within the NWP model. For wind resource characterization applications, this sensitivity is often addressed by constructing a range of setups and selecting the one that best validates against observations. However, this approach is not possible in areas that lack high-quality hub height observations, especially offshore wind areas. In such cases, techniques to quantify and disseminate confidence in NWP-modeled wind speeds in the absence of observations are needed. We address this need in the present study and propose best practices for quantifying the spread in NWP-modeled wind speeds. We implement an ensemble approach in which we consider 24 different setups to the Weather Research and Forecasting (WRF) model. We construct the ensemble by considering variations in WRF version, WRF namelist, atmospheric forcing, and sea surface temperature (SST) forcing. Our analysis finds that the standard deviation produces more consistent estimates compared to the interquartile range and tends to be the more conservative estimator for ensemble variability. We further find that model spread increases closer to the surface and on shorter time scales. In conclusion, we explore methods to attribute total ensemble variability to the different ensemble components (e.g., atmospheric forcing and SST product) and find that contributions by components also vary depending on time scale. We anticipate that the methods and results presented in this paper will provide a reasonable foundation for further research into ensemble-based wind resource data sets.

17 WIND ENERGY↗

US ATLAS and US CMS HPC and Cloud Blueprint

The Large Hadron Collider (LHC) at CERN houses two general purpose detectors - ATLAS and CMS - which conduct physics programs over multi-year runs to generate increasingly precise and extensive datasets. The efforts of the CMS and ATLAS collaborations lead to the discovery of the Higgs boson, a fundamental particle that gives mass to other particles, representing a monumental achievement in the field of particle physics that was recognized with the awarding of the Nobel Prize in Physics in 2013 to François Englert and Peter Higgs. These collaborations continue to analyze data from the LHC and are preparing for the high luminosity data taking phase at the end of the decade. The computing models of these detectors rely on a distributed processing grid hosted by more than 150 associated universities and laboratories worldwide. However, such new data will require a significant expansion of the existing computing infrastructure. To address this, both collaborations have been working for years on integrating High Performance Computers (HPC) and commercial cloud resources into their infrastructure and continue to assess the potential role of such resources in order to cope with the demands of the new high luminosity era. US ATLAS and US CMS computing management have charged the authors to provide a blueprint document looking at current and possibly future use of HPC and Cloud resources, outlining integration models, possibilities, challenges and costs. The document will address key questions such as the optimal use of resources for the experiments and funding agencies, the main obstacles that need to be overcome for resource adoption, and areas that require more attention.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Short-term solar radiation forecast using total sky imager via transfer learning

Ground-based sky cameras, which capture hemispherical images, have been extensively used for localized monitoring of clouds. This paper proposes a short-term forecasting approach based on transfer learning using Total Sky-Imager (TSI) images of the Southern Great Plains (SGP) site obtained from the Atmospheric Radiation Measurement (ARM) dataset. An accurate estimation of solar irradiance using TSI is key for short-term solar energy generation forecasting and optimal energy consumption planning. We make use of deep neural network architectures such as AlexNet and ResNet-101 to extract the underlying deep convolution features from TSI images and then train using an ensemble learning approach to model and forecast solar radiation. We demonstrate the performance of the proposed approach by showcasing the best and worst cases. Thus, the transfer learning approach significantly reduces the time and resources required for modeling solar radiation. We outperform with reference to another state-of-art technique for solar modeling using TSI images at different forecast lead times.

54 ENVIRONMENTAL SCIENCES↗