Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “remediation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Generation and Characteristics of Plutonium and Americium Contaminated Soils Underlying Waste Sites at Hanford

In 2012, a Hanford site-wide review on plutonium and americium geochemistry (Cantrell and Felmy 2012) identified remaining research challenges associated with defining scientifically defensible end-states and supporting remediation decisions. Three research challenges were identified in this review: 1. Determine the transformations of Hanford Site sediments in response to changes in waste/groundwater composition. Significant mineralogical transformations can take place when wastes contact Hanford sediments. These transformations can significantly impact the solubility and acidic adsorption of plutonium and americium and possibly result in the generation of pseudo colloids that could facilitate plutonium/americium migration. 2. Assess the impact of changes in waste/groundwater chemistry on the potential for plutonium/americium solubilization or colloid formation. Changes in waste or groundwater chemistry can greatly impact the chemical form or speciation of plutonium and americium. Knowledge of plutonium and americium speciation will be crucial in terms of evaluating the potential for solubilization, adsorption or remobilization of adsorbed complexes, colloid formation, and colloid interactions with sedimentary minerals. 3. Establish the role of organic complexants and/or non-aqueous solvents in the transport of plutonium/americium in the deep subsurface. Plutonium has been found to be associated with TBP and the presence of non-aqueous solvents, at least in certain Z-9 sediments. It will be important to establish the role of non-aqueous solvent in past movement of plutonium and its potential role in future mobility. This report provides the technical basis for interpreting data obtained from field samples and will allow waste chemistry impacts on plutonium/americium re-mobilization mechanisms to be assessed. This report helps address the three previously identified research challenges – sediment transformations, solution chemistry impacts, and the role of organic complexants and solvents – in plutonium and americium contaminated Hanford sediments. Ultimately, these and potential future studies will lead to a defensible description of plutonium and americium mobility in relation to waste site conditions that can be interpreted to balance the risks posed by their migration and envisioned remediation activities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of Dose- and Risk-Based Groundwater Cleanup Levels for Low Energy Beta Radioisotopes

Low-energy beta-emitting radionuclides that were released historically during reactor operations and plutonium separations activities at some U.S. Department of Energy sites have migrated into the groundwater, forming contaminant plumes that are subject to federally regulated remediation actions. At the Hanford Site, the low-energy beta-emitting radionuclides include iodine-129, technetium-99, chlorine-36, carbon-14, and tritium (H-3). All are highly mobile in the subsurface, and except for tritium, and have very long half-lives—thousands to millions of years. The geochemistry and transport behavior of these contaminants in the subsurface present significant challenges for remediation of groundwater to federal drinking water standards (DWS)—the appropriate or relevant and applicable requirements (ARARs) for cleanup. For some of the low-energy beta-emitter contaminants, particularly iodine-129, cleanup and restoration of groundwater to DWS may not be attainable within a reasonable timeframe using currently available treatment technologies.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Western Sector In-Situ Chemical Oxidation Project: Additional Injection Pilot Testing Supplemental Results (U)

Trichloroethylene (TCE) and tetrachloroethylene (PCE) are persistent at elevated concentrations in the Western Sector of the M-Area Hazardous Waste Management Facility (HWMF) groundwater plume. Migration of these chlorinated ethenes as Dense Non-Aqueous Phase Liquids (DNAPLs) occurred from the M-Area Settling Basin along geologic strata resulting in a high concentration groundwater plume in Western Sector. Pump-and-treat has been active for over 30 years at the M-Area HWMF to hydraulically contain the primary sources of the plume in addition to other remediation strategies throughout the contaminated zone, like soil vapor extraction, dynamic underground stripping, groundwater recirculation wells, and bioremediation. In-situ chemical oxidation (ISCO) has been identified as a viable treatment method for removal of these volatile organic compounds (VOCs) due to the complex lithology and high concentrations in this part of the aquifer. In addition to ISCO, a new recovery well (i.e., RWM018) was also installed in Western Sector to contain the high concentration VOC plume. The ISCO projects have utilized the gradient induced by RWM018 to help plan the injection and monitoring locations. The combination of ISCO and the additional pump and treat in Western Sector with the installation of RWM018 will help to control the plume and maximize remediation efforts.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of Microbial Communities as Indicators of Microbially Induced Corrosion Potential in Stainless Steel Piping

The 200 West Area Pump-and-Treat (200W P&T) facility is part of the final remedy decision for the 200 ZP-1 Operable Unit (OU) and is the interim remedial action for 200-UP-1 OU at the Hanford Site. The facility also treats water from other sources across the site, including 200-DV-1 OU perched water, groundwater from the 200-BP-5 OU, and leachate from the Environmental Restoration Disposal Facility. The facility originally operated a biological treatment process for nitrate that resulted in systemic biofouling and loss of injection well capacity, requiring frequent and costly well rehabilitation. Biofouling has also contributed to corrosion of welds and pitting of stainless-steel piping at the facility. The biological treatment for nitrate was suspended at the end of 2019 calendar year to eliminate negative impacts from biological treatments which improve facility operations and treatment of carbon tetrachloride. Evaluation of the 200W P&T facility’s response to operational improvements, specifically the suspension of the biological treatment, provides information on the potential for continued microbially induced corrosion (MIC). To this end, historical data sets (2015-2017) were compared with molecular biological analyses of 200W P&T water samples from 2018-2020 to quantify trends in total microbial biomass and specific microbial indicator species (iron, sulfate, nitrate, and manganese reducing bacteria) known to cause and enhance metal corrosion. Results showed unequivocal reductions (in excess of 90%) in all microbiological indicators measured following the suspension of the biological treatment. Although abundance measurements for all corrosive MIC populations initially declined after removal of the treatment system, nitrate-reducing bacteria (nirK) and sulfate-reducing bacteria remain highly abundant in the system, an order of magnitude higher than the number of cells present prior to the removal of the biological treatment system [5.14e (1.4) cells/L, vs. 1.14e (0.07) cells/L, reported as average (±SD) for n=3]. In addition, there was an unexpected inflection point in 2019 where all microbial indicators increased unexpectedly in abundance in 2020 by as much as two orders of magnitude compared to 2019 samples. Given the limited number of water samples available for this analysis, the cause of the increase in microbial indicators post-biological treatment has not yet been determined. Systematic sampling of the facility for continued monitoring is recommended so that the responses of MIC populations can be evaluated to ensure that further corrosion is avoided, allowing the 200W P&T facility to operate safely and efficiently at design capacity.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Alpha Spectrometry Results for Groundwater Samples Collected in Northern Iraq and a Summary of the Environmental Setting of the Adaya Burial Site

The Radiation Protection Center (RPC) of the Iraqi Ministry of Environment continues to evaluate the potential health impacts associated with the Adaya Burial Site, which is located 33 kilometers (20.5 miles) southwest of Mosul. This report documents the radiological analyses of 16 groundwater samples collected from wells located in the vicinity of the Adaya Burial Site and at other sites in northern Iraq. The Adaya Burial Site is a high-risk dump site because a large volume of radioactive material and contaminated soil is located on an unsecure hillside above the village of Tall ar Ragrag. The uranium activities for the 16 water samples in northern Iraq are considered to be naturally occurring and do not indicate artificial (man-made) contamination. With one exception, the alpha spectrometry results for the 16 wells that were sampled in 2019 indicate that the water quality concerning the three uranium isotopes (Uranium-233/234, Uranium-235/236, and Uranium-238) was acceptable for potable purposes (drinking and cooking). However, Well 7 in Mosul had a Uranium-233/234 activity concentration that slightly exceeded the World Health Organization guidance level. Eight of the 16 wells are located in the villages of Tall ar Ragrag and Adaya and had naturally occurring uranium concentrations. Wells in the villages of Tall ar Ragrag and Adaya are located near the Adaya Burial Site and should be sampled on an annual schedule. The list of groundwater analytes should include metals, total uranium, isotopic uranium, gross alpha/beta, gamma spectroscopy, organic compounds, and standard water quality parameters. Our current understanding of the hydrogeologic setting in the vicinity of the Adaya Burial Site is solely based on villager's domestic wells, topographic maps, and satellite imagery. To better understand the hydrogeologic setting, a Groundwater Monitoring Program needs to be developed and should include the installation of twelve groundwater monitoring wells in the vicinity of Tall ar Ragrag and the Adaya Burial Site. Characterization of the limestone aquifer and overlying alluvium is needed. RPC should continue to support health assessments for the villagers in Tall ar Ragrag and Adaya. Collecting samples for surface water (storm water), airborne dust, vegetation, and washway sediment should be conducted on a routine basis. Human access to the Adaya Burial Site needs to be strictly limited. Livestock access on or near the burial site needs to be eliminated. The surface-water exposure pathway is likely a greater threat than the groundwater exposure pathway. Installation of a surface-water diversion or collection system is recommended in order to reduce the potential for humans and livestock to come in contact with contaminated water and sediment. To reduce exposure to villagers, groundwater treatment should be considered if elevated uranium or other contaminants are detected in drinking water. Installing water-treatment systems would likely be quicker to accomplish than remediation and excavation of the Adaya Burial Site. The known potential for human exposure to uranium and metals (such as arsenic, chromium, selenium, and strontium) at the Adaya Burial Site is serious. Additional characterization , mitigation, and remediation efforts should be given a high priority.

54 ENVIRONMENTAL SCIENCES↗

Removal of Institutional Controls at CERCLA Site ANL-01 Ditches A, B and C at the Materials and Fuels Complex

ANL-01 is a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) site within Operable Unit (OU) 9-04 at the Materials and Fuels Complex (MFC). The ANL-01 site includes the Industrial Waste Pond and its associated ditches. Ditches A, B and C within ANL-01 were remediated in accordance with the Final Record of Decision for Argonne National Laboratory - West (DOE-CH 1998a). Due to the success of the selected and contingent remedies for the ditches and the determination that they are protective of human health and the environment, institutional controls (ICs) are no longer required and Idaho National Laboratory (INL) recommends termination of the ICs. In addition, the documentation requirements of the INL Site-wide Institutional Controls, and Operations and Maintenance Plan for CERCLA Response Actions (DOE-ID 2017) have been met to allow termination to occur.

54 ENVIRONMENTAL SCIENCES↗

Predictive Contaminant Transport Simulation with the P2R Model for the Composite Analysis Inventory Sensitivity Case

The Plateau to River (P2R) Model is a groundwater flow and contaminant fate and transport (F&T) simulation model used to support remedial activities conducted by the Central Plateau Cleanup Company (CPCCo) at the Hanford Site in Washington State. The model simulates contaminants of concern within the saturated zone of the uppermost aquifer beneath the Central Plateau and downgradient to the Columbia River. The overall objective of the saturated zone modeling effort is to provide a basis for making informed remedial action decisions based on descriptions of current and expected future contaminant concentrations in groundwater at decision points within and downgradient of the Central Plateau of the Hanford Site. Specifically, the purpose of this environmental calculation file (ECF) is to describe an inventory sensitivity case of the CA base case. The inventory sensitivity case implements a change in the activity contribution from the vadose zone in the A Trenches Area model (for tritium (H-3) and iodine-129 (I-129)), BC Cribs and Trenches model (for I-129 and technetium-99 (Tc-99)), and the PUREX Area model (for H-3 and I-129). All other simulated inventories are identical to the CA base case. The simulation of F&T of contaminants reported in this case will support dose predictions as part of the Hanford Site CA.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Predictive Contaminant Transport Simulation with the P2R Model for the Composite Analysis Recharge Sensitivity Case

The Plateau-to-River (P2R) model is a groundwater flow and contaminant fate and transport (F&T) simulation model used to support remedial activities conducted by the Central Plateau Cleanup Company (CPCCo) at the Hanford Site in south-central Washington State. The overall objective of the saturated zone modeling effort is to provide a basis for making informed remedial action decisions based on descriptions of current and expected future contaminant concentrations in groundwater at decision points within and downgradient of the Central Plateau of the Hanford Site. Specifically, the purpose of this environmental calculation file (ECF) is to describe a recharge sensitivity case of the CA base case. The recharge sensitivity case implements a change in the activity contribution from the vadose zone in the A Trenches Area model (for tritium [H-3] and iodine-129 [I-129]), BC Cribs and Trenches model (for I-129 and technetium-99 [Tc-99]), or the Plutonium Uranium Extraction (PUREX) Area model (for H-3 and I-129). All other simulated inventories are identical to the CA base case. The simulation of fate and transport of contaminants reported in this case will support dose predictions as part of the updated Hanford Site CA.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Removable, Sequestration Coatings for Mitigating Hazardous Contaminants Related to Deactivation and Decommissioning Activities

This project is a collaborative effort between InnoSense LLC (ISL) and Oak Ridge National Laboratory (ORNL) aimed at mitigating the mercury (Hg) contamination problem at the Y-12 National Security Complex (NSC). The report summarizes the research and technology development work of the Phase IIB Project, led by Dr. Uma Sampathkumaran at ISL for the period of July 31, 2017–October 31, 2021. The Y-12 site cleanup includes technologies for safe and cost-effective facility demolition, soil remediation, and on-site treatment and disposal of mercury bearing wastes. One of the technology demonstration goals was a reactive strippable coating for targeted pre-demolition and de-contamination to limit Hg mobilization and the volume of debris requiring treatment for disposal. Toward this, ISL has developed a water-based reactive strippable coating (Trap & See-Hg™) to sequester elemental Hg(0) and mercuric Hg(II) species in the coating. The coating provides multiple benefits including (1) Hg vapor suppression, (2) sealing in the hazardous contaminants, (3) visually locating the contaminant through color changes, and (4) remediating the contaminated surfaces upon coating removal. Through collaboration between ORNL and ISL in Phase II work, the team successfully demonstrated the Trap & See-Hg technology to (1) visually locate the presence of Hg on concrete, soil and drywall surfaces, (2) effectively sequester all mercury species (elemental, soluble and insoluble Hg) from lab-generated and ex-situ soil and brick/rubble samples collected from the Y 12 site with 80 to 95% efficiency to capture/reduce Hg vapor concentration, (3) be applied by manual and robotic spray applicators and cure at room ambient, (4) remain a cohesive and peelable coating upon drying, and (5) sequester Hg0 from walls in the alpha-2 building basement at Y-12 during a small scale in-situ field trial. In Phase IIB, ISL’s effort was focused on refining the coating formulations with additives containing passive and reactive sorbents, colorimetric indicator, and thixotropic agents to achieve the desired performance. The paints were then evaluated at ORNL for applicability to metal and concrete surfaces of different sizes and shapes, and soil rubble, Hg-sorption capacity and achieving sag-free coating on surfaces when applied by a manual spray applicator. Ambient cure of the coating resulted in a dry thickness of 16–20 mil. The coatings were removed from smooth or rough surfaces with low to moderate force. Both lab-generated Hg-contaminated samples and soil and brick/rubble samples containing a range of Hg concentrations (collected from the Y-12 site by UCOR) were used in this project. Optimized formulations were applied to these samples and evaluated for ability to suppress Hg vapors, sequester Hg 0 and Hg(II) species and color mapping of mercury species on the test surface. The ORNL team initially identified three to four potential sites at Y-12 and ORNL for potential demonstration. However, the pandemic closed any possible avenues for on-site demonstration of the robotic spray applicator. The metal and concrete samples with low to high Hg content provided by UCOR from an ongoing demolition were subsequently used for ex-situ sample characterization and analysis at ORNL over a period of 25 days. The coatings suppressed Hg vapors with an efficiency of 95–99% from heavily contaminated metal and 60% from concrete substrate. Analysis of total Hg in the peeled paints indicates sorption capacities ranging from 12 µg Hg/g of paint from concrete to 1.2 mg Hg/g of paint from the metal substrates while peeled paints from soil samples could capture a total Hg from 2.3 mg Hg/g to 66 mg/g paint. Toxicity characteristic leaching procedure (TCLP) tests recovered total mercury leached at 0.15±0.0008 µg/L for concrete to 126.81±0.67 µg/L and 377.25±5.67 µg/L for the two metal substrates, to allow for informed decisions on downstream disposal considerations. Together, this Phase IIB demonstrated the potential value of the Trap & See-Hg for Hg uptake, vapor suppression, and color mapping, and may thus be used to enhance worker safety during site cleanup, facility demolition, and downstream waste disposal at Y-12 NSC.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lawrence Livermore National Laboratory Environmental Report 2021

The purposes of the Lawrence Livermore National Laboratory Environmental Report 2021 are to record Lawrence Livermore National Laboratory’s (LLNL’s) compliance with environmental standards and requirements, describe LLNL’s environmental protection and remediation programs, and present the results of environmental monitoring at the two LLNL sites—the Livermore Site and Site 300. The report is prepared for the U.S. Department of Energy (DOE) by LLNL’s Environmental Functional Area. Submittal of the report satisfies requirements under DOE Order 231.1B, “Environment, Safety and Health Reporting,” and DOE Order 458.1, “Radiation Protection of the Public and Environment.” The report is distributed electronically and is available at https://saer.llnl.gov/, the website for the LLNL annual environmental report. Previous LLNL annual environmental reports beginning with 1994 are also on the website. Some references in the electronic report text are underlined, which indicates that they are clickable links. Clicking on one of these links will open the related document, data workbook, or website. Sampling location maps throughout this report were created using ArcGIS® software by Esri. The report begins with an executive summary, which provides the purpose of the report and an overview of LLNL’s compliance and monitoring results. The first three chapters provide background information: Chapter 1 is an overview of the location, meteorology, and hydrogeology of the two LLNL sites; Chapter 2 is a summary of LLNL’s compliance with environmental regulations; and Chapter 3 is a description of LLNL’s environmental programs with an emphasis on the Environmental Management System including pollution prevention. The majority of the report covers LLNL’s environmental monitoring programs and monitoring data for 2021: effluent and ambient air monitoring and dose assessment (Chapter 4); waters, including wastewater, storm water runoff, surface water, rain, and groundwater (Chapter 5); and terrestrial, including soil, sediment, vegetation, foodstuff, ambient radiation, and special status wildlife and plants (Chapter 6). The remaining two chapters discuss LLNL’s groundwater remediation program (Chapter 7), and quality assurance for the environmental monitoring programs (Chapter 8). Complete monitoring data, which are summarized in the body of the report, are provided in Appendix A. The report uses Système International units, consistent with the federal Metric Conversion Act of 1975 and Executive Order 12770, “Metric Usage in Federal Government Programs” (1991). For ease of comparison to environmental reports issued prior to 1991, dose values and many radiological measurements are given in both metric and U.S. customary units. A conversion table is provided in the glossary. The report is the responsibility of LLNL’s Environmental Functional Area. Monitoring data were obtained through the combined efforts of the Environmental Functional Area; Environmental Restoration Department; Physical and Life Sciences Environmental Monitoring Radiological Laboratory; and the Radiation Protection Functional Area.

54 ENVIRONMENTAL SCIENCES↗

Advanced Long-Term Environmental Monitoring Systems (ALTEMIS) Artificial Intelligence Data Management Plan

Across the Department of Energy’s Environmental and Legacy Management sites, complex groundwater plumes exist that will require long-term monitoring to ensure remedial actions that have been put in place remain effective decades into the future. The current monitoring paradigm predominantly consists of groundwater well sampling, whereby samples are collected, concentrations analyzed, and plume anomalies are detected after they have occurred. The Advanced Long Term Environmental Monitoring Systems (ALTEMIS) program is a multi-lab, multi-institution team of researchers that is deploying spatially integrative technologies (i.e., real-time in situ sensor networks), coupled with artificial intelligence and machine learning, to establish a more proactive monitoring paradigm. Within this approach, plume anomalies can be predicted, and corrective actions can be established prior to the occurrence, offering a more cost-effective and robust approach to long-term monitoring. The team has deployed a variety of different in situ sensing technologies at the Savannah River Site’s F-Area Hazardous Waste Management Facility around the F-Area Seepage Basins, which are unlined basins that received 7 billion liters of acidic low-level radioactive waste from the 1950s until the late 1980s. The technologies and techniques that the team is deploying are intended to ensure that the remedial actions that have been taken by the site remain effective decades into the future. Foundational to this approach is a robust, integrated data management and analysis plan to ensure accurate and timely reporting from the variety of sensor systems that are in place. This report will outline the data management plan that has been implemented by the ALTEMIS team at the Savannah River Site and will serve as a blueprint as the technology is translated to new sites across the DOE Complex.

54 ENVIRONMENTAL SCIENCES↗

An Online Prototype Toolset for Predicting and Optimizing P&T Performance (FY23 Status Report)

A new web-based toolset is being developed to support ongoing remediation optimization efforts and implementation of an adaptive site management strategy for the 200 West Area Pump-and-Treat (P&T) system at the Hanford Site. This toolset, comprising the well performance index tool and the well optimization pre-screening tool, will offer a user-friendly interface to predict and optimize the P&T well network’s performance at a preliminary level. Efforts in fiscal year (FY) 2023 focused on three main components: updating the existing deep learning model for predicting P&T performance, designing and developing a prototype of a web-based performance index tool, and initiating the conceptual design of the well optimization pre-screening tool. The well performance index tool is based on a pre-trained deep learning model that allows users to select a target contaminant and well screen length, then visualize the predicted performance of potential new wells across the site. The well optimization pre-screening tool includes two separate modules: the pre-computed scenario viewer, which organizes and visualizes offline optimization simulation results, and the quick analysis module, which provides real-time model prediction using user-specified well locations. In FY24, the plan is to add web-based applications to SOCRATES for both the well performance prediction tool and the optimization prescreening tool, with accompanying user and theory guides. These tools are intended to enable an accessible, easily applied, and transparent approach to remedy planning and decision-making.

97 MATHEMATICS AND COMPUTING↗

Is Clean Hydrogen Production a Good Fit for Questa? (Final Economic Impact Results) [Slides]

The Village of Questa, New Mexico is aiming to become a regional clean energy hub with robust and diverse employment opportunities for the local community supported by the energy sector and by other businesses inspired or attracted by abundant clean energy, outdoor recreation, and cultural opportunities. A coalition of stakeholders in the Village of Questa, comprising the Village, Kit Carson Electric Cooperative (KCEC), Questa Economic Development Fund, and Chevron, is exploring options to develop hydrogen production facilities as an opportunity to create jobs, provide reliable clean energy, and utilize former mine resources. Questa is home to a molybdenum mine owned by Chevron that closed in 2014. Several residents in Questa and surrounding communities lost their jobs when the mine closed and transitioned from active operations into environmental remediation. Although remediation efforts have been ongoing since 2014 and are expected to continue for at least 16 more years, the number of jobs with Chevron is much smaller now than it was before the closure. Between available workforce, brownfield land, and water rights formerly supporting mine operations but now in a transition period, there are considerable local resources that could be directed toward clean energy generation. Questa's electricity supply is already 100% solar during daylight hours thanks to Kit Carson Electric Cooperative's (KCEC's) strategic decision-making and partnering over the last decade. Now, Questa, KCEC, and Chevron are exploring the potential costs and benefits of siting an electrolytic hydrogen production facility and additional solar photovoltaic (PV) capacity in Questa to further advance the region's clean energy economy. In this report, we estimated the potential economic impacts (i.e., jobs, value added, gross output, tax revenue) of constructing and operating a combined hydrogen (32 MW polymer electrolyte membrane electrolizer + 7.5 MW fuel cell) and solar facility (22.5 MW) in the Village of Questa, as well as the resulting economic spillovers to Taos County and the state of New Mexico. We employ an input-output model that leverages IMPLAN's economic data for the region complemented by construction and operating expenses estimated by NREL and feedback from the local coalition to evaluate the direct, indirect and induced effects of the project construction (transient impacts) and operation (more permanent impacts). Based on the area's average trade profile, feedback from the coalition and current market conditions, these projects are expected to support 487 full-time equivalent jobs during construction, generating $\$24$ million in income for those workers and $\$82$ million in local economic activity in the state. Of those jobs, 106 are expected to be construction sector jobs. These investments are also estimated to add $\$36.5$ million to New Mexico's gross state product (GSP). In the Village of Questa, we estimate 16 jobs will be supported in construction and transportation industries, generating $\$0.9$ million in earnings. In Taos County, the construction phase is expected to support 285 jobs primarily in construction and professional services, while manufacturing jobs dominate the results for the Rest of New Mexico. The Village is also estimated to receive $\$0.9$ million in tax revenue from the construction phase alone. Once in operation, the project continues to impact the state and Questa. Around 20 jobs (full-time equivalent for each year of operation) are supported across New Mexico, with approximately 11 directly employed in Questa by both facilities. The total annual local economic activity supported by ongoing operations is just over $\$1.3$ million/yr, generating $\$1.6$ million/yr in additional income in the state. Annual operations are estimated to add $\$2.1$ million to the state's GSP. The Village is expected to receive around $\$43,000$/yr in tax revenue. Impacts vary significantly depending on which businesses are supplying materials, equipment and services, and where construction workers reside. Choosing local suppliers will most benefit Questa and the New Mexico economy, adding up to 500 jobs during construction and 13 long-term jobs. Local and state governments may consider ways to incentivize local businesses in order to maximize economic benefits.

08 HYDROGEN↗

Is Clean Hydrogen Production a Good Fit for Questa? Final Economic Impact Results

The Village of Questa, New Mexico is aiming to become a regional clean energy hub with robust and diverse employment opportunities for the local community supported by the energy sector and by other businesses inspired or attracted by abundant clean energy, outdoor recreation, and cultural opportunities. A coalition of stakeholders in the Village of Questa, comprising the Village, Kit Carson Electric Cooperative (KCEC), Questa Economic Development Fund, and Chevron, is exploring options to develop hydrogen production facilities as an opportunity to create jobs, provide reliable clean energy, and utilize former mine resources. Questa is home to a molybdenum mine owned by Chevron that closed in 2014. Several residents in Questa and surrounding communities lost their jobs when the mine closed and transitioned from active operations into environmental remediation. Although remediation efforts have been ongoing since 2014 and are expected to continue for at least 16 more years, the number of jobs with Chevron is much smaller now than it was before the closure. Between available workforce, brownfield land, and water rights formerly supporting mine operations but now in a transition period, there are considerable local resources that could be directed toward clean energy generation. Questa's electricity supply is already 100% solar during daylight hours thanks to Kit Carson Electric Cooperative's (KCEC's) strategic decision-making and partnering over the last decade. Now, Questa, KCEC, and Chevron are exploring the potential costs and benefits of siting an electrolytic hydrogen production facility and additional solar photovoltaic (PV) capacity in Questa to further advance the region's clean energy economy. In this report, we estimated the potential economic impacts (i.e., jobs, value added, gross output, tax revenue) of constructing and operating a combined hydrogen (32 MW polymer electrolyte membrane electrolizer + 7.5 MW fuel cell) and solar facility (22.5 MW) in the Village of Questa, as well as the resulting economic spillovers to Taos County and the state of New Mexico. We employ an input-output model that leverages IMPLAN's economic data for the region complemented by construction and operating expenses estimated by NREL and feedback from the local coalition to evaluate the direct, indirect and induced effects of the project construction (transient impacts) and operation (more permanent impacts). Based on the area's average trade profile, feedback from the coalition and current market conditions, these projects are expected to support 487 full-time equivalent jobs during construction, generating $\$24$ million in income for those workers and $\$82$ million in local economic activity in the state. Of those jobs, 106 are expected to be construction sector jobs. These investments are also estimated to add $\$36.5$ million to New Mexico's gross state product (GSP). In the Village of Questa, we estimate 16 jobs will be supported in construction and transportation industries, generating $\$0.9$ million in earnings. In Taos County, the construction phase is expected to support 285 jobs primarily in construction and professional services, while manufacturing jobs dominate the results for the Rest of New Mexico. The Village is also estimated to receive $\$0.9$ million in tax revenue from the construction phase alone. Once in operation, the project continues to impact the state and Questa. Around 20 jobs (full-time equivalent for each year of operation) are supported across New Mexico, with approximately 11 directly employed in Questa by both facilities. The total annual local economic activity supported by ongoing operations is just over $\$1.3$ million/yr, generating $\$1.6$ million/yr in additional income in the state. Annual operations are estimated to add $\$2.1$ million to the state's GSP. The Village is expected to receive around $\$43,000$/yr in tax revenue. Impacts vary significantly depending on which businesses are supplying materials, equipment and services, and where construction workers reside. Choosing local suppliers will most benefit Questa and the New Mexico economy, adding up to 500 jobs during construction and 13 long-term jobs. Local and state governments may consider ways to incentivize local businesses in order to maximize economic benefits.

08 HYDROGEN↗

2024 Geothermal Rising Conference Poster

As part of a U.S. DOE Geothermal Technologies Office funding opportunity, Geysers Power Company, LLC, an indirect subsidiary of Calpine Corporation, partnered with Sandia National Labs, EGI at the University of Utah, and Texas A&M University to demonstrate increased drilling performance at The Geysers Geothermal Field. The performance target in the drilling demonstrations is at least a 25% improvement in rates of penetration with increased time on bottom for each bit. The planned drilling demonstrations are being conducted as part of an existing drilling campaign intended to enhance reservoir utilization. A major goal of the project is to assess the effectiveness of implementing mechanical specific energy (MSE) and drilling dysfunction diagnosis and remediation in these challenging environments, as well as alternate bit technologies. The first demonstration well has been completed, with a total of 15 PDC bit runs in the 17.5”, 12.25” and 8.5” sections. Initial analysis shows ROP gains in all three hole sections, especially in the 17.5” and 12.25” sections, compared with conventional roller cone bit runs in the demonstration well and offset wells. However in the 8.5” hole, wear and damage to the PDC bits resulted in relatively short bit runs. Analysis is underway to take advantage of the positive results and remediate the challenges.

15 GEOTHERMAL ENERGY↗

Microbial Analysis of 100-N Borehole Samples: Estimation of Diesel and BTEX Degrading Bacterial Populations

Historical unplanned releases at the UPR-100-N-17 166-N Diesel Oil Supply Line Leak waste site located within the 100-NR-1 OU resulted in diesel fuel contamination of the unsaturated vadose zone and site groundwater. Enhanced in situ bioremediation of the deep vadose zone was the final remedy decision for the 100-NR-1 Operable Unit (OU) and the full-scale bioventing demo began in 2012. For this remedy, oxygen is actively supplied to the deep vadose zone to stimulate aerobic hydrocarbon degrading microorganisms to metabolize petroleum contamination. Degradation rate calculations based on vadose zone respirometry measurements, however, have indicated declining activity over recent years, though the precise reason for this apparent decline has not been determined. In this investigation 100-NR-1 OU sediment cores were analyzed for total microbial biomass, as well as enumeration of diesel and BTEX degrading bacteria to determine if these microbial populations have declined relative to previous measurements taken in 2009.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pantex Plant Ogallala Aquifer and Perched Groundwater Contingency Plan

The Pantex Plant Ogallala Aquifer and Perched Groundwater Contingency Plan has been developed in accordance with the requirements identified in the: • Interagency Agreement for the Pantex Superfund Site, Article 8.5 Work to be Performed, • Compliance Plan Provision of Hazardous Waste Permit No. 50284, and • Record of Decision for Groundwater, Soil, and Associated Media, Pantex Plant. A Long‐Term Monitoring System Design has been designed to monitor conditions in the perched groundwater including changes in the perched aquifer as a result of implementing the response actions. Monitoring is required for verifying the effectiveness of perched groundwater response actions (i.e., conditions in the perched aquifer are being affected as intended) and for confirming that the perched aquifer and Ogallala Aquifer characterization as defined in the Resource Conservation and Recovery Act Facility Investigation Report and the Corrective Measure Studies/Feasibility Study remains accurate. If monitoring results obtained through the monitoring network identify an unexpected condition or deviation, contingent actions will be considered and implemented as necessary to ensure continued protection of the Ogallala Aquifer and human health and the environment. Potential deviations to expected technology performance may be encountered for each of the four primary response actions that compose the selected remedy for perched groundwater; Playa 1 Pump and Treat System, Southeast Area Pump and Treat System, Southeast Area In‐Situ Bioremediation System (comprised of the Southeast In‐Situ Bioremediation System Original System, Southeast Area In‐Situ Bioremediation System Extension System, Offsite In‐Situ Bioremediation System, Perchlorate/Chromium ISB, Northeast ISB and County Road 8 ISB), and Zone 11 In‐Situ Bioremediation System. Monitoring will also be conducted to determine if there are deviations to the expected characterization, e.g., contaminants not expected as a result of the RCRA Facility Investigation characterization. Deviations to expected conditions in the Ogallala Aquifer could also be encountered if the response actions in the perched groundwater are not performing as expected, i.e., preventing contaminants from migrating to the Ogallala Aquifer. Currently, Pantex has begun investigation of detections of high explosives above groundwater protection standards in wells on the Texas Tech University property and a plume that is moving to the northeast from that area. Due to those detections, this Plan recognizes the fact that future detections in the Ogallala will be focused on first‐ time detections of analytes. After a remedy is determined, this Plan will require modification to address-deviations and contingent actions. This Plan was developed to identify the contingent actions necessary to mitigate impacts resulting from deviations to site conditions or response action performance. The Plan defines the environmental problem being addressed by the response actions, clarifies the expected conditions and objectives of the response actions, and identifies the potential deviations to the response actions (due to site conditions or technology performance) that could be encountered. The deviations were evaluated to determine the likelihood of occurrence, potential impact, and time to respond to avoid impact. The Plan also identifies the monitoring outlined in the Long‐Term Monitoring System Design Report (Consolidated Nuclear Security, 2024) and Sampling Analysis Plan (PanTeXas Deterrence, 2024) that will be used to detect the deviations. Lastly, the Plan specifies the contingent actions that could be implemented in response to the deviations. Because each response focuses on a discrete portion of the perched aquifer and contaminant plume, each response action has a different set of expected conditions, and therefore differing impacts from deviations to the site and technology expectations. As a result, the contingent actions are identified for each response action and potential deviation including specific constituents, location, and conditions. If deviations are encountered that impact the ability of the response action to meet performance objectives, the contingent actions will be focused on ensuring the response action can meet the performance objective. Contingent actions may be implemented as interim actions (ISMs/removal actions) in accordance with the Record of Decision, Interagency Agreement, and Hazardous Waste Permit‐50284, if warranted by the specific circumstances. For deviations to site characterization expected conditions, the contingent action will focus on determination of the source of the deviation, determination of the appropriate response, and evaluation of additional work to be completed. However, if the deviation to characterization impacts the performance of the response action, the contingent action will again focus on ensuring performance objectives can be met. Early source term removals and cleanup actions have been implemented to protect the Ogallala Aquifer. Because of these actions and based on modeling results, the expected conditions in the Ogallala Aquifer are that constituents of concern will not be detected above the Groundwater Protection Standards (GWPSs) nor will they reach potential points of exposure above the GWPS. The primary deviation of concern for the Ogallala is if constituents are detected in the Ogallala Aquifer near or above GWPSs. If it occurs, this change in expected conditions would require further evaluation of site and contaminant characteristics to determine an appropriate course of action. The evaluation would include additional monitoring, source identification, implementation of interim protective measures (if necessary), and delineation of extent. These evaluations are necessary to determine an appropriate response action for the Ogallala. The primary goal of the Plan is to provide for the continued protection of the Ogallala Aquifer and the health of its consumers. In recognition, this Plan presents a flexible and rational approach for making future decisions associated with confirming the change in perched and Ogallala aquifer conditions and identifying a response (technical activities, changes to response actions, regulatory oversight, and public involvement).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of Contaminant Bioaccumulation in Aquatic Biota on and Adjacent to the Oak Ridge Reservation—2020

This report provides information on contaminant concentrations in multiple wildlife prey species inhabiting or associated with water bodies on and downstream from the Oak Ridge Reservation (ORR), including regional reference sites. This information can be used to understand the nature and extent of contaminant exposure and transfer through the food web and to provide a baseline for evaluating temporal trends in contaminant exposure and accumulation. This information was gathered as part of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Five-Year Review (FYR) process, and it also addresses regulator comments on the annual Remediation Effectiveness Report (RER). This report summarizes the results of biological sampling completed in the spring and summer of 2020, prior to the 2021 FYR. Sampled locations included key sites upstream from the point sources of contaminants, along with watershed integration points on and off the ORR. Integration points are spatially the most important sampling sites because they capture biological responses to upstream contaminant inputs from both aqueous and groundwater sources, as well as responses to various remedial actions. These sites are most often located at a watershed administration unit boundary and may have regulatory significance for performance measures. In many cases, there are long-term biological and other monitoring data associated with these sites; these data generally fall within the areas of exposure and effects.

54 ENVIRONMENTAL SCIENCES↗