Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “performance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Risk of Performance and Behavioral Health Decrements Due to Inadequate Cooperation, Coordination, and Psychosocial Adaptions within a Team

The Risk of Performance and Behavioral Health Decrements Due to Inadequate Cooperation, Coordination, Communication, and Psychosocial Adaptation within a Team (the Team Risk) is primarily performance-focused, with a secondary emphasis on behavioral health outcomes resulting from team performance and interpersonal interactions. Monitoring tools, measures, and countermeasures are aimed at enhancing team processes and team composition configurations to optimize team performance and functioning. Long-duration exploration missions (LDEMs) will include major challenges that could affect team performance, including social isolation, physical confinement, a small and diverse crew, communication delays between crew and ground, limited or no crew rotation or evacuation options, limited or no resupply, and a high-consequence environment. Each of these conditions will affect the crew’s coordination, cooperation, psychological well-being, and performance. Although the International Space Station (ISS) remains important for studies that require spaceflight testing and validation, the current conditions on the ISS do not adequately mimic the exploration environment that is required for National Aeronautics and Space Administration (NASA) teams research, and thus access to terrestrial or ground-based analogs of LDEM conditions is paramount. The emphasis on analogs for research is reflected in this updated evidence review of the Team Risk, and includes data from studies conducted at isolated, confined, extreme (ICE) environments (e.g., Antarctic stations), and from several mission simulation analogs such as the Human Exploration Research Analog (HERA) (HERA Experiment Information Package, 2014), also known as isolated, confined, controlled (ICC) environments. These studies have characterized many team factors regarding LDEMs, and the Team Risk has now matured from risk characterization to focusing more on countermeasure development. Because spaceflight evidence for team-level research is lacking, no reliable data is available to quantify the impact of team-level variables on individual and team-level outcomes during spaceflight missions. Until recently, no systematic attempt had been undertaken to measure the performance effects of team cohesion, team composition, team training, or team-related psychosocial adaptation during spaceflight. The Team Risk is a relatively young research area for NASA, with substantial growth only since the 2000s, and with limited access to spaceflight performance data. As a result, spaceflight evidence is lacking to identify specifically what team composition, level of training, amount of cohesion, or quality of psychosocial adaptation is necessary to reduce the risk of performance errors in space. However, astronaut journals and interviews and reports from spaceflight subject matter experts (SMEs) provide testimonies that team performance during spaceflight is important for mission success and to maintain crew health. Team spaceflight data is now being collected as part of the Spaceflight Standard Measures task (Clement, 2021)—a set of core measurements related to many human spaceflight risks that are collected from astronauts before, during, and after long-duration missions. The team-related standard measures focus on team cohesion, team performance, group living, team climate, and team processes. Collection of standard measures data is ongoing and published data is not yet available. Finally, although spaceflight evidence is lacking, evidence gleaned from ground studies and spaceflight analog studies will help close the gaps outlined in the Team Risk. Ground-based studies provide quantitative evidence for team functioning in ICE environments. Academic research on teams has produced dozens of meta-analyses that can be used to understand the general relationships among team inputs (e.g., team member characteristics and skills, job context), team processes, and emergent states (e.g., coordination, communication, cooperation, cohesion, trust, shared cognition), and team outcomes (e.g., effectiveness, errors, adaptation). Teams are complex, incorporating individual characteristics of team members, but also existing at a level that is greater than the sum of its parts. Therefore, the Team Risk must be integrated with other individual-focused NASA Human Research Program (HRP) risks, including Behavioral Medicine (BMed), Sleep, and Human-Systems Integration Architecture (HSIA), and emerging research indicates more integration may needed between the Team Risk and the physiologically oriented risks. Much of this integration occurs through the Human Systems Risk Board (HSRB). A lack of team functioning may be a stressor in some circumstances, but the team often acts as a countermeasure. For example, support for team leaders and teammates can facilitate individual functioning and encourage psychological and physically healthy behaviors and attitudes. However, more research is needed regarding teams during LDEMs and the remaining gaps in the research are described in the current report.

Lauren Blackwell Landon↗

Special Analyses for the Hanford Integrated Disposal Facility Performance Assessment - 20102

In 2014, the Department of Energy (DOE) Office of River Protection and its contractors began to develop a performance assessment for the near-surface disposal of low-level and mixed low-level waste at the Hanford Site's Integrated Disposal Facility (IDF). The IDF is a doubly-lined landfill that was constructed between 2004 and 2006 to be the disposal facility for the vitrified low-activity waste that will be produced at the Waste Treatment and Immobilization Plant (WTP). IDF is also expected to receive solid secondary waste produced at the WTP and other solid wastes from site activities. The IDF has been in a preoperational state awaiting authorization from DOE and a RCRA permit modification from the State of Washington Department of Ecology to receive waste. Both the Disposal Authorization Statement and permit modification require a performance assessment demonstrating that the system of engineered and natural features will limit releases of radionuclides and hazardous chemicals from the IDF and be protective of human health and the environment. The simulated duration is 10,000 years. Based on the analyses presented in the 2017 Integrated Disposal Facility Performance Assessment, DOE issued a conditional Operating Disposal Authorization Statement for the IDF in June 2018. The long-term performance of the IDF to be protective of human health and the environment was evaluated under the requirements of DOE Order 435.1, Radioactive Waste Management. Computer simulations were performed to evaluate whether or not the IDF would comply with DOE requirements. In the time that has passed since the performance assessment was approved by DOE, new information has been discovered that had not been considered in the performance assessment. Since this new information has not been evaluated, the potential impact of the changes have not been taken into consideration in DoE's disposal authorization. DOE and its contractors follow a change control process to screen and, when necessary, evaluate new information that could potentially impact the conclusions of the completed performance assessment. This paper will describe the change control process and provide two examples of evaluations performed following the change control process. The first example evaluates a new waste form for liquid secondary waste that was not evaluated in the performance assessment. In the performance assessment, liquid secondary waste was assumed to be solidified with grout. A new recommendation to dispose of the liquid secondary waste after drying it to a powder was evaluated. The second example evaluates inventory implications from changes to the flow sheet that estimates the feed composition to the low-activity waste vitrification facility. The changes result in higher strontium concentrations in the vitrified waste stream. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Update to the Performance Assessment for the Savannah River Site Saltstone Disposal Facility - 20124

In 2019, Savannah River Remediation developed a revision to the performance assessment (PA) on behalf of the U.S. Department of Energy (DOE) Savannah River Operations Office (SR) for the near-surface disposal of low-level waste at the Savannah River Site (SRS) Saltstone Disposal Facility (SDF). Soluble waste from SRS Tank Farms undergoes salt processing to remove cesium and other high activity constituents. The low-activity decontaminated salt solution (DSS) is then immobilized by mixing it into a cementitious waste form known as saltstone. After mixing, the saltstone is poured into leak-tight concrete vaults, known as saltstone disposal units (SDUs), where the waste form cures. By the time of facility closure, the SDF is expected to consist of 15 SDUs with a combined capacity of 1.06 E+09 L (280 Mgal) of cured saltstone. The facility operates under a Disposal Authorization Statement (DAS) from DOE and a permit from the South Carolina Department of Health and Environmental Control (SCDHEC). Since the start of operations in 1990, the SDF has received almost 6.7 E+07 L (18 Mgal) of DSS, resulting in the safe disposal of 2.7 E+16 Bq (7.3 E+05 Ci) of activity. Due to the radioactive decay of short-lived contaminants, the total remaining activity in the disposed waste is estimated to be approximately 1.4 E+16 Bq (3.9 E+05 Ci), as of September 2018. The Disposal Authorization Statement requires a demonstration that the system of engineered and natural features of the disposal facility will limit releases from the facility and be protective of human health and the environment for at least the next 1,000 years. The long-term performance of the facility was evaluated under the requirements of the DoE's Radioactive Waste Management Manual (US DOE Manual 435.1-1). Simulations were performed to demonstrate that the disposal facility would meet performance objectives specified in the manual. The evaluation was based on numerical models that simulate the releases of contaminants from the saltstone waste form. Contaminants were transported through groundwater and air pathways to points of assessment to evaluate compliance. In addition, the potential consequences of an inadvertent human intrusion (IHI) were also evaluated. In accordance with the guidance and recommendations in US DoE's technical standard for DAS, deterministic and probabilistic analyses were performed to demonstrate the SDF system, which includes the engineered cover system, the SDUs, the waste form, and the natural features of the site, provides a reasonable expectation that saltstone disposal will meet performance objectives. Post-closure doses to future members of the public (MOP) were evaluated; dose estimates from the air pathway were well below the 1.0 E-04 Sv/yr (10 mrem/yr) performance objective within 1,000 years, and the calculated doses to the MOP from all exposure pathways, including the groundwater and air pathways, were well below the 2.5 E-04 Sv/yr (25 mrem/yr) performance objective within 1,000 years. Doses following an assumed intrusion event within the facility boundaries were well below the IHI performance objectives, where the acute IHI dose was below the acute IHI dose performance objective of 5.0 E-03 Sv (500 mrem) and the chronic IHI dose was below the chronic IHI dose performance objective of 1.0 E-03 Sv/yr (100 mrem/yr) within 1,000 years. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modeling and Evaluating Pilot Performance in NextGen: Review of and Recommendations Regarding Pilot Modeling Efforts, Architectures, and Validation Studies

NextGen operations are associated with a variety of changes to the national airspace system (NAS) including changes to the allocation of roles and responsibilities among operators and automation, the use of new technologies and automation, additional information presented on the flight deck, and the entire concept of operations (ConOps). In the transition to NextGen airspace, aviation and air operations designers need to consider the implications of design or system changes on human performance and the potential for error. To ensure continued safety of the NAS, it will be necessary for researchers to evaluate design concepts and potential NextGen scenarios well before implementation. One approach for such evaluations is through human performance modeling. Human performance models (HPMs) provide effective tools for predicting and evaluating operator performance in systems. HPMs offer significant advantages over empirical, human-in-the-loop testing in that (1) they allow detailed analyses of systems that have not yet been built, (2) they offer great flexibility for extensive data collection, (3) they do not require experimental participants, and thus can offer cost and time savings. HPMs differ in their ability to predict performance and safety with NextGen procedures, equipment and ConOps. Models also vary in terms of how they approach human performance (e.g., some focus on cognitive processing, others focus on discrete tasks performed by a human, while others consider perceptual processes), and in terms of their associated validation efforts. The objectives of this research effort were to support the Federal Aviation Administration (FAA) in identifying HPMs that are appropriate for predicting pilot performance in NextGen operations, to provide guidance on how to evaluate the quality of different models, and to identify gaps in pilot performance modeling research, that could guide future research opportunities. This research effort is intended to help the FAA evaluate pilot modeling efforts and select the appropriate tools for future modeling efforts to predict pilot performance in NextGen operations.

pilot human performance models↗

Accurate Efficiency Measurements for Emerging PV: A Comparison of NREL's Steady-State Performance Calibration Protocol Between Conventional and Emerging PV Technologies

Emerging PV technologies (e.g. Perovskite, and Quantum Dot) are commonly known to possess challenges for accurate performance measurement under the existing IEC 60904 series of standards, which were developed for conventional Si solar cells. Potential performance artifacts depending on scan rates and directions and light bias exposure history are often seen in those emerging solar cells. To avoid these artifacts and provide an unbiased and reliable efficiency measurement, NREL's Cell and Module Performance (CMP) Group has developed a steady-state performance calibration protocol - the asymptotic P MAX method. In this paper, we applied this procedure to four PV cell technologies, Si, CIGS, perovskite, and Quantum Dot (QD), and compared their performance variations between the transient and the steady-state conditions. By comparison, we found that the performance parameters ( i.e. V OC , I SC , FF, ..eta..) measured between fast I-V scans (and the asymptotic method (steady-state) change significantly for perovskite and QD cells. These changes do not happen for Si and CIGS cells. Furthermore, the statistical performance analysis on nearly 100 emerging cells received globally (including OPV, Perovskite, and QD) shows that over 70 % of the fast I-V scans have a relative performance deviation larger than 1% compared to those determined using the asymptotic P MAX scan. Given the complex dynamic behavior observed in emerging PV devices, the CMP group at NREL thus only certifies their steady steady-state performance using the Asymptotic P MAX method. We highly recommend similar steady-state performance calibration protocol for all researchers in emerging PV because accuracy in reported efficiencies is critical to the long-term success of those promising new PV technologies.

41 EE - Solar Energy Technologies Office (EE-4S)↗

A Guide to Energy Master Planning of High-Performance Districts and Communities

This guide was developed with partners throughout the United States to demonstrate how implementing district-scale high-performance strategies can be successful and scalable approaches to achieving deep energy savings that increase affordability, improve resilience, reduce emissions, and foster economic development. This document serves as a framework for districts, campuses, and communities, illustrating an iterative process of building support for, planning, and implementing high-performance districts by engaging stakeholders, setting aggressive energy goals, completing technical and financial planning, and implementing a high-performance energy master plan. The information in this guide is based on a 3-year U.S. Department of Energy Zero Energy District Accelerator and a range of real-world examples of emerging high-performance districts. It is particularly useful for architects, planners, engineers, local government agencies, and real estate developers in the early phases of planning a district with high-performance or other deep energy goals. For the purposes of this guide, a high-performance district is a multibuilding development that achieves aggressive energy and related goals such as zero energy, carbon neutrality, sustainability, ultra-efficiency, etc. High-performance districts optimize energy efficiency to reduce energy loads and use renewable energy resources to meet the remaining loads whenever possible. The Energy Independence and Security Act of 2007 defines a high-performance building as “a building that integrates and optimizes on a life cycle basis all major high-performance attributes, including energy conservation, environment, safety, security, durability, accessibility, cost-benefit, productivity, sustainability, functionality, and operational considerations.” High-performance districts are collections of such buildings that take advantage of the synergies available when energy consumption and production are considered at a district level rather than one building at a time.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Energy Northwest - Horn Rapids Solar and Storage: An Assessment of Battery Technical Performance

Chartered in 1957 as a joint action agency of the state, Energy Northwest (ENW) is a consortium of 27 public utility districts and municipalities across Washington state. ENW takes advantage of economies of scale and shared services to help utilities run their operations more efficiently and at lower cost, to the benefit of more than 1.5 million customers. ENW develops, owns, and operates a diverse mix of electricity generating resources, including hydro, solar, and wind projects – and the Northwest’s only active nuclear energy facility. These projects provide enough reliable, affordable, and environmentally responsible energy to power more than a million homes each year, and that carbon-free electricity is provided at the cost of generation. The agency continually explores new generation projects to meet its members’ needs. In 2017, as part of the second round of funding from the Washington state Clean Energy Fund, the Washington State Department of Commerce granted up to $3 million in matching funds to develop an estimated $6.5 million project that deployed a 4-MW, 20-acre solar generating array of photovoltaic (PV) panels coupled with a 1 MW/5.5 MWh lithium-iron-phosphate battery energy storage system (BESS) in Richland, Washington. The combination of PV and BESS will provide a predictable, renewable generating source and will also serve as a training ground for solar and battery technicians throughout the nation. The City of Richland will purchase the power from the project and utilize the benefits of the energy storage. The project provides Washington state with its first opportunity to integrate a large-scale solar and storage facility into its clean mix of hydro, nuclear, and wind resources. This first-of-its-kind facility combines solar generation with battery storage and technician training. In 2019, Pacific Northwest National Laboratory (PNNL) worked with ENW to assess the integrated PV and BESS in representative use cases that could benefit the City of Richland. Between March and May 2022, extensive testing was conducted, and the results were used to assess the technical performance of the BESS subjected to actual field operations. Both reference performance and use case tests were performed: (A) Reference performance tests assess the general technical capabilities of the BESS, such as energy capacity, round-trip efficiency (RTE), ramp rate, and signal tracking capability. These are the first tests performed (baseline), and they are repeated after use case tests (post cycle). A standardized U.S. Department of Energy (DOE) energy storage performance protocol was used to characterize the BESS, including representative duty cycle profiles, test procedure guidance, and calculation guidance for determining key characteristics. (B) Use case tests examine the performance of the BESS for specific use cases using duty cycles developed by PNNL in collaboration with ENW. Five use cases were selected for testing: 1) demand charge reduction, 2) load shaping, 3) transmission charge reduction, 4) Volt-VAR service, and 5) outage mitigation. The use case duty cycles were developed based on utility and site-specific characteristics in addition to the technical characteristics and physical capabilities of the BESS. Use case tests were performed between the baseline and post cycle tests. This report describes the BESS and its components, presents testing and performance analysis results, and shares key insights and lessons learned from this project. Outcomes of the tests and analyses will help ENW understand the performance of the Horn Rapids BESS in its current state and design appropriate operational strategies for this and other BESSs over the long term.

14 SOLAR ENERGY↗

OPALCO - Decatur Island Solar and Energy Storage Project: An Assessment of Battery Technical Performance

Orcas Power & Light Cooperative (OPALCO) is a member-owned, nonprofit cooperative utility that provides energy services to approximately 11,200 customers across 20 islands in San Juan County, Washington. OPALCO’s mostly hydroelectric power is generated by Bonneville Power Administration and delivered to the islands by submarine cables. In 2016, as part of the second round of funding from the Washington state Clean Energy Fund, OPALCO received a $1 million matching grant to support a project that deployed a 504-kW LG community photovoltaic (PV) system in combination with a 1 MW/2 MWh lithium-iron-phosphate battery energy storage system (BESS) on Decatur Island, Washington. The Decatur Island Substation is essential to ensuring reliable energy for the residents of the San Juan Islands as it is the point of interconnection with the mainland transmission system. The BESS, in combination with the community solar array, will deliver an innovative method to both defer the costly upgrade of the transmission system and allow for other high-value applications intended to benefit the utility and its customers. In 2018, Pacific Northwest National Laboratory (PNNL) completed a preliminary economic assessment for several identified use cases in collaboration with OPALCO. Between August 2021 and May 2022, extensive testing was conducted, and the results were used to assess the technical performance of the BESS subjected to actual field operations. Both reference performance and use case tests were performed: (a) Reference performance tests assess the general technical capabilities of the BESS, such as energy capacity, round-trip efficiency (RTE), ramp rate, and signal tracking capability. These are the first tests performed (baseline) and are repeated after use case tests (post cycle). A standardized U.S. Department of Energy (DOE) energy storage performance protocol was used to characterize the BESS, including representative duty cycle profiles, test procedure guidance, and calculation guidance for determining key characteristics. (b) Use case tests examine the performance of the BESS for specific use cases using duty cycles developed by PNNL in collaboration with OPALCO. Four use cases were selected for testing: 1) demand charge reduction, 2) load shaping, 3) outage mitigation, and 4) transmission deferral. The use case duty cycles were developed based on utility and site-specific characteristics in addition to the technical characteristics and physical capabilities of the BESS. Use case tests were performed between the baseline and post cycle tests. This report describes the BESS and its components, presents testing and performance analysis results, and shares key insights and lessons learned from this project. Outcomes of the tests and analyses will help OPALCO understand the performance of the Decatur Island BESS in its current state and design appropriate operational strategies for this and other BESSs over the long term.

14 SOLAR ENERGY↗

Availability and Performance Loss Factors for U.S. PV Fleet Systems

In the PV Fleet Performance Data Initiative, we partner with photovoltaic (PV) fleet owners to collect time-series PV production data and publish aggregated, anonymized results. This report is an update of our previous publications, specifically a FY 2021 performance index publication and a FY 2022 fleet degradation analysis. In this analysis, we have increased our data participants and system totals by around 10% to 8.5 GW and 24,000 separate inverter data channels. Four major analysis topics are considered in this report: Performance Index (PI) trends, PV system availability, soiling losses, and PV system degradation. Performance Index and inverter availability are assessed on a larger set of data from our FY 2021 report: 1,128 systems compared with 200 systems from before. The increased number of systems is due to an improved data quality methodology, as well as introducing new systems to the analysis. Overall results are similar to previously published values - overall inverter availability is low in the first six months of system performance before reaching steady-state by the end of the first year. Excluding this six-month startup period, system-level aggregated data shows a median (P50) system availability of 0.99 and a lower 10th percentile (P90) value of 0.95 (Figure ES-1). A dependence on system size is also demonstrated, with worse inverter availability results for larger PV systems. Causes of this effect are under investigation, but may be impacted by inverter size, which also show lower availability for larger inverter sizes. This report also investigates PI, correcting for degradation, soiling, snow, and availability. Following these corrections, the median system PI over its entire lifetime is 0.95. PI values reported here are approximately 3% lower than what we presented in our previous FY 2021 report. Soiling loss is assessed in a comprehensive way for the first time in this report. Results are presented using the COmbined Degradation and Soiling (CODS) method, as implemented in RdTools (v3.0.0a4). Soiling values are presented for 255 systems, which indicated irradiance-weighted soiling loss greater than 1%. The values have been published in an updated NREL soiling map at nrel.gov/pv/soiling.html. Finally, we investigated system degradation using three different data analysis techniques: conventional RdTools (year-on-year (YOY)), CODS, and Performance Loss Rate (PLR) analysis. Overall degradation results are consistent with our previous publications. Rerunning conventional RdTools on our updated fleet shows that some data partners have systematically fallen below the median system degradation rate (change over time) of -0.75 %/year. A comparison with PLR analysis, which looks at change in annual PI over time, shows that median system degradation is consistent with -0.5% to -0.75% per year change. However, at the P90 value, system degradation is substantially faster. These two results are consistent and indicate that resulting degradation statistics depend to a great degree on the population of PV systems making up the analysis cohort and whether soiling impacts the systems. The use of CODS for degradation analysis provides a different method for degradation assessment, which explicitly excludes the impact of recoverable soiling on degradation analysis. Excluding soiling effects yields an annual system degradation around -0.5% per year on average. This indicates that a portion of system performance loss may be attributed to periodic soiling that is not fully recovered. This report provides PV system owners/operators with background and methods to analyze PV system performance, give guidance for expected cohort performance, and performance loss values for use in pro-forma financial models, which guide new-build system design and bankability reports.

14 SOLAR ENERGY↗

Performance assessment for climate intervention (PACI): preliminary application to a stratospheric aerosol injection scenario

As the prospect of exceeding global temperature targets set forth in the Paris Agreement becomes more likely, methods of climate intervention are increasingly being explored. With this increased interest there is a need for an assessment process to understand the range of impacts across different scenarios against a set of performance goals in order to support policy decisions. The methodology and tools developed for Performance Assessment (PA) for nuclear waste repositories shares many similarities with the needs and requirements for a framework for climate intervention. Using PA, we outline and test an evaluation framework for climate intervention, called Performance Assessment for Climate Intervention (PACI) with a focus on Stratospheric Aerosol Injection (SAI). We define a set of key technical components for the example PACI framework which include identifying performance goals, the extent of the system, and identifying which features, events, and processes are relevant and impactful to calculating model output for the system given the performance goals. Having identified a set of performance goals, the performance of the system, including uncertainty, can then be evaluated against these goals. Using the Geoengineering Large Ensemble (GLENS) scenario, we develop a set of performance goals for monthly temperature, precipitation, drought index, soil water, solar flux, and surface runoff. The assessment assumes that targets may be framed in the context of risk-risk via a risk ratio, or the ratio of the risk of exceeding the performance goal for the SAI scenario against the risk of exceeding the performance goal for the emissions scenario. From regional responses, across multiple climate variables, it is then possible to assess which pathway carries lower risk relative to the goals. The assessment is not comprehensive but rather a demonstration of the evaluation of an SAI scenario. Future work is needed to develop a more complete assessment that would provide additional simulations to cover parametric and aleatory uncertainty and enable a deeper understanding of impacts, informed scenario selection, and allow further refinements to the approach.

climate intervention↗

Total System Performance Ratio—A Systems Based Approach for Evaluating HVAC System Efficiency

The prescriptive path is the most widely used approach for commercial code compliance in the United States. Though easy to implement, prescriptive approaches do not typically discriminate between minimally compliant, high-performing and poorly performing HVAC system configurations. Hence, to meet aggressive energy and carbon reduction goals, it is clear that energy codes will need to transition from prescriptive to performance-based approaches, a transition that is riddled with several challenges. This paper discusses a new HVAC system-based performance approach (HVAC System Performance) which provides a simpler solution to HVAV system evaluation compared to whole building performance, while keeping tradeoffs limited to specific building systems. The Total System Performance Ratio (TSPR) is a metric for evaluation of overall system efficiency instead of individual component efficiency, a solution which could also eventually facilitate the transition to a 100% performance-based code structure. TSPR is a ratio that compares the annual heating and cooling load of a building to the annual energy consumed by the building’s HVAC system. A calculation software tool has been developed for determining a building’s TSPR. Already incorporated into the 2018 Washington State Energy Code, this approach is also being evaluated by ASHRAE Standard 90.l Project Committee and has the potential to provide a comprehensive performance-based approach for HVAC system evaluation and analysis.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Data-Driven Performance Optimization of Gamma Spectrometers With Many Channels

In gamma spectrometers with variable spectroscopic performance across many channels (e.g., many pixels or voxels), a tradeoff exists between including data from successively worse-performing readout channels and increasing efficiency. Brute-force calculation of the optimal set of included channels is exponentially infeasible as the number of channels grows, and approximate methods are required. In this work, we present a data-driven framework for attempting to find near-optimal sets of included detector channels. The framework leverages non-negative matrix factorization (NMF) to learn the behavior of gamma spectra across the detector and clusters similarly-performing detector channels together. Performance comparisons are then made between spectra with channel clusters removed, which is more feasible than brute force. The framework is general and can be applied to arbitrary, user-defined performance metrics depending on the application. We apply this framework to optimizing gamma spectra measured by H3D M400 CdZnTe (CZT) spectrometers, which exhibit variable performance across their crystal volumes. In particular, we show several examples optimizing various performance metrics for uranium and plutonium gamma spectra in non-destructive assay (NDA) for nuclear safeguards, and explore trends in performance versus parameters such as clustering algorithm type. We also compare the NMF + clustering pipeline to several non-machine-learning (ML) algorithms, including several greedy algorithms. Although, we find that the NMF + clustering pipeline tends to find the best-performing set of detector voxels, significantly improving over the unoptimized spectra, but that a greedy accumulation of spectra segmented by detector depth can, in some cases, give similar performance improvements in much less computation time.

Energy resolution↗

Parallelization and Performance Portability in Hydrodynamics Codes

With the eve of Exascale computing, performance and portability are at the forefront of all scientific codes. Adding more cores and more energy to a system is no longer a sustainable way to achieve performance, and extra effort must now be made to improve performance in all areas of code and code development. Using hydrodynamic codes as a basis, this work explores numerous techniques to achieve performance in different ways. Adaptive mesh refinement (AMR) is a necessary technique to improve memory optimization in mesh-based simulations. However it is invasive and conventionally difficult to integrate into existing applications, so we present a new branch of AMR to create a smooth transition to these optimizations, which not only improves performance, but also greatly reduces developer effort. We introduce the concept of this improvement as Phantom-Cell AMR, and assess theoretically the improvements, as well as present an application of its use. Other work included involves and investigation into an efficient data structure that ensures optimal memory layout for cache performance, with a target of making codes performant and portable across all architectures. All of the work targets both performance and portability, not just on CPU hardware, but specifically across GPU architectures. Parallel performance is key to all of the methods presented, but the research makes a great effort to improve the portability of all applications to prepare for current high performance computing systems and those on the horizon.

97 MATHEMATICS AND COMPUTING↗

Building Performance Standards and Energy Code Alignment - Technical Brief

Building energy codes focus on building design, construction and renovation and have significantly increased building efficiency since the first national energy code was published in 1975. Most jurisdictions have energy codes based on ANSI/ASHRAE/IES Standard 90.1 (hereto referred to as Standard 90.1) and the International Energy Conservation Code (IECC). Compliance options available in these model energy codes include a prescriptive path, whole building performance paths – including IECC Total Building Performance (TBP), Standard 90.1 Energy Cost Budget (ECB) method and Performance Rating Method (PRM) – and system performance paths for envelope and heating, ventilation, and air-conditioning systems. Building performance standard (BPS) policies are an emerging policy tool used by jurisdictions to reduce the operational energy use or greenhouse gas (GHG) emissions of the existing commercial building stock. BPS policies vary widely between jurisdictions and are tailored to each location’s climate and energy goals. Intuitively, projects that met a recent edition of the energy code should comply with the BPS targets. However, some new buildings may struggle with meeting the BPS for the following reasons: 1. Energy codes focus on the design of the building and its projected ability to perform efficiently, while BPS compliance is dependent on the actual ongoing performance of the building, considering variables like occupancy, operation, and maintenance. 2. There are significant differences in the methodologies used to determine BPS compliance versus code compliance, including how each handles compliance metrics, handling of building amenities, and renewable energy generation. 3. The prescriptive compliance path in the energy code is based on performance of individual building components, as opposed to the performance compliance path which accounts for holistic building design strategies and interdependent building systems. This can result in a significant variability in post-occupancy performance for buildings built using the prescriptive path. Designs on the lower end of the permitted efficiency range may struggle with meeting the BPS.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Skylab program earth resources experiment package sensor performance evaluation, volume 1, (S190A)

The results of S190A sensor performance evaluation are summarized based on data presented by all contributors to the sensor performance evaluation interim reports. Techniques used in sensor performance evaluation are discussed. Topics discussed include: performance degradation identified during the Skylab missions, S190A and EREP system anomalies that affected S190A performance, and the performance achieved, in terms of pertinent S190A parameters. Additional analyses include final performance analyses completed after submittal of the SL4 interim sensor performance evaluation reports, including completion of detailed analyses of basic performance parameters initiated during the interim report periods and consolidation analyses to reduce independent mission data (SL2, SL3, and SL4) to determine overall performance realized during all three Skylab missions.

Kenney, G. P.↗

Performance deterioration based on existing (historical) data; JT9D jet engine diagnostics program

The results of the collection and analysis of historical data pertaining to the deterioration of JT9D engine performance are presented. The results of analyses of prerepair and postrepair engine test stand performance data from a number of airlines to establish the individual as well as average losses in engine performance with respect to service use are included. Analysis of the changes in mechanical condition of parts, obtained by inspection of used gas-path parts of varying age, allowed preliminary assessments of component performance deterioration levels and identification of the causitive factors. These component performance estimates, refined by data from special engine back-to-back testing related to module performance restoration, permitted the development of preliminary models of engine component/module performance deterioration with respect to usage. The preliminary assessment of the causes of module performance deterioration and the trends with usage are explained, along with the role each module plays in overall engine performance deterioration. Preliminary recommendations with respect to operating and maintenance practices which could be adopted to control the level of performance deterioration are presented. The needs for additional component sensitivity testing as well as outstanding issues are discussed.

Sallee, G. P.↗

Airplane takeoff and landing performance monitoring system

The invention is a real-time takeoff and landing performance monitoring system which provides the pilot with graphic and metric information to assist in decisions related to achieving rotation speed (V sub R) within the safe zone of the runway or stopping the aircraft on the runway after landing or take off abort. The system processes information in two segments: a pretakeoff segment and a real-time segment. One-time inputs of ambient conditions and airplane configuration information are used in the pretakeoff segment to generate scheduled performance data. The real-time segment uses the scheduled performance data, runway length data and transducer measured parameters to monitor the performance of the airplane throughout the takeoff roll. An important feature of this segment is that it updates the estimated runway rolling friction coefficient. Airplane performance predictions also reflect changes in headwind occurring as the takeoff roll progresses. The system displays the position of the airplane on the runway, indicating runway used and runway available, summarizes the critical information into a situation advisory flag, flags engine failures and off-nominal acceleration performance, and indicates where on the runway particular events such as decision speed (V sub 1), rotation speed (V sub R) and expected stop points will occur based on actual or predicted performance. The display also indicates airspeed, wind vector, engine pressure ratios, second segment climb speed, and balanced field length (BFL). The system detects performance deficiencies by comparing the airplane's present performance with a predicted nominal performance based upon the given conditions.

Middleton, David B.↗

Performance measurement for information systems: Industry perspectives

Performance measurement has become a focal topic for information systems (IS) organizations. Historically, IS performance measures have dealt with the efficiency of the data processing function. Today, the function of most IS organizations goes beyond simple data processing. To understand how IS organizations have developed meaningful performance measures that reflect their objectives and activities, industry perspectives on IS performance measurement was studied. The objectives of the study were to understand the state of the practice in IS performance techniques for IS performance measurement; to gather approaches and measures of actual performance measures used in industry; and to report patterns, trends, and lessons learned about performance measurement to NASA/JSC. Examples of how some of the most forward looking companies are shaping their IS processes through measurement is provided. Thoughts on the presence of a life-cycle to performance measures development and a suggested taxonomy for performance measurements are included in the appendices.

Bishop, Peter C.↗