Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “outage”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Risk-controlled Expansion Planning with Distributed Resources (REPAIR) v1.0

The Risk-controlled Expansion Planning with Distributed Resources (REPAIR) is an innovative tool to support decisions around utility grid planning to prevent and mitigate the impact of outages caused by routine equipment failures (reliability) or by extreme events (resilience), such as storms, earthquakes or wildfires that long term interruption of service. REPAIR is a risk-based optimization and decision-making model allowing informed and transparent "cost vs risk" decisions regarding infrastructural planning of electric utilities. The model considers long-term resilience and reliability planning strategies that rely on traditional infrastructure upgrade (e.g. circuit hardening, reinforcement, new substations, etc.) or new investment alternatives, such as DERs.

Heleno, Miguel [Lawrence Berkeley National Laborat↗

Robotic automation of maintenance work in nuclear power plants a cross-sector survey and roadmap

Nuclear power plants face increasing cost pressures, workforce constraints (aging workforce and skilled labor shortages), and safety requirements that are accelerating interest in robotic systems for inspection and maintenance. We conducted semi-structured interviews with personnel from seven U.S. nuclear utilities and compared deployment models, operational use cases, and integration practices with those reported by participants in the oil, gas, and petrochemical sector. In nuclear plants, robotic use remains concentrated in inspection—particularly indoor unmanned aerial vehicles and submersible remotely operated vehicles—with limited application to physical maintenance tasks. Reported near-term value includes reduced radiological and industrial risk, reduced outage labor, and improved data for planning and condition assessment. Key barriers include integration and data-interoperability constraints, operator qualification requirements, cybersecurity review burden, and difficulty demonstrating reliability in plant-representative environments. Cross-sector benchmarking highlights organizational and deployment practices that may help nuclear plants scale from pilots to routine use. We propose a deployment-oriented roadmap emphasizing modular payload strategies, representative qualification pathways and testing environments, and improved data governance to support safe and economically justified expansion of robotics in operating nuclear power plants.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Decomposable Formulation of Transmission Constraints for Decentralized Power Systems Optimization

One of the most complicating factors in decentralized solution methods for a broad range of power system optimization problems is the modeling of power flow equations. Existing formulations for direct current power flows either have limited scalability or are very dense and unstructured, making them unsuitable for large-scale decentralized studies. Here, in this work, we present a novel sparsified variant of the injection shift factors formulation, which has a decomposable block-diagonal structure and scales well for large systems. We also propose a decentralized solution method, based on the alternating direction multiplier method, that efficiently handles transmission line outages in N-1 security requirements. Benchmarks on multizonal security-constrained unit commitment problems show that the proposed formulation and algorithm can reliably and efficiently solve interconnection-level test systems with up to 6,515 buses with no convergence or numerical issues.

Alternating-method of multipliers (ADMM)↗

Dynamic Transmission Line Switching Amid Wildfire-Prone Weather Under Decision-Dependent Uncertainty

During dry and windy seasons, environmental conditions significantly increase the risk of wildfires, exposing power grids to disruptions caused by transmission line failures. Wildfire propagation exacerbates grid vulnerability, potentially leading to prolonged power outages. To address this challenge, we propose a multistage optimization model that dynamically adjusts transmission grid topology in response to wildfire propagation, aiming to develop an optimal response policy. By accounting for decision-dependent uncertainty, where line survival probabilities depend on usage, we employ distributionally robust optimization to model uncertainty in line survival distributions. We adapt the stochastic nested decomposition algorithm and derive a deterministic upper bound for its finite convergence. To enhance computational efficiency, we exploit the Lagrangian dual problem structure for a faster generation of Lagrangian cuts. Using realistic data from the California transmission grid, we demonstrate the superior performance of dynamic response policies against two-stage alternatives through a comprehensive case study. In addition, after solving the multistage formulation, we construct easy-to-implement policies that significantly reduce computational burden while maintaining good performance in real-time deployment. History: Accepted by Russell Bent, Area Editor for Network Optimization: Algorithms and Applications. Funding: This work was supported by the U.S. Department of Energy, Office of Electricity [Grant DE-AC02-05CH11231]. The work of R. Jiang was supported in part by the U.S. National Science Foundation, Division of Electrical, Communications and Cyber Systems [Grant ECCS-1845980] and the U.S. Air Force Office of Scientific Research [Grant FA9550-23-1-0323]. Supplemental Material: The software that supports the findings of this study is available within the paper and its Supplemental Information ( https://pubsonline.informs.org/doi/suppl/10.1287/ijoc.2025.1210 ) as well as from the IJOC GitHub software repository ( https://github.com/INFORMSJoC/2025.1210 ). The complete IJOC Software and Data Repository is available at https://informsjoc.github.io/ .

Estrada-Garcia, Juan-Alberto↗

Soil water content, matric potential, carbon dioxide and oxygen concentrations, Oct 2018-Dec 2021, Slate River Floodplain, Crested Butte, Colorado

This data package includes a time series of soil sensor data (temperature, water content, bulk electrical conductivity, porewater dissolved oxygen and porewater dissolved carbon dioxide) in a vertical profile from the Slate River floodplain outside Crested Butte, Colorado, a focus field site for the SLAC Floodplain Hydro-Biogeochemistry SFA. The data was generated as part of the work targeting the overarching research question for the SLAC SFA: How do ubiquitous subsurface interfaces mediate molecular-scale biogeochemical processes and groundwater quality in floodplains and watersheds? The package includes: (1) soil temperature, volumetric water content and electrical conductivity at 40, 60 and 82.5 cm depth; (2) soil matric potential at 40, 60, 79 and 100 cm depth; (3) soil CO2 concentrations at 40, 60 and 82.5 cm depth; and (4) soil oxygen concentrations at 60, 82.5, 100, 135, 170 and 182 cm depth. Both the carbon dioxide and oxygen sensors are optical sensors that can measure the partial pressure of oxygen in both saturated and unsaturated conditions. Unfortunately, soil CO2 in the profile is unexpectedly high and above the sensor calibration range (0-25,000 ppm). In addition, soil CO2 sensors failed within a year of deployment, so we only report CO2 data from 2019-2020.Within the data package, "FLMD.csv" describes file-level metadata and "dd.csv" defines column headers and universal terms across the dataset. The data package includes 4 "*data.csv" files, one for each calendar year in the dataset. Each "*data.csv" file has a corresponding "*_InstallationMethods.csv" file that describes the location, sensor model, sensor serial number and other metadata corresponding for each measured parameter. Because sensors have been added over time, not every sensor has data dating back to Oct 2018. Note that there is a data gap over winter 2019-2020 due to a power outage. While this repository currently only contains data through December 2021, the dataset will be updated as additional years are collected and processed.

54 ENVIRONMENTAL SCIENCES↗

AmeriFlux US-GL2 Granite Island

This is the AmeriFlux version of the carbon flux data for the site US-GL2 Granite Island. Site Description - Granite Island is a small island on Lake Superior approximately 10 miles due north of Marquette, Michigan. It is roughly 6.5 miles from shore and is occupied by a lighthouse, bell tower, Coast Guard light tower, and other small structures. A flux tower to measure H, LE, and meteorological data was installed atop the bell tower in July of 2009 and has been in continuous operation since then (aside from occasional power outages or other sources of data loss). CO2 measurements were added to the flux tower in October of 2010.

Lenters, John [University of Michigan Biological S↗

Anomaly Detection in Seismic Data with Deep Learning: Application for Instrument Failure Detection and Forecasting

Seismic data quality assessment (QA) is the first and one of the most important steps before conducting any further data analysis. Traditional methods involve checking various metrics, such as spike detection and power spectral density, by setting strict thresholds or comparing data against synthetic benchmarks. However, these approaches often rely on pre-existing knowledge and assumptions about data anomalies, leading to potential misclassification of unusual cases. Here, in this study, we propose a deep autoencoder model, an unsupervised learning approach that evaluates data quality without making assumptions about normal and anomalous data, which can be used to identify deviations in recorded data that may indicate nascent instrument failure. We test the model with the U.S. International Monitoring System (IMS) seismic stations and demonstrate the capability of detecting anomalies on a monthly scale. This could prompt station operators to examine potential problems early, allowing sufficient time for instrument maintenance to prevent data outages. In addition, we use a new manually selected testing dataset to compare our model performance against two supervised machine learning (ML) approaches and a standard QA package, as baseline models. When applied to the dataset containing known data anomalies, performance of the supervised and unsupervised ML approaches is similar, with an accuracy of 88.1% for our model compared to ∼90% for the supervised ML approach and 78.2% for the standard QA package. Our model outperforms the baseline models when applied to new stations, where new types of data anomalies can be station-specific and not included in the training dataset. Finally, we show model transferability by training the model with data from the Global Seismograph Network only and applying it to the IMS network data. The results suggest that our model is generalizable and can be applied to new stations with good accuracy.

Lin, Jiun-Ting [Lawrence Livermore National Labora↗

An Operationally Integrated Approach to the SNS 2.8 MW Power Upgrade

The SNS accelerator consist of a 1 GeV H⁻ linac and an accumulator ring producing a 1.4 MW pulsed proton beam which drives a spallation neutron source. The Proton Power Upgrade project will double the power capability from 1.4 to 2.8 MW by increasing the linac energy 30% and the beam current about 50%. Equipment upgrades include new superconducting RF cryomodules and supporting RF equipment, upgraded ring equipment, and upgraded high power target systems. An important aspect of the upgrade is a gradual power ramp-up starting in 2022 in which new equipment is installed during maintenance outages as it arrives.

Galambos, John D↗

Artificial Intelligence for improved facilities operation in the FNAL LINAC

The energy consumption in accelerator structures during beam downtimes is a significant fraction of the overall energy budget. Accurate prediction of downtime duration could inform actions to reduce this energy consumption. The LCAPE project started in 2020 and develops artificial intelligence to improve operations in the FNAL control room by reducing the time to identify the cause of a beam outage, improving the reproducibility of labeling it, predicting their duration and forecasting their occurrence. We present our solution for incorporating information from ~2.5k monitored devices in near-real time to distinguish between dozens of different causes of down time. We discuss the performance of different techniques for modeling the state of health of the facility and we compare unsupervised clustering techniques to distinguish between different causes of down time.

43 PARTICLE ACCELERATORS↗

Progress towards the completion of the proton power upgrade project

The Proton Power Upgrade project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion in early 2025, 2 MW of beam power will be available for neutron production at the existing first target station (FTS) with the remaining beam power available for the future second target station (STS). The project has installed seven superconducting radio-frequency (RF) cryomodules and supporting RF power systems to increase the beam energy by 30% to 1.3 GeV, and the beam current will be increased by 50%. The injection and extraction region of the accumulator ring are being upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. The first four cryomodules and supporting systems were commissioned in 2022-2023 and supported neutron production at 1.05 GeV, 1.7 MW with high reliability. The first-article 2 MW target was operated successfully for approximately 4400 MW-Hours over two run periods. The long outage began in August 2023 for installation of the remaining technical equipment and construction of the Ring-to-Target Beam Transport tunnel stub that will enable connection to the STS without interrupting operation of the FTS. The upgrade is proceeding on-schedule and on-budget, and resumption of neutron production for the user program is planned for July 2024.

43 PARTICLE ACCELERATORS↗

Progress on the Proton Power Upgrade Project at the Spallation Neutron Source

The Proton Power Upgrade Project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion of the project, 2 MW of beam power will be available for neutron production at the existing first target station with the remaining beam power available for the future second target station. The project will install seven superconducting RF cryomodules and supporting RF power systems and ancillaries to increase the beam energy to 1.3 GeV . The injection and extraction region of the accumulator ring will be upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. Equipment is being received from vendors and partner laboratories, and installation is underway with three major installation outages planned in 2022-2024. The project is planned to be completed in 2025.

43 PARTICLE ACCELERATORS↗

Predicting Solar Plant Generation with Machine Learning Techniques

Accurately predicting power generation for PV sites is critical for prioritizing relevant operations & maintenance activities, thereby extending the lifetime of a system and improving profit margins. A number of factors influence power generation at PV sites, including local weather, shading and soiling losses, design of modules, DC mismatches, and degradation over time. Other external factors such as curtailment and grid outages can also have a notable impact on power generation. Machine learning techniques can be used to provide more accurate predictions of PV power production by accounting for important weather and climate information neglected by current industry methods. This article will cover the deficiencies of those methods and will show how machine learning can dramatically improve power generation predictions.

14 SOLAR ENERGY↗

Holistic Measurement Driven Resilience: Combining Operational Fault and Failure Measurements and Fault Injection for Quantifying Fault Detection, Propagation and Impact. Final report

For HPC systems to date, application resilience to faults and failures has been accomplished by the brute- force method of checkpoint/restart, which allows an application to make forward progress in the face of system and application faults, errors, and failures independent of root cause or end result. It has remained the primary resilience mechanism because we lack a way to identify faults and anticipate consequences early enough to take meaningful mitigating action. However, checkpoint/restart implementations put a tremendous burden on system resources and on the applications themselves and is becoming less feasible at scale. Because we have not yet operated at scales at which checkpoint/restart fails to provide forward progress, despite increasing costs, vendors have had little motivation to provide the instrumentation necessary for early identification of faults and failures. However, as we move from petascale to exascale, component mean time to failure (MTTF) will render the existing techniques ineffectual and/or too expensive. Furthermore, fault recovery mechanisms such as failover and/or error correction introduce performance inconsistency. Instrumentation allowing early indication of problems and tools to enable use of such information by systems, operating systems, and applications offer an alternative, more scalable and less costly solution. In the HMDR project, we built on our experience and expertise developed and accumulated over years of research on design, monitoring, measurement, and assessment of resilient computing systems. Analysis of field data on the current and past generations of extreme-scale systems revealed several challenges that, if not addressed in increasingly larger and more complex systems, may hinder the effectiveness of future exascale computing systems. Specifically, i) file systems and interconnects in current-generation large-scale systems already operate at the margins of resiliency, including consistent performance, and may not scale to larger deployments; ii) automated, software-based failover mechanisms are frequently inadequate and can introduce wider failures, such that failures during recovery may lead to system/application failures, including system-wide outages; and iii) silent data corruption represents a critical fault mode and will require efficient detection mechanisms if next-generation applications are to take full advantage of exascale hardware. To address the above challenges, we assembled a team of world-renowned experts in resilient extreme- scale computing from the University of Illinois (Electrical and Computer Engineering, Computer Science, and NCSA), SNL, LANL, NERSC, and Cray. Our team includes representatives from centers that house many of the largest HPC resources in the world, both today and over the coming years. The team has a unique track record of research in i) system and application failure characterization based on the analysis of field data, ii) data-driven design of fault/error detection mechanisms, and iii) experimental characterization of system/application resiliency. The team includes system owners/operators who provide continuous data collection and access and ensure installation of appropriate analysis tools.

97 MATHEMATICS AND COMPUTING↗

Evaluation and Demonstration of Intrusion Detection for Spent Fuel Storage Facilities

The IAEA recommends dual containment and surveillance (C/S) systems for difficult to access or difficult to measure spent fuel storage areas. However, many storage areas have limitations that prevent traditional secondary C/S systems, such as radiation levels too high for inspectors to apply individual Tamper Indicating Devices (TID) or have physical impedances to the use of TIDs. Recent developments in C/S technology include Laser Curtain for Containment (LCCT) technology implemented at Atucha-1 power plant in Argentina. The LCCT is a new approach to perimeter-wide C/S and the IAEA has granted provisional approval for its use as one of two required C/S systems. This proposal focuses on investigating and testing new and evolving completely passive (or ultra-low power) tamper indicating systems that will provide backup C/S to the LCCT even during power outages. An investigation of Commercial Off The Shelf (COTS) technology will be conducted to identify readily available options. Optically Stimulated Luminescence (OSL) fibers will also be investigated. OSL fibers are a passive technology that can measure radiation dose by knocking an electron into a metastable state where it remains until the fiber is interrogated with light. The goal of this project would be to investigate COTS technologies that can be used in low or no power scenarios for radiation detection as well as test and evaluate OSL technology, which can operate passively in no power scenarios. Limitations for each technology will be determined and documented in an effort to determine the best technology for spent fuel storage monitoring.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Resilient Operations of Networked Microgrids (RONM)

Objective: Improve the resiliency of power systems with optimization-based methods that leverage advanced microgrid technologies to reduce system recovery times after extreme event induced outages. Outcome: First-of-kind, high-fidelity physics-based optimization method for modeling networked microgrids which includes key engineering constraints associated with system recovery after extreme events.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Financing Microgrids in the Federal Sector

Recent high-impact events such as hurricanes and wildfires highlight the need for energy system resilience. One potential impact of these events is the loss of utility grid power to federal sites, negatively affecting the ability to carry out their missions. Depending on the need to sustain critical functions, it may be important to continue operations during an outage of the electric grid, or at least have power restored quickly after the event. One approach to addressing this need is through a microgrid. Microgrids can provide a more reliable solution than the traditional approach of using a backup generator at individual buildings. A microgrid can enhance a site’s electrical power system during normal operations, as well as provide reliable backup power to critical loads when electric utility power is interrupted. Many times, certain components of a microgrid (and potentially the entire system) can be justified economically and paid for out of energy savings or avoided costs. In cases where savings can cover the project costs, one of several privately financed procurement mechanisms may be used to implement the project. Procurement options available to all federal agencies include utility energy services contracts (UESC), energy savings performance contracts (ESPC), and utility services contracts (USC); other mechanisms such as a power purchase agreement (PPA), enhanced use lease (EUL), and utility privatization (UP) may also be useful to agencies that have the authority to use them. Implementing a microgrid in a comprehensive effort that also includes energy efficiency can provide an important savings component, while reducing power requirements for critical loads, thus reducing the cost of the microgrid and associated distributed energy resources (DER). However, it can be difficult to achieve enough savings and avoided costs to cover the entire microgrid system, so leveraging these avoided costs in combination with appropriated funds may be necessary to implement the full project. When a site is deciding if a microgrid is the best solution, activities early in the process include identifying critical loads and existing DERs, conversations with the local electric utility, and implementation options that work best for the agency and site. This paper explores procurement options and agreements that may be useful to federal agencies interested in implementing microgrids at their sites. Microgrid complexities, implementation considerations, and suggestions to get started are also discussed. This information will be most useful to agencies when they are exploring electric energy system resilience options and/or considering different procurement options to meet their needs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Networked Microgrid Optimal Design and Operations Tool: Regulatory and Business Environment Study

Microgrids aim to increase the resilience of the electric supply to the loads within the microgrid through the ability to disconnect from the distribution utility in the event of a power outage and by supplying power to the microgrid loads from a combination of multiple power generation assets and storage systems. Microgrids can also improve reliability at the distribution level by reducing the load on the system under stress conditions. Networking two or more microgrids has the potential to increase reliability and resilience at a reduced cost by taking advantage of economies of scale and increasing the diversity of the generation assets and loads. This report is part of a collaborative effort among several U.S. Department of Energy national laboratories to develop a networked microgrid (NMG) Optimal Design and Operations (OD&O) tool. This tool addresses the goal defined in the Grid Modernization Multi-Year Program Plan to develop a suite of tools that addresses functional requirements for system optimal design and the operations of NMGs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Financing Microgrids in the Federal Sector

Recent high-impact events such as hurricanes and wildfires highlight the need for energy system resilience. One potential impact of these events is the loss of utility grid power to federal sites, negatively affecting the ability to carry out their missions. Depending on the need to sustain critical functions, it may be important to continue operations during an outage of the electric grid, or at least have power restored quickly after the event. One approach to addressing this need is through a microgrid. Microgrids can provide a more reliable solution than the traditional approach of using a backup generator at individual buildings. A microgrid can enhance a site’s electrical power system during normal operations, as well as provide reliable backup power to critical loads when electric utility power is interrupted. Many times, certain components of a microgrid (and potentially the entire system) can be justified economically and paid for out of energy savings or avoided costs. In cases where savings can cover the project costs, one of several privately financed procurement mechanisms may be used to implement the project. However, it can be difficult to achieve enough savings and avoided costs to cover the entire microgrid system, so leveraging these avoided costs in combination with appropriated funds may be necessary to implement the full project. This paper explores procurement options and agreements that may be useful to federal agencies interested in implementing microgrids at their sites. Microgrid complexities, implementation considerations, and suggestions to get started are also discussed. This information will be most useful to agencies when they are exploring electric energy system resilience options and/or considering different procurement options to meet their needs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗