Investigation of Microphysics and Precipitation for Atlantic Coast-Threatening Snowstorms (IMPACTS) Field Campaign Report
The scientific focus here is interagency collaboration to support a National Aeronautics and Space Administration (NASA)-sponsored 2023 field campaign: Investigation of Microphysics and Precipitation for Atlantic Coast-Threatening Snowstorms (IMPACTS). IMPACTS objectives are to provide observations critical to understanding the mechanisms of snowband formation, organization, and evolution; study how the microphysical characteristics and likely growth mechanisms of snow particles vary across snowbands; and improve snowfall remote-sensing interpretation and modeling to significantly advance predictive capabilities. The relevance to The U.S. Department of Energy Atmospheric Radiation Measurement (ARM) user facility's mission was to support the Interagency Council for Advancing Meteorological Services (ICAMS)’ objectives to enhance communication and coordination, and promote sharing, within and across agencies. NASA therefore requested to borrow ARM’s two-dimensional stereo probe (2DS) for possible use during the 2023 IMPACTS project. Additionally, this use of the 2DS could improve understanding of ARM 2DS measurements collected on previous field campaigns. The plan was to have the 2DS available for possible backup deployment on the NASA Lockheed Orion P-3 aircraft during the 2023 IMPACTS field project. NASA has a 2DS probe and the ARM 2DS is a hot swappable probe in case the project's 2DS fails. The 2DS is a critical probe and we had issues during a 2022 field project that prevented us from obtaining 2DS data on several flights. Hence, we wanted a hot swappable 2DS on stand-by. We have a data acquisition system, along with a backup data acquisition system for the 2DS, so we only needed the 2DS probe. David Delene was responsible for the use of the 2DS on the NASA P-3 aircraft. He has experience deploying the 2DS on several aircraft, including previously on the NASA P-3 in 2022. The team ensured that the aircraft wiring and deployment of the 2DS were completed correctly for the ARM 2DS.