Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “mission progress”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Earth Independent Medical Operations (EIMO)

Inherent in interplanetary space travel are unprecedented challenges that could threaten mission success and negatively impact crew health and performance. Return to definitive care is essentially untenable and resources will be constrained with practically no re-supply capability. Access to ground-based medical expertise will be significantly delayed under nominal conditions with exacerbation during conjunction or prolonged dust storms. Taken together, these challenges necessitate the development of a progressively autonomous medical operational support system to assist the crew medical officer (CMO). While support from ground based medical experts will remain indispensable for pre-mission planning, the approach to management of acute/emergent medical contingencies will require a gradual transition of medical care and decision making from terrestrial to space-based assets, enabling support of astronaut health and performance and reducing overall mission risk. To progressively enable EIMO, a series of meetings were convened with subject matter experts from within NASA, academia and industry to facilitate mapping of the path to support autonomous medical operations. Topics explored in these meetings included the scope of data (storage capacity, usage, transmission rate and bandwidth, computing capacity), CMO training, supply and resource management and task load balance. Recommendations from these meetings will inform the EIMO Concept of Operations and definition of the associated requirements culminating in updates to the NASA 3001 standards. The EIMO project team will work with stakeholders to conceptualize a clinical decision support system (CDSS) to assist the CMO in response to medical contingencies when terrestrial support is delayed or otherwise unavailable. The CDSS will be a system of systems that will utilize data from numerous input vectors. Successful deployment of the CDSS will facilitate medical decision making while decreasing the cognitive load leading to an improvement in task load balancing. Additional benefits of the envisioned CDSS include assistance with inventory management, locating resources, storage/retrieval of medical records, highlighting trends in recorded data, in addition to providing a consult for diagnosis and treatment. More advanced features might include passive monitoring to identify early warning signs of behavioral or medical anomalies to possibly pre-empt onset of conditions that would compromise crew health and performance.

Benjamin Easter↗

Participation in the Cluster Magnetometer Consortium for the Cluster Mission

Prof. M. G. Kivelson (UCLA) and Dr. R. C. Elphic (LANL) are Co-investigators on the Cluster Magnetometer Consortium (CMC) that provided the fluxgate magnetometers and associated mission support for the Cluster Mission. The CMC designated UCLA as the site with primary responsibility for the inter-calibration of data from the four spacecraft and the production of fully corrected data critical to achieving the mission objectives. UCLA was also charged with distributing magnetometer data to the U.S. Co-investigators. UCLA also supported the Technical Management Team, which was responsible for the detailed design of the instrument and its interface. In this final progress report we detail the progress made by the UCLA team in achieving the mission objectives.

Kivelson, Margaret↗

NASA's Exploration and In-Space Services (NExIS) Division OSAM-1 Propellant Transfer Subsystem Progress 2020

National Aeronautics and Space Administration (NASA)’s Exploration and In-Space Services (NExIS) Division of Goddard Space Flight Center has been developing technology for the On-orbit Servicing, Assembly and Manufacturing Mission 1 (OSAM-1) to robotically refuel heritage and new satellites on-orbit. OSAM-1, formerly known as Restore-L, successfully passed an important NASA milestone called Key Decision Point-C (KDP-C), receiving agency-level approval for its implementation. The decision point also establishes the mission’s official schedule and budget. The OSAM-1 spacecraft, Servicing Payload and the Space Infrastructure Dexterous Robot (SPIDER) payload will refuel a satellite in space, assemble a communications antenna and manufacture a beam. By demonstrating these capabilities, the mission is advancing never-before tested technologies for use in future missions (by NASA and other government organizations and private industry). The mission is funded by the Technology Demonstration Missions program within NASA’s Space Technology Mission Directorate. This paper covers a review of servicing extensibility and critical technologies that are being developed within NExIS with a focus on the fluid transfer refueling technology within the framework of the Propellant Transfer Subsystem (PTS). An overview of the planned initial technology demonstration servicing mission via the OSAM-1 Space Vehicle is provided as an extension of the technology development progress reported in 20181, and 20192. The general objectives, challenges, and key technologies are presented as an introduction to the context of the OSAM-1 mission, and a precursor to the OSAM-1 PTS specific development status. Development and progress of the Hose Management Assembly (HMA) and Propellant Transfer Assembly (PTA) are discussed. HMA risk reduction test results including those of thermal vacuum testing are presented. Important analytical results are discussed and progress of drawings and procedures developed for the fabrication and testing phase are shown. A summary of the PTS overall verification status and design activities prepared for the critical design peer review are presented. Procurement progress is shown with status on long, medium, and short term efforts to acquire the hardware required to support the mission objectives. Technology development, challenges, and testing status are discussed with particular regard to the OSAM-1 specific key assemblies including the PTA and HMA along with the overall integrated flight mockup of the spacecraft to client fluid transfer testing conducted in the servicing testbeds. The paper concludes with key milestones leading to the goal of on-orbit refueling to be demonstrated in 2024. The overall mission Launch Readiness Date (LRD) has been realigned to accommodate budget profiles and incorporation of additional on-orbit assembly and manufacturing demonstration efforts.

Propellant transfer, satellite servicing↗

The Ares I-1 Flight Test--Paving the Road for the Ares I Crew Launch Vehicle

In accordance with the U.S. Vision for Space Exploration and the nation's desire to again send humans to explore beyond Earth orbit, NASA has been tasked to send human beings to the moon, Mars, and beyond. It has been 30 years since the United States last designed and built a human-rated launch vehicle. NASA is now building the Ares I crew launch vehicle, which will loft the Orion crew exploration vehicle into orbit, and the Ares V cargo launch vehicle, which will launch the Lunar Surface Access Module and Earth departure stage to rendezvous Orion for missions to the moon. NASA has marshaled unique resources from the government and private sectors to perform the technically and programmatically complex work of delivering astronauts to orbit early next decade, followed by heavy cargo late next decade. Our experiences with Saturn and the Shuttle have taught us the value of adhering to sound systems engineering, such as the "test as you fly" principle, while applying aerospace best practices and lessons learned. If we are to fly humans safely aboard a launch vehicle, we must employ a variety of methodologies to reduce the technical, schedule, and cost risks inherent in the complex business of space transportation. During the Saturn development effort, NASA conducted multiple demonstration and verification flight tests to prove technology in its operating environment before relying upon it for human spaceflight. Less testing on the integrated Shuttle system did not reduce cost or schedule. NASA plans a progressive series of demonstration (ascent), verification (orbital), and mission flight tests to supplement ground research and high-altitude subsystem testing with real-world data, factoring the results of each test into the next one. In this way, sophisticated analytical models and tools, many of which were not available during Saturn and Shuttle, will be calibrated and we will gain confidence in their predictions, as we gain hands-on experience in operating the first of two new launch vehicle systems. The Ares I-1 flight test vehicle (FTV) will incorporate a mix of flight and mockup hardware, reflecting a configuration similar in mass, weight, and shape (outer mold line or OML) to the operational vehicle. It will be powered by a four-segment reusable solid rocket booster (RSRB), which is currently in Shuttle inventory, and will be modified to include a fifth, inert segment that makes it approximately the same size and weight as the five segment RSRB, which will be available for the second flight test in 2012. The Ares I-1 vehicle configuration is shown. Each test flight has specific objectives appropriate to the design analysis cycle in progress. The Ares I-1 demonstration test, slated for April 2009, gives NASA its first opportunity to gather critical data about the flight dynamics of the integrated launch vehicle stack, understand how to control its roll during flight, and other characterize the severe stage separation environment that the upper stage will experience during future operational flights. NASA also will begin the process of modifying the launch infrastructure and fine-tuning ground and mission operational scenarios, as NASA transitions from the Shuttle to the Ares/Orion system.

Davis, Stephan R.↗

Modeling Constellation Virtual Missions Using the Vdot(Trademark) Process Management Tool

The authors have identified a software tool suite that will support NASA's Virtual Mission (VM) effort. This is accomplished by transforming a spreadsheet database of mission events, task inputs and outputs, timelines, and organizations into process visualization tools and a Vdot process management model that includes embedded analysis software as well as requirements and information related to data manipulation and transfer. This paper describes the progress to date, and the application of the Virtual Mission to not only Constellation but to other architectures, and the pertinence to other aerospace applications. Vdot s intuitive visual interface brings VMs to life by turning static, paper-based processes into active, electronic processes that can be deployed, executed, managed, verified, and continuously improved. A VM can be executed using a computer-based, human-in-the-loop, real-time format, under the direction and control of the NASA VM Manager. Engineers in the various disciplines will not have to be Vdot-proficient but rather can fill out on-line, Excel-type databases with the mission information discussed above. The author s tool suite converts this database into several process visualization tools for review and into Microsoft Project, which can be imported directly into Vdot. Many tools can be embedded directly into Vdot, and when the necessary data/information is received from a preceding task, the analysis can be initiated automatically. Other NASA analysis tools are too complex for this process but Vdot automatically notifies the tool user that the data has been received and analysis can begin. The VM can be simulated from end-to-end using the author s tool suite. The planned approach for the Vdot-based process simulation is to generate the process model from a database; other advantages of this semi-automated approach are the participants can be geographically remote and after refining the process models via the human-in-the-loop simulation, the system can evolve into a process management server for the actual process.

Hardy, Roger↗

TurboBrayton Cryocooler: A Flight Worthy and Promising Future

A new development in cryocooler technology, a reverse TurboBrayton cycle cryocooler, developed by Creare, Inc. of Hanover, NH, has now been flight tested. This cooler provides high reliability and long life. With no linear moving components common in current flight cryocoolers, the TurboBrayton cooler requires no active control systems to provide a vibration-free signature. The cooler provides first stage cooling for advanced cryogenic systems and serves as a direct replacement for stored cryogen systems with a longer lifetime. Following a successful flight on STS-95, a TurboBrayton cryocooler will be flown on Hubble Space Telescope (HST) in 2000 to provide renewed refrigeration capability for the Near Infrared Camera and Multi-Object Spectrometer (NICMOS). The TurboBrayton cycle cooler is a promising technology already being considered for additional flight programs such as Next Generation Space Telescope (NGST) and Constellation X. These future missions require an advanced generation of the cooler that is currently under development to provide cooling at 10K and less. This paper presents an overview of the current generation cooler with recent flight test results and details the current plans and development progress on the next generation TurboBrayton technology for future missions.

Gibbon, Judith A.↗

Evolution of telemedicine in the space program and earth applications

Remote monitoring of crew, spacecraft, and environmental health has always been an integral part of the National Aeronautics and Space Administration's (NASA's) operations. Crew safety and mission success face a number of challenges in outerspace, including physiological adaptations to microgravity, radiation exposure, extreme temperatures and vacuum, and psychosocial reactions to space flight. The NASA effort to monitor and maintain crew health, system performance, and environmental integrity in space flight is a sophisticated and coordinated program of telemedicine combining cutting-edge engineering with medical expertise. As missions have increased in complexity, NASA telemedicine capabilities have grown apace, underlying its role in the field. At the same time, the terrestrial validation of telemedicine technologies to bring healthcare to remote locations provides feedback, improvement, and enhancement of the space program. As NASA progresses in its space exploration program, astronauts will join missions lasting months, even years, that take them millions of miles from home. These long-duration missions necessitate further technological breakthroughs in tele-operations and autonomous technology. Earth-based monitoring will no longer be real-time, requiring telemedicine capabilities to advance with future explorers as they travel deeper into space. The International Space Station will serve as a testbed for the telemedicine technologies to enable future missions as well as improve the quality of healthcare delivery on Earth.

long duration↗

Independent Reliability Assessment of the NASA GSFC Laser Transmitter for the LISA Program

The Laser Interferometer Space Antenna (LISA) is a partnership between the European Space Agency (ESA) and NASA to build a Gravitational Wave (GW) observatory. The observatory, which consists of a three-spacecraft constellation with a nominal separation of 2.5 million km between each spacecraft, provides a tool for scientists to directly detect gravitational waves generated from various astronomical phenomena in a waveband that is not accessible from Earth. NASA is developing laser transmitters as one of the potential US contributions to LISA. The NASA laser design leverages lessons learned from previous flight missions and included the latest technologies in photonics packaging and reliability engineering to ensure a laser lifetime of >16 years covering integration and test through a possible extended mission phase. As part of the laser development process, NASA’s Goddard Space Flight Center (GSFC) requested support from the NASA Engineering and Safety Center (NESC) to independently assess the Technology Readiness Level (TRL) of the LISA Laser System (LS). The independent assessment included the following tasks: (a) assess the design for weaknesses and suggest improvements to mitigate risks, (b) assess the laser reliability plan for weaknesses and suggest improvements to mitigate risks and improve effectiveness, and (c) assess the current redundancy plan on laser subsystems for weaknesses and suggest improvements to mitigate risks and improve effectiveness. The NESC team comprised of a team of subject matter experts (SMEs) and performed a 12-month review of every aspect of the laser design. We present the assessment findings and the current development progress of the LISA laser to meet the mission requirements with a delivery of a form, fit, and functional TRL6 laser to the LSIA mission by late 2023.

LISA↗

The Exploration Crew Health and Performance System of the Future - A Shared Mental Model

The challenges involved in vehicle/habitat design and operation for long-duration deep space missions are complex, and the needs of a human crew must be considered in the context of all the system trades required to enable such missions. An exploration Crew Health and Performance (CHP) system complements all the other vehicle/habitat systems to achieve one specific and critical endpoint – ensuring that the astronauts can perform the job that they were sent into space to do. This includes accounting for all aspects of the physiological, psychological, medical, and environmental realities that the human crew must face in deep space. Along with this system complexity comes the additional need for increased autonomy of the crew due to the immense distance from Earth. The design of future systems must respect the real human capabilities and limitations within the context of a mission to the Moon or Mars. The NASA Moon to Mars Objectives document outlines the need for advanced CHP system designs: • Develop systems that monitor and maintain crew health and performance throughout all mission phases, including during communication delays to Earth, and in an environment that does not allow emergency evacuation or terrestrial medical assistance. • Evaluate and validate progressively Earth-independent crew health & performance systems and operations with mission durations representative of Mars-class missions. • Validate readiness of systems and operations to support crew health and performance for the initial human Mars exploration campaign. This presentation will outline the initial work that Exploration Medical Capability is leading on the development of a prototype design for an exploration Crew Health and Performance (CHP) system for future NASA human deep space long-duration missions. This effort will require commitment from all stakeholders to a shared mental model of what a future exploration CHP system should look like, one that will address the needs, goals, and objectives of the Agency and help to ensure mission success in deep space.

K R Lehnhardt↗

Next Generation Thermal Protection System for Outer Planet Probes and Orbiter

Saturn Probe and Ice Giant Orbiter along with in-situ Probe Missions continue to be very high priority mis-sions. A result of the advocacy by OPAG and other Analysis Groups, the 3D Woven, Dual-Layer HEEET thermal protection system, mature at TRL 6, has closed the TPS gap for extreme environment missions. A mid density follow on to DL HEEET, developed to meet earth entry requirements, is a Single Layer vari-ant of the 3D woven TPS, which provides a mass effi-cient single layer 3D Mid-Density TPS (3MDCP) that has been baselined as the heatshield for MSR EEV. Continued development of 3MDCP will elevate it to TRL 6 by 2025. Conformal-PICA (C-PICA) devel-opment was pursued to establish a more efficient and robust alternate to PICA, and it is at TRL 4+. Our rationale for the next generation of TPS de-velopment is based on the on the missions needs of the next decade Outer Planet missions that are unique and more demanding than any other destinations. Taking advantage of the recent planned development of sev-eral materials, the next generation of TPS offers a much more mass efficient option for small, medium, and large class Outer Planet missions. Saturn Probes: While mission designers are gen-erally interested in shallow entry to maintain the g-load during entry around 50g, the heat-load for shallow entry can range between (100 kJ/cm2 – 300 kJ/cm2), two orders of magnitude higher than Venus or Sample Return missions. TPS must not only offer protection but must be mass efficient to perform reasonable sci-ence. TPS mass can quickly become 50% or more of the mass of the entire entry system. Recent analysis performed shows Saturn Probe missions could signifi-cantly benefit from the single layer HEEET (SL-HEEET/3MDCP). A DL-HEEET based heatshield mass could be ~ (40% -50%), SL-HEEET can provide additional (30% - 50%) mass savings. At the same time, C-PICA can provide (30% - 50%) mass savings on the backshell. The combined mass savings can be significant enough to carry an additional probe, if de-sired. Ice Giant Aerocapture Missions: Aerocapture mission architectures can provide significant ad-vantage over traditional propulsive insertion missions in multiple ways. 1) Reduced trip time ~ (4- 6) years (30% -40%), 2) Enables placing the orbiter, probe, and lander, all together and 3) Allows for greater science mass (probes and landers) due to mass efficiency. The delivery of a probe from orbit makes it easier and eliminates mission design constraints by HEEET for direct entry [4] of probes and allows for more targeted in-situ science once the Orbiter is able to collect data. In the past 20 years, progress made in GN&C for lift-guided entry missions (MSL, Orion EFT1, Mars 2020) and the expertise in blunt body aerodynamics at large scale (~ 5m) has led the EDL community to conclude that aerocapture is a “go do” engineering activity. An aerocapture mission that will deplete the excess energy of a fast arrival mission will require a mass efficient TPS that can handle extreme heat-load, ~ (100 kJ/cm2 – 500 kJ/cm2). Hence TPS, feasibility as well as mass efficiency requires assessment. Utilizing the recent developments, a comprehensive, bounding analysis was done to establish the potential for SOA (HEEET) system as well as emerging new TPS such as SL-HEEET and C-PICA. In this proposed poster, we will outline the process by which we establish bounding aerocapture trajecto-ries for hyperbolic excess velocities ranging from 27 km/s to 35 km/s, for low L/D (~ 0.4) configurations and determine conservative/bounding estimate of aer-othermal environment by using a combination of CFD simulations and stagnation point heating estimates [7]. This engineering approach allows us to assess the TPS need vs. TPS capability and determine the applicability of existing TPS. Once an applicable suite of TPS is determined, the TPS thickness and mass are comput-ed. We show that the TPS mass fraction can be as low as 5% to as high as 20%, depending on the use of ad-vanced TPS, while HEEET is sufficient but will require 50% of the entry mass.

E Venkatapathy↗

SOLAR-B Mission Extreme Ultraviolet (EUV) Imaging Spectrometer (EIS) Instrument Components

This Monthly Progress Report covers the reporting period July 2001 of the Detailed Design and Development through Launch plus Thirty Days, Phase C/D, for selected components and subsystems of the Extreme Ultraviolet Imaging Spectrometer (EIS) instrument, hereafter referred to as EIS Instrument Components. This document contains the program status through the reporting period and forecasts the status for the upcoming reporting period.

Doschek, George A.↗

SOLAR-B Mission Extreme Ultraviolet (EUV) Imaging Spectrometer (EIS) Instrument Components

This Monthly Progress Report covers the reporting period through June 2001, Phase C/D, Detailed Design and Development Through Launch Plus Thirty Days, for selected components and subsystems of the Extreme ultraviolet Imaging Spectrometer (EIS) instrument, hereafter referred to as EIS Instrument Components. This document contains the program status through the reporting period and forecasts the status for the upcoming reporting period.

Doschek, George A.↗

Solar-B Mission Extreme Ultraviolet (EUV) Imaging Spectrometer (EIS) Instrument Components

This Monthly Progress Report covers the reporting period August 2002 of the Detailed Design and Development through Launch plus Thirty Days, Phase C/D, for selected components and subsystems of the Extreme ultraviolet Imaging Spectrometer (EIS) instrument, hereafter referred to as EIS Instrument Components. This document contains the program status through the reporting period and forecasts the status for the upcoming reporting period.

Doschek, George A.↗

Recent progress in planetary balloons

In the last 15 years several balloon mission concepts have been proposed for Mars and Venus, one of them - Russian-French Mars Aerostat - was extensively developed in 1988-1995 but was terminated before completion.

planets balloons aerobots↗

Terrestrial Planet Finder Interferometer: Architecture, Mission Design, and Technology Development

This slide presentation represents an overview progress report about the system design and technology development of two interferometer concepts studied for the Terrestrial Planet Finder (TPF) project. The two concepts are a structurally-connected interferometer (SCI) intended to fulfill minimum TPF science goals and a formation-flying interferometer (FFI) intended to fulfill full science goals. Described are major trades, analyses, and technology experiments completed. Near term plans are also described. This paper covers progress since August 2003

nulling↗