Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “load scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Challenges of Mars Sample Return Lander Entry, Descent, and Landing

The proposed Mars Sample Return (MSR) campaign would be perhaps the most ambitious robotic mission ever attempted in space exploration. The notional cam-paign consists of three Flagship-class missions operating in cooperation for over a decade in order to return samples of the Martian surface and atmosphere to Earth for analysis. The Mars 2020 rover, scheduled to launch in July 2020, will cache samples and place them on the surface for possible return. The second mission would be a Sample Return Lander (SRL) that consists of a small Sample Fetch Rover (SFR) to gather the samples, a Sample Transfer Arm (STA) to load the samples into a Mars Ascent Vehicle (MAV), and the MAV itself to launch the samples into orbit around Mars. The third mission would be an Earth Return Or-biter (ERO) designed to rendezvous and capture the Orbiting Sample (OS), return to Earth, and separate the Earth Entry Vehicle (EEV) for Entry, Descent, and Landing (EDL) at a location to be determined. This paper will focus on the SRL mission concept, specifically the EDL phase. Given the ambitious SRL sample re-trieval baseline surface mission, including a rocket launch of the samples into Mars orbit, it is estimated that the EDL system may be required to deliver as much as 2100 kg of dry mass to the surface. This represents an approximate 20-25% in-crease in mass capability over previous landed Mars missions. Additionally, there is a high probability that SRL would have to land very close to the samples on the surface to expedite retrieval operations; therefore, Pin Point Landing (PPL) accu-racy may be required. To address these challenges, promising EDL configuration augmentations were studied to include larger forebody/higher drag entry capsules, hypersonic/supersonic inflatable/non-inflatable aerodynamic decelerators, hypersonic trim tabs, ballute drag devices, larger parachutes, higher Mach and higher dynamic pressure parachute deployments, lower parachute deployment altitudes having shorter chute timelines necessitating more efficient terrain sensor strategies, and ad-ditional fuel for longer powered descent diverts to the target landing site. Over-arching the entire trade study was an attempt to stay as close to the experience base of past successful missions as possible to reduce implementation cost and risk. This paper will discuss the entire SRL EDL trade study in detail. The information presented about the potential MSR campaign is pre-decisional and is provided for planning and discussion purposes only.

Ivanov, Mark C.↗

The International Space Station Assembly on Schedule

As engineers continue to prepare the International Space Station (ISS) for in-orbit assembly in the year 2002, ANSYS software has proven instrumental in resolving a structural problem in the project's two primary station modules -- Nodes 1 and 2. Proof pressure tests performed in May revealed "low temperature, post-yield creep" in some of the Nodes' gussets, which were designed to reinforce ports for loads from station keeping and reboost motion of the entire space station. An extensive effort was undertaken to characterize the creep behavior of the 2219-T851 aluminum forging material from which the gussets were made. Engineers at Sverdrup Technology, Inc. (Huntsville, AL) were responsible for conducting a combined elastic-plastic-creep analysis of the gussets to determine the amount of residual compressive stress which existed in the gussets following the proof pressure tests, and to determine the stress-strain history in the gussets while on-orbit. Boeing, NASA's Space Station prime contractor, supplied the Finite Element Analysis (FEA) model geometry and developed the creep equations from the experimental data taken by NASA's Marshall Space Flight Center and Langley Research Center. The goal of this effort was to implement the uniaxial creep equations into a three dimensional finite element program, and to determine analytically whether or not the creep was something that the space station program could live with. The objective was to show analytically that either the creep rate was at an acceptable level, or that the node module had to be modified to lower the stress levels to where creep did not occur. The elastic-plastic-creep analysis was performed using the ANSYS finite element program of ANSYS, Inc. (Houston, PA). The analysis revealed that the gussets encountered a compressive stress of approximately 30,000 pounds per square inch (psi) when unloaded. This compressive residual stress significantly lowered the maximum tension stress in the gussets which decreased the creep strain rate. The analysis also showed that the gussets would not experience a great deal of creep from future pressure tests if braces or struts proposed by Boeing were installed to redistribute stress away from them. Subsequent analysis of on-orbit station keeping and reboost loads convinced Boeing that the gussets should be removed altogether.

Source record↗

The Impacts of Distinct Flexibility Enhancements on the Value and Dynamics of Natural Gas Power Plant Operations

The rapid increase of renewable generation and its anticipated continued growth requires greater operational flexibility in modern power systems. Previous studies explored the addition of more flexible resources to improve system flexibility, but this may also be achieved at lower cost by enhancing existing power plants via flexibility retrofits. Potential flexibility upgrades to existing thermal plants include modifications that enable faster ramp rates, increase maximum load levels, decrease minimum load levels, and provide faster and lower cost startup operations. In this paper, we focus on improvements to existing natural gas combined cycle generators, and apply a unit commitment model to analyze the impact that each specific upgrade has on their operational dynamics and profitability from both the system perspective and from the asset owner perspective. We show that the value of each type of flexibility improvement varies depending on the capacity factor and usage pattern of the generator before the upgrade, and that the relative benefit of each type of flexibility varies. We demonstrate diminishing returns to increased flexibility when upgrading multiple generators simultaneously. Sensitivity tests for several shares of renewable generation, different generation mixes and different net load realizations confirm the generality of the results shown.

03 NATURAL GAS↗

Front-End Engineering Design for Piperazine with the Advanced Stripper

This Department of Energy (DOE) funded project was executed with the goal of preparing a Front-End Engineering Design (FEED) for the capture and compression of 90% of the CO2 that would normally be emitted from an existing natural gas combined cycle (NGCC) plant. The FEED focused on the application of the piperazine advanced stripper (PZAS) process at Mustang Station of the Golden Spread Electric Cooperative (GSEC), which consists of two gas turbines with common heat recovery steam generator (HRSG). The University of Texas at Austin (UT) served as the prime contractor, and subcontracted AECOM Technical Services and Trimeric Corporation to support FEED development. This project team has worked together to advance PZAS for more than a decade. ExxonMobil, Chevron, and Total provided project co-funding. The objectives of this work included: 1. To advance engineering design such that a comprehensive estimate for the total installed cost of a full-scale PZAS CO2 Capture Plant with CO2 compression can be developed on an existing NGCC power plant. a. These detailed costs can also be used to qualify PZAS and other related second generation (2G) amine scrubbing processes for use on cogeneration facilities in refineries and chemical plants that use gas turbines with HRSGs to produce steam. b. These detailed costs will help qualify 2G amine scrubbing for use on NGCC power plants and establish a more accurate baseline cost to be used as a target by other capture technologies. 2. To provide cost details to be used in the economic optimization of the process features of PZAS and other 2G amine scrubbing processes. 3. To provide DOE with a more detailed understanding of carbon capture costs in a commercial application, enabling DOE to better design its R&D program to improve the economics for carbon capture. 4. To provide the host site and cost share partners with the information necessary to determine whether a commercial project to capture and use CO2 for enhanced oil recovery (EOR) or for sequestration can be justified (when accounting for the 45Q tax credit). A key component of the FEED is the estimated total installed cost, which provides a basis for the likely capital investment necessary to implement the PZAS carbon capture process at this location and scale. In combination with the included economic analysis, which accounts for potential revenue from the produced CO2, potential avenues to profitability are explored. The major findings of the FEED are as follows: The Mustang Station PZAS CO2 Capture Plant estimated total project cost of $698 MM of which $384 MM was direct costs. The annual operating costs were $32.6 MM. The total investment for a PZAS facility at Mustang Station is $725 MM. This estimate includes owner’s cost of $25 million and a contingency of $110 MM. • The study estimated the CO2 capture plant at Mustang Station would generate CO2 at $110/tonne for EOR, assuming a 12% IRR (internal rate of return) and an 85% capacity factor. For CO2 storage, the same case would achieve a 12% IRR at about $114/tonne. At a capacity factor of 52%, the storage and EOR cases would break even when carbon is priced ~$150/tonne. The economic analysis determined that the capacity factor and utility pricing, among other variable factors, had a significant effect on the economics and will need additional studied. • The energy penalty of the PZAS plant would be about 46 MW in connected power and 35 MW in operating load. The natural gas requirement (for the Gas Boiler package) would be about 354 MMBTU/hr. • The FEED revealed no major risks in process maturity. However, some areas were outlined for further engineering during detailed design, which included the Gas Boiler system, general arrangement and site layout, air coolers, schedule development, and optimization of the process for higher CO2 removal. • If PZAS were to be implemented at another host site, additional opportunities for cost reduction for would include cost reduction through use of cooling water and steam extraction.

03 NATURAL GAS↗

Spacecraft load, design and test philosophies

The development of spacecraft loads, design and test philosophies at the Jet Propulsion Laboratory (JPL) during the past 25 years is presented. Examples from the JPL's Viking, Voyager and Galileo spacecraft are used to explain the changes in philosophy necessary to meet the program requirements with a reduction in cost and schedule. Approaches to validate mathematical models of large structures which can't be ground tested as an overall system because of size and/or adverse effects of terrestrial conditions such as gravity are presented.

Wada, B. K.↗

Fatigue life prediction modeling for turbine hot section materials

This paper presents a summary of the life prediction methods developed under the NASA Lewis Research Center's Hot Section Technology (HOST) program. A major objective of the fatigue and fracture efforts under the HOST program was to significantly improve the analytic life prediction tools used by the aeronautical gas turbine engine industry. This has been achieved in the areas of high-temperature thermal and mechanical fatigue of bare and coated high-temperature superalloys. Such technical improvements will eventually reduce life cycle costs. The cyclic crack initiation and propagation resistance of nominally isotropic polycrystalline alloys and highly anisotropic single crystal alloys has been addressed. A sizeable data base has been generated for three alloys [cast PWA 1455 (B-1900 + Hf), wrought Inconel 718, and cast single crystal PWA 1480] in bare and coated conditions. Two coatings systems, diffusion aluminide (PWA 273) and plasma sprayed MCrAIY overlay (PWA 286) were employed. Life prediction modeling efforts were devoted to creep-fatigue interaction, oxidation, coatings interactions, multiaxiality of stress-strain states, mean stress effects, cumulative damage, and thermomechanical fatigue. The fatigue crack initiation life models developed to date include the Cyclic Damage Accumulation (CDA) Model of Pratt & Whitney and the Total Strain Version of Strainrange Partitioning (TS-SRP) of NASA Lewis for nominally isotropic materials, and the Tensile Hysteretic Energy Model of Pratt & Whitney for anisotropic superalloys. The fatigue model being developed by the General Electric Company is based upon the concepts of Path-lndependent Integrals (PII) for describing cyclic crack growth under complex nonlinear response at the crack tip due to thermomechanical loading conditions. A micromechanistic oxidation crack extension model has been derived by researchers at Syracuse University. The models are described and discussed in the paper. Only limited verification has been achieved to-date as several of the technical programs are still in progress and the verification tasks are scheduled, quite naturally, near the conclusion of the program. To-date, efforts have concentrated on development of independent models for cyclic constitutive behavior, cyclic crack initiation, and cyclic crack propagation. The transition between crack initiation and crack propagation has not been thoroughly researched as yet, and the integration of these models into a unified life prediction method has not been addressed.

Metal fatigue↗

EVI-Rental: A Scalable Model to Quantify the Impact of Rental Car Electrification

This fact sheet describes the Electric Vehicle Infrastructure - Rental Car (EVI-Rental) tool, a flexible and comprehensive simulation tool that addresses key questions about the charging demand, infrastructure needs, and business impacts of adding growing numbers of electric vehicles (EVs) to rental fleets. To validate the EVI-Rental model, the Athena research team conducted a case study at Dallas-Fort Worth International Airport (DFW) to understand the impact of state-of-charge requirements, different charger types and charging schedules, solar power generation, and behind-the-meter storage on a fully electrified rental car fleet.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Thermal Management Design for the X-33 Lifting Body

The X-33 Advantage Technology Demonstrator offers a rare and exciting opportunity in Thermal Protection System development. The experimental program incorporates the latest design innovation in re-useable, low life cycle cost, and highly dependable Thermal Protection materials and constructions into both ground based and flight test vehicle validations. The unique attributes of the X-33 demonstrator for design application validation for the full scale Reusable Launch Vehicle, (RLV), are represented by both the configuration of the stand-off aeroshell, and the extreme exposures of sub-orbital hypersonic re-entry simulation. There are several challenges of producing a sub-orbital prototype demonstrator of Single Stage to Orbit/Reusable Launch Vehicle (SSTO/RLV) operations. An aggressive schedule with budgetary constraints precludes the opportunity for an extensive verification and qualification program of vehicle flight hardware. However, taking advantage of off the shelf components with proven technologies reduces some of the requirements for additional testing. The effects of scale on thermal heating rates must also be taken into account during trajectory design and analysis. Described in this document are the unique Thermal Protection System (TPS) design opportunities that are available with the lifting body configuration of the X-33. The two principal objectives for the TPS are to shield the primary airframe structure from excessive thermal loads and to provide an aerodynamic mold line surface. With the relatively benign aeroheating capability of the lifting body, an integrated stand-off aeroshell design with minimal weight and reduced procurement and operational costs is allowed. This paper summarizes the design objectives of the X-33 TPS, the flight test requirements driven configuration, and design benefits. Comparisons are made of the X-33 flight profiles and Space Shuttle Orbiter, and lifting body Reusable Launch Vehicle aerothermal environments. The X-33 TPS is based on a design to cost configuration concept. Only RLV critical technologies are verified to conform to cost and schedule restrictions. The one-off prototype vehicle configuration has evolved to minimize the tooling costs by reducing the number of unique components. Low cost approaches such as a composite/blanket leeward aeroshell and the use of Shuttle technology are implemented where applicable. The success of the X-33 will overcome the ballistic re-entry TPS mindset. The X-33 TPS is tailored to an aircraft type mission while maintaining sufficient operational margins. The flight test program for the X-33 will demonstrate that TPS for the RLV is not simply a surface insulation but rather an integrated aeroshell system.

Bouslog, S.↗

Microgrid Assisted Design for Remote Areas

In this work, we present a three-stage multiobjective mixed-integer linear programming (MILP) for the optimal expansion planning and operation of isolated multienergy microgrids in remote areas. By selecting the optimal distributed generators (DGs) and energy storage systems (ESSs) mix selection, siting, sizing, and scheduling in the remote microgrid, the proposed model is targeted to minimize the annualized total cost of microgrids while enhancing the performance of the system, i.e., minimizing the voltage deviations and line power loss. To represent the electricity and heat flow between generation resources and various electrical, heating, and cooling loads in the isolated microgrid, linearized power flow, and heat flow constraints are employed in the proposed optimization model. The available capacity of DGs and ESSs are modeled as discrete constants instead of continuous variables for practical purpose. Numerical simulation results on a remote microgrid consisting of DGs, ESSs, and various loads validate the proposed method.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Enabling More than Moore: Accelerated Reliability Testing and Risk Analysis for Advanced Electronics Packaging

For five decades, the semiconductor industry has distinguished itself by the rapid pace of improvement in miniaturization of electronics products-Moore's Law. Now, scaling hits a brick wall, a paradigm shift. The industry roadmaps recognized the scaling limitation and project that packaging technologies will meet further miniaturization needs or ak.a "More than Moore". This paper presents packaging technology trends and accelerated reliability testing methods currently being practiced. Then, it presents industry status on key advanced electronic packages, factors affecting accelerated solder joint reliability of area array packages, and IPC/JEDEC/Mil specifications for characterizations of assemblies under accelerated thermal and mechanical loading. Finally, it presents an examples demonstrating how Accelerated Testing and Analysis have been effectively employed in the development of complex spacecraft thereby reducing risk. Quantitative assessments necessarily involve the mathematics of probability and statistics. In addition, accelerated tests need to be designed which consider the desired risk posture and schedule for particular project. Such assessments relieve risks without imposing additional costs. and constraints that are not value added for a particular mission. Furthermore, in the course of development of complex systems, variances and defects will inevitably present themselves and require a decision concerning their disposition, necessitating quantitative assessments. In summary, this paper presents a comprehensive view point, from technology to systems, including the benefits and impact of accelerated testing in offsetting risk.

Ghaffarian, Reza↗

Artemis I Countdown 101

Before the Artemis I mission launches on its way around the Moon, the launch team at Kennedy Space Center and supporting teams across the country will begin the launch countdown about two days before liftoff. The launch countdown contains "L Minus” and "T Minus" times. "L minus" indicates how far away we are from liftoff in hours and minutes and does not include built-in holds. “T minus” time is a sequence of events that are built into the launch countdown where counting and holds are inserted. The 730,000 gallons of propellants that will be loaded into the rocket are liquid oxygen (LO2) and liquid hydrogen (LH2). Pauses in the countdown, or "holds," are built into the countdown to allow the launch team to target a precise launch window, and to provide a cushion of time for certain tasks and procedures without impacting the overall schedule. For the Artemis I countdown, planned built-in holds vary in length and occur at the following times: L-8 hours, 40 minutes, and L-40 minutes.

Madison Elizabeth Tuttle↗

Platform-Independence and Scheduling In a Multi-Threaded Real-Time Simulation

Aviation research often relies on real-time, pilot-in-the-loop flight simulation as a means to develop new flight software, flight hardware, or pilot procedures. Often these simulations become so complex that a single processor is incapable of performing the necessary computations within a fixed time-step. Threads are an elegant means to distribute the computational work-load when running on a symmetric multi-processor machine. However, programming with threads often requires operating system specific calls that reduce code portability and maintainability. While a multi-threaded simulation allows a significant increase in the simulation complexity, it also increases the workload of a simulation operator by requiring that the operator determine which models run on which thread. To address these concerns an object-oriented design was implemented in the NASA Langley Standard Real-Time Simulation in C++ (LaSRS++) application framework. The design provides a portable and maintainable means to use threads and also provides a mechanism to automatically load balance the simulation models.

Sugden, Paul P.↗

NASA Tech Briefs, March 2011

Topics covered include: Optimal Tuner Selection for Kalman-Filter-Based Aircraft Engine Performance Estimation; Airborne Radar Interferometric Repeat-Pass Processing; Plug-and-Play Environmental Monitoring Spacecraft Subsystem; Power-Combined GaN Amplifier with 2.28-W Output Power at 87 GHz; Wallops Ship Surveillance System; Source Lines Counter (SLiC) Version 4.0; Guidance, Navigation, and Control Program; Single-Frame Terrain Mapping Software for Robotic Vehicles; Auto Draw from Excel Input Files; Observation Scheduling System; CFDP for Interplanetary Overlay Network; X-Windows Widget for Image Display; Binary-Signal Recovery; Volumetric 3D Display System with Static Screen; MMIC Replacement for Gunn Diode Oscillators; Feature Acquisition with Imbalanced Training Data; Mount Protects Thin-Walled Glass or Ceramic Tubes from Large Thermal and Vibration Loads; Carbon Nanotube-Based Structural Health Monitoring Sensors; Wireless Inductive Power Device Suppresses Blade Vibrations; Safe, Advanced, Adaptable Isolation System Eliminates the Need for Critical Lifts; Anti-Rotation Device Releasable by Insertion of a Tool; A Magnetically Coupled Cryogenic Pump; Single Piezo-Actuator Rotary-Hammering Drill; Fire-Retardant Polymeric Additives; Catalytic Generation of Lift Gases for Balloons; Ionic Liquids to Replace Hydrazine; Variable Emittance Electrochromics Using Ionic Electrolytes and Low Solar Absorptance Coatings; Spacecraft Radiator Freeze Protection Using a Regenerative Heat Exchanger; Multi-Mission Power Analysis Tool; Correction for Self-Heating When Using Thermometers as Heaters in Precision Control Applications; Gravitational Wave Detection with Single-Laser Atom Interferometers; Titanium Alloy Strong Back for IXO Mirror Segments; Improved Ambient Pressure Pyroelectric Ion Source; Multi-Modal Image Registration and Matching for Localization of a Balloon on Titan; Entanglement in Quantum-Classical Hybrid; Algorithm for Autonomous Landing; Quantum-Classical Hybrid for Information Processing; Small-Scale Dissipation in Binary-Species Transitional Mixing Layers; Superpixel-Augmented Endmember Detection for Hyperspectral Images; Coding for Parallel Links to Maximize the Expected Value of Decodable Messages; and Microwave Tissue Soldering for Immediate Wound Closure.

Source record↗

Deep Reinforcement Learning for Residential HVAC Control with Consideration of Human Occupancy

The Artificial Intelligence (AI) development described herein uses model-free Deep Reinforcement Learning (DRL) to minimize energy cost during residential heating, ventilation, and air conditioning (HVAC) operation. Building cooling loads and HVAC operation are difficult to accurately model due to complexity, lack of measurements and data, and model specific performance, so online machine learning is used to allow for real-time readjustment in performance. Energy costs for the multi-zone cooling unit shown in this work are minimized by scheduling on/off commands around dynamic prices. By taking advantage of precooling events that take place when the price is low, the agent is able to reduce operational cost without violating user comfort. The DRL controller was tested in simulation where the learner achieved a 43.89% cost reduction when compared to traditional, fixed-setpoint operation. The system is now ready for the next phase of testing in a live, real-time home environment.

Mckee, Evan↗

Future space transportation system architecture avionics requirements

NASA began a multi-center study in January 1993 to examine options for providing the most cost effective space transportation system in the future. The key advanced avionics requirements for these vehicle concepts are envisioned to provide significantly improved operational efficiency and effectiveness. It is very desirable to have adaptive guidance, navigation, and control approaches that will allow launch and return in almost any weather condition. The vehicles must be able to accommodate atmospheric density variations and winds without software changes. The flight operations must become much more autonomous in all flight regimes like an aircraft, and preflight checkout should make use of the onboard systems. When the vehicle returns to the launch site, subsystem health must be known and maintenance tasks scheduled accordingly. Ground testing of most subsystems must be eliminated. Also, the health monitoring system must be designed to enhance the ability to abort the mission significantly and save the crew and the vehicle. The displays and controls must be much less complex than current systems and must significantly reduce pilot work load. It is important to have low power, light weight displays and controls. Rendezvous and docking and all flight phases must have autopilot capability to reduce pilot work load for routine operations and in abort situations. The vehicles must have the demonstrated ability to return to the launch site. Abort from all mission phases can put additional demands on the communications system.

Stone, Howard↗

Testing to Transition the J-2X from Paper to Hardware

The J-2X Upper Stage Engine (USE) will be the first new human-rated upper stage engine since the Apollo program of the 1960s. It is designed to carry the Ares I and Ares V into orbit and send the Ares V to the Moon as part of NASA's Constellation Program. This paper will provide an overview of progress on the design, testing, and manufacturing of this new engine in 2009 and 2010. The J-2X embodies the program goals of basing the design on proven technology and experience and seeking commonality between the Ares vehicles as a way to minimize risk, shorten development times, and live within current budget constraints. It is based on the proven J-2 engine used on the Saturn IB and Saturn V launch vehicles. The prime contractor for the J-2X is Pratt & Whitney Rocketdyne (PWR), which is under a design, development, test, and engineering (DDT&E) contract covering the period from June 2006 through September 2014. For Ares I, the J-2X will provide engine start at approximately 190,000 feet, operate roughly 500 seconds, and shut down. For Ares V, the J-2X will start at roughly 190,000 feet to place the Earth departure stage (EDS) in orbit, shut down and loiter for up to five days, re-start on command and operate for roughly 300 seconds at its secondary power level to perform trans lunar injection (TLI), followed by final engine shutdown. The J-2X development effort focuses on four key areas: early risk mitigation, design risk mitigation, component and subassembly testing, and engine system testing. Following that plan, the J-2X successfully completed its critical design review (CDR) in 2008, and it has made significant progress in 2009 and 2010 in moving from the drawing board to the machine shop and test stand. Post-CDR manufacturing is well under way, including PWR in-house and vendor hardware. In addition, a wide range of component and sub-component tests have been completed, and more component tests are planned. Testing includes heritage powerpack, turbopump inducer water flow, turbine air flow, turbopump seal testing, main injector and gas generator, injector testing, augmented spark igniter testing, nozzle side loads cold flow testing, nozzle extension film cooling flow testing, control system testing with hardware in the loop, and nozzle extension emissivity coating tests. In parallel with hardware manufacturing, work is progressing on the new A-3 test stand to support full duration altitude testing. The Stennis A-2 test stand is scheduled to be turned over to the Constellation Program in September 2010 to be modified for J-2X testing also. As the structural steel was rising on the A-3 stand, work was under way in the nearby E complex on the chemical steam generator and subscale diffuser concepts to be used to evacuate the A-3 test cell and simulate altitude conditions.

Byrd, Tom↗

Method and system for providing flexible reserve power for power grid

An optimization-based method and system is disclosed to enable heterogeneous loads and distributed energy resources (DERs) to participate in grid ancillary services, such as spinning and non-spinning reserves, and ramping reserves. The method includes receiving inputs for decision parameters for optimizing an objective for obtaining flexible reserve power, solving the objective for obtaining flexible reserve power, determining a reserve power schedule for a prediction horizon for providing flexible reserve power based on the objective, generating a service bid based on the reserve power schedule for the power grid; and when the service bid is accepted, providing flexible reserve power to the power grid based on the service bid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Fast Dynamic Internal Predictive Power Scheduling Approach for Power Management in Microgrids: Preprint

This paper presents a Dynamic Internal Predictive Power Scheduling (DIPPS) approach for optimizing power management in microgrids, particularly focusing on external power exchanges among diverse prosumers. DIPPS utilizes a dynamic objective function with a time-varying binary parameter to control the timing of power transfers to the external grid, facilitated by efficient usage of energy storage for surplus renewable power. The microgrid power scheduling problem is modeled as a mixed-integer nonlinear programming (MINLP-PS) and subsequently transformed into a mixed-integer linear programming (MILPPS) optimization through McCormick's relaxation to reduce computational complexity. A predictive window window with 6 data points is solved at an average of 0.92s, a 97.6% improvement over the 38.27s required for the MINLP-PS formulation, implying the numerical feasibility of the DIPPS approach for real-time implementation. Finally, the approach is validated against a static objective using real-world load data across three case studies with different time-varying parameters, demonstrating the ability of DIPPS to optimize power exchanges and efficiently utilize distributed resources while shifting the external power transfers to specified time durations.

24 POWER TRANSMISSION AND DISTRIBUTION↗