Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “large”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Including operational aspects in the planning of power systems with large amounts of variable generation: A review of modeling approaches

In the past, power system planning was based on meeting the load duration curve at minimum cost. The increasing share of variable generation (VG) makes operational constraints more important in the planning problem, and there is more and more interest in considering aspects such as sufficient ramping capability, sufficient reserve procurement, power system stability, storage behavior, and the integration of other energy sectors often through demand response assets. In VG integration studies, several methods have been applied to combine the planning and operational timescales. We present a four-level categorization for the modeling methods, in order of increasing complexity: (1a) investment model only, (1b) operational model only, (2) unidirectionally soft-linked investment and operational models, (3a) bidirectionally soft-linked investment and operational models, (3b) operational model with an investment update algorithm, and (4) co-optimization of investments and operation. The review shows that using a low temporal resolution or only few representative days will not suffice in order to determine the optimal generation portfolio. In addition, considering operational effects proves to be important in order to get a more optimal generation portfolio and more realistic estimations of system costs. However, operational details appear to be less significant than the temporal representation. Furthermore, the benefits and impacts of more advanced modeling techniques on the resulting generation capacity mix significantly depend on the system properties. Thus, the choice of the model should depend on the purpose of the study as well as on system characteristics.

24 POWER TRANSMISSION AND DISTRIBUTION↗

$\mathrm{RADICAL}$-Pilot and $\mathrm{PMIx}$/$\mathrm{PRRTE}$: Executing Heterogeneous Workloads at Large Scale on Partitioned $\mathrm{HPC}$ Resources

Execution of heterogeneous workflows on high-performance computing (HPC) platforms present unprecedented resource management and execution coordination challenges for runtime systems. Task heterogeneity increases the complexity of resource and execution management, limiting the scalability and efficiency of workflow execution. Re-source partitioning and distribution of tasks execution over portioned re-sources promises to address those problems but we lack an experimental evaluation of its performance at scale. Here this paper provides a performance evaluation of the Process Management Interface for Exascale (PMIx) and its reference implementation PRRTE on the leadership-class HPC plat-form Summit, when integrated into a pilot-based runtime system called RADICAL-Pilot. We partition resources across multiple PRRTE Distributed Virtual Machine (DVM) environments, responsible for launching tasks via the PMIx interface. We experimentally measure the work-load execution performance in terms of task scheduling/launching rate and distribution of DVM task placement times, DVM startup and termination overheads on the Summit leadership-class HPC platform. Integrated solution with PMIx/PRRTE enables using an abstracted, standardized set of interfaces for orchestrating the launch process, dynamic process management and monitoring capabilities. It extends scaling capabilities allowing to overcome a limitation of other launching mechanisms (e.g., JSM/LSF). Explored different DVM setup configurations provide insights on DVM performance and a layout to leverage it. Our experimental results show that heterogeneous workload of 65,500 tasks on 2048 nodes, and partitioned across 32 DVMs, runs steady with resource utilization not lower than 52%. While having less concurrently executed tasks resource utilization is able to reach up to 85%, based on results of heterogeneous workload of 8200 tasks on 256 nodes and 2 DVMs.

97 MATHEMATICS AND COMPUTING↗

Search for new phenomena in final states with large jet multiplicities and missing transverse momentum using $\sqrt {s}$ = 7 TeV pp collisions with the ATLAS detector

Results are presented of a search for any particle(s) decaying to six or more jets in association with missing transverse momentum. The search is performed using 1.34 fb -1 of $\sqrt {s}$ = 7 TeV proton-proton collisions recorded by the ATLAS detector during 2011. Data-driven techniques are used to determine the backgrounds in kinematic regions that require at least six, seven or eight jets, well beyond the multiplicities required in previous analyses. No evidence is found for physics beyond the Standard Model. The results are interpreted in the context of a supersymmetry model (MSUGRA/CMSSM) where they extend previous constraints.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗