Corral Summit Pumped Storage Hydropower Hybrid: Site Suitability Assessment

In 2024, Idaho National Laboratory (INL) and Pacific Northwest National Laboratory (PNNL) initiated a technical-assistance project to support Cat Creek Energy, LLC, (CCE) in evaluating site suitability for the proposed Corral Summit Pumped Storage Hydropower (PSH) project in south-central Idaho near Mackay Reservoir. The Corral Summit facility incorporates battery storage and photovoltaic (PV) solar arrays in a Trybrid configuration to deliver large-volume long-duration (LVLD) storage solutions for rural electric cooperatives in eastern Idaho. The evaluation process focused on determining the most-suitable location for the upper reservoir of the PSH system, guided by a comprehensive assessment framework spanning multiple categories, including physical characteristics, environmental constraints, building infrastructure, regulatory constraints, cultural resources and sensitivity, social factors, and power market and grid integration. Each site was analyzed based on a ranking scale (0–1), which scores ranging from “severely disfavored” to “highly favored,” allowing detailed comparisons of site-specific conditions. Categories such as hydraulic head, utilities corridor, land ownership, and transmission-grid limitations emerged as key contributors to the overall assessment. Site 2 (Idaho Trust) demonstrated a slight advantage over Site 1 (Bureau of Land Management) primarily due to favorable outcomes in regulatory constraints, building infrastructure, and power-market integration. However, Site 1 outperformed Site 2 in factors related to physical characteristics and social factors. The report emphasizes the need for further evaluation of both sites before clear determination of which site is preferred, due to the limited information available on either site at the time of this report. Key areas of evaluation to clearly define the preferred site are ecological impacts, cultural-resource surveys, and economic-feasibility assessments. For successful project execution, recommended follow-up actions include seismic and geotechnical surveys, groundwater and habitat monitoring, regulatory reviews of water rights and right-of-way agreements, cultural engagement with local tribal governments, and enhanced stakeholder strategies. These efforts will ensure the Corral Summit Trybrid facility meets local energy needs while balancing environmental, social, and regulatory responsibilities.

13 - HYDRO ENERGY↗

Corral Summit Pumped Storage Hydropower Hybrid Site Suitability Assessment (Rev.1)

In 2024, Idaho National Laboratory (INL) and Pacific Northwest National Laboratory (PNNL) initiated a technical-assistance project to support Cat Creek Energy, LLC, (CCE) in evaluating site suitability for the proposed Corral Summit Pumped Storage Hydropower (PSH) project in south-central Idaho near Mackay Reservoir. The Corral Summit facility incorporates battery storage and photovoltaic (PV) solar arrays in a Trybrid configuration to deliver large-volume long-duration (LVLD) storage solutions for rural electric cooperatives in eastern Idaho. The evaluation process focused on determining the most-suitable location for the upper reservoir of the PSH system, guided by a comprehensive assessment framework spanning multiple categories, including physical characteristics, environmental constraints, building infrastructure, regulatory constraints, cultural resources and sensitivity, social factors, and power market and grid integration. Each site was analyzed based on a ranking scale (0–1), which scores ranging from “severely disfavored” to “highly favored,” allowing detailed comparisons of site-specific conditions. Categories such as hydraulic head, utilities corridor, land ownership, and transmission-grid limitations emerged as key contributors to the overall assessment. Site 2 (Idaho Trust) demonstrated a slight advantage over Site 1 (Bureau of Land Management) primarily due to favorable outcomes in regulatory constraints, building infrastructure, and power-market integration. However, Site 1 outperformed Site 2 in factors related to physical characteristics and social factors. The report emphasizes the need for further evaluation of both sites before clear determination of which site is preferred, due to the limited information available on either site at the time of this report. Key areas of evaluation to clearly define the preferred site are ecological impacts, cultural-resource surveys, and economic-feasibility assessments. For successful project execution, recommended follow-up actions include seismic and geotechnical surveys, groundwater and habitat monitoring, regulatory reviews of water rights and right-of-way agreements, cultural engagement with local tribal governments, and enhanced stakeholder strategies. These efforts will ensure the Corral Summit Trybrid facility meets local energy needs while balancing environmental, social, and regulatory responsibilities.

13 - HYDRO ENERGY↗

Assessment of the Electrical Substation-Grid Testbed with Inside/Outside Devices and Distributed Ledger Technology

The electrical substation-grid testbed was created to integrate the GOOSE and/or DNP (Distributed Network Protocol) messages with time synchronized sources and Distributed Ledger Technology (DLT). The objective was to study the impact of faults and cyber-events at an electrical substation with inside (protective relays) and outside (power meters) substation devices. The electrical substation-grid testbed was based on the design of a 34.5/ 12.47 kV electrical substation (sectionalized bus configuration) with two power transformers, connected to radial power lines and load feeders. The electrical substation-grid testbed was installed at 252 lab space (Advanced Power System Protection), Grid Research Integration and Deployment Center (GRID-C), Oak Ridge National Laboratory. This testbed was created for Task 5, DarkNet project. The electrical substation-grid testbed was created to simulate fault and/or cyber events that could potentially result in damage to the electrical infrastructure. In addition, tests were run that are usually not allowed to be performed in an operational electrical power grid, because these test scenarios could trip breakers and/or generate fault situations that could potentially damage equipment. The number of tests performed in the electrical substation-grid testbed were executed in a better way than in a real electrical substation and/or power grid, because multiple tests could be run in a short period of time, and complex permits, and safety/ schedule restrictions like in a real electrical substation environment were not needed. The electrical substation-grid testbed was created using real measurement, communication, and protection devices that are used by electrical utilities, to have same conditions that we could observe in a real power grid or electrical substation. The electrical substation-grid testbed was based on using a real time simulator and expansion box with amplifiers that were wired to electrical substation-grid devices. This hardware-in-the-loop (HIL) was provided by protective relays, power meters, ethernet switches, remote terminal units, synchronized timing network clock, DLT devices, workstations, and servers. This report includes the design, installation, and assessment of the electrical substation-grid testbed that was similar to an operational electrical substation, integrating the power system protection, communication, and control systems. The results for the electrical substation-grid testbed were based on:• verifying the analog signals for protective relays and power meters, • observing the synchronized time source frame at devices, • authenticating the GOOSE (IEC 61850) and DNP messages from power meters and protective relays, and • verifying the trip conditions of protective relays at fault tests with the power system fault event detection, using DLT devices. For future work, the electrical substation-grid testbed with protective relays and power meters, using DLT and synchronized time source from DarkNet, will be used to study the impact of cyber-events at inside and outside substation devices. Advanced algorithms for detecting cyber-events produced by non-desired protective relay settings will be studied, to improve the detection and reliability of protection, control, and communication systems at power grids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electric Vehicle Infrastructure Consequence Assessment

With consumers’ growing interest in electric vehicles, extreme fast charging stations are poised to provide high-power charging to rapidly recharge light-duty passenger vehicles. High-power charging requires high-level communication between vehicle and charger to govern the charging process. The coupling of power and communication increases the potential scale of cyberattacks. Using a full Western Electricity Coordinating Council planning model, load manipulation from high-power charging infrastructure is investigated. Two cases of load manipulation are studied: (i) a discrete, widespread system event and (ii) loads modulated near the Western Interconnect’s resonant frequency. In (i) some generation trips and in (ii) oscillations are observed on the California Oregon Intertie. Neither scenario results in significant adverse effects to the grid.

33 ADVANCED PROPULSION SYSTEMS↗

Northeast Freight Corridor Charging Plan (Roadmap Report)

Final report produced as part of grant awarded to National Grid. The final report is a roadmap of 39 prioritized sites. These sites would create a minimum viable network of charging infrastructure, enabling the electrification of trucks across the Northeast

02 PETROLEUM↗

A Framework to Evaluate the Grid Impacts of EV Fleet Charging Solutions

Growing Electric vehicle (EV) adoption in residential and commercial applications is driving the need for the charging infrastructures required to fulfill the charging needs. The resulting increase in demand for electric power will add a significant load to the electric grid, which could negatively impact the grid operation. EVs are power electronic loads and draw harmonic currents which can lead to a host of power quality issues. Therefore, it is crucial to assess the grid impacts and management of EV charging loads to ensure the reliable operation of the electric grid. In this paper, we develop a framework to help determine power-quality impacts given an EV charging schedule on the system. We compare the performance of unmanaged and managed charging solutions on factors like voltage drop, flicker, harmonic distortion and the peak site load - based on the EV depot in Hazelwood school district. The results allow insights into operation and site design of EV depots.

ADVANCED PROPULSION SYSTEMS,POWER TRANSMISSION AND↗

Cyber Resilient Design and Controls for Energy Systems

As the grid of today is evolving into a highly distributed and autonomous cyber-physical system with higher penetration of Distributed Energy Resources (DERs) and autonomous controls that are dependent on the cyber infrastructure, there are novel and increasing challenges to cyber-resilient operation of the grid. While the traditional mechanisms take a "bolt on" approach to cybersecurity and resiliency, this talk presents two novel technologies developed at NREL that "bake in" security and resilience into the design and control of the grid. An Adaptive Resilience Metrics framework is a novel mechanism for system owners and operators to understand the impact of cyber and physical system design and topology on the resilient operation, while also helping determine optimal policies in response to adverse cyber events. Along with that a zero-knowledge proof-based technique helps incorporate security into the controls layer by focusing on computational integrity rather than data integrity. By leveraging design and control properties unique to Operational Technology systems these technologies will not only help enhance cyber-resilience for the grid of today, but a highly distributed and autonomous grid of tomorrow.

cyber resilience↗

Enhancing Grid Resilience during Wildfires in Socioeconomic Vulnerable Regions using Powered and Non-Powered Hydro Dams

In many regions around the world, wildfires have become a growing threat, exacerbated by factors such as climate change, droughts, and urban sprawl. These wildfires often wreak havoc on power infrastructure, leading to extended power outages, which can have devastating consequences for communities, especially in socioeconomically vulnerable areas. Ensuring grid resiliency in the face of these challenges is of paramount importance. One innovative approach to mitigating the impact of wildfires on the power grid is the utilization of hydropower facilities including both powered and non-powered hydro dams. While powered hydro dams along with additional infrastructure like energy storage and solar photovoltaic can provide resilience during wildfire-related outages, non-powered dams, originally constructed for purposes other than electricity generation, also offer a unique opportunity to bolster grid resilience. In this paper, we aim to explore the efficacy of hydro-dams in general to provide resiliency during wildfire-induced outages.

Wildfires, Resilience, Grid Resiliency, Hydropower↗

eMosaic: Electrification Mosaic Platform for Grid Informed Smart Charging Management (Final Scientific/Technical Report)

ABB (Prime Contractor), in collaboration with its partners at the Utah State University (USU), Idaho National Laboratory, Rocky Mountain Power (RMP), and Electric Power Engineers (EPE), have performed research, development, and wide scale demonstration of a scalable and resilient Electrification Mosaic (eMosaic) platform for Smart Charge Management (SCM) for Electric Vehicle Infrastructure. Work was completed under DE EE0009194, titled “eMosaic Electrification Mosaic Platform for Grid Informed Smart Charging Management”, funded by the US Department of Energy. The project members developed algorithms that provide localized and bulk grid services and that reduce and stabilize costs all the way down the supply chain to the PEV owner through SCM. This platform aggregates telemetry from multiple data sources as pieces of the larger picture including personal, private fleet or transportation EVs, fast chargers and other supply equipment, weather service information, and geographically distributed charging sites such as public lots, garage and retail, and private or shared usage depots. ABB and the project team designed, tested, and improved a charging management system at local/edge and cloud levels. The ultimate objective of the project was to convincingly demonstrate that the developed secure eMosaic plat-form can be readily and favorably adopted by diverse utilities and site owners at scale. This was achieved through a demonstration plan with field deployment at several physical sites across 4 states and additional scalable simulation from high fidelity charging models.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Near Term Reliability and Resilience: Revisiting Resilience Metrics for the Electric Grid

This report presents the metrics employed in the Near-Term Reliability and Resilience (NTRR) project to study the inter-dependencies between electric and natural gas infrastructures, particularly under challenging conditions. These metrics were developed and applied to evaluate the reliability and resilience of the electric grid and natural gas systems in near-term scenarios (within the next 10 years) involving extreme weather events and major supply disruptions. The report defines the metrics, explains how they are calculated, and describes the process by which they are used to evaluate reliability and resilience across simulated scenarios. It also demonstrates how the resilience metrics integrate with other project activities and summarizes the software tools deployed to calculate and visualize the results.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure; A Nationwide Assessment

Ambitious federal clean goals, along with historic investment in American manufacturing, have put the United States on track to see 30-42 million light-duty electric vehicles (EVs) on the road by 2030. Now, a groundbreaking study from the National Renewable Energy Laboratory (NREL) has estimated the EV charging infrastructure needed nationwide to support a sweeping transition to electrified transportation. The study, titled "The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure," estimates the number, type, and location of the chargers needed to create a comprehensive network of EV charging infrastructure. Its use of proprietary NREL software tools and sophisticated analysis have resulted in a nationwide infrastructure needs assessment with a never-before-seen level of detail - one that takes into account the different ways Americans travel, from running errands to taking road trips, and can adjust to changing circumstances as EV adoption rates change over time.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Grid Utility Asset Vulnerability Assessment (GUAVA) Software Tool

Increasing demand and changes in generation portfolios is pushing power grid to operate towards the limit. However, due to lack of analytical tools for understanding various scales of impact on grid, it is becoming more vulnerable to wide scale power outages and blackouts. A vulnerable grid operating at its limit can be easily disrupted by asset failures caused by devastating hurricanes which has been known to damage transmission and distribution lines along its track. In this direction, researchers have focused on determining these assets by conducting Monte Carlo simulations of hurricanes with uncertainties and collected a large set of simulation data. To determine the infrastructure updates necessary for mitigating wide scale impact of hurricanes on the grid, we propose a software tool named “Grid Utility Asset Vulnerability Analysis” (GUAVA) framework. GUAVA presents a novel data-driven probabilistic analytical approach to (1) post-process hurricane failure scenarios, (2) identify/rank assets that are most vulnerable and critical to failing and are associated with highest impact/risk, and (3) to inform system upgrade decisions & prioritization. Based on the observed results and employed data-driven methodology, it is expected GUAVA can be adapted to provide power system planners with a recommendation engine for making informed decisions to improve resilience of grid.

Mahapatra, Kaveri↗

Virtual Power Plant Architecture and Resilient Design

Virtual Power Plants (VPPs) represent a fundamental shift in electric grid operations, aggregating distributed energy resources (DERs) such as solar panels and battery storage to deliver utility-scale grid services traditionally provided by centralized power plants. This report examines the unique architectural, operational, and digital assurance considerations that distinguish VPPs from conventional utility infrastructure as they scale from pilot projects to mainstream deployment across the United States. While VPPs offer significant opportunities for grid modernization and enhanced flexibility, their distributed, multi-stakeholder architecture introduces distinct security challenges that differ fundamentally from traditional generation facilities. The analysis identifies risks in VPP operations, including device-level security gaps, platform vulnerabilities, and communication protocol weaknesses that create expanded attack surfaces compared to centralized power plants. Through examination of real-world incidents and emerging threat patterns, the report demonstrates how some VPPs' reliance on consumer-owned devices, public internet infrastructure, and complex vendor ecosystems require new approaches to digital assurance and operational security. The findings provide practical guidance for utilities, regulators, and aggregators to implement robust security frameworks and operational best practices essential for maintaining grid reliability as VPP deployment accelerates under the Federal Energy Regulatory Commission (FERC) Order 2222 and related regulatory initiatives.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Assessment of peak power demand reduction available via modulation of building ventilation systems.

Peak power demand strains electrical grids and increases cost of electricity generation, transmission and distribution infrastructure. Many studies have examined ways of reducing peak power demand, including modification of room air temperature setpoints or reduction of lighting levels. However, very few or no studies have examined the peak power reduction resource offered by temporary curtailment of building ventilation systems. For this reason, we conducted a simulation campaign in which we examined the resource offered by temporary ventilation curtailment in commercial buildings of different use types across the United States and in residences in the state of California, with the essential constraint that any changes resulted in air quality acceptable to occupants through additional ventilation to compensate for the curtailment. To do this, we employed previously validated building models implemented in the airflow and contaminant transport tool CONTAM and building thermal and systems modeling tool EnergyPlus, in some cases co-simulated. Overall, results show savings are highly dependent on building type and climate but range from 0–2 W/ft 2 and up to 40% of total peak building power demand. Depending on building type, this power shed can be conducted for 1.5–8 h before acute exposure or odor concerns are expected, assuming a safety factor of 2. This reduction is of the same magnitude as that offered by thermal control strategies such as setpoint increase, or from lighting reduction strategies.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Decarbonization and technology cost drivers: considerations for potential future thermoelectric water use in the power sector

The power sector is currently undergoing significant changes, driven by a combination of factors, including decarbonization and technology innovation. This study aims to assess implications of these drivers on U.S. power sector technology futures and the associated water and environmental implications for cooling thermoelectric power plants. Specifically, we evaluate four decarbonization scenarios for the contiguous United States that vary in assumptions concerning demand growth and technology costs, with technology costs driving alternative outcomes that prioritize either technologies that require low amounts of water (such as wind, solar, and battery) or high amounts of water (such as nuclear and carbon capture and storage). These scenarios are executed in a power sector capacity expansion model and compared to two reference scenarios that assume status quo with policy and cost drivers. Our analysis indicates that future U.S. thermoelectric water withdrawals could decrease by 25%–60%, but water consumption could more than triple in some scenarios. These changes are driven by a combination of retirement of some power facilities, shifts in cooling technologies, and new technology deployment. The water use patterns vary across the United States, with the eastern regions demonstrating a lot more variability in water consumption across scenarios than western regions. However, local concerns can influence these possible investments, since increased water consumption can exacerbate water scarcity, leading to conflicts among competing users and affecting regional social, environmental, and economic dynamics. Future work should consider possible costs associated with alternate water sources, as well as improve the representation of water constraints within simulations. Inclusion of extreme events and alternate modeling platforms (e.g. production cost modeling and resource adequacy) may also be warranted to further stress test the robustness of these possible technology futures. Such assessments will be critical for ensuring decarbonization and other infrastructure-oriented investments lead to a reliable and resilient power grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Thermal Modeling and Limitations for Power Electronics Embedded in Medium-Voltage Cables

As next-generation energy technologies gain traction and power demand increases, the existing electrical infrastructure faces significant stress, prompting innovative solutions to enhance the grid's capacity and lifespan. This work explores the possibility of embedding medium-voltage (MV) power electronics directly inline with the cable, and the resulting thermal challenges. Since the majority of power distribution cables installed in the U.S. are passively cooled, the work focuses primarily on passive cooling, with an emphasis on the limitations of axial heat spreading within the cable. To date, literature on axial spreading of high incident heat loads on cables and cable environments is limited, typically reporting cases with <10 W of incident heat load. This work will explore the considerations, limits, and tradeoffs of cable-embedded heat loads significantly larger than the cable losses. Both external and internal effects are modeled analytically in nondimensional terms via a Biot number analysis, allowing fundamental limits and tradeoffs to be derived. The work culminates in the design and experimental validation of a cable-embedded thermal system capable of passively dissipating 300 W of heat from a coaxial SiC mosfet switch module over a length of 20 cm, thus validating the possibility of MV cable-embedded power electronics from a thermal standpoint.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Enhancing Discovery, Search, and Access of NASA Hydrological Data by Leveraging GEOSS

An ongoing NASA-funded project has removed a longstanding barrier to accessing NASA data (i.e., accessing archived time-step array data as point-time series) for selected variables of the North American and Global Land Data Assimilation Systems (NLDAS and GLDAS, respectively) and other EOSDIS (Earth Observing System Data Information System) data sets (e.g., precipitation, soil moisture). These time series (data rods) are pre-generated. Data rods Web services are accessible through the CUAHSI Hydrologic Information System (HIS) and the Goddard Earth Sciences Data and Information Services Center (GES DISC) but are not easily discoverable by users of other non-NASA data systems. The Global Earth Observation System of Systems (GEOSS) is a logical mechanism for providing access to the data rods. An ongoing GEOSS Water Services project aims to develop a distributed, global registry of water data, map, and modeling services cataloged using the standards and procedures of the Open Geospatial Consortium and the World Meteorological Organization. The ongoing data rods project has demonstrated the feasibility of leveraging the GEOSS infrastructure to help provide access to time series of model grid information or grids of information over a geographical domain for a particular time interval. A recently-begun, related NASA-funded ACCESS-GEOSS project expands on these prior efforts. Current work is focused on both improving the performance of the generation of on-the-fly (OTF) data rods and the Web interfaces from which users can easily discover, search, and access NASA data.

GEOSS↗

Defense Resilience Technical Assistance Options - Initial Overview

The Defense Resilience Technical Assistance (TA) project, a collaboration between the DOE Grid Deployment Office and the DoD, aims to enhance energy infrastructure at military installations and utilities and the surrounding community. It focuses on improving energy system performance, addressing power infrastructure inadequacies, enhancing power quality, reducing cyber sabotage impacts, and strengthening digital supply chains. Defense Resilience Technical Assistance Options - Initial Overview. Intend to tailor to the pilot installation.