Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “flooring”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

1- by 1-Foot Supersonic Wind Tunnel Sidewall Flowfield Compression Plate Study

A method for locally increasing the dynamic pressure in the test section of a supersonic wind tunnel is investigated from a theoretical, computational and experimental perspective, culminating in a reduced-scale, proof-of-concept test at Mach 3.44. Symmetric, variable-angle compression plates along the test section sidewalls generate oblique shockwaves to elevate the test section dynamic pressure (q). The experimental effort utilizes boundary-layer pitot rakes to sample the incoming flow near the floor, pitot and static rakes to measure the high-q core flow and numerous surface taps to map out the static pressure distribution along the floor, ceiling and sidewalls. A reliable and robust starting procedure is developed to establish supersonic flow in the test section and behind the compression plates. A characterization of the incoming floor boundary layer reveals previously documented features (such as a bulge toward the centerline) and an unexpected (and as-yet-unexplained) thickening of the boundary layer with increasing Reynolds number around total pressures of 40–60 psia. The high-q core flow is characterized for eight compression plate angles (4.0–8.0°), eight tunnel total pressures (20–139 psia) and three axial stations (24.95–27.35 inches). The peak dynamic pressure rise exceeds expectations. At conditions relevant to full-scale testing (6.0° and 139 psia), the dynamic pressure increases by a factor of 1.73, the Mach number becomes 2.85 and the total pressure drops imperceptibly. Basic distortion metrics show transverse non-uniformity of less than 5 %. Limited spatial resolution in the static rake measurements warrants additional, higher fidelity testing or computational analysis. Surface-mounted, fast-response instrumentation suggests minimal unsteadiness in the flow, less than a few percent of the mean (comparable to the sensor accuracy).

Wind tunnel testing, test techniques/methods, dyna↗

Internal Architecture of the Common Habitat

The core stage liquid oxygen tank of the Space Launch System can be manufactured as a habitat instead of as a propellant tank, with a common design such that it is equally suitable for use in 0g, 1/6g, 3/8g, 1g, or variable artificial gravity. This Common Habitat can be the central element of a human spaceflight architecture that encompasses the Moon, Mars, and other destinations within the inner solar system. The Common Habitat is specifically used within an alternative architecture study (that is not part of the current NASA baseline) as the core habitation element within a Lunar Basecamp, Mars Basecamp, and the Deep Space Exploration Vehicle. The Common Habitat internal architecture applies a design philosophy to separate crew functions according to deck. The lower deck is reserved for private functions. It includes eight private crew quarters and four waste and hygiene clusters – each with a private waste management compartment, private full body hygiene compartment, and foyer/clothes changing area. The mid deck is primarily allocated to mission-related working functions. It includes an exercise facility, fabrication / maintenance / repair facility, physical science laboratory (physics, geology, and astronomy), and life science laboratory (biology and human research). The mid deck also has four external hatches, clocked one every 90 degrees, centered on the vehicle vertical centerline. Each hatch has a 60-inch tall by 40-inch wide opening with the mid deck floor 16 inches below the bottom lip of the hatch opening. The upper deck is primarily allocated to group or social functions. It includes a large galley, wardroom with projector and display screen, plant growth chambers, bulk stowage, command and control station, medical facility, hygiene compartment, and vehicle subsystems. A Vertical Translation System, based in part on results from a GrabCAD public challenge, enables crew and equipment traverse between habitat decks in 0g, 1/6g, 3/8g, and 1g. A 40-inch by 60-inch vertical translation corridor ensures that anything that can fit through the external hatches can also be moved from deck to deck. The system includes three component systems: a deploying floor to safety barrier system that folds down to become a traversable floor when vertical translation is not in use and deploys to become a safety barrier during vertical translations; a folding ladder that stows in the ceiling when not in use; and an elevator platform that can attach to the ladder for cargo or incapacitated crew member transport. This system is complemented by a Horizontal Translation System, also based in part on the same GrabCAD challenge, provides for horizontal crew translation in microgravity but requires no vehicle reconfiguration for fractional or whole gravity operation. It relies primarily on gecko-inspired grippers, originally developed at Stanford and NASA JPL, attached to footwear to enable crew to emulate walking. Some handrails are also strategically placed throughout the Common Habitat to aid translation in both gravity and microgravity environments.

Common Habitat↗

First-results from the Perseverance SHERLOC Investigation: Aqueous Alteration Processes and Implications for Organic Geochemistry in Jezero Crater, Mars

The Perseverance rover landed in Jezero crater, a site selected to fulfill the Mars-2020 mission goals of characterizing the geology of habitable environments and searching for signs of life while collecting samples for return to Earth [1]. Jezero hosted an open-basin lake during the late Noachian/early Hesperian (~3.7 Ga) [1-2], has units associated with the largest carbonate deposit identified on Mars [3-4], and has a well-preserved delta with clay and carbonate-bearing sediments, well-suited to preservation of organics [1,3-4]. Investigating the nature of organics and aqueous environments within their geologic con-text allows us to understand important aqueous processes and determine habitability within Jezero crater. Previous in situ landed measurements of organics could not resolve their spatial and mineralogical con-text [5-6]. Although Martian meteorites lack geological context, the spatial distribution of organic compounds in Martian meteorites have allowed recognition of an association between aqueous processes and organics [7-8]. Here, we show for the first time in-situ associations between carbonate-forming ultramafic alteration process, later stage aqueous sulfate and perchlorate formation, and organics on the Martian surface. Methodology and geological context: We use the Perseverance rover’s SHERLOC instrument (Scanning Habitable Environments with Raman and Lumines-ence of Organics and Chemicals), a deep-ultraviolet fluorescence and Raman scattering spectrometer capable of mapping the organic and mineral composition with a spatial resolution of 100 μm resolution to report the presence of organics and aqueously formed minerals at Jezero crater [9]. These spectral detections were compared with co-located images obtained with the autofocus context imager (ACI) and the WATSON camera for textural analysis [9]. As of writing, the Per-severance rover has abraded five targets that were measured with the SHERLOC instrument. The five targets are located in two different orbitally-identified geological units within the floor of Jezero crater; the Crater Floor Fractured Rough unit (CF-Fr) and the Séítah region within the Crater Floor Fractured 1 unit (CF-F1) [10]. In orbital infrared spectroscopic data, the CF-Fr unit is associated with pyroxene spectral signatures and minor alteration, while the Séítah region is associated with olivine and minor Mg-rich carbonates and clays [3-4,10]. Carbonation of ultramafic protolith recorded within Jezero crater: All scans of abraded targets within the Séítah region reveal strong peaks at 1080–1090 cm−1 consistent with carbonate and peak singlets or doublets at 820–840 cm−1 attributed to olivine (Fig. 1), consistent with orbital infrared observations. Our detailed micron-scale petrographic and spectroscopic evidence shows that these carbonates formed through carbonation of an ultramafic protolith. The supporting observations include: (1) Carbonate cation compositions match those of olivine, suggesting mixed Fe- and Mg-olivine gave rise to mixed Fe- and Mg-carbonates, similar to observations of ultramafic systems on Earth and within Martian meteorites [3-4,7-8]. (2) The ob-served carbonates co-occur with hydrated materials, gypsum, and potentially aqueously-formed phases, amorphous silicates and phosphate. (3) The spectral and textural variation of olivine and carbonate dominated zones and olivine-carbonate mixtures within both primary grains and interstitial zones are expected for carbonated ultramafic protoliths. (4) These mineral associations and textures closely resemble those observed within the ALH84001 and Nakhlite meteorites attributed to olivine carbonation on Mars [6-7]. Taken together, micron-scale SHERLOC documentation of these phenomena bridge previous orbital and meteorite observations and demonstrate in-situ regionally extensive (~106 km2) ultramafic alteration resulting in geo-logical deposition of carbonates. Furthermore, we observe that olivine carbonation was involved in preserving and possibly synthesizing organics, which makes this environment potentially habitable, as previously suggested in [1,3-4] (Fig. 1). Late-stage aqueous perchlorate and sulfate in Jezero crater: An abrasion target within the CF-Fr unit contains combinations of high intensity 950-955 cm−1 peaks and minor 1090-1095 cm−1 and 1150-1155 cm−1 peaks that are spectral fits to anhydrous perchlorate (Fig. 1). Some spectra show a combination of 950-955 cm−1 peaks with equally strong 1010-1020 cm−1 peaks, low intensity broad features at 1120 cm−1, and occasional broad 3450 cm−1 hydration (-OH) features, indicating a mixture of Ca-sulfate and perchlorate that is minimally hydrated (Fig. 1). The detections of per-chlorates within Jezero crater differ from previous measurements (e.g. Phoenix lander, Curiosity rover, Tissint meteorite [7,11]) because they are observed to be intimately related to aqueous processes including sulfate formation, they present as a secondary white void-fill occurring within the interior of the rock, and they are found to likely be Na-perchlorate. implications for their formation: Three different types of organics embedded within three different lithologies were observed within the abraded targets. Organics associated with low intensity ~340 nm fluorescence were widespread within targets with no apparent association to particular minerals (Fig. 1). Organics associated with ~305 nm and ~275 nm fluorescence correlated with sulfates within the Bellegarde target in the CF-Fr unit, while organics associated with high intensity ~340 nm fluorescence correlated with carbonate, phosphate, and amorphous silicate mixtures within the Garde target in the Séítah region (Fig. 1). Although assignment of fluorescence signatures to specific organic compounds is not conclusive, ~340 nm fluorescence is generally more consistent with 2-ring aromatic organics, ~275 nm fluorescence is more consistent with 1-ring aromatic organics, and ~305 nm fluorescence can be created by either 2- or 1-ring aromatics [12]. These observations indicate that the strongest fluorescence signatures interpreted as organics were found in materials associated with aqueous processes, i.e. sulfate- and carbonate-bearing materials, suggesting both brines and ultramafic carbonation aqueous environments were capable of preserving organics on ancient Mars. In Martian meteorites, simple aromatic organics proposed to have been synthesized through aqueous processes can be found within minerals associated with olivine carbonation and in spatial association with perchlorate and sulfate materials [7-8], similar to SHERLOC observations. Hence, we advance an abiotic aqueous synthesis origin for the organics although we cannot rule out the presence of organics from meteoritic in-fall or putative organic biosignatures. Detailed analyses will be required upon return of these materials to Earth.

E L Scheller↗

On the Alleviation of Background Noise for the High-Lift Common Research Model Aeroacoustic Test

Microphone array measurements of the airframe noise from the High-Lift Common Research Model (CRM-HL) in the NASA Langley 14- by 22- Foot Subsonic Tunnel were initially hindered by extraneous noise sources. The steps taken to reduce the background noise in the open-jet test section for the aeroacoustic test are described in this paper. Adhesive-backed felt was used to attenuate noise resulting from the interaction of the test section shear layer with the collector and diffuser surfaces, scrubbing noise from the floor perforated panels, as well as an extraneous noise source produced near the junction of the model and the floor when the model was producing significant lift. The effects of the felt on noise attenuation and acoustic reflections are discussed. Following the CRM-HL test, scrubbing noise measurements from a floor basket with a perforated top panel were acquired in the Quiet Flow Facility to compare the performance of different perforated panel covers and their respective effects on the noise spectra. Aside from a smooth, hard wall, the felt cover was found to produce the minimum scrubbing noise of all the materials tested.

background noise↗

Hellas, Ken and Me: Adventures in Exhumation and Inundation

Hellas is the largest and deepest basin on Mars. A 1993 study by Moore and Edgett (GRL, 20, 1599-1602) noted that Hellas undergoes net dust erosion. Thus, the exposed surface must represent whatever lag or rock surface and could not be removed by the strong winds blowing at these low elevations. The particle size distributions and particularly the rock or boulder population in this lag was thought to be potentially useful for distinguishing between processes that formed the lithologic units that comprise Hellas Planitia. Earlier studies had suggested the Hellas floor might be paved with basalt or glacial deposits. Ken, who at the time was working with Viking Orbiter IRTM data knew that there were late mission observations of the Hellas floor acquired though clear skies. His derived thermal inertia from these observations strongly suggested that the abundance of particles larger than coarse sand was very low. Hence, our study concluded that the floor deposits were, among other possibilities, ancient loess or lacustrine deposits. In 2001 a subsequent study on the Hellas basin by Moore and Wilhelms (Icarus, 54, 258-276) proposed that the basin was once a site of an ice covered sea, based on a series of circum-basin scarps that follow constant elevations as well as other landforms seen my Mars Global Surveyor’s MOC (an instrument that Ken played a major role in daily operations and data analysis) and topography derived from MOLA. Subsequently the best contiguous observations of the Hellas basin have been acquired from the Mars Reconnaissance Orbiter’s Context Camera, which again Ken has been a central player in its operations. Much of what we know about the grain-scale sedimentology of martian lacustrine deposits comes from the Curiosity Rover’s Mars Hand Lens Imager (which Ken was the PI through development and original operations within Gale crater). Under Ken’s watch several members of the Murray Formation were determined to be deposited in a lacustrine environment. A conclusion strongly demonstrated by MHLI imaging. My personal relationship with Hellas isn’t over. The Europa Clipper flew directly over the Hellas basin including its deepest regions. Ther REASON Ice Penetrating Radar system collected data during this flyby ostensibly for calibration, yet the quality of the observations may yet provide new discoveries from Hellas.

Jeffrey M Moore↗

Thermal Analysis for Ion-Exchange Column System

Models have been developed to simulate the thermal characteristics of crystalline silicotitanate ion exchange media fully loaded with radioactive cesium either in a column configuration or distributed within a waste storage tank. This work was conducted to support the design and operation of a waste treatment process focused on treating dissolved, high-sodium salt waste solutions for the removal of specific radionuclides. The ion exchange column will be installed inside a high level waste storage tank at the Savannah River Site. After cesium loading, the ion exchange media may be transferred to the waste tank floor for interim storage. Models were used to predict temperature profiles in these areas of the system where the cesium-loaded media is expected to lead to localized regions of elevated temperature due to radiolytic decay. Normal operating conditions and accident scenarios (including loss of solution flow, inadvertent drainage, and loss of active cooling) were evaluated for the ion exchange column using bounding conditions to establish the design safety basis. The modeling results demonstrate that the baseline design using one central and four outer cooling tubes provides a highly efficient cooling mechanism for reducing the maximum column temperature. In-tank modeling results revealed that an idealized hemispherical mound shape leads to the highest tank floor temperatures. In contrast, even large volumes of CST distributed in a flat layer with a cylindrical shape do not result in significant floor heating.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Double-Shell Tank Visual Inspection Changes Resulting from the Tank 241-AY-102 Primary Tank Leak

As part of the Double-Shell Tank (DST) Integrity Program, remote visual inspections are utilized to perform qualitative in-service inspections of the DSTs in order to provide a general overview of the condition of the tanks. During routine visual inspections of tank 241-AY-102 (AY-102) in August 2012, anomalies were identified on the annulus floor which resulted in further evaluations. In October 2012, Washington River Protection Solutions, LLC determined that the primary tank of AY-102 was leaking. Following identification of the tank AY-102 probable leak cause, evaluations considered the adequacy of the existing annulus inspection frequency with respect to the circumstances of the tank AY-102 1eak and the advancing age of the DST structures. The evaluations concluded that the interval between annulus inspections should be shortened for all DSTs, and each annulus inspection should cover > 95 percent of annulus floor area, and the portion of the primary tank (i.e., dome, sidewall, lower knuckle, and insulating refractory) that is visible from the annulus inspection risers. In March 2013, enhanced visual inspections were performed for the six oldest tanks: 241-AY-101, 241-AZ-101,241-AZ-102, 241-SY-101, 241-SY-102, and 241-SY-103, and no evidence of leakage from the primary tank were observed. Prior to October 2012, the approach for conducting visual examinations of DSTs was to perform a video examination of each tank's interior and annulus regions approximately every five years (not to exceed seven years between inspections). Also, the annulus inspection only covered about 42 percent of the annulus floor.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Thermal Performance Evaluation of Attic Radiant Barrier Systems Using the Large Scale Climate Simulator (LSCS)

Application of radiant barriers and low-emittance surface coatings in residential building attics can significantly reduce conditioning loads from heat flow through attic floors. The roofing industry has been developing and using various radiant barrier systems and low-emittance surface coatings to increase energy efficiency in buildings; however, minimal data are available that quantifies the effectiveness of these technologies. This study evaluates performance of various attic radiant barrier systems under simulated summer daytime conditions and nighttime or low solar gain daytime winter conditions using the large scale climate simulator (LSCS). The four attic configurations that were evaluated are 1) no radiant barrier (control), 2) perforated low-e foil laminated oriented strand board (OSB) deck, 3) low-e foil stapled on rafters, and 4) liquid applied low-emittance coating on roof deck and rafters. All test attics used nominal RUS 13 h-ft2- F/Btu (RSI 2.29 m2-K/W) fiberglass batt insulation on attic floor. Results indicate that the three systems with radiant barriers had heat flows through the attic floor during summer daytime condition that were 33%, 50%, and 19% lower than the control, respectively.

building energy efficiency↗

Analysis of Radiant Cooling System Configurations Integrated with Cooling Tower for Different Indian Climatic Zones

Radiant cooling system has proven to be a low energy consumption system for building cooling needs. This study describes the use of cooling tower in radiant cooling system to improve the overall system efficiency. A comprehensive simulation feasibility study of the application of cooling tower in radiant cooling system was performed for the fifteen cities in different climatic zones of India. It was found that in summer, the wet bulb temperature (WBT) of the different climatic zones except warm-humid is suitable for the integration of cooling tower with radiant cooling system. In these climates, cooling tower can provide on average 24 C to 27 C water In order to achieve the energy saving potential, three different configurations of radiant cooling system have been compared in terms of energy consumption. The different configurations of the radiant cooling system integrated with cooling tower are: (1) provide chilled water to the floor, wall and ceiling mounted tubular installation. (2) provide chilled water to the wall and ceiling mounted tabular installation. In this arrangement a separate chiller has also been used to provide chilled water at 16 C to the floor mounted tubular installation. (3) provide chilled water to the wall mounted tabular installation and a separate chiller is used to provide chilled water at 16 C to the floor and ceiling mounted tabular installation. A dedicated outdoor air system is also coupled for dehumidification and ventilation in all three configurations. A conventional all-air system was simulated as a baseline to compare these configurations for assessing the energy saving potential.

Mathur, Jyotirmay↗

Real-time modeling of heat distributions

Techniques for real-time modeling temperature distributions based on streaming sensor data are provided. In one aspect, a method for creating a three-dimensional temperature distribution model for a room having a floor and a ceiling is provided. The method includes the following steps. A ceiling temperature distribution in the room is determined. A floor temperature distribution in the room is determined. An interpolation between the ceiling temperature distribution and the floor temperature distribution is used to obtain the three-dimensional temperature distribution model for the room.

99 GENERAL AND MISCELLANEOUS↗

Decommissioning the physics laboratory, building 777-10A, at the Savannah River Site (SRS)

SRS recently completed a four year mission to decommission {approx}250 excess facilities. As part of that effort, SRS decommissioned a 48,000 ft{sup 2} laboratory that housed four low-power test reactors, formerly used by SRS to determine reactor physics. This paper describes and reviews the decommissioning, with a focus on component segmentation and handling (i.e. hazardous material removal, demolition, and waste handling). The paper is intended to be a resource for engineers, planners, and project managers, who face similar decommissioning challenges. Building 777-10A, located at the south end of SRS's A/M-Area, was built in 1953 and had a gross area of {approx}48,000 ft{sup 2}. Building 777-10A had two main areas: a west wing, which housed four experimental reactors and associated equipment; and an east wing, which housed laboratories, and shops, offices. The reactors were located in two separate areas: one area housed the Process Development Pile (PDP) reactor and the Lattice Test Reactor (LTR), while the second area housed the Standard Pile (SP) and the Sub-critical Experiment (SE) reactors. The west wing had five levels: three below and three above grade (floor elevations of -37', -28', -15', 0', +13'/+16' and +27' (roof elevation of +62')), while the east wing had two levels: one below and one above grade (floor elevations of -15' and 0' (roof elevation of +16')). Below-grade exterior walls were constructed of reinforced concrete, {approx}1' thick. In general, above-grade exterior walls were steel frames covered by insulation and corrugated, asbestos-cement board. The two interior walls around the PDP/LTR were reinforced concrete {approx}5' thick and {approx}30' high, while the SP/SE reactors resided in a reinforced, concrete cell with 3.5'-6' thick walls/roof. All other interior walls were constructed of metal studs covered with either asbestos-cement or gypsum board. In general, the floors were constructed of reinforced concrete on cast-in-place concrete beams below-grade and concrete on metal beams above-grade. The roofs were flat concrete slabs on metal beams. Building 777-10A was an important SRS research and development location. The reactors helped determine safe operational limits and loading patterns for fuel used in the SRS production reactors, and supported various low power reactor physics studies. All four reactors were shut down and de-inventoried in the 1970's. The building was DD and R 2007, Chattanooga, Tennessee, September 16-19, 2007 169 subsequently used by various SRS organizations for office space, audio/visual studio, and computer network hub. SRS successfully decommissioned Building 777-10A over a thirty month period at a cost of {approx}$14 M ({approx}$290/ft{sup 2}). The decommissioning was a complex and difficult effort due to the building's radiological contamination, height, extensive basement, and thick concrete walls. Extensive planning and extensive hazard analysis (e.g. of structural loads/modifications leading to unplanned collapse) ensured the decommissioning was completed safely and without incident. The decommissioning met contract standards for residual contamination and physical/chemical hazards, and was the last in a series of decommissioning projects that prepared the lower A/M-Area for SRS's environmental restoration program.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Handling of Highly Radioactive Radiation Sources in a Hot Cell Using a Mechanically Driven Cell Crane - 13452

In 2010, Siempelkamp Nukleartechnik GmbH was awarded the contract for design and erection of a Hot Cell for handling and storage of highly radioactive radiation sources. This Hot Cell is part of a new hot cell laboratory, constructed for the NHZ (Neues Handhabungszentrum = New Handling Center) of the Nuclear Engineering Seibersdorf GmbH (NES). All incurring radioactive materials from Austria are collected in the NHZ, where they are safely conditioned and stored temporarily until their final storage. The main tasks of the NES include, apart from the collection, conditioning and storage of radioactive waste, also the reprocessing and the decontamination of facilities and laboratories originating from 45 years of research and development at the Seibersdorf site as well as the operation of the Hot Cell Laboratory [1]. The new Hot Cell Laboratory inside the NHZ consists of the following room areas: - One hot cell, placed in the center, for remote controlled, radiation protected handling of radioactive materials, including an integrated floor storage for the long-term temporary storage of highly radioactive radiation sources; - An anteroom for the loading and unloading of the hot cell; - One control room for the remote controlling of the hot cell equipment; - One floor storage, placed laterally to the hot cell, for burial, interim storage and removal of fissionable radioactive material in leak-proof packed units in 100 l drums. The specific design activity of the hot cell of 1.85 Pbq relating to 1-Me-Radiator including the integrated floor storage influences realization and design of the components used in the cell significantly. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning and Demolition of a Redundant UK Research Facility at AWE Aldermaston - 12453

The redundant two-storey brick built research facility on the AWE Site at Aldermaston, UK is in the closing stages of decommissioning and demolition. The facility was used for a variety of purposes up to 1995 predominately involving the use of alpha-emitting isotopes. The two main areas of alpha-based contamination have been decommissioned with the removal of hot -boxes and fume cupboards on the ground floor and HEPA filter units and ventilation equipment on the first floor. Many of these activities were undertaken using both airline fed suits, (supplied via a free standing mobile unit), and full face respirators. Asbestos materials were located and cleared from the first floor by specialist contractor. All sections of active drain running from the building to the site active effluent disposal system were removed early in the program using established techniques with specialist monitoring equipment used to provide confidence in the data required for disposal of the decommissioning debris. In particular a dedicated High Resolution Gamma Spectrometer (radioactive materials scanning unit) was utilized to categorise waste drums and wrapped packages. The building has been decommissioned and the monitoring and sampling of the structure was completed in November 2011 - the results demonstrating that the building was clear of contamination in accordance with UK clearance and exemption requirements. The demolition plan was developed and implemented in December with site excavation of foundations and site clearance currently ongoing in preparation for final site backfill activities and project close. A number of useful lessons have been learnt during the operations and are set out at the rear of the main text. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Access Hatch used for Debris Retrieval of the Fukushima Damaged Reactors - 17094

IHI have studied to establish debris retrieval technique for top and side access. Top access approaches to the reactor inside from the top floor. Side access is from the first floor. The top access is more regular technique in comparison with side access, because of same direction as fuel rods carrying in and out. Debris retrieval operation will be done under either flooding (in water) or air condition. Combination of them is also a possibility. This will be decided in 2017 by the Government. As for both techniques, it is mandatory requirement to make confining and shielding boundary against inside PCV during operation. This access hatch is an important equipment to make the boundary. Top access will have an advantage over side access. This paper introduces conceptual design of the access hatch of top access based on shielding calculation, strength calculation and system requirements. The access hatch of top access will be installed on the refueling floor as the top of the reactor building. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Conceptual Study of Fuel Debris Retrieval System for Fukushima Daiichi Reactors - 16111

Fuel debris retrieval in the Unit 1-3 reactors of Fukushima Daiichi Nuclear Power Station (NPS) has been one of the most primal tasks for Fukushima restoration project in Japan since the accident happened in March 2011. Various approaches for the fuel debris retrieval have been considered so far. As one of the approaches, there is the in-air fuel retrieval approach which consists of two independent systems to access fuel debris from each access route: one is 'Top Side Access System' and another is 'Side Access System'. The conceptual design of this approach was performed by IHI Corporation (IHI) and Kurion, Inc. (Kurion) in 2014-2015. The Top Side Access System will be provided to access fuel debris in Reactor Pressure Vessel (RPV) from the refueling floor located on upper side of the reactor. A platform with manipulators, installed in an enclosure located on the refueling floor, is the major equipment to retrieve fuel debris for the Top Side Access System. On the other hand, the Side Access System will be provided to access fuel debris in RPV pedestal (under part of RPV) from the first floor of the reactor building. A long-reach manipulator system is the major equipment to retrieve fuel debris for the Side Access System. It accesses the pedestal through a designated rail installed between the entrance of the pedestal and the enclosure installed on the outside of biological shield. This paper will provide outline of the major systems for this fuel debris retrieval approach stated above. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Survey and Remediation Project at the DOE Bannister Site - 16280

The Department of Energy Kansas City office has operated the Bannister site with a variety of contractors since the late 1940's. This facility has had a number of missions, some of which included using natural and depleted uranium. In order to prepare for the demolition of the site, ANTECH was contracted to perform radiometric surveys of the areas where these uranium operations took place. In the process of performing these surveys, areas with low levels of fixed radioactive contamination were identified; ANTECH then remediated these areas using a variety of techniques. In all areas surveyed, the only radioactive contaminant of interest was uranium and members of its decay chain. In no cases were other radionuclides found. The detection equipment used for the surveys included a Ludlum model 239- 1F Floor Monitor, a Ludlum 2360 Alpha Beta Data Logger Scaler/Ratemeter, and an ORTEC IDM-200-V High Purity Germanium Detector. The Ludlum instruments were used for bulk surveys and the ORTEC instrument was used to determine an accurate radioactive background spectra and subsequent spectra for areas where radioactive contamination was identified. Contamination was located on concrete floors and columns, cinder block walls, steel beams, inside ductwork and in floor drain piping. After these areas were identified, a number of methods were used to remove the contamination for disposal including scabbling, core drilling and wholesale removal. Extensive use of Pentek scabbling equipment on the concrete sections proved to be very effective at removing the contaminated layer. Upon completion, the waste materials were consolidated and packaged in a strong tight sea land container and shipped to the Energy Solutions waste facility in Utah. The completed work at the Bannister site serves as an example and demonstration of an effective and comprehensive decommissioning project. It involved the integration of a variety of decommissioning activities all executed and managed by a single contractor. These included radiometric measurement surveying using a variety of detection technologies to identify and locate uranium contamination, decontamination and removal of low level radioactive waste including some deconstruction activities and finally the management of low level radioactive waste including packaging, consignment and shipping of waste to a remediation site. The effective and efficient identification and removal of radioactive contamination at the Bannister site has contributed to the overall goal of returning the site to unrestricted use. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

D and D of a Large Waste Treatment Plant in Germany - 18458

With its 40 years of nuclear experience, GNS, the world leading supplier of casks for spent fuel, ILW and HLW, also offers services for conditioning and management of all types of radioactive waste, especially for the German NPP. Since 1985, GNS treats and packages ILW and LLW from the operations and phase-out of German NPP in its Duisburg plant. To enable its permanent safe final disposal, solid wastes are compacted and dried before being shipped to an interim storage facility or - later - the Konrad repository. The total premises cover 20.000 m{sup 2} (215.000 sq ft), of which 9000 m{sup 2} (97.000 sq ft) is controlled area. The Duisburg Plant has three large industrial warehouses (each 25 m x 136 m or 82 ft x 446 ft) with a total capacity of 10.200 m{sup 2} or 110.000 sqft. For the treatment of open contaminated waste, six enclosures were built. These enclosures have a special ventilation system including a specific filtration plant. In one enclosure a high compaction plant was used, in another enclosures a drying facility for drums was in operation. During peak periods, more than 900 tonne of waste were treated annually. One enclosure was mainly used for maintenance, restoration and extension of mobile facilities, which were normally used for campaigns in NPP. Due to the decreasing amount of operational waste during the nuclear phase out in Germany, GNS has decided to close the Duisburg Plant. In the first half-year of 2017, the last waste packages were treated but around 80 20'-containers are still located on site. The D and D started in January 2017. The presentation will show the first experience of decommission processes of the first three enclosures. The following steps including the techniques used will be explained in detail: - Dismantling and removal of the high compaction facility; - Dismantling and removal of the drying facility; - Cleaning and wipe tests of the empty enclosures; - Removal of the stainless steel plates of the floor; - Investigations of the lower floor parts for contamination; - Removal of contaminated underground drainpipes; - Decontamination of the concrete floor; - Dismantling of the ventilation system in three enclosures; - Dismantling of the steel constructions. An important aim during the dismantling is to reduce the amount of nuclear waste and maximize the fraction material for free release. Next to the first three enclosures, in one of the enclosure IV - VI, a 150 tons scrap shear had been installed before the construction of the enclosure building. The scrap shear has to be dismantled and handled by heavy duty lifting equipment. Only afterwards is it possible to start the decommissioning of the last three enclosures. Our goal is to transfer this very large controlled area and the whole plant to the site owner, the Duisburg Port company, after 2 years and 5 months and doing so in a way so that the industrial warehouses can be used again for all possible types of industries. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Result of Investigation for Inside PCV in 1F-1 by Shape Changing Robot named PMORPH - 18617

In Fukushima Daiichi Nuclear Power Station, before retrieval of molten fuel debris inside PCV, the operation such as decontamination, survey, repair and taking sample of fuel debris are implemented step by step. In case of investigation inside primary containment vessel (PCV), some remotely operated robots have been used for because human can't access to high radiation environment. Because a radiation dose is very high in PCV, therefore it is necessary to prevent the leak of radiation from PCV when a robot is inserted in PCV. Then a pipe of 100 mm inside diameter was let go through by the PCV wall, and the seal box which was completely sealed up attached to the end of pipe. The robot is put in the seal box beforehand and is inserted inside PCV through the pipe. So it is necessary for the robot to be small. In addition, it is necessary to be stable movement on rough plane inside PCV. Therefore shape change type robot 'PMORPH' was developed. This robot consists of three parts of the slim main body and two crawlers attached to the both ends of main body. When this robot is passed in the pipe, three parts lie in a straight line like 'I' shape. And when the robot moves on a rough plane, three parts are formed like 'U' shape. We minimized the use of electric parts in the main body against high radiation environment. And this robot carries a winch to let a sensor unit descend to basement floor. And we carried out the basement floor investigation (B2 investigation) using the robot to obtain information of fuel debris condition in March, 2017. As a result, some information of basement floor condition was acquired. In this paper, it is described the outline of the shape change robot and summary of the B2 investigation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗