Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “environmental testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Environmental and dynamic testing

Low frequency plane wave sound generator and impedance measuring device applicable in environmental qualification testing of spacecraft and subsystems

Source record↗

A new approach for performing contamination control bakeouts in JPL thermal vacuum test chambers

Contamination control requirements for the Wide Field/Planetary Camera II (WF/PC II) are necessarily stringent to protect against post-launch contamination of the sensitive optical surfaces, particularly the cold charge coupled device (CCD) imaging surfaces. Typically, thermal vacuum test chambers have employed a liquid nitrogen (LN2) cold trap to collect outgassed contaminants. This approach has the disadvantage of risking recontamination of the test article from shroud offgassing during post-test warmup of the chamber or from any shroud warming of even a few degrees during the bakeout process. By using an enclave, essentially a chamber within a chamber, configured concentrically and internally within an LN2 shroud, a method was developed, based on a design concept by Taylor, for preventing recontamination of test articles during bakeouts and subsequent post-test warmup of the vacuum chamber. Enclaves for testing WF/PC II components were designed and fabricated, then installed in three of JPL's Environmental Test Lab chambers. The design concepts, operating procedures, and test results of this development are discussed.

Johnson, Kenneth R.↗

Space flight manipulator technologies and requirements for the NASA Flight Telerobotic Servicer (FTS)

NASA Headquarters' Office of Advanced Concepts and Technology (OACT) joined efforts with Johnson Space Center's (JSC) Automation and Robotics Division and Langley Research Center's (LaRC) Information Systems Division to capture the technologies developed during the cancelled NASA Flight Telerobotic Servicer (FTS) program planned for use on Space Station Freedom. The recent FTS technology capture effort completed the build and testing of one flight qualifiable FTS manipulator, deliverable to JSC's Automation & Robotics Division for environmental testing. The many robotic technologies developed to meet the 30 year space environment design requirements are discussed in this paper. The manipulator properties were to allow positioning control to one thousandths of an inch, with zero actuator backlash over a temperature range of -50 to +95 C, and were to include impedance control and inertial decoupling. Safety and reliability requirements are discussed that were developed to allow a thirty year life in space with minimum maintenance. The system had to meet the safety requirements for hazardous payloads for operation in the shuttle payload bay during demonstration test flights prior to station use. A brief description is contained on an orbiter based robotic experiment and operational application using the dexterous FTS manipulator operating on the end of the shuttle remote manipulator systems (SRMS) from ground control.

Chladek, John T.↗

NASA GRC and MSFC Space-Plasma Arc Testing Procedures

Tests of arcing and current collection in simulated space plasma conditions have been performed at the NASA Glenn Research Center (GRC) in Cleveland, Ohio, for over 30 years and at the Marshall Space Flight Center (MSFC) in Huntsville, Alabama, for almost as long. During this period, proper test conditions for accurate and meaningful space simulation have been worked out, comparisons with actual space performance in spaceflight tests and with real operational satellites have been made, and NASA has achieved our own internal standards for test protocols. It is the purpose of this paper to communicate the test conditions, test procedures, and types of analysis used at NASA GRC and MSFC to the space environmental testing community at large, to help with international space-plasma arcing-testing standardization. To be discussed are: 1.Neutral pressures, neutral gases, and vacuum chamber sizes. 2. Electron and ion densities, plasma uniformity, sample sizes, and Debuy lengths. 3. Biasing samples versus self-generated voltages. Floating samples versus grounded. 4. Power supplies and current limits. Isolation of samples from power supplies during arcs. 5. Arc circuits. Capacitance during biased arc-threshold tests. Capacitance during sustained arcing and damage tests. Arc detection. Prevention sustained discharges during testing. 6. Real array or structure samples versus idealized samples. 7. Validity of LEO tests for GEO samples. 8. Extracting arc threshold information from arc rate versus voltage tests. 9. Snapover and current collection at positive sample bias. Glows at positive bias. Kapon (R) pyrolisis. 10. Trigger arc thresholds. Sustained arc thresholds. Paschen discharge during sustained arcing. 11. Testing for Paschen discharge threshold. Testing for dielectric breakdown thresholds. Testing for tether arcing. 12. Testing in very dense plasmas (ie thruster plumes). 13. Arc mitigation strategies. Charging mitigation strategies. Models. 14. Analysis of test results. Finally, the necessity of testing will be emphasized, not to the exclusion of modeling, but as part of a complete strategy for determining when and if arcs will occur, and preventing them from occurring in space.

Ferguson, Dale C.↗

NASA GRC and MSFC Space-Plasma Arc Testing Procedures

Tests of arcing and current collection in simulated space plasma conditions have been performed at the NASA Glenn Research Center (GRC) in Cleveland, Ohio, for over 30 years and at the Marshall Space flight Center (MSFC) for almost as long. During this period, proper test conditions for accurate and meaningful space simulation have been worked out, comparisons with actual space performance in spaceflight tests and with real operational satellites have been made, and NASA has achieved our own internal standards for test protocols. It is the purpose of this paper to communicate the test conditions, test procedures, and types of analysis used at NASA GRC and MSFC to the space environmental testing community at large, to help with international space-plasma arcing testing standardization. To be discussed are: 1. Neutral pressures, neutral gases, and vacuum chamber sizes. 2. Electron and ion densities, plasma uniformity, sample sizes, and Debye lengths. 3. Biasing samples versus self-generated voltages. Floating samples versus grounded. 4. Power supplies and current limits. Isolation of samples from power supplies during arcs. Arc circuits. Capacitance during biased arc-threshold tests. Capacitance during sustained arcing and damage tests. Arc detection. Preventing sustained discharges during testing. 5. Real array or structure samples versus idealized samples. 6. Validity of LEO tests for GEO samples. 7. Extracting arc threshold information from arc rate versus voltage tests. 8 . Snapover and current collection at positive sample bias. Glows at positive bias. Kapton pyrolization. 9. Trigger arc thresholds. Sustained arc thresholds. Paschen discharge during sustained arcing. 10. Testing for Paschen discharge thresholds. Testing for dielectric breakdown thresholds. Testing for tether arcing. 11. Testing in very dense plasmas (ie thruster plumes). 12. Arc mitigation strategies. Charging mitigation strategies. Models. 13. Analysis of test results. Finally, the necessity of testing will be emphasized, not to the exclusion of modeling, but as part of a complete strategy for determining when and if arcs will occur, and preventing them from occurring in space.

Ferguson, Dale C.a↗

NASA GRC and MSFC Space-Plasma Arc Testing Procedures

Tests of arcing and current collection in simulated space plasma conditions have been performed at the NASA Glenn Research Center (GRC) in Cleveland, Ohio, for over 30 years and at the Marshall Space Flight Center (MSFC) in Huntsville, Alabama, for almost as long. During this period, proper test conditions for accurate and meaningful space simulation have been worked out, comparisons with actual space performance in spaceflight tests and with real operational satellites have been made, and NASA has achieved our own internal standards for test protocols. It is the purpose of this paper to communicate the test conditions, test procedures, and types of analysis used at NASA GRC and MSFC to the space environmental testing community at large, to help with international space-plasma arcing-testing standardization. Discussed herein are neutral gas conditions, plasma densities and uniformity, vacuum chamber sizes, sample sizes and Debye lengths, biasing samples versus self-generated voltages, floating samples versus grounded samples, test electrical conditions, arc detection, preventing sustained discharges during testing, real samples versus idealized samples, validity of LEO tests for GEO samples, extracting arc threshold information from arc rate versus voltage tests, snapover, current collection, and glows at positive sample bias, Kapton pyrolysis, thresholds for trigger arcs, sustained arcs, dielectric breakdown and Paschen discharge, tether arcing and testing in very dense plasmas (i.e. thruster plumes), arc mitigation strategies, charging mitigation strategies, models, and analysis of test results. Finally, the necessity of testing will be emphasized, not to the exclusion of modeling, but as part of a complete strategy for determining when and if arcs will occur, and preventing them from occurring in space.

Ferguson, Dale C.↗

Development of the Resource Prospector Planetary Rover

The Resource Prospector (RP) is an In-­‐Situ Resource Utilization (ISRU) lunar rover mission under study by NASA. RP is planned to launch in 2020 to prospect for subsurface volatiles and to extract oxygen from lunar regolith. The mission will address several of NASA's "Strategic Knowledge Gaps" for lunar exploration. The mission will also address the Global Exploration Roadmap's strategic goal of using local resources for human exploration. The distribution of lunar subsurface volatiles drives the mission requirement for mobility. The spatial distribution is hypothesized to be governed by impact cratering with the top 0.5 m being patchy at scales of 100 m. The mixing time scale increases with depth (less frequent larger impacts). Consequently, increased mobility reduces the depth requirement for sampling. The target RP traverse will extend 1 km radially from the landing site to sample craters of varying sizes. Sampling craters with different ages will reveal possible volatile emplacement history. In 1 Ga, approximately 60-­70 craters of 10 m diameter form per km2. Thus, the rover will need to sample at least ten of these craters, which may require a total traverse path length of 2-­‐3 km. During 2014-­2015, we developed an initial prototype rover for RP. The current design is a solar powered, four-­wheeled vehicle, with hub motor drive, offset four wheel steering, and active suspension. Active suspension provides capabilities including changing vehicle ride height, traversing comparatively large obstacles, and controlling load on the wheels. All-­wheel steering enables the vehicle to point arbitrarily while roving, e.g., to keep the solar array pointed at the sun while in motion. The offset steering combined with active suspension improves driving in soft soil. The rover's on-­board software utilizes NASA's Core Flight Software, which is a reusable flight software environment. During 2015, we completed the initial rover software build, which provides low-­level hardware interfaces, basic mobility control, waypoint driving, odometry, basic error checking, and camera services. Development of the prototype rover has enabled maturation of many of the subsystems to TRL 5. During the next year, we will conduct integrated testing of concepts of operation, navigation, and remote driving tools. In addition, we will perform environmental tests including radiation (avionics), thermal and thermal/vacuum (mechanisms), and gravity offload (mobility).

robotics↗

L’Ralph Integration and Testing

This paper describes the plans, flows, key facilities, components and equipment necessary to fully integrate, functionally test, qualify and calibrate the L’Ralph instrument on the Lucy observatory. Lucy is currently in the final design and fabrication phase (phase C) of mission development. It is scheduled to launch out of Cape Canaveral, Florida, in October 2021. Lucy will be the first space mission to study the Trojan asteroids associated with Jupiter, that are thought to be remnants of the primordial material that formed the outer planets. Lucy will fly by and carry out remote sensing on six different Trojan asteroids. The mission takes its name from the fossilized human ancestor (called “Lucy” by her discoverers) whose skeleton provided unique insight into humanity's evolution. Likewise, the Lucy mission will revolutionize our knowledge of planetary origins and the formation of the solar system. L’Ralph is one of the instruments on Lucy and it is provided by the NASA Goddard Space Flight Center (GSFC). L’Ralph is a combined multi-band visible imager (the Multi-spectral Visible Imaging Camera, MVIC, 0.4-0.85 microns) and wedge-filter infrared spectrometer (Linear Etalon Imaging Spectral Array, LEISA, 1-3.6 microns). LEISA will allow the team to look for the absorption lines that serve as the fingerprints for different silicates, ices and organics that likely will be on the surface of the Trojan asteroids. MVIC will take color images of the Trojan asteroid targets, and help determine how active they are. This paper will focus on the Integration and Test (I&T) activities for L’Ralph while it is at the NASA GSFC. L’Ralph has two assemblies, the telescope detector assembly (TDA) and main electronics box (MEB). The TDA is a single telescope feeding two focal planes, MVIC and LEISA. L’Ralph integration consists of assembly and alignment of the telescope, electronics box integration, thermal systems integration and the final assembly and testing. This I&T phase will be followed by the L’Ralph calibration and characterization, environmental tests which include electromagnetic interference (EMI)/electromagnetic compatibility (EMC), vibration with sine sweep, acoustics, shock, thermal balance, thermal vacuum, mass properties and center of gravity determination. This paper will briefly discuss L’Ralph shipment and delivery to the spacecraft vendor for observatory level I&T as well as some launch preparation activities.

Spaceflight Instruments↗

Development of an Infrared Lamp Array for the Smap Spacecraft Thermal Balance Test

NASA launched the SMAP observatory in January 2015 aboard a Delta II into a sun-synchronous orbit around Earth. The science payload of a radar and a radiometer utilizes a shared rotating six-meter antenna to provide a global map of the Earth's soil moisture content and its freeze/thaw state on a global, high-resolution scale in this three-year mission. An observatory-level thermal balance test conducted in May/June 2014 validated the thermal design and demonstrated launch readiness as part of the planned environmental test campaign. An infrared lamp array was designed and used in the thermal balance test to replicate solar heating on the solar array and sunlit side of the spacecraft that would normally be seen in orbit. The design, implementation, and operation of an infrared lamp array used for this nineteen-day system thermal test are described in this paper. Instrumental to the smooth operation of this lamp array was a characterization test performed in the same chamber two months prior to the observatory test to provide insight into its array operation and flux uniformity. This knowledge was used to identify the lamp array power settings that would provide the worst case predicted on-orbit fluxes during eclipse, cold, and hot cases. It also showed the lamp array variation when adjustments in flux were needed. Calorimeters calibrated prior to testing determined a relationship between calorimeter temperature and lamp array flux. This allowed the team to adjust the lamp output for the desired absorbed flux on the solar array. Flux levels were within 10% of the desired value at the center of the solar array with an ability to maintain these levels within 5% during steady state cases. All tests demonstrated the infrared lamp array functionality and furthered lamp array understanding for modeling purposes. This method contributed to a high-fidelity environmental simulation, which was required to replicate the extreme on-orbit thermal environments.

Miller, Jennifer R.↗

Thermal Model Performance for the James Webb Space Telescope OTIS Cryo-Vacuum Test

The James Webb Space Telescope (JWST), set to launch in mid-2020, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, has recently been completed at the Johnson Space Center's Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A system-level pre-test thermal model was constructed which fully captured the behavior of the payload, ground support equipment, and surrounding test chamber. This thermal model simulated both the transient cooldown to and warmup from a 20 K flight-like environment, as well as predicted the payload performance at cryo-stable conditions. The current work is an assessment of thermal model pre-test prediction performance against actual payload response during the OTIS CV test. Overall, the thermal model performed exceedingly well at predicting schedule and payload response. Looking in depth, this work examines both the benefits and shortcomings of assumptions made pre-test to simplify model execution when compared against test data. It explores in detail the role of temperature-dependent emissivities during transition to cryogenic temperatures, as well as the impact that model geometry simplifications have on tracking of critical hardware limits and constraints. This work concludes with a list of recommendations to improve the accuracy of thermal modeling for future large cryogenic tests. The insight gained from the OTIS CV test thermal modeling will benefit planning and execution for upcoming cryogenic missions.

Testing↗

Thermal Model Performance for the James Webb Space Telescope OTIS Cryo-Vacuum Test

The James Webb Space Telescope (JWST), set to launch in early 2019, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, has recently been completed at the Johnson Space Center's Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A system-level pre-test thermal model was constructed which fully captured the behavior of the payload, ground support equipment, and surrounding test chamber. This thermal model simulated both the transient cooldown to and warmup from a 20K flight-like environment, as well as predicted the payload performance at cryo-stable conditions. The current work is a preliminary assessment of thermal model performance against actual payload response during the OTIS CV test. It examines both the benefits and shortcomings of assumptions made pre-test to simplify model execution when compared against test data. It explores in detail the role of temperature-dependent emissivities during transition to cryogenic temperatures, as well as the impact that model geometry simplifications have on tracking of critical hardware limits and constraints. This work concludes with a list of recommendations to improve the accuracy of thermal modeling for future large cryogenic tests. It is hoped that the insight gained from the OTIS CV test thermal modeling will benefit planning and execution for upcoming cryogenic missions.

JWST↗

Thermal Model Performance for the James Webb Space Telescope OTIS Cryo-Vacuum Test

The James Webb Space Telescope (JWST), set to launch in early 2019, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, has recently been completed at the Johnson Space Center’s Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A system-level pre-test thermal model was constructed which fully captured the behavior of the payload, ground support equipment, and surrounding test chamber. This thermal model simulated both the transient cooldown to and warmup from a 20K flight-like environment, as well as predicted the payload performance at cryo-stable conditions. The current work is a preliminary assessment of thermal model performance against actual payload response during the OTIS CV test. Overall, the thermal model performed exceedingly well at predicting schedule and payload response. Looking in depth, this work examines both the benefits and shortcomings of assumptions made pre-test to simplify model execution when compared against test data. It explores in detail the role of temperature-dependent emissivities during transition to cryogenic temperatures, as well as the impact that model geometry simplifications have on tracking of critical hardware limits and constraints. This work concludes with a list of recommendations to improve the accuracy of thermal modeling for future large cryogenic tests. It is hoped that the insight gained from the OTIS CV test thermal modeling will benefit planning and execution for upcoming cryogenic missions.

Yang, Kan↗

Determination of failure limits for sterilizable solid rocket motor

A structural evaluation to establish probable failure limits and a series of environmental tests involving temperature cycling, sustained acceleration, and vibration were conducted on an 18-inch diameter solid rocket motor. Despite the fact that thermal, acceleration and vibration loads representing a severe overtest of conventional environmental requirements were imposed on the sterilizable motor, no structural failure of the grain or flexible support system was detected. The following significant conclusions are considered justified. It is concluded that: (1) the flexible grain retention system, which permitted heat sterilization at 275 F on the test motor, can readily be adopted to meet the environmental requirements of an operational motor design, and (2) if further substantiation of structural integrity is desired, the motor used is considered acceptable for static firing.

Lambert, W. L.↗

FY21 Status Report on Creep Rupture Testing at ANL to Support the Development of Alloy 709 Code Case

This report provides an update on the status of the creep rupture testing on the first commercial heat of Alloy 709 in support of the Alloy 709 Code Case development. Creep tests were performed in air on the lever-arm load frames in the Mechanical and Environmental Testing Laboratory at Argonne National Laboratory (ANL). In FY21, the focus was on the age-hardened ESR-1150°C material. Twenty two tests were initiated, among which ten were completed. This report presents the data from the completed tests. Metallographic characterization of the fractured specimens were performed and the results are included. The creep data enabled the preliminary analysis of the creep behavior of this material. The characterization showed the effect of test temperature and stress on the deformation microstructure.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Testing panels in tension and flexure

Simple jig adapts tensile test machine for simulataneous application of tension and flexure, for evaluating panel composition, processing, and design. Environmental test chamber can be added so that panel properties can be measured at extreme temperatures.

Jing, G. K.↗