Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “delay errors.”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Overview of NASA's Ocean Color Instrument Solar Calibration Architecture, Pre-Launch Tests and Preliminary On-Orbit Results

Launched in February 2024, the PACE mission represents NASA’s next investment in ocean biology, clouds, and aerosol data records. A key feature of PACE is the inclusion of an advanced satellite radiometer known as the Ocean Color Instrument (OCI), a global mapping radiometer that combines multispectral and hyperspectral remote sensing. Like its predecessors, OCI will provide two day global coverage of TOA radiances. Unlike its predecessors, OCI will cover a spectral range from 340nm to 2260nm. Below 900nm, OCI will include two spectrometers that continuously span the ultraviolet to 600nm and 600nm to near-infrared spectral regions to provide hyperspectral radiances sampled every 2.5 nm, with a bandwidth of 5 nm for each channel. Wavelengths above 900nm are measured in seven discrete multispectral bands of varying bandwidths, six of which are at similar wavelengths to those on heritage missions to support both atmospheric and ocean color applications. Nominal spatial resolution is similar to the SeaWiFS instrument with 1050 m at nadir. As for SeaWiFS, the pixel size increases due to a ~20 degree tilt and as a function of scan angle. Variations in the radiometric sensitivity of each OCI channel over time will be monitored by solar diffuser measurements for short term instrument gain adjustments and independent lunar measurements for trend adjustments of long time periods, similar to the approach employed for the VIIRS instrument [4]. The OCI flight-unit was built at NASA’s Goddard Space Flight Center. At the time of this writing, OCI has completed on-orbit commissioning activities and normal science operations have begun. A key aspect of the OCI architecture is the capability to trend absolute and relative calibration changes over the course of mission life with solar calibration. Every 24 hours, the PACE spacecraft performs an inertial hold as the ground track nears the North Pole which orients a Quasi-Volume Diffuser (QVD) mounted on OCI towards the sun. By knowing the irradiance of the sun and the reflectivity of the target, the absolute radiance at the input to the OCI aperture can be computed as OCI scans the target. The allowable absolute uncertainty budget for each solar calibration measurement is 1.6% 1-sigma below 900nm at beginning of life (BOL) and the allowable relative uncertainty budget is ~0.26% 1-sigma. The Solar Calibration Assembly (SCA) consists of three targets selectable via a single mechanism which also opens a door. The targets consist of a Daily Bright Target (DBT), Monthly Bright Target (MBT), and Daily Dim Target (DDT). The bright targets are quartz QVDs with the monthly target being used to track the degradation of the daily target. The dim target is used to track CCD linearity using Progressive Time-Delay Integration (PTDI). A composite baffle is attached to the SCA housing aperture to block Earth shine and stray light from the spacecraft. The SCA assembly is mounted to a view port ~90° from OCI nadir. This paper provides an overview of driving solar calibration requirements, error-budgets and early trade studies which drove the solar calibration assembly (SCA) architecture and on-orbit maneuver. Measurements of the diffuser Bidirectional Reflectance Distribution Function (BRDF) at TNO, Netherlands and GSFC are briefly described. Optical modelling and test results at the sub-system and instrument level are included. Finally, preliminary measurements on-orbit are compared to pre-launch predictions.

Joseph J Knuble↗

Overview of NASA's Ocean Color Instrument Solar Calibration Architecture, Pre-Launch Tests and Preliminary On-Orbit Results

Launched in February 2024, the PACE mission represents NASA’s next investment in ocean biology, clouds, and aerosol data records. A key feature of PACE is the inclusion of an advanced satellite radiometer known as the Ocean Color Instrument (OCI), a global mapping radiometer that combines multispectral and hyperspectral remote sensing. Like its predecessors, OCI will provide two day global coverage of TOA radiances. Unlike its predecessors, OCI will cover a spectral range from 340nm to 2260nm. Below 900nm, OCI will include two spectrometers that continuously span the ultraviolet to 600nm and 600nm to near-infrared spectral regions to provide hyperspectral radiances sampled every 2.5 nm, with a bandwidth of 5 nm for each channel. Wavelengths above 900nm are measured in seven discrete multispectral bands of varying bandwidths, six of which are at similar wavelengths to those on heritage missions to support both atmospheric and ocean color applications. Nominal spatial resolution is similar to the SeaWiFS instrument with 1050 m at nadir. As for SeaWiFS, the pixel size increases due to a ~20 degree tilt and as a function of scan angle. Variations in the radiometric sensitivity of each OCI channel over time will be monitored by solar diffuser measurements for short term instrument gain adjustments and independent lunar measurements for trend adjustments of long time periods, similar to the approach employed for the VIIRS instrument [4]. The OCI flight-unit was built at NASA’s Goddard Space Flight Center. At the time of this writing, OCI has completed on-orbit commissioning activities and normal science operations have begun. A key aspect of the OCI architecture is the capability to trend absolute and relative calibration changes over the course of mission life with solar calibration. Every 24 hours, the PACE spacecraft performs an inertial hold as the ground track nears the North Pole which orients a Quasi-Volume Diffuser (QVD) mounted on OCI towards the sun. By knowing the irradiance of the sun and the reflectivity of the target, the absolute radiance at the input to the OCI aperture can be computed as OCI scans the target. The allowable absolute uncertainty budget for each solar calibration measurement is 1.6% 1-sigma below 900nm at beginning of life (BOL) and the allowable relative uncertainty budget is ~0.26% 1-sigma. The Solar Calibration Assembly (SCA) consists of three targets selectable via a single mechanism which also opens a door. The targets consist of a Daily Bright Target (DBT), Monthly Bright Target (MBT), and Daily Dim Target (DDT). The bright targets are quartz QVDs with the monthly target being used to track the degradation of the daily target. The dim target is used to track CCD linearity using Progressive Time-Delay Integration (PTDI). A composite baffle is attached to the SCA housing aperture to block Earth shine and stray light from the spacecraft. The SCA assembly is mounted to a view port ~90° from OCI nadir. This paper provides an overview of driving solar calibration requirements, error-budgets and early trade studies which drove the solar calibration assembly (SCA) architecture and on-orbit maneuver. Measurements of the diffuser Bidirectional Reflectance Distribution Function (BRDF) at TNO, Netherlands and GSFC are briefly described. Optical modelling and test results at the sub-system and instrument level are included. Finally, preliminary measurements on-orbit are compared to pre-launch predictions.

ocean color↗

Identifying Cognitive Capabilities Required for Optimal Exploration EVA Performance: A Cognitive Task Analysis

BACKGROUND Extravehicular activity (EVA) is one of the most dangerous and cognitively demanding actions that astronauts can execute, and the cognitive demands associated with future exploration EVA on the Moon and Mars are expected to be higher compared to EVA currently conducted from the International Space Station (ISS). Decrements in cognitive performance present an important risk to crew safety during exploration mission class EVA. Yet there is currently insufficient characterization of the cognitive capabilities required prior to, during, and following EVA. Furthermore, it is unclear which cognitive domains are most important for conducting mission critical decisions with crew safety implications. To address this gap, we conducted a cognitive task analysis of exploration EVA to characterize the cognitive capabilities, critical safety decisions, and contributing factors (e.g., lunar communications delay) important to monitor for optimal performance in future exploration EVA. This cognitive task analysis was conducted through interviews with astronauts and subject matter experts in EVA research and operations. Interviews focused on exploration EVA and elicited feedback on the cognitive capabilities required for specific EVA tasks and subtasks. The information from this cognitive task analysis will help close the gap in our understanding of the key cognitive capabilities required for safe decision-making during exploration mission class EVA on the Moon and Mars. METHOD We used an applied cognitive task analysis method1 over the course of interviews with a total of 15 NASA astronauts and subject matter experts in EVA. Each interview was led by a scientist with expertise in cognitive neuroscience from the Behavioral Health & Performance (BHP) Laboratory at NASA Johnson Space Center. Notes were taken by a research coordinator in the BHP Laboratory and interviews were recorded on Microsoft Teams to ensure the accuracy of notetaking. In the first interview protocol, participants were asked about the specific tasks and cognitive demands associated with EVA. This provided a high-level overview of the steps involved in the major tasks conducted during exploration EVA, as well as which of the steps require the most cognitive skill. Next, participants completed a knowledge audit, which employs a set of probes designed to describe types of domain knowledge of skill and elicit appropriate examples. In the second interview protocol, completed with a separate set of subject matter experts, interviewees were asked to complete a simulated incapacitated crew rescue (ICR) scenario2, which provided specific context that allowed probing around relevant issues such as situational awareness and potential errors. Experts were then asked to identify the knowledge, skills, and abilities (KSAs) underlying each EVA task and to provide ratings on the importance and cognitive demand of each KSA. Finally, participants also described the most likely and consequential critical safety incidents related to decrements in cognitive performance during exploration EVA and assessed the impact of lunar communication delay on cognitive performance. RESULTS & DISCUSSION Interviews for this cognitive task analysis are nearly complete and results will be presented in full at IWS 2025. Results will include a summary of all expert ratings of EVA tasks and subtasks, qualitative summaries of content from each interview part, and a discussion of future directions for products addressing cognitive performance monitoring and cognitive domain mapping in exploration EVA.

S R Anderson↗

Algorithms for the determination of the time delays of the signal when using unequal detectors

In treating the recorded results from detectors at different locations in space, the analysis of the time delays of signals is crucial to locating the sources of detected radiation. Because the correlation method requires the manipulation of awkward matrices to evaluate its accuracy, a solution is outlined based on minimizing the sum of the squares of signal deviations, and the algorithms for evaluating the resulting error are presented.

Novak, B. L.↗

An extragalactic reference frame from DSN VLBI measurements - 1989

Assessment of the impact of recent improvements Deep Space Network (DSN) instrumentation, as well as of joint data analyses, provide a prognosis for the accuracy level to be expected in future realizations of an inertial radio reference frame. Intercontinental dual-frequency radio interferometric measurements during 68 sessions (including two recent sessions employing Mark III instrumentation) from 1978 to 1989 using NASA's DSN stations in California, Spain, and Australia give 8900 pairs of delay and delay-rate observations. Analysis yields a catalog of positions of 200 extragalactic radio sources north of -45 deg declination. The resulting source-position formal uncertainty distributions peak below 1 milliarcsecond, with 75 percent being smaller than 2 mas. Comparison with independent measurements shows some evidence for systematic errors at the milliarcsecond level.

Sovers, O. J.↗

On the Robustness Properties of M-MRAC

The paper presents performance and robustness analysis of the modified reference model MRAC (model reference adaptive control) or M-MRAC in short, which differs from the conventional MRAC systems by feeding back the tracking error to the reference model. The tracking error feedback gain in concert with the adaptation rate provides an additional capability to regulate not only the transient performance of the tracking error, but also the transient performance of the control signal. This differs from the conventional MRAC systems, in which we have only the adaptation rate as a tool to regulate just the transient performance of the tracking error. It is shown that the selection of the feedback gain and the adaptation rate resolves the tradeoff between the robustness and performance in the sense that the increase in the feedback gain improves the behavior of the adaptive control signal, hence improves the systems robustness to time delays (or unmodeled dynamics), while increasing the adaptation rate improves the tracking performance or systems robustness to parametric uncertainties and external disturbances.

Stepanyan, Vahram↗

Rate of erosion of dayside magnetic flux based on a quantitative study of the dependence of polar cusp latitude on the interplanetary magnetic field

In a consideration of only those periods when the delay time from the interplanetary observing position to the magnetosphere is less than 5 minutes, it is found that, irrespective of substorm activity: (1) The 45 minute average value of interplanetary B(z) predicts the latitudes of the poleward and equatorward boundaries of polar cusp electron precipitation with rms errors of 1.34 deg and 1.16 deg respectively; (2) Both boundaries more equatorward by about 5 deg as B(z) varies from 1 to -6 gammas, the cusp remaining about 40 deg wide; (3) The amount of flux added to the polar cap is about 9.2 percent of the total southward flux impingent on the magnetosphere in the previous 45 minutes; (4) As B(z) becomes more positive, the equatorward boundary moves only slightly more poleward (1/2 deg between B(z) = 2 gammas and B(z) = 6 gammas, while the poleward boundary moves significantly toward higher latitudes, resulting in a cusp approximately 7 deg wide for B(z) = 6 gammas.

Burch, J. L.↗

Unsymmetrical QPSK demodulator

The present invention is a demodulator for demodulating an unsymmetrical QPSK signal (1), i.e., one in which the amplitudes of the I and Q channels are different, and the I and Q channels have been modulated by signals having differnt bit rates. Analog versions of the I and Q modulating baseband signals are first extracted from the carrier. Each baseband signal is then subjected to a bit-rate-matched low pass filter (23, 13). The channel having the higher bit rate is subjected to a delay (32) to time-align the two baseband signals. The time-aligned filtered signals are then amplified by amplifiers (22, 12) having unequal gains that are preselected to substantially equalize the amplifier (22, 12) outputs. The amplified time-aligned filtered signals are then subjected to a phase error (E) generating means (15, 25, 16, 26, 34). The phase error (E) is passed through a loop integrator (38) and a VCO (30) and back to the baseband signal extracting means to complete a phase lock loop. Frequency searching means (40), frequency lock detect means (42, 44), and AGC control ( 46, 8) are optionally present.

Guyer, Edward↗

Evidence Report: Risk of Performance Errors Due to Training Deficiencies

Substantial evidence supports the claim that inadequate training leads to performance errors. Barshi and Loukopoulos (2012) demonstrate that even a task as carefully developed and refined over many years as operating an aircraft can be significantly improved by a systematic analysis, followed by improved procedures and improved training (see also Loukopoulos, Dismukes, & Barshi, 2009a). Unfortunately, such a systematic analysis of training needs rarely occurs during the preliminary design phase, when modifications are most feasible. Training is often seen as a way to compensate for deficiencies in task and system design, which in turn increases the training load. As a result, task performance often suffers, and with it, the operators suffer and so does the mission. On the other hand, effective training can indeed compensate for such design deficiencies, and can even go beyond to compensate for failures of our imagination to anticipate all that might be needed when we send our crew members to go where no one else has gone before. Much of the research literature on training is motivated by current training practices aimed at current training needs. Although there is some experience with operations in extreme environments on Earth, there is no experience with long-duration space missions where crews must practice semi-autonomous operations, where ground support must accommodate significant communication delays, and where so little is known about the environment. Thus, we must develop robust methodologies and tools to prepare our crews for the unknown. The research necessary to support such an endeavor does not currently exist, but existing research does reveal general challenges that are relevant to long-duration, high-autonomy missions. The evidence presented here describes issues related to the risk of performance errors due to training deficiencies. Contributing factors regarding training deficiencies may pertain to organizational process and training programs for spaceflight, such as when training programs are inadequate or unavailable. Furthermore, failure to match between tasks on the one hand, and learning and memory abilities on the other hand is a contributing factor, especially when individuals' relative efficiency with which new information is acquired, and adjustments made in behavior or thinking, are inconsistent with mission demands. Thus, if training deficiencies are present, the likelihood of errors or of the inability to successfully complete a task increases. What's more, the overall risk to the crew, the vehicle, and the mission increases.

Barshi, Immanuel↗

Evaluation of the Seasat altimeter time tag bias

Two methods were used in analyses of Seasat altimeter data, aimed at the corroboration of an inherent altimeter microprocessor delay compensation value of -79.4 msec, which benefited from a global data distribution in the oceanic areas: (1) the crossover method, using altimeter data differenced at points where the Seasat ground track intersected with itself, and (2) the direct use of the altimeter data. Because the former method is independent of errors in the geoid model, it is considered the more reliable. For all crossover method results, the adopted value of -79.4 msec is within the bounds of the standard deviation associated with the estimates, of which -78.1 + or - 2.0 msec is considered the best representative.

Schutz, B. E.↗

Performance analysis of replication ALOHA for fading mobile communications channels

This paper describes an ALOHA random access protocol for fading communications channels. A two-state Markov model is used for the channel error process to account for the channel fading memory. The ALOHA protocol is modified to send multiple contiguous copies of a message at each transmission attempt. Both pure and slotted ALOHA channels are considered. The analysis is applicable to fading environments where the channel memory is short compared to the propagation delay. It is shown that smaller delay may be achieved using replications and, in noisy conditions, can also improve throughput.

Yan, Tsun-Yee↗

A proposed time transfer experiment between the USA and the South Pacific

This paper describes the concept, architecture and preliminary details of an experiment directc<l towards providing continuous Ultra High Precision (UHP) time transfer between Washington, DC; Salisbury, SA Australia; Orroral Valley, ACT Australia; arid Lower Hutt, New Zealand. It further describes a proposed method of distributing UTC(USNO) at a high level of precision to passive users over a broad area of the South Pacific. The concept is based on active two-way satellite time transfer from the United States Naval Observatory (USNO) to the proposed USNO Master Clock West (MCW) in Wahiwa, HI USA at the 1 nanosecond level using active satellite two-way time transfer augmented by Precise Positioning Service (PPS) of the Global Positioning System (GPS). MCW would act as an intermediate transfer/reference station, again linked to Salisbury at the 1 nanosecond level using active satellite two-way time transfer augmented by PPS GPS. From this point, time would bc distributed within the region by two methods. The first is an existing TV line sync system using an Australian communications satellite (AUSSAT K1) which is useful to the 20 nanosecond level. The second approach is RF ranging and multilateration between Salisbury, Orroral Observatory, Lower Hutt and the AUSSAT B1 and B2 to be launched in 1992. Orroral Observatory will provide precise laser ranging to the AUSSAT B1/B2 retro reflectors which will reduce ephemeris related time transfer errors to below 1 nanosecond. The corrected position will be transmitted by both the time transfer modem and the existing TV line sync dissemination process. Multilateration has the advantage of being an all weather approach and when used with the laser ranging technique will provide a precise measurement of the propagation path delays. This will result in time transfer performance levels on the order of 10 nanoseconds to passive users in both Australia and New Zealand.

John Luck↗

A low-complexity and high performance concatenated coding scheme for high-speed satellite communications

This report presents a low-complexity and high performance concatenated coding scheme for high-speed satellite communications. In this proposed scheme, the NASA Standard Reed-Solomon (RS) code over GF(2(exp 8) is used as the outer code and the second-order Reed-Muller (RM) code of Hamming distance 8 is used as the inner code. The RM inner code has a very simple trellis structure and is decoded with the soft-decision Viterbi decoding algorithm. It is shown that the proposed concatenated coding scheme achieves an error performance which is comparable to that of the NASA TDRS concatenated coding scheme in which the NASA Standard rate-1/2 convolutional code of constraint length 7 and d sub free = 10 is used as the inner code. However, the proposed RM inner code has much smaller decoding complexity, less decoding delay, and much higher decoding speed. Consequently, the proposed concatenated coding scheme is suitable for reliable high-speed satellite communications, and it may be considered as an alternate coding scheme for the NASA TDRS system.

Lin, Shu↗

Scheduling and Delivering Aircraft to Departure Fixes in the NY Metroplex with Controller-Managed Spacing Tools

In this paper, successful Time-Based Flow Management (TBFM) scheduling systems for arrivals are considered and adapted to apply to departures. We present a concept of operations that integrates Controller-Managed Spacing tools for departures (CMS-D) with existing tactical departure scheduling tools to coordinate demand at departure fixes in a metroplex environment. We tested our concept in a Human-in-the-Loop simulation and compared the effect of two scheduling conditions: 1) "Departure Scheduling" consisting of an emulation of the Integrated Departure and Arrival Capability (IDAC) where Towers and a Planner (Traffic Management Coordinator at the appropriate facility) coordinate aircraft scheduled takeoff times to departure fixes; and 2) "Arrival Sensitive Departure Scheduling" where, in addition, the Tower and Planner also consider arrival Scheduled Time of Arrivals (STAs) at the airport's dependent runway. Results indicate little difference between the two scheduling conditions, but a large difference between the No Tools and the two scheduling conditions with CMS-D tools. The scheduling/CMS-D tools conditions markedly reduced heading, speed clearances, and workload for controllers who were merging flows at the departure fixes. In the tool conditions, departure controllers conditioned departures earlier rather than later when aircraft were tied near the departure fixes. In the scheduling/CMS-D tools conditions, departures crossed the departure fixes 50 seconds earlier and with an 8% error rate (consisting of time ahead or behind desired time of arrival) compared to a 19% error rate in the No Tool condition. Two exploratory runs showed that similar beneficial effects can be obtained only with the CMS-D tools without scheduling takeoff times, but at the cost of a somewhat higher workload for controllers, indicating the benefits of pre-departure scheduling of aircraft with minimal delays. Hence, we found that CMS-D tools were very beneficial in the metroplex environment we tested but that further research is needed to clarify the benefits of the various scheduling approaches.

terminal airspace↗

Seasat altimeter timing bias estimation

A technique developed for the solution of time lag bias based on the analysis of sea surface height discrepancies at ground track intersections, prompted by the presence of a time calibration bias in Seasat altimeter data that produced measurement errors in excess of 1 m, is shown to yield a separation of the dominant, once-per-revolution ephemeris error amounting to about 1.5 m rms from the timing error signature. The technique does not depend on precise geoid data, and in application to a global Seasat altimeter data set covering July 28-August 9, 1978, has yielded a time lag value of -81.0 + or - 2 msec. This corroborates the -79.4 msec revised value derived from a reexamination of internal instrument time delays.

Marsh, J. G.↗

The Effects of Aviation Weather Information Systems on General Aviation Weather Information Systems on General Pilots' Workload

My work at NASA Langley has focused around Aviation Weather Information CAWING displays. The majority of my time at LYRIC has been spent on the Workload and Relative Position (WaRP) Study. The goal of this project is to determine how an AWIN display at various positions within the cockpit affects pilot performance and workload. The project is being conducted in Languages Cessna 206H research aircraft. During the past year the design of the experiment was finalized and approved. Despite facing several delays the data collection was completed in early February. Alter the completion of the data collection an extensive data entry task began. This required recording air speed, altitude, course heading, bank angle, and vertical speed information from videos of the primary flight displays. This data was then used to determine root mean square error (RMSE) for each experimental condition. In addition to the performance data (RMSE) taken from flight path deviation, the study also collected data on pilot;s accuracy in reporting weather information, and a subjective rating of workload from the pilot. The data for this experiment is currently being analyzed. Overall the current experiment should help to determine potential costs and benefits associated with AWIN displays. The data will be used to determine if a private pilot can safely fly a general aviation aircraft while operating a weather display. Clearly a display that adds to the pilot#s already heavy workload represents a potential problem. The study will compare the use of an AWIN display to conventional means of acquiring weather data. The placement of the display within the cockpit (i.e., either on the yoke, kneeboard, or panel) will be also compared in terms of workload, performance, and pilot preference.

Scerbo, Mark↗

Structure Corrections in Modeling VLBI Delays for RDV Data

Since 1997, bimonthly S- and X-band observing sessions have been carried out employing the VLBA (Very Long Baseline Array) and as many as ten additional antennas. Maps of the extended structures have been generated for the 160 sources observed in ten of these experiments (approximately 200,000 observations) taking place during 1997 and 1998. This paper reports the results of the first massive application of such structure maps to correct the modeled VLBI (Very Long Baseline Interferometry) delay in astrometric data analysis. For high-accuracy celestial reference frame work, proper choice of a reference point within each extended source is crucial. Here the reference point is taken at the point of maximum emitted flux. Overall, the weighted delay residuals (approximately equal to 30 ps) are reduced by 8 ps in quadrature upon introducing source maps to model the structure delays of the sources. Residuals of some sources with extended or fast-varying structures improve by as much as 40 ps. Scatter of 'arc positions' about a time-linear model decreases substantially for most sources. Based on our results, it is also concluded that source structure is presently not the dominant error source in astrometric/geodetic VLBI.

Sovers, Ojars J.↗

Estimating Controller Intervention Probabilities for Optimized Profile Descent Arrivals

Simulations of arrival traffic at Dallas/Fort-Worth and Denver airports were conducted to evaluate incorporating scheduling and separation constraints into advisories that define continuous descent approaches. The goal was to reduce the number of controller interventions required to ensure flights maintain minimum separation distances of 5 nmi horizontally and 1000 ft vertically. It was shown that simply incorporating arrival meter fix crossing-time constraints into the advisory generation could eliminate over half of the all predicted separation violations and more than 80% of the predicted violations between two arrival flights. Predicted separation violations between arrivals and non-arrivals were 32% of all predicted separation violations at Denver and 41% at Dallas/Fort-Worth. A probabilistic analysis of meter fix crossing-time errors is included which shows that some controller interventions will still be required even when the predicted crossing-times of the advisories are set to add a 1 or 2 nmi buffer above the minimum in-trail separation of 5 nmi. The 2 nmi buffer was shown to increase average flight delays by up to 30 sec when compared to the 1 nmi buffer, but it only resulted in a maximum decrease in average arrival throughput of one flight per hour.

continous descent arrivals↗