Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “data assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

OLS data system/global survey of lightning

A global lightning climatology is being assembled from the nighttime imagery of the DMSP Optical Linescan Sensor (OLS). Lightning saturates the visible channel of the OLS at nighttime and can be identified as a horizontal streak on the order of 50-100 km in horizontal extent. Lightning streaks apparent in the film strips located at the National Snow and Ice Data Center (NSIDC) prior to 1991 are being digitized. An initial survey was completed for the F7 satellite observation period January 1986 - October 1987 and for the Q satellite for the period June-July 1973. Comparisons between the OLS lightning climatology with the Arkin GPI data set during the 1986-87 El Nino event shows similar regional variations in convective activity. The digital archive of global DMSP data began at the end of February. Software is being developed at both MSFC and NSIDC to extract, navigate, and view the OLS fine and smooth imagery.

Goodman, Steven J.↗

Mars aerobrake assembly demonstration

NASA has identified aerobraking as a potentially critical technology for the Space Exploration Initiative (SEI). The size of Mars aerobrakes may be beyond the capabilities of future launch vehicles to place them into orbit in one launch. On-orbit assembly using facilities and operations developed under the Space Station Freedom (SSF) Program represent one approach for realizing such large structures. the results of early testing in this subject can help influence the future evolution of the SSF. The objectives are to: (1) generate empirical data on operational procedures for on-orbit assembly of a large Mars aerobrake; (2) develop aerobrake design concepts; (3) identify critical issues and requirements associated with SSF utilization; and (4) to stimulate student participation in the SEI.

Garvey, John M.↗

Automated installation of large platform utilities

The capabilities of the assembler in installing nonstructural platform systems were assessed. These systems include electrical power distribution, heat transport, command and data signal transmission, and payload data transmission. The effects of including installation of utilities on the assembly process and on the design, operation, and performance of the assembler were evaluated. In addition, any special requirements on the assembler and/or the platform due to the installation of utilities were identified. The procedure followed was to define a set of candidate utility characteristics and installation requirements, define and design installation concepts, and perform an assessment of impacts on the assembler and its operation.

Vernon, R. M.↗

Post-translational control of collagen fibrillogenesis in mineralizing cultures of chick osteoblasts

Cultured osteoblasts from chick embryo calvaria were used as a model system to investigate the post-translational extracellular mechanisms controlling the macroassembly of collagen fibrils. The results of these studies demonstrated that cultured osteoblasts secreted a collagenous extracellular matrix that assembled and mineralized in a defined temporal and spatial sequence. The assembly of collagen occurred in a polarized fashion, such that successive orthogonal arrays of fibrils formed between successive cell layers proceeding from the culture surface toward the media. Mineralization followed in the same manner, being observed first in the deepest and oldest fibril layers. Collagen fibrillogenesis, the kinetics of cross-link formation, and collagen stability in the extracellular matrix of the cultures were examined over a 30 day culture period. Between days 8 and 12 in culture, collagen fibril diameters increased from < 30 nm to an average of 30-45 nm. Thereafter, diameters ranged in size from 20 to 200 nm. Quantitation of the collagen cross-linking residues, hydroxylysyl pyridinoline (HP) and lysyl pyridinoline (LP), showed that these mature cross-links increased from undetectable levels to concentrations found in normal chick bone. Analysis of the kinetics of their formation by pulse-chase labeling the cultures with [3H]lysine showed a doubling time of approximately 5 days. The relationships between cross-link formation, fibrillogenesis, and collagen stability were examined in cultures treated with beta-aminopropionitrile (beta-APN), a potent inhibitor of lysyl oxidase and cross-link formation. In beta-APN-treated cultures, total collagen synthesis was increased twofold, with no change in mRNA levels for type I collagen, whereas the amount of collagen accumulated in the cell layer was decreased by 50% and mineral deposition was reduced. The rate of collagen retention in the matrix was assessed by pulse-chase analysis of [3H]proline over a 16 day period in control and beta-APN-treated cultures. In control cultures, about 20% of the labeled collagen was lost from the cell layers over a 16 day period compared with > 80% in the presence of beta-APN. The beta-APN-treated cultures also showed a wider diversity of fibril diameters with a median in the > 45-60 nm range. In summary, these data suggest that cross-linking and assembly of collagen fibrils secreted by osteoblasts in vitro occur in a fashion similar to that found in vivo. The rate of cross-link formation is relatively constant and may be correlated with increasing collagen mass.(ABSTRACT TRUNCATED AT 400 WORDS).

NASA Discipline Musculoskeletal↗

Managed Development Environment Successes for MSFC's VIPA Team

This paper outlines the best practices of the Vehicle Design Team for VIPA. VIPA is the Vehicle Integrated Performance Analysis Team at MSFC. This team was created to reconnect the individual engineering disciplines to be able to perform system level technical assessments in support of program decisions. The functions of the VIPA Vehicle Design (VVD) discipline team are to maintain the controlled reference geometry and provide linked, simplified geometry for each of the other discipline analyses. The core of the VVD work, and the approach for VVD s first task of controlling the reference geometry, involves systems engineering, top-down, layout-based CAD modeling within a Product Data Manager (PDM) development environment. The topdown approach allcws for simple contrnl of very large, integrated assemblies and greatly enhances the ability to generate trade configurations and reuse data. The second W D task, model simplification for analysis, is handled within the managed environment through application of the master model concept. In this approach, there is a single controlling, or master, product definition dataset. Connected to this master model are reference datasets with live geometric and expression links. The referenced models can be for drawings, manufacturing, visualization, embedded analysis, or analysis simplification. A discussion of web based interaction, including visualization, between the design and other disciplines is included. Demonstrated examples are cited, including the Space Launch Initiative development cycle, the Saturn V systems integration and verification cycle, an Orbital Space Plane study, and NASA Exploration Office studies of Shuttle derived and clean sheet launch vehicles. The VIPA Team has brought an immense amount of detailed data to bear on program issues. A central piece of that success has been the Managed Development Environment and the VVD Team approach to modeling.

Finckenor, Jeff↗

Design and testing of an energy flywheel for an Integrated Power/Attitude Control System /IPACS/

This paper summarizes the design of a prototype flywheel energy storage assembly developed to evaluate the spacecraft Integrated Power and Attitude Control System (IPACS) concept. In the IPACS application, the flywheel assembly is used for kinetic electrical energy storage as well as conventional angular momentum control. The kinetic energy storage function dictates high rotational speeds which require new approaches to the design of the major components: rotors, motor-generators, bearing systems, and electronics. The paper includes a general description of a NASA-contracted prototype assembly, a discussion of major component design characteristics, and the presentation of preliminary test results as compared with analytical predictions. The test data were obtained from preliminary tests of the NASA prototype assembly as well as from a Rockwell prototype test unit.

Notti, J. E.↗

Computer-Aided Engineering Of Cabling

Program generates data sheets, drawings, and other information on electrical connections. DFACS program, centered around single data base, has built-in menus providing easy input of, and access to, data for all personnel involved in system, subsystem, and cabling. Enables parallel design of circuit-data sheets and drawings of harnesses. Also recombines raw information to generate automatically various project documents and drawings, including index of circuit-data sheets, list of electrical-interface circuits, lists of assemblies and equipment, cabling trees, and drawings of cabling electrical interfaces and harnesses. Purpose of program to provide engineering community with centralized data base for putting in, and gaining access to, functional definition of system as specified in terms of details of pin connections of end circuits of subsystems and instruments and data on harnessing. Primary objective to provide instantaneous single point of interchange of information, thus avoiding

Billitti, Joseph W.↗

Telescope Scientist on the Advanced X-Ray Astrophysics Observatory

The most important activity during this reporting period was the calibration of the AXAF High Resolution Mirror Assembly (HRMA) and the analysis of the copious data which were obtained during that project. The calibration was highly successful, and will result in the AXAF being by far the best calibrated X-ray observatory ever flown, and more accurate results by all of its users. This period also included participation in the spacecraft alignment and assembly activities and final flight readiness reviews. The planning of the first year of Telescope Scientist AXAF observations also was accomplished. The Telescope Scientist team also served as a technical resource for various problems which were encountered during this period. Many of these contributions have been documented in memoranda sent to the project.

VanSpeybroeck, Leon↗

Clearance Analysis of CTC2 (on ELC4) to S-TRRJ HRS Radiator Rotation Envelope

In response to the planned retirement of the Space Shuttle Program, International Space Station (ISS) management began stockpiling spare parts on the ISS. Many of the larger orbital replacement units were stored on the Expedite the Processing of Experiments to Space Station (EXPRESS) Logistics Carriers (ELCs) mounted on the end of the S3 and P3 truss segments, immediately outboard of the Thermal Radiator Rotary Joints (TRRJs) and their attached radiators. In an August 2009 computer-aided design (CAD) assessment, it was determined that mounting the Cargo Transport Container (CTC) 2 on the inboard face of ELC4 as planned would create insufficient clearance between the CTC2 and the rotational envelope of the radiators when the TRRJs were rotated to a gamma angle of 35.0 degrees. The true clearance would depend on how the Unpressurized Cargo Carrier Attachment System (UCCAS) was mounted to the S3 truss and how the ELC4 was attached to it. If the plane of the UCCAS attachment points were tilted even slightly inboard, it would significantly change the clearance between CTC2 and the Starboard TRRJ (S-TRRJ) radiators. Additionally, since CTC2 would be covered in multilayer insulation (MLI), the true outer profile of CTC2 was not captured in the CAD models used for the clearance assessment. It was possible that, even if the S-TRRJ radiators cleared CTC2, they could snag the MLI covering. In the fall of 2010, the Image Science and Analysis Group (ISAG) was asked to perform an on-orbit clearance analysis to determine the location of CTC2 on ELC4 and the S-TRRJ radiators at the angle of closest approach so that a positive clearance could be assured. To provide the measurements as quickly as possible to aid in the assessment, it was decided that the clearance analysis would be broken into two phases. Phase I: The location and orientation of the UCCAS fittings, which support and hold the ELC4 in place, would be measured relative to the ISS Analytical Coordinate System (ISSACS) as defined by nine preexisting Space Vision System (SVS) targets affixed to the forward/zenith side of the S1 and S3 truss segments. The location of the outboard edge of the S-TRRJ radiator would also be measured when positioned at the angle of closest approach to CTC2 (gamma = 35.0 degrees). This data would allow the Digital Pre-Assembly Group to predict how the ELC4 would sit on the UCCAS and how that would translate into the clearance between CTC2 and the S-TRRJ radiators. Phase II: After the ELC4 was delivered and installed into the UCCAS, the position of the CTC2 mounting plate on the inboard face of ELC4, would be measured in the ISSACS coordinate system relative to the SVS control points used in Phase I. Although CTC2 would not yet be mounted on ELC4, the working envelope of CTC2 could be mathematically added to the measured position of ELC4 to produce a best estimate for CTC2's mounted location. Comparing CTC2's best estimated location to the S-TRRJ radiator (measured in Phase I); relative to the ISSACS coordinate system, would provide a direct measurement of the expected clearance. Due to the impending delivery of ELC4 (scheduled for January 2011), planning for the Phase I clearance analysis began immediately. Using the Dynamic Onboard Ubiquitous Graphics (DOUG) program, ISAG designed a way to acquire images of the SVS control points on truss segments S1 and S3, the aft facing edge of the S-TRRJ Heat Rejection Subsystem (HRS) radiator, and the three UCCAS latch mechanisms mounted on the zenith face of the S3 truss using the Space Station Remote Manipulator System (SSRMS). To minimize the number of SSRMS movements, the Special Purpose Dexterous Manipulator (SPDM) would be attached to the SSRMS. This would make it possible to park the SPDM in one position and acquire multiple images by changing the viewing orientation of the SPDM body cameras using the pan/tilt units on which they are mounted. Using this implementation concept, ISAG identified four SSRMS/SPDM positions from which the majority of the needed imagery could be acquired. Five additional images would be acquired using the CP-3 external ISS camera mounted on the S1 truss immediately inboard of ELC4. Based on a photogrammetric simulation, it was estimated that the measured location of the HRS radiator and UCCAS latch points would be accurate to about 0.3 in. in each of the three axes relative to ISSACS. Working with ROBO, ISAG collected 78 images of the ISS December 29, 2010. From this imagery, the best 40 were selected for use in the analysis process. The images were radiometrically enhanced to improve color and contrast and loaded into the FotoG analysis software along with the camera parameters and control data, which consisted of the coordinates for the nine SVS targets on the S1 and S3 trusses in the ISSACS coordinate system.

Liddle, Donn↗

Space Science and Technology Partnership Forum: Integration with Commercial In-Space Assembly Activities

The interagency Space Science and Technology (S&T) Partnership Forum was established in 2015 with participation from the United States Air Force, the National Aeronautics and Space Administration, and the National Reconnaissance Office. Seeking to leverage synergies and influence agency portfolios with a focus on key pervasive and game-changing technologies, the S&T Partnership Forum successfully identified and prioritized several collaboration topic areas with high potential for future cross-agency work. The S&T Partnership Forum determines the forum strategy, goals, and objectives, as well as the strategies and objectives specific to each collaboration topic area. In November 2018, the Partnership held a public open forum that focused on the topic area of in-space assembly (iSA). This open forum was coordinated to facilitate government and commercial dialogue, collect data, and perform data analysis to identify potential cross-agency collaboration between government and commercial participants for in-space assembly and promising technologies. This paper discusses the analysis performed on the commercially provided data in relation to previously identified government needs, observations on the correlation between technologies and capabilities between government and commercial industry, and recommendations for future government collaborations with commercial industry for iSA.

Benjamin, Gregory↗

Reduction of hub- and pylon-fairing drag

A wind tunnel test was conducted to obtain data on several drag reduction methods for rotorcraft hubs. The objective of the test was to use small-scale models to develop the technology to substantially reduce hub drag. A helicopter test model, which did not incorporate a rotor, was used to study single-rotor fairing configurations. The rotor shaft assembly was modeled with nonrotating hardware. Drag trend data was obtained for the following fairing configuration changes: hub-fairing camber, hub-fairing thickness ratio, hub-fairing surface curvature, hub-fairing height with respect to the fuselage, inclusion of blade shanks in the hub fairings, hub- and pylon-fairing gaps, pylon-fairing cross-sectional geometry, pylon-fairing thickness ratio and camber. Substantial drag reductions could potentially result from application of the test results to helicopter hub- and pylon-fairing design.

Young, Larry A.↗

Dynamic testing for shuttle design verification

Space shuttle design verification requires dynamic data from full scale structural component and assembly tests. Wind tunnel and other scaled model tests are also required early in the development program to support the analytical models used in design verification. Presented is a design philosophy based on mathematical modeling of the structural system strongly supported by a comprehensive test program; some of the types of required tests are outlined.

Green, C. E.↗

Static and control investigations of an 0.030-scale space shuttle orbiter configuration 140A/B model in the Ames Research Center 11 by 11-foot transonic wind tunnel (OA53A), Volume 1

A wind tunnel test of an 0.030 scale model of the Rockwell International Configuration 140A/B Space Shuttle Vehicle Orbiter were conducted in the Ames Research Center 11- by 11-Foot Transonic Wind Tunnel. This part (part A) of test series 0A53 was conducted at Mach numbers of 0.6, 0.8, 0.9, 1.05, and 1.20, and at Reynolds numbers from 1.8 x to 6.5 million per foot. The objective of this test was to establish and verify longitudinal and lateral-directional aerodynamic performance, stability, and control characteristics for the Configuration 140A/B SSV Orbiter. Reynolds number studies were performed for certain nominal control-settings. An alternate leading-edge wing configuration and sealed elevon-split arrangement were tested. Bodyflap, elevon, speedbrake, and rudder hinge moments were measured in addition to standard six-component forces and moments and base pressure data. Furthermore, six-component force and moment data were measured for the vertical tail assembly.

Nichols, M. E.↗

LANDSAT-1 and LANDSAT-2 flight evaluation

Flight performances of LANDSAT 1 and LANDSAT 2 are evaluated. The in-flight systems discussed are: (1) power supplies, (2) attitude control, (3) command/clock, (4) telemetry, (5) orbit adjust, (6) electrical interface, (7) thermal, (8) tape recorders, (9) multispectral scanner, (10) data collection and (11) magnetic moment compensating assembly. Tables are presented for easy reference.

Source record↗

Ensuring the relocatability of programs in the operational system DOS YeS

Specific modifications in the Disk Operational System Unified Series to insure the relocatability of programs stored permanently in the core image library is described. A self-relocating method for loading programs into the working memory with re-editing all the programs recorded in the core image library is presented. The modified linkage editor can be included in a relocation dictionary containing data about each address constant at the assembly stage at the request of the programmer. The relocation dictionary increases the dimension of the RL-phase in comparison with the dimension of this same phase when edited by the standard method, making possible the creation of multiphase program complexes. Generation and use of the modified system using Assembly language is described. An example of the use of the system is given, and limitations of the use of the relocatable programs in the modified system are outlined.

Novoseltsev, S. K.↗

Turbojet engine blade damping

The potentials of various sources of nonaerodynamic damping in engine blading are evaluated through a combination of advanced analysis and testing. The sources studied include material hysteresis, dry friction at shroud and root disk interfaces as well as at platform type external dampers. A limited seris of tests was conducted to evaluate damping capacities of composite materials (B/AL, B/AL/Ti) and thermal barrier coatings. Further, basic experiments were performed on titanium specimens to establish the characteristics of sliding friction and to determine material damping constants J and n. All the tests were conducted on single blades. Mathematical models were develthe several mechanisms of damping. Procedures to apply this data to predict damping levels in an assembly of blades are developed and discussed.

Srinivasan, A. V.↗

Personal-Computer Video-Terminal Emulator

OWL-1200 video terminal emulator has been written for IBM Personal Computer. The OWL-1200 is a simple user terminal with some intelligent capabilities. These capabilities include screen formatting and block transmission of data. Emulator is written in PASCAL and Assembler for the IBM Personal Computer operating under DOS 1.1.

Buckley, R. H.↗

Passive Orbital Disconnect Strut (PODS 3) structural test program

A passive orbital disconnect strut (PODS-3) was analyzed structurally and thermally. Development tests on a graphite/epoxy orbit tube and S glass epoxy launch tube provided the needed data to finalize the design. A detailed assembly procedure was prepared. One strut was fabricated. Shorting loads in both the axial and lateral direction (vs. load angle and location) were measured. The strut was taken to design limit loads at both ambient and 78 K (cold end only). One million fatigue cycles were performed at predicted STS loads (half in tension, half in compression) with the cold end at 78 K. The fatigue test was repeated at design limit loads. Six struts were then fabricated and tested as a system. Axial loads, side loads, and simulated asymmetric loads due to temperature gradients around the vacuum shell were applied. Shorting loads were measured for all tests.

Parmley, R. T.↗