Techno-Economics for Conversion of Lignocellulosic Biomass to Ethanol by Indirect Gasification and Mixed Alcohol Synthesis

This techno-economic study investigates the production of ethanol and a higher alcohols coproduct by conversion of lignocelluosic biomass to syngas via indirect gasification followed by gas-to-liquids synthesis over a precommercial heterogeneous catalyst. The design specifies a processing capacity of 2,205 dry U.S. tons (2,000 dry metric tonnes) of woody biomass per day and incorporates 2012 research targets from NREL and other sources for technologies that will facilitate the future commercial production of cost-competitive ethanol. Major processes include indirect steam gasification, syngas cleanup, and catalytic synthesis of mixed alcohols, and ancillary processes include feed handling and drying, alcohol separation, steam and power generation, cooling water, and other operations support utilities. The design and analysis is based on research at NREL, other national laboratories, and The Dow Chemical Company, and it incorporates commercial technologies, process modeling using Aspen Plus software, equipment cost estimation, and discounted cash flow analysis. The design considers the economics of ethanol production assuming successful achievement of internal research targets and nth-plant costs and financing. The design yields 83.8 gallons of ethanol and 10.1 gallons of higher-molecular-weight alcohols per U.S. ton of biomass feedstock. A rigorous sensitivity analysis captures uncertainties in costs and plant performance.

09 BIOMASS FUELS↗

Analysis of the Production Cost for Various Grades of Biomass Thermal Treatment

Process flow sheets were developed for the thermal treatment of southern pine wood chips at four temperatures (150, 180, 230, and 270 degrees C) and two different scales (20 and 100 ton/hour). The larger capacity processes had as their primary heat source hot gas assumed to be available in quantity from an adjacent biorefinery. Mass and energy balances for these flow sheets were developed using Aspen Plus process simulation software. The hot gas demands in the larger processes, up to 1.9 million lb/hour, were of questionable feasibility because of the volume to be moved. This heat was of low utility because the torrefaction process, especially at higher temperatures, is a net heat producer if the organic byproduct gases are burned. A thermal treatment flow sheet using wood chips dried in the biorefinery to 10% moisture content (rather than 30% for green chips) with transfer of high temperature steam from the thermal treatment depot to the biorefinery was also examined. The equipment size information from all of these cases was used in several different equipment cost estimating methods to estimate the major equipment costs for each process. From these, factored estimates of other plant costs were determined, leading to estimates (± 30% accuracy) of total plant capital cost. The 20 ton/hour processes were close to 25 million dollars except for the 230 degrees C case using dried wood chips which was only 15 million dollars because of its small furnace. The larger processes ranged from 64-120 million dollars. From these capital costs and projections of several categories of operating costs, the processing cost of thermally treated pine chips was found to be $28-33 per ton depending on the degree of treatment and without any credits for steam generation. If the excess energy output of the two 20 ton/hr depot cases at 270 degrees C can be sold for $10 per million BTU, the net processing cost dropped to $13/ton product starting with green wood chips or only $3 per ton if using dried chips from the biorefinery. Including a 12% return on invested capital raised all of the operating cost results by about $20/ton.

09 BIOMASS FUELS↗

Project resource reallocation algorithm

A methodology for adjusting baseline cost estimates according to project schedule changes is described. An algorithm which performs a linear expansion or contraction of the baseline project resource distribution in proportion to the project schedule expansion or contraction is presented. Input to the algorithm consists of the deck of cards (PACE input data) prepared for the baseline project schedule as well as a specification of the nature of the baseline schedule change. Output of the algorithm is a new deck of cards with all work breakdown structure block and element of cost estimates redistributed for the new project schedule. This new deck can be processed through PACE to produce a detailed cost estimate for the new schedule.

Myers, J. E.↗

Decommissioning of the V1 Nuclear Power Plant Jaslovske Bohunice - 20270

The paper focuses on introducing the approach and method applied for decommissioning of the V1 nuclear power plant (further the 'V1 NPP') located in Jaslovske Bohunice in the Slovak Republic, to the conference participants. The Paper outlines activities and steps necessary to comply with the requirements contained in the decision of the Slovak government from 1999 regarding the early shutdown of the V1 NPP. The company responsible for the V1 NPP decommissioning is Jadrova a vyradovacia spolocnost, a.s., (further JAVYS) with the State as a sole shareholder. On the basis of the V1 NPP Decommissioning Conceptual Plan, out of four assessed options, JAVYS selected the immediate decommissioning option (the 'IDO') for the V1 NPP. On the basis of multi-criteria analysis, the IDO specified the approach of immediate and continuous dismantling of equipment followed by demolition of buildings and preparation of the site for its further potential use. The IDO also included the summary of technical, environmental, legislative information as well as the determination of assumed costs for decommissioning of the V1 NPP. Prior to commencement of the V1 NPP decommissioning, within the process of termination of operation, activities connected with de-fuelling, monitoring, processing of historical waste and, not to forget, the process of obtaining the license for the V1 NPP decommissioning were executed. JAVYS decided to divide the decommissioning process into two stages. In 2011, JAVYS obtained a license for the first stage of the V1 NPP decommissioning. Within this stage, dismantling of inactive equipment, demolitions of inactive buildings, monitoring of systems and preparatory works for the upcoming stage of decommissioning were implemented. In 2015, in line with the license for the 2. stage of the V1 NPP decommissioning, the activities of decontamination and dismantling of contaminated and active equipment as well as demolitions of remaining buildings began. In this stage radioactive waste (RAW) produced during the decommissioning is to be processed. After decontamination, the material fulfilling the free release criteria is to be released into the environment, the site is to be cleared from the scope of the Atomic Act and released from the surveillance of the national regulators. Future application of certain methods and techniques for decontamination and dismantling in similar environments might bring an added value to the operators. Paper includes a description of best practices for Nuclear Power Plant VVER type reactors decommissioning. Schedule comparison is given to show how the critical path of certain projects is being managed. Application of the International Standard for Decommissioning Costing (ISDC) methodology provides a uniform method which enables comparison of cost estimates to other nuclear facilities under decommissioning. The cost estimate for the V1 NPP decommissioning has been continuously updated based on more advanced and detailed information on the decommissioning activities and projects. Monitoring of progress of the V1 NPP decommissioning is performed via four key-performance indicators. The Earned Value Management (EVM) methodology is used for evaluating time and cost aspect of decommissioning activities while waste conditioning index is calculated by comparing the actually produced waste to planned values of waste for a respective monitored period. Radiological safety index is assessed by comparison of the personnel records on the individual yearly doses received by each respective employee to the boundary value. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lignite-plus-Biomass to Synthetic Jet Fuel with CO2 Capture and Storage: Design, Cost, and Greenhouse Gas Emissions Analysis for a Near-Term First-of-a-Kind Demonstration Project and Prospective Future Commercial Plants

We report on a 30-month design study for a first-of-a-kind (FOAK) demonstration plant that would be built at a site near Meridian, Mississippi, to coprocess lignite coal and woody biomass into jet fuel. The design uses an oxygen-blown TRIG™ gasifier developed by KBR and Southern Company. Fischer-Tropsch conversion of the syngas produces synthetic paraffinic kerosene (SPK) as the primary product, plus naphtha. Other co-products include electricity sold to the grid and CO 2 sold for use in enhanced oil recovery (EOR). Previous studies have identified coprocessing of various coals and biomass with CO 2 capture as promising options for cost-competitive production of low net lifecycle greenhouse gas (GHG) emissions synthetic fuels. The effort reported here goes beyond earlier studies in the level of detail in process design and cost estimation with the aim of improving the understanding of the economic prospects for lignite and woody biomass coprocessing systems. Key objectives in the design of the FOAK lignite/biomass-to-jet (LBJ) plant were to achieve net lifecycle GHG emissions for the SPK that are less than for conventional petroleum-derived jet fuel and to make process design and equipment selections such that the plant could be built and operated in the near term, e.g., before 2025. The process design was developed by researchers at Princeton University and the University of Queensland and validated by engineers at the WorleyParsons Group (WP). Commercial vendors provided design and cost estimates for several major plant components. Bare-erected capital costs and operating and maintenance costs were estimated by WP. The primary objective in building and operating the FOAK plant would be to demonstrate the technical viability of the LBJ concept as an essential first step toward launching commercial-scale plants in the longer term. With this in mind, the project team developed a set of principles to help guide the process design: the total plant cost should be less than 2 billion USD (to limit investment risk); the level of input biomass should be both proportionally significant to reflect biomass/lignite co-gasification and sufficient to achieve GHG emissions goals; process design decisions and vendor/equipment selections should prioritize the likelihood of technical success over minimizing the cost of jet fuel production. The resulting FOAK plant design capacity is 1,551 metric t/d (45.5% moisture) lignite and 556 t/d (43.3% moisture) biomass, for a total input of 295 MW HHV , of which 25% is biomass. The design output is 1,252 actual barrels per day of liquids, of which 80% is SPK (62.3 MW LHV ) and 20% is naphtha (13.9 MW LHV ). It exports 15 MW e of electricity after satisfying a 38 MW e onsite auxiliary load. Additional products are 1,326 t/d of pressurized pipeline-quality CO 2 and 49 t/day of sulfuric acid (93 wt% H 2 SO 4 ). With thinnings from sustainably-managed southern pine plantations as the biomass, and with captured CO 2 stored underground via EOR, the net lifecycle emissions for the SPK product are estimated to be about one-quarter of those for petroleum-derived jet fuel. The bare-erected cost (BEC) estimated by WP for this plant is 588 million USD (2015). The authors’ best estimate of total plant cost (TPC) is 1,230 million USD, arrived at by assuming engineering, procurement and construction management services (20% of BEC), process 5 contingencies (35% of BEC), and project contingencies (35% of the sum of all other costs, i.e., 35% of 1.55xBEC). Not surprisingly, an annual discounted cash flow (DCF) analysis determined that it would be impossible to generate a positive net present value (NPV) over a wide range in key input assumptions. An SPK production cost subsidy of nearly 400/bbl USD over a 20-year plant life would be required to achieve zero NPV under a baseline set of assumptions (including 3% real weighted average cost of capital and a levelized crude oil price of 80/bbl USD). Alternatively, a capital grant in excess of the TPC value would also achieve zero NPV. The poor financial results reflect the small scale of the plant, the design principle to prioritize technical success, the levels of contingencies appropriate for the relatively early stage of project development, and the first-of-a-kind nature of the plant. Technology innovations, learning via construction and operating experience, alternative plant configurations, and larger scale should improve economics of future plants. To help understand these prospects, a preliminary analysis of N th -of-a-kind (NOAK) plants was developed, but with the limitation that plants would use only equipment components that for the most part are already commercial today: consideration of advanced, not-yet-commercial technologies and of R&D-driven improvements in existing technologies were beyond the scope of this analysis. The analysis found that a variety of NOAK plant designs that coprocess lignite and woody biomass to make jet fuel are unlikely to be economically competitive without subsidy even in the presence of a high future carbon tax or equivalent greenhouse gas mitigation policy. This conclusion applies to process configurations and input biomass/lignite ratios that result in net GHG emissions as high as those for petroleum-derived jet fuel and as low as zero. In contrast, encouraging results were found for plants processing only biomass. The economics of these “BECCS” plants (biomass energy with CCS) improve dramatically with the strength of carbon mitigation policies because of their strongly negative net GHG emissions. These findings do not imply that coal/biomass coprocessing strategies for making synfuels with CCS are not economically promising – only that, in the case of lignite, much more than a 25% biomass coprocessing rate would be needed. However, our analysis shows that all such systems are unlikely to be economic in the absence of a strong carbon mitigation policy. Future R&D driven technological innovations could modify this conclusion. Among other R&D priorities, an emphasis on better understanding and reducing plant auxiliary loads is warranted.

09 BIOMASS FUELS↗

A fixed collector employing reversible vee-trough concentrator and a vacuum tube receiver for high temperature solar energy systems

A solar heat collection system employing non-tracking reflectors integrated with a fixed vacuum tube receiver which achieves modest year-round concentration (about 2) of the sunlight at low capital costs is discussed. The axis of the vee-trough reflector lies in a east-west direction and requires reversal of the reflector surfaces only twice a year without disturbing the receiver tubes and associated plumbing. It collects most of the diffuse flux. The vacuum tube receiver with selective absorber has no convection losses while radiation and conduction losses are minimal. Significant cost reductions are offered since the vee-trough can be fabricated from inexpensive polished or plastic reflector laminated sheet metal covering 2/3 of the collection area, and only about 1/3 of the area is covered with the more expensive vacuum tube receivers. Thermal and economic performance of the vee-trough vacuum tube system, year-round variation of the concentration factor, incident flux, useful heat per unit area at various operation temperatures and energy cost estimates are presented. The electrical energy cost is estimated to be 77 mills/kWh, and the system construction cost is estimated to be $1140/kWe.

Selcuk, M. K.↗

Assessment of industrial applications for fuel cell cogeneration systems

The fuel cell energy systems are designed with and without a utility connection for emergency back-up power. Sale of electricity to the utility during periods of low plant demand is not considered. For each of the three industrial applications, conceptual designs were also developed for conventional utility systems relying on purchased electric power and fossil-fired boilers for steam/hot water. The capital investment for each energy system is estimated. Annual operating costs are also determined for each system. These cost estimates are converted to levelized annual costs by applying appropriate economic factors. The breakeven electricity price that would make fuel cell systems competitive with the conventional systems is plotted as a function of naphtha price. The sensitivity of the breakeven point to capital investment and coal price is also evaluated.

Stickles, R. P.↗

Earth Sciences Data and Information System (ESDIS) program planning and evaluation methodology development

An Earth Sciences Data and Information System (ESDIS) Project Management Plan (PMP) is prepared. An ESDIS Project Systems Engineering Management Plan (SEMP) consistent with the developed PMP is also prepared. ESDIS and related EOS program requirements developments, management and analysis processes are evaluated. Opportunities to improve the effectiveness of these processes and program/project responsiveness to requirements are identified. Overall ESDIS cost estimation processes are evaluated, and recommendations to improve cost estimating and modeling techniques are developed. ESDIS schedules and scheduling tools are evaluated. Risk assessment, risk mitigation strategies and approaches, and use of risk information in management decision-making are addressed.

Dickinson, William B.↗

CMC Property Variability and Life Prediction Methods for Turbine Engine Component Application

The ever increasing need for lower density and higher temperature-capable materials for aircraft engines has led to the development of Ceramic Matrix Composites (CMCs). Today's aircraft engines operate with >3000"F gas temperatures at the entrance to the turbine section, but unless heavily cooled, metallic components cannot operate above approx.2000 F. CMCs attempt to push component capability to nearly 2700 F with much less cooling, which can help improve engine efficiency and performance in terms of better fuel efficiency, higher thrust, and reduced emissions. The NASA Glenn Research Center has been researching the benefits of the SiC/SiC CMC for engine applications. A CMC is made up of a matrix material, fibers, and an interphase, which is a protective coating over the fibers. There are several methods or architectures in which the orientation of the fibers can be manipulated to achieve a particular material property objective as well as a particular component geometric shape and size. The required shape manipulation can be a limiting factor in the design and performance of the component if there is a lack of bending capability of the fiber as making the fiber more flexible typically sacrifices strength and other fiber properties. Various analysis codes are available (pcGINA, CEMCAN) that can predict the effective Young's Moduli, thermal conductivities, coefficients of thermal expansion (CTE), and various other properties of a CMC. There are also various analysis codes (NASAlife) that can be used to predict the life of CMCs under expected engine service conditions. The objective of this summer study is to utilize and optimize these codes for examining the tradeoffs between CMC properties and the complex fiber architectures that will be needed for several different component designs. For example, for the pcGINA code, there are six variations of architecture available. Depending on which architecture is analyzed, the user is able to specify the fiber tow size, tow spacing, weave parameter, and angle of orientation of fibers. By holding the volume fraction of the fibers constant, variations in tow spacing can be explored for different architectures. The CMC material properties are usually calculated assuming the component is manufactured perfectly. However, this is typically not the case so that a quantification of the material property variability is needed to account for processing and/or manufacturing imperfections. The overall inputs and outputs are presented using a regression software to rapidly investigate the tradeoffs associated with fiber architecture, material properties, and ultimately cost. This information is then propagated through lifing models and Larson-Miller data to assess timehemperature-dependent CMC strength. In addition, a first order cost estimation will be quantified from a current qualitative perspective. This cost estimation includes the manufacturing challenges, such as tooling, as well as the component cost for a particular application. Ultimately, a cost to performance ratio should be established that compares the effectiveness of CMCs to their current rival, nickel superalloys.

Cheplak, Matthew L.↗

Software Transition Project Retrospectives and the Application of SEL Effort Estimation Model and Boehm's COCOMO to Complex Software Transition Projects

The Multimission Image Processing Subsystem (MIPS) at the Jet Propulsion Laboratory (JPL) has managed transitions of application software sets from one operating system and hardware platform to multiple operating systems and hardware platforms. As a part of these transitions, cost estimates were generated from the personal experience of in-house developers and managers to calculate the total effort required for such projects. Productivity measures have been collected for two such transitions, one very large and the other relatively small in terms of source lines of code. These estimates used a cost estimation model similar to the Software Engineering Laboratory (SEL) Effort Estimation Model. Experience in transitioning software within JPL MIPS have uncovered a high incidence of interface complexity. Interfaces, both internal and external to individual software applications, have contributed to software transition project complexity, and thus to scheduling difficulties and larger than anticipated design work on software to be ported.

SEL Boehm COCOMO↗

Integrating Efficiency of Industry Processes and Practices Alongside Technology Effectiveness in Space Transportation Cost Modeling and Analysis

This paper presents past and current work in dealing with indirect industry and NASA costs when providing cost estimation or analysis for NASA projects and programs. Indirect costs, when defined as those costs in a project removed from the actual hardware or software hands-on labor; makes up most of the costs of today's complex large scale NASA space/industry projects. This appears to be the case across phases from research into development into production and into the operation of the system. Space transportation is the case of interest here. Modeling and cost estimation as a process rather than a product will be emphasized. Analysis as a series of belief systems in play among decision makers and decision factors will also be emphasized to provide context.

Zapata, Edgar↗

ION Engineering Commercial Carbon Capture Design & Costing (C3DC) (Final Report)

ION Engineering LLC (ION) has coupled its proven, solvent-based CO 2 capture technology with an exceptionally qualified design and engineering team to complete a pre FEED for a 300-megawatt equivalent commercial-scale CO 2 capture plant for Gerald Gentleman Station’s (GGS) Generation Unit 2 (GGS2). The remarkable team was comprised of ION, Nebraska Public Power District (NPPD), Sargent & Lundy (S&L) with continued support from Koch Modular Process Systems (KMPS), and Siemens. The overall objective of the project was to provide the engineering design and cost estimate at an American Association of Cost Engineers (AACE) Class 3 estimate, resulting in accuracy ranges of -20 to +30% for the capital cost estimate. The project team was successful in completing this objective and was able to overcome the challenges that were presented during the process. A conservative interest rate of 7.0% with a financing term of 20 years was used based on interest rates utilized by S&L for this level of study. The resulting annualization factor is multiplied by the total EPC cost to calculate an annualized capital expenditure. It is estimated that the carbon capture facility treating a 300 MWe slipstream will capture 1.9 million tonnes per year of CO 2 at a capacity factor of 85%. The resulting cost of capture for the CO 2 island was determined to be $\$$36.55/tonne. Utilizing an interest rate of 4.5%, supported by historical rates for previous large capital projects in the power industry, reduces the cost of capture to $32.52/tonne. These cost of capture numbers continue to further ION’s case for commercial deployment of ION’s solvent technology.

20 FOSSIL-FUELED POWER PLANTS↗

Pre-Project Planning for a Flameless Pressurized Oxy-Combustion Pilot Plant (Final Technical Report)

The team of Southwest Research Institute® (SwRI®), ITEA, Electric Power Research Institute, Inc. (EPRI), GE Global Research (GE), Jacobs Engineering (Jacobs), and Peter Reineck Associates (PRA) are advancing Flameless Pressurized Oxy-Combustion (FPO), a novel coal technology. This effort seeks to complete the preliminary engineering and planning of a 50-MWth Pilot Plant that produces electricity and steam for district heating. The technology, pioneered by ITEA at the 5-MWth scale, must be brought to a higher technology readiness level (TRL) to be viable at the commercial scale. This project builds upon extensive evaluation of the techno-economic performance of the FPO technology already performed by ITEA. This includes system improvements, such as the addition of a turbo-expander to the flue gas stream. Some of the performance-enhancing components are not as well defined as others. The primary goal of this project was to bring all of the core cycle components to the same level of design maturity. Extensive cycle modeling and evaluation explored various configurations of the process. Different coals, operating conditions, and heat recovery devices were considered and modeled using Aspen Plus. The results of the cycle modeling informed the pilot plant configuration and the planned configuration at the commercial scale. The system pressurization is maintained in the flue gas clean-up and water removal. This allows for efficient and cost-effective carbon dioxide compression and sequestration package. Once the cycle was optimized, preliminary drawings, layouts, and plans defined the pilot facility. Process flow diagrams (PFD) were used to describe the pilot configuration in greater detail. A heat and mass balance with stream data was created. A master equipment list specified the operating conditions for major pieces of equipment within the pilot using this heat and mass balance. A detailed cost estimate for the planned configuration was completed with an Association for the Advancement of Cost Engineering (AACE) Class IV level of cost analysis. A site selection effort evaluated a variety of potential candidate sites. The selection effort focused on three sites for an in-depth evaluation of the merits and viability of hosting a pilot demonstration. The ability of the host site to support the project with cost sharing was also assessed. The selection process chose the University of Wyoming (UW) as the host site, and cost estimates for the pilot capital estimate were made using local data. A preliminary test plan and operation plan, which creates figures of merit, control, and instrumentation was produced. An effort that outlines methods of pilot cost reduction was completed near the end of the project. A techno-economic assessment (TEA) evaluated the FPO technology at the commercial scale in comparison to the NETL baseline cases. The reference plants were used in combination with proprietary equipment estimates to build a plant capital cost and cost of electricity evaluation. FPO performed better than the sub-bituminous post-combustion capture cases. Further preliminary estimates of improvements to the FPO cycle show even further gains when compared to conventional carbon capture methods.

01 COAL, LIGNITE, AND PEAT↗

Pre-Commercial Scale-Up of a Gas-Fired Absorption Heat Pump

The project sought to advance the maturity of SMTI’s 80 kBTU/hr residential space and water heating GAHP from the engineering prototype stage (TRL-7) to pre-production readiness by addressing manufacturing, balance of system design and installation, cost, reliability, and field application questions. As part of this project, the project team has: (1) Matured the design package for a commercially ready product (2) Demonstrated compliance with relevant ANSI standards (3) Completed manufacturing and assembly process specifications (4) Completed total production cost estimates and capital equipment requirements (5) Initiated component and system level reliability assessments (6) Completed a small field demonstration including measured performance, installation requirements and expected costs, and customer/key stakeholder feedback. (7) Completed a Techno-economic analysis for representative applications and climate zones, including justification for utility incentive programs. (8) Completed a market intelligence report. Scope of Work: A multi-faceted project was completed that included: (a) design for manufacturing tasks for both the sealed system and balance of system, (b) development and trial of key manufacturing processes and techniques, (c) evaluation of component and system level reliability, (d) exploration of make/buy decisions including impact on cost and required capital. Additionally, (e) installation and monitoring of a small number of field test units was completed to demonstrate energy savings and collect customer/installer feedback, and (f) a focused market research task was completed to explore potential barriers and improve market introduction plans. These tasks addressed many of the remaining technical risks regarding long-term reliability, verification of manufacturing cost estimates and identification of cost concerns, identify installation and balance of system design criteria necessary to achieve energy savings and installed cost goals, and identify market barriers and strategies prior to product market introduction.

03 NATURAL GAS↗

Site-specific Design Case Study for Wet Waste Hydrothermal Liquefaction and Biocrude Upgrading to Hydrocarbon Fuels

Hydrothermal liquefaction (HTL) is a thermal process that converts wet biomass to renewable hydrocarbon fuel blendstocks (i.e., renewable naphtha, renewable diesel, and sustainable aviation fuel (SAF)). It can utilize a wide range of pure and blended wet feedstocks, including sewage sludge from water resource recovery facilities (WRRF), food and agriculture wastes, algae, fats, oils and greases (FOG) and blends of dry and wet wastes/feedstocks. Historically, techno-economic analysis (TEA) and annual state of technology (SOT) assessments with standard economic assumptions used by the Bioenergy Technologies Office (BETO) were conducted for the wet waste HTL pathway leveraging experimental data collected from Pacific Northwest National Laboratory’s (PNNL) continuous flow reactor systems. The objective of the SOT assessment has been to guide and track progress of BETO’s HTL research and development (R&D) toward reduced cost and greenhouse gas (GHG) emissions for the pathway. However, gaps exist between BETO’s traditional SOT updates and the needs of key external stakeholders that – if addressed – will accelerate technology adoption. This Business Case Study aims to bridge this gap by providing an updated design, TEA, and LCA based on PNNL’s FY23 R&D with added analyses and information that provide enhanced relevance for stakeholders of the HTL technology. This includes specific siting, regional wet waste resource inventory and transportation cost analyses, fuel market information, sustainable fuel policy impacts, economic metrics of net present value (NPV) and internal rate of return (IRR), greenhouse gas (GHG) emissions analysis, and statistical analysis of cost and technical uncertainties of the HTL plant design. The study focuses on the “Detroit combined statistical area (CSA)” region for siting of a wet waste HTL plant adjacent to the Great Lakes Water Authority (GLWA) facility with guidance from industry participants. Regional resource and siting analyses were conducted to identify feedstock availability, scale, and cost, as well as a beneficial site location. TEA with detailed rigorous capital cost estimation for the specific site application was conducted to evaluate the key economic metrics of most value to industrial partners. These include total capital investment, operating costs, minimum fuel selling price (MFSP) of the biocrude and fuel blendstock, and NPV and internal rate of return IRR with sustainable fuel credits. Life cycle analysis was conducted to evaluate the supply chain greenhouse gas (GHG) emissions for the wet waste HTL process as compared with petroleum derived diesel. This study is also informed by years of R&D and process de-risking learnings and was conducted with a basic engineering HTL plant design and costing that akin to a “first-of-a-kind” plant economics. This differs from our conventional “nth plant ” SOT assessments. Specifically, the HTL process model has been updated with more operationally reliable methods for feed heating and phase separations. Further, we have implemented additional spare equipment for redundancy, a more rigorous installed equipment cost estimation approach, and additional costs associated with feed formatting and delivery, building, piping and site development. An Excel-based cost sheet based on the basic engineering design is also released alongside the report that allows users to conduct customized TEA with their own feed composition and financial assumptions.

09 BIOMASS FUELS↗

Supporting data for Site-specific Design Case Study for Wet Waste Hydrothermal Liquefaction and Biocrude Upgrading to Hydrocarbon Fuels

Hydrothermal liquefaction (HTL) is a thermal process that converts wet biomass to renewable hydrocarbon fuel blendstocks (i.e., renewable naphtha, renewable diesel, and sustainable aviation fuel (SAF)). It can utilize a wide range of pure and blended wet feedstocks, including sewage sludge from water resource recovery facilities (WRRF), food and agriculture wastes, algae, fats, oils and greases (FOG) and blends of dry and wet wastes/feedstocks. Historically, techno-economic analysis (TEA) and annual state of technology (SOT) assessments with standard economic assumptions used by the Bioenergy Technologies Office (BETO) were conducted for the wet waste HTL pathway leveraging experimental data collected from Pacific Northwest National Laboratory’s (PNNL) continuous flow reactor systems. The objective of the SOT assessment has been to guide and track progress of BETO’s HTL research and development (R&D) toward reduced cost and greenhouse gas (GHG) emissions for the pathway. However, gaps exist between BETO’s traditional SOT updates and the needs of key external stakeholders that – if addressed – will accelerate technology adoption. This Business Case Study aims to bridge this gap by providing an updated design, TEA, and LCA based on PNNL’s FY23 R&D with added analyses and information that provide enhanced relevance for stakeholders of the HTL technology. This includes specific siting, regional wet waste resource inventory and transportation cost analyses, fuel market information, sustainable fuel policy impacts, economic metrics of net present value (NPV) and internal rate of return (IRR), greenhouse gas (GHG) emissions analysis, and statistical analysis of cost and technical uncertainties of the HTL plant design. The study focuses on the “Detroit combined statistical area (CSA)” region for siting of a wet waste HTL plant adjacent to the Great Lakes Water Authority (GLWA) facility with guidance from industry participants. Regional resource and siting analyses were conducted to identify feedstock availability, scale, and cost, as well as a beneficial site location. TEA with detailed rigorous capital cost estimation for the specific site application was conducted to evaluate the key economic metrics of most value to industrial partners. These include total capital investment, operating costs, minimum fuel selling price (MFSP) of the biocrude and fuel blendstock, and NPV and internal rate of return IRR with sustainable fuel credits. Life cycle analysis was conducted to evaluate the supply chain greenhouse gas (GHG) emissions for the wet waste HTL process as compared with petroleum derived diesel. This study is also informed by years of R&D and process de-risking learnings and was conducted with a basic engineering HTL plant design and costing that akin to a “first-of-a-kind” plant economics. This differs from our conventional “nth plant ” SOT assessments. Specifically, the HTL process model has been updated with more operationally reliable methods for feed heating and phase separations. Further, we have implemented additional spare equipment for redundancy, a more rigorous installed equipment cost estimation approach, and additional costs associated with feed formatting and delivery, building, piping and site development. An Excel-based cost sheet based on the basic engineering design is also released alongside the report that allows users to conduct customized TEA with their own feed composition and financial assumptions.

Li, Shuyun↗

Integrating the Clearance in NPP Residual Material Management

Previous Experiences in decommissioning projects are being used to optimize the residual material management in NPP, metallic scrap usually. The approach is based in the availability of a materials Clearance MARSSIM-based methodology developed and licensed in Spain. A typical project includes the integration of segregation, decontamination, clearance, quality control and quality assurance activities. The design is based in the clearance methodology features translating them into standard operational procedures. In terms of ecological taxes and final disposal costs, significant amounts of money could be saved with this type of approaches. The last clearance project managed a total amount of 405 tons scrap metal and a similar amount of other residual materials occupying a volume of 1500 m{sup 3}. After less than a year of field works 251 tons were finally recycled in a non-licensed smelting facility. The balance was disposed as LILW. In the planning phase the estimated cost savings were 4.5 Meuro. However, today a VLLW option is available in European countries so, the estimated cost savings are reduced to 1.2 Meuro. In conclusion: the application of materials clearance in NPP decommissioning lessons learnt to the NPP residual material management is an interesting management option. This practice is currently going on in Spanish NPP and, in a preliminary view, is consistent with the new MARSAME Draft. An interesting parameter is the cost of 1 m3 of recyclable scrap. The above estimates are very project specific because in the segregation process other residual materials were involved. If the effect of this other materials is removed the estimated Unit Cost were in this project around 1700 euro/m{sup 3}, this figure is clearly below the above VLLW disposal cost of 2600 euro. In a future project it appears feasible to descend to 839 euro/m{sup 3} and if it became routine values and is used in big Decommissioning projects, around 600 euro/m{sup 3} or below possibly could be achieved. A rough economical analysis permits to estimate a saving around 2000 US$ to 13000 US$ per cubic meter of steel scrap according the variability of materials and disposal costs. Many learnt lessons of this practice were used as a feed back in the planning of characterization activities for decommissioning a Spanish NPP and today are considered as a significant reference in our Decommissioning engineering approaches.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Launching Science: Science Opportunities Provided by NASA's Constellation System

In 2004 NASA began implementation of the first phases of a new space exploration policy. This implementation effort included the development of a new human-carrying spacecraft, known as Orion; the Altair lunar lander; and two new launch vehicles, the Ares I and Ares V rockets.collectively called the Constellation System (described in Chapter 5 of this report). The Altair lunar lander, which is in the very preliminary concept stage, is not discussed in detail in the report. In 2007 NASA asked the National Research Council (NRC) to evaluate the science opportunities enabled by the Constellation System. To do so, the NRC established the Committee on Science Opportunities Enabled by NASA's Constellation System. In general, the committee interpreted "Constellation-enabled" broadly, to include not only mission concepts that required Constellation, but also those that could be significantly enhanced by Constellation. The committee intends this report to be a general overview of the topic of science missions that might be enabled by Constellation, a sort of textbook introduction to the subject. The mission concepts that are reviewed in this report should serve as general examples of kinds of missions, and the committee s evaluation should not be construed as an endorsement of the specific teams that developed the mission concepts or of their proposals. Additionally, NASA has a well-developed process for establishing scientific priorities by asking the NRC to conduct a "decadal survey" for a particular discipline. Any scientific mission that eventually uses the Constellation System will have to be properly evaluated by means of this decadal survey process. The committee was impressed with the scientific potential of many of the proposals that it evaluated. However, the committee notes that the Constellation System has been justified by NASA and selected in order to enable human exploration beyond low Earth orbit.not to enable science missions. Virtually all of the science mission concepts that could take advantage of Constellation s unique capabilities are likely to be prohibitively expensive. Several times in the past NASA has begun ambitious space science missions that ultimately proved too expensive for the agency to pursue. Examples include the Voyager-Mars mission and the Prometheus program and its Jupiter Icy Moons Orbiter spacecraft (both examples are discussed in Chapter 1). Finding: The scientific missions reviewed by the committee as appropriate for launch on an Ares V vehicle fall, with few exceptions, into the "flagship" class of missions. The preliminary cost estimates, based on mission concepts that at this time are not very detailed, indicate that the costs of many of the missions analyzed will be above $5 billion (in current dollars). The Ares V costs are not included in these estimates. All of the costs discussed in this report are presented in current-year (2008) dollars, not accounting for potential inflation that could occur between now and the decade in which these missions might be pursued. In general, preliminary cost estimates for proposed missions are, for many reasons, significantly lower than the final costs. Given the large cost estimates for many of the missions assessed in this report, the potentially large impacts on NASA's budget by many of these missions are readily apparent.