Development of Improved Graphical Displays for an Advanced Outage Control Center, Employing Human Factors Principles for Outage Schedule Management

The long-term viability of existing nuclear power plants in the United States (U.S.) is dependent upon a number of factors, including maintaining high capacity factors, maintaining nuclear safety, and reducing operating costs, particularly those associated with refueling outages. Refueling outages typically take 20-30 days, and for existing light water NPPs in the U.S., the reactor cannot be in operation during the outage. Furthermore, given that many NPPs generate between $1-1.5 million/day in revenue when in operation, there is considerable interest in shortening the length of refueling outages. Yet refueling outages are highly complex operations, involving multiple concurrent and dependent activities that are somewhat challenging to coordinate; therefore, finding ways to improve refueling outage performance, while maintaining nuclear safety has proven to be difficult. The Advanced Outage Control Center (AOCC) project is a research and development (R&D) demonstration activity under the LWRS Program. LWRS is an R&D program that works closely with industry R&D programs to establish technical foundations for the licensing and managing of long-term, safe, and economical operation of current fleet of NPPs. As such, the LWRS Advanced Outage Control Center project has the goal of improving the management of commercial NPP refueling outages. To accomplish this goal, INL is developing an advanced outage control center (OCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. The overall focus is on developing an AOCC with the following capabilities that enables plant and OCC staff to; Collaborate in real-time to address emergent issues; Effectively communicate outage status to all workers involved in the outage; Effectively communicate discovered conditions in the field to the OCC; Provide real-time work status; Provide automatic pending support notifications; Provide real-time requirements monitoring; Maximize their collective situational awareness to improve decision-making; and Leverage macro data to better support resource allocation. INL has partnered with several commercial NPP utilities to develop a number of advanced outage management technologies. These outage management technologies have focused on both collaborative technologies for control centers and developing mobile technologies for NPP field workers. This report describes recent efforts made in developing a suite of outage technologies to support more effective schedule management. Currently, a master outage schedule is created months in advance using the plant’s existing scheduling software (e.g., Primavera P6). Typically, during the outage, the latest version of the schedule is printed at the beginning of each shift. INL and its partners are developing technologies that will have capabilities such as Automatic Schedule Updating, Automatic Pending Support Notifications, and the ability to allocate and schedule outage support task resources on a sub-hour basis (e.g., outage Micro-Scheduling). The remaining sections of this report describe in more detail the scheduling challenges that occur during outages, how the outage scheduling technologies INL is developing helps address those challenges, and the latest developments on this task (e.g., work accomplished to date and the path forward)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Comparison of X-31 flight, wind-tunnel, and water-tunnel yawing moment asymmetries at high angles of attack

The X-31 aircraft are being used in the enhanced fighter maneuverability (EFM) research program, which is jointly funded by the (U.S.) Advanced Research Projects Agency (ARPA) and Germany's Federal Ministry of Defense (FMOD). The flight test portion of the program, which involves two aircraft, is being conducted by an International Test Organization (ITO) comprising the National Aeronautics and Space Administration (NASA), the U.S. Navy, the U.S. Air Force, Rockwell International, and Deutsche Aerospace (DASA). The goals of the flight program are to demonstrate EFM technologies, investigate close-in-combat exchange ratios, develop design requirements, build a database for application to future fighter aircraft, and develop and validate low-cost prototype concepts. For longitudinal control the X-31 uses canards, symmetrical movement of the trailing-edge flaps, and pitch deflection of the thrust vectoring system. The trim, inertial coupling, and engine gyroscopic coupling compensation tasks are performed primarily by the trailing-edge flaps. For lateral-directional control the aircraft uses differential deflection of the trailing-edge flaps for roll coordination and a conventional rudder combined with the thrust vectoring system to provide yaw control. The rudder is only effective up to about 40 deg angle of attack (alpha), after which the thrust vectoring becomes the primary yaw control effector. Both the leading-edge flaps and the inlet lip are scheduled with the angle of attack to provide best performance.

Brent R Cobleigh↗

The Temporal Configuration of Airline Networks

The deregulation of US aviation in 1978 resulted in the reconfiguration of airline networks into hub-and-spoke systems, spatially concentrated around a small number of central airports or 'hubs' through which an airline operates a number of daily waves of flights. A hub-and-spoke network requires a concentration of traffic in both space and time. In contrast to the U.S. airlines, European airlines had entered the phase of spatial network concentration long before deregulation. Bilateral negotiation of traffic fights between governments forced European airlines to focus their networks spatially on small number of 'national' airports. In general, these star-shaped networks were not coordinated in time. Transfer opportunities at central airports were mostly created 'by accident'. With the deregulation of the EU air transport market from 1988 on, a second phase of airline network concentration started. European airlines concentrated their networks in time by adopting or intensifying wave-system structures in their flight schedules. Temporal concentration may increase the competitive position of the network in a deregulated market because of certain cost and demand advantages.

Burghouwt, Guillaume↗

Multi-Agent Control Planes for Quantum Networks: A Scalable Architecture for Autonomous Quantum Internet Management

Quantum networks are expected to enable distributed quantum computing, secure communication, and global entanglement distribution. However, operating such networks presents significant challenges, including stochastic quantum processes, fragile entanglement resources, dynamic topology, and cross-layer control requirements. Current quantum network control architectures largely rely on centralized or hierarchical controllers inspired by classical software-defined networking (SDN). While effective for small testbeds, these approaches face scalability, latency, and reliability limitations as quantum networks grow. This paper proposes a multi-agent control plane architecture for quantum networks. In this design, intelligent software agents operate at quantum nodes, repeaters, and orchestration layers, collectively managing entanglement generation, routing, purification, and scheduling. The distributed intelligence of the agent system allows the network to adapt dynamically to quantum hardware variability and environmental noise. We argue that multi-agent systems provide significant advantages over centralized control approaches, including scalability, resilience, local autonomy, and real-time adaptation. The paper discusses architectural design principles, agent coordination mechanisms, and research challenges in deploying multi-agent control planes for the emerging quantum Internet.

Alnajjar, Anees [ORNL] (ORCID:0000000237101601)↗

Server-side Log Data Analytics for I/O Workload Characterization and Coordination on Large Shared Storage Systems

Inter-application I/O contention and performance interference have been recognized as severe problems. In this work, we demonstrate, through measurement from Titan (world s No. 3 supercomputer), that high I/O variance co-exists with the fact that individual storage units remain under-utilized for the majority of the time. This motivates us to propose AID, a system that performs automatic application I/O characterization and I/O-aware job scheduling. AID analyzes existing I/O traffic and batch job history logs, without any prior knowledge on applications or user/developer involvement. It identifies the small set of I/O-intensive candidates among all applications running on a supercomputer and subsequently mines their I/O patterns, using more detailed per-I/O-node traffic logs. Based on such auto- extracted information, AID provides online I/O-aware scheduling recommendations to steer I/O-intensive applications away from heavy ongoing I/O activities. We evaluate AID on Titan, using both real applications (with extracted I/O patterns validated by contacting users) and our own pseudo-applications. Our results confirm that AID is able to (1) identify I/O-intensive applications and their detailed I/O characteristics, and (2) significantly reduce these applications I/O performance degradation/variance by jointly evaluating out- standing applications I/O pattern and real-time system l/O load.

Liu, Y.↗

Robotic and Human-Tended Collaborative Drilling Automation for Subsurface Exploration

Future in-situ lunar/martian resource utilization and characterization, as well as the scientific search for life on Mars, will require access to the subsurface and hence drilling. Drilling on Earth is hard - an art form more than an engineering discipline. Human operators listen and feel drill string vibrations coming from kilometers underground. Abundant mass and energy make it possible for terrestrial drilling to employ brute-force approaches to failure recovery and system performance issues. Space drilling will require intelligent and autonomous systems for robotic exploration and to support human exploration. Eventual in-situ resource utilization will require deep drilling with probable human-tended operation of large-bore drills, but initial lunar subsurface exploration and near-term ISRU will be accomplished with lightweight, rover-deployable or standalone drills capable of penetrating a few tens of meters in depth. These lightweight exploration drills have a direct counterpart in terrestrial prospecting and ore-body location, and will be designed to operate either human-tended or automated. NASA and industry now are acquiring experience in developing and building low-mass automated planetary prototype drills to design and build a pre-flight lunar prototype targeted for 2011-12 flight opportunities. A successful system will include development of drilling hardware, and automated control software to operate it safely and effectively. This includes control of the drilling hardware, state estimation of both the hardware and the lithography being drilled and state of the hole, and potentially planning and scheduling software suitable for uncertain situations such as drilling. Given that Humans on the Moon or Mars are unlikely to be able to spend protracted EVA periods at a drill site, both human-tended and robotic access to planetary subsurfaces will require some degree of standalone, autonomous drilling capability. Human-robotic coordination will be important, either between a robotic drill and humans on Earth, or a human-tended drill and its visiting crew. The Mars Analog Rio Tinto Experiment (MARTE) is a current project that studies and simulates the remote science operations between an automated drill in Spain and a distant, distributed human science team. The Drilling Automation for Mars Exploration (DAME) project, by contrast: is developing and testing standalone automation at a lunar/martian impact crater analog site in Arctic Canada. The drill hardware in both projects is a hardened, evolved version of the Advanced Deep Drill (ADD) developed by Honeybee Robotics for the Mars Subsurface Program. The current ADD is capable of 20m, and the DAME project is developing diagnostic and executive software for hands-off surface operations of the evolved version of this drill. The current drill automation architecture being developed by NASA and tested in 2004-06 at analog sites in the Arctic and Spain will add downhole diagnosis of different strata, bit wear detection, and dynamic replanning capabilities when unexpected failures or drilling conditions are discovered in conjunction with simulated mission operations and remote science planning. The most important determinant of future 1unar and martian drilling automation and staffing requirements will be the actual performance of automated prototype drilling hardware systems in field trials in simulated mission operations. It is difficult to accurately predict the level of automation and human interaction that will be needed for a lunar-deployed drill without first having extensive experience with the robotic control of prototype drill systems under realistic analog field conditions. Drill-specific failure modes and software design flaws will become most apparent at this stage. DAME will develop and test drill automation software and hardware under stressful operating conditions during several planned field campaigns. Initial results from summer 2004 tests show seven identifi distinct failure modes of the drill: cuttings-removal issues with low-power drilling into permafrost, and successful steps at executive control and initial automation.

Glass, Brian↗

Integrated Control Design for A Partially Turboelectric Aircraft Propulsion System

Electrified Aircraft Propulsion (EAP) holds great potential for reducing aviation emissions and fuel burn. A variety of EAP architectures have been proposed including partially-turboelectric configurations that combine turbofan engines with motor-driven propulsors. Such architectures exhibit coupling between subsystems and thus require an integrated control solution. To address this need, this paper presents an integrated control design strategy for a commercial single-aisle partially-turboelectric aircraft concept consisting of two wing-mounted turbofan engines and an electric motor driven tailfan propulsor. Within this architecture the turbofans serve the dual purpose of generating thrust and supplying mechanical offtake power used to generate electricity for the tailfan motor. The propulsion control system is tasked with coordinating turbofan and tailfan operation under both steady-state and transient scenarios. The paper introduces a linear state-space representation of the architecture reflecting the coupling between the turbofan and tailfan subsystems along with loop transfer functions reflecting open- and closed-loop system dynamics. Also discussed is an applied strategy for scheduling the tailfan setpoint command based on the average sensed fan speed of the two turbofans. This approach ensures synchronized operation of the turbofan and tailfan subsystems while also allowing the turbofan fuel control design to be simplified. Performance of the integrated control design is assessed through a real-time hardware-in-the-loop test conducted at the NASA Electric Aircraft Testbed. During this test a scaled version of the electrical system and turbomachinery shaft dynamics were implemented in electrical machine hardware and evaluated under closed-loop control. Results from this facility test are presented to illustrate the efficacy of the applied integrated control design approach under steady-state and transient scenarios including a full-flight mission profile.

Electrified Aircraft Propulsion↗

Integrated Control Design for A Partially Turboelectric Aircraft Propulsion System

Electrified Aircraft Propulsion (EAP) holds great potential for reducing aviation emissions and fuel burn. A variety of EAP architectures have been proposed including partially-turboelectric configurations that combine turbofan engines with motor-driven propulsors. Such architectures exhibit coupling between subsystems and thus require an integrated control solution. To address this need, this paper presents an integrated control design strategy for a commercial single-aisle partially-turboelectric aircraft concept consisting of two wing-mounted turbofan engines and an electric motor driven tailfan propulsor. Within this architecture the turbofans serve the dual purpose of generating thrust and supplying mechanical offtake power used to generate electricity for the tailfan motor. The propulsion control system is tasked with coordinating turbofan and tailfan operation under both steady-state and transient scenarios. The paper introduces a linear state-space representation of the architecture reflecting the coupling between the turbofan and tailfan subsystems along with loop transfer functions reflecting open- and closed-loop system dynamics. Also discussed is an applied strategy for scheduling the tailfan setpoint command based on the average sensed fan speed of the two turbofans. This approach ensures synchronized operation of the turbofan and tailfan subsystems while also allowing the turbofan fuel control design to be simplified. Performance of the integrated control design is assessed through a real-time hardware-in-the-loop test conducted at the NASA Electric Aircraft Testbed. During this test a scaled version of the electrical system and turbomachinery shaft dynamics were implemented in electrical machine hardware and evaluated under closed-loop control. Results from this facility test are presented to illustrate the efficacy of the applied integrated control design approach under steady-state and transient scenarios including a full-flight mission profile.

Electrified Aircraft Propulsion↗

Integrated Control Design for A Partially Turboelectric Aircraft Propulsion System

Electrified Aircraft Propulsion (EAP) holds great potential for reducing aviation emissions and fuel burn. A variety of EAP architectures have been proposed including partially-turboelectric configurations that combine turbofan engines with motor-driven propulsors. Such architectures exhibit coupling between subsystems and thus require an integrated control solution. To address this need, this paper presents an integrated control design strategy for a commercial single-aisle partially-turboelectric aircraft concept consisting of two wing-mounted turbofan engines and an electric motor driven tailfan propulsor. Within this architecture the turbofans serve the dual purpose of generating thrust and supplying mechanical offtake power used to generate electricity for the tailfan motor. The propulsion control system is tasked with coordinating turbofan and tailfan operation under both steady-state and transient scenarios. The paper introduces a linear state-space representation of the architecture reflecting the coupling between the turbofan and tailfan subsystems along with loop transfer functions reflecting open- and closed-loop system dynamics. Also discussed is an applied strategy for scheduling the tailfan setpoint command based on the average sensed fan speed of the two turbofans. This approach ensures synchronized operation of the turbofan and tailfan subsystems while also allowing the turbofan fuel control design to be simplified. Performance of the integrated control design is assessed through a real-time hardware-in-the-loop test conducted at the NASA Electric Aircraft Testbed. During this test a scaled version of the electrical system and turbomachinery shaft dynamics were implemented in electrical machine hardware and evaluated under closed-loop control. Results from this facility test are presented to illustrate the efficacy of the applied integrated control design approach under steady-state and transient scenarios including a full-flight mission profile.

Electrified Aircraft Propulsion↗

Safeguards-by-Design:Guidance for High Temperature Gas Reactors (HTGRs) With Prismatic Fuel

Introduction and Purpose The following is a guidance document from a series prepared for the U.S. Department of Energy (DOE) National Nuclear Security Administration (NNSA), under the Next Generation Safeguards Initiative (NGSI), to assist facility designers and operators in implementing international Safeguards-by-Design (SBD). SBD has two main objectives: (1) to avoid costly and time consuming redesign work or retrofits of new nuclear fuel cycle facilities and (2) to make the implementation of international safeguards more effective and efficient at such facilities. In the long term, the attainment of these goals would save industry and the International Atomic Energy Agency (IAEA) time, money, and resources and be mutually beneficial. This particular safeguards guidance document focuses on prismatic fuel high temperature gas reactors (HTGR). The purpose of the IAEA safeguards system is to provide credible assurance to the international community that nuclear material and other specified items are not diverted from peaceful nuclear uses. The safeguards system consists of the IAEA’s statutory authority to establish safeguards; safeguards rights and obligations in safeguards agreements and additional protocols; and technical measures implemented pursuant to those agreements. Of foremost importance is the international safeguards agreement between the country and the IAEA, concluded pursuant to the Treaty on the Non-Proliferation of Nuclear Weapons (NPT). According to a 1992 IAEA Board of Governors decision, countries must: notify the IAEA of a decision to construct a new nuclear facility as soon as such decision is taken; provide design information on such facilities as the designs develop; and provide detailed design information based on construction plans at least 180 days prior to the start of construction, and on "as-built" designs at least 180 days before the first receipt of nuclear material. Ultimately, the design information will be captured in an IAEA Design Information Questionnaire (DIQ), prepared by the facility operator, typically with the support of the facility designer. The IAEA will verify design information over the life of the project. This design information is an important IAEA safeguards tool. Since the main interlocutor with the IAEA in each country is the State Regulatory Authority/SSAC (or Regional Regulatory Authority, e.g. EURATOM), the responsibility for conveying this design information to the IAEA falls to the State Regulatory Authority/SSAC. For the nuclear industry to reap the benefits of SBD (i.e. avoid cost overruns and construction schedule slippages), nuclear facility designers and operators should work closely with the State Regulatory Authority and IAEA as soon as a decision is taken to build a new nuclear facility. Ideally, this interaction should begin during the conceptual design phase and continue throughout construction and start-up of a nuclear facility. Such early coordination and planning could influence decisions on the design of the nuclear material processing flow-sheet, material storage and handling arrangements, and facility layout (including safeguards equipment), etc.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Shaping the FutureWorkforce: Challenges and Lessons Learned in HPC Education from National Labs and Computing Centers

Workforce training at national laboratories and computing centers is essential and typically falls into two categories: foundational training for newcomers and advanced training for experienced users. Foundational topics—such as version control, build systems, and basic HPC usage—are largely transferable across institutions, while cluster-specific training varies due to differences in hardware, job schedulers, and local workflows. Training on emerging technologies is split between hardware-specific content and broadly applicable programming paradigms. Here, to reduce redundancy and increase impact, national labs, computing centers, and vendors are collaborating through initiatives like the HPC Training Working Group to share best practices, co-develop materials, and broaden outreach. These coordinated efforts aim to make HPC training more accessible, scalable, and consistent across the community.

HPC↗

Multi Wave Link: An interactive database for co-ordination of multiwavelength programs

Multi Wave Link is an operational database used by the international astronomical community to plan and coordinate multiwavelength observational campaigns on various celestial objects. This facility has been and continues to be an essential tool for the organization of numerous simultaneous ground-based and satellite observations. The Multi Wave Link system has both an interactive component and an electronic mail alert notice component. The interactive portion contains a database of schedules from several of the world's larger observatories and orbiting satellites. Lists of observers, observatories, and their available instrumentation are additionally contained in the system. Another feature added to the software allows the user to search the Royal Greenwich Observatory e-mail listing of international astronomers. This capability is often used by astronomers to find the electronic address of colleagues for improved communication. However, the most productive aspect of the Multi Wave Link system appears to be one of the simplest parts of the system: the electronic mail alert notices for observing campaigns. Information useful in planning the structure of future astronomical databases can be obtained by studying patterns of use of the Multi Wave Link system. This paper analyzes 22 months of Multi Wave Link usage from Sep. 1991 - Jul. 1993.

Cordova, France↗

Subject Matter Expert Evaluation of Multi-Flight Common Route Advisories

Traffic flow management seeks to balance the demand for National Airspace System (NAS) flight resources, such as airspace and airports, with the available supply. When forecasted weather blocks nominal air traffic routes, traffic managers must re-route affected flights for weather avoidance. Depending on the nature and scope of the weather, traffic managers may use pre-coordinated re-routes such as Playbook Routes or Coded Departure Routes, or may design ad hoc local re-routes. The routes of affected flights are modified accordingly. These weather avoidance routes will, of course, be less efficient than the nominal routes due to increased flight time and fuel burn. In current traffic management operations, the transition into a weather avoidance re-routing initiative is typically implemented more aggressively than the transition out of that initiative after the weather has dissipated or moved away. For example, strategic large-scale Playbook re-routes are sometimes left in place (as initially implemented) for many hours before being lifted entirely when the weather dissipates. There is an opportunity to periodically modify the re-routing plan as weather evolves, thereby attenuating its adverse impact on flight time and fuel consumption; this is called delay recovery. Multi-Flight Common Routes (MFCR) is a NASA-developed operational concept and associated decision support tool for delay recovery, designed to assist traffic managers to efficiently update weather avoidance traffic routes after the original re-routes have become stale due to subsequent evolution of the convective weather system. MFCR groups multiple flights to reduce the number of advisories that the traffic manager needs to evaluate, and also merges these flights on a common route segment to provide an orderly flow of re-routed traffic. The advisory is presented to the appropriate traffic manager who evaluates it and has the option to modify it using MFCRs graphical user interface. If the traffic manager finds the advisory to be operationally appropriate, he or she would coordinate with the Area Supervisor(s) of the sectors that currently control the flights in the advisory. When the traffic manager accepts the MFCR advisory via the user interface, the corresponding flight plan amendments would be sent to the displays of the appropriate sector controllers, using the Airborne Re-Routing (ABRR) capability which is scheduled for nationwide operation in 2017. The sector controllers would then offer this time-saving route modification to the pilots of the affected flights via datalink (or voice), and implement the corresponding flight plan amendment if the pilots accept it. MFCR is implemented as an application in the software environment of the Future Air traffic management Concepts Evaluation Tool (FACET). This paper focuses on an initial subject matter expert (SME) evaluation of MFCR. The evaluation covers MFCRs operational concept, algorithm, and user interface.

Human-in-the-loop Evaluation↗

Subject Matter Expert Evaluation of Multi-Flight Common Route Advisories

Traffic flow management seeks to balance the demand for National Airspace System (NAS) flight resources, such as airspace and airports, with the available supply. When forecasted weather blocks nominal air traffic routes, traffic managers must re-route affected flights for weather avoidance. Depending on the nature and scope of the weather, traffic managers may use pre-coordinated re-routes such as Playbook Routes or Coded Departure Routes, or may design ad hoc local re-routes. The routes of affected flights are modified accordingly. These weather avoidance routes will, of course, be less efficient than the nominal routes due to increased flight time and fuel burn. In current traffic management operations, the transition into a weather avoidance re-routing initiative is typically implemented more aggressively than the transition out of that initiative after the weather has dissipated or moved away. For example, strategic large-scale Playbook re-routes are sometimes left in place (as initially implemented) for many hours before being lifted entirely when the weather dissipates. There is an opportunity to periodically modify the re-routing plan as weather evolves, thereby attenuating its adverse impact on flight time and fuel consumption; this is called delay recovery. Multi-Flight Common Routes (MFCR) is a NASA-developed operational concept and associated decision support tool for delay recovery, designed to assist traffic managers to efficiently update weather avoidance traffic routes after the original re-routes have become stale due to subsequent evolution of the convective weather system. MFCR groups multiple flights to reduce the number of advisories that the traffic manager needs to evaluate, and also merges these flights on a common route segment to provide an orderly flow of re-routed traffic. The advisory is presented to the appropriate traffic manager who evaluates it and has the option to modify it using MFCRs graphical user interface. If the traffic manager finds the advisory to be operationally appropriate, he or she would coordinate with the Area Supervisor(s) of the sectors that currently control the flights in the advisory. When the traffic manager accepts the MFCR advisory via the user interface, the corresponding flight plan amendments would be sent to the displays of the appropriate sector controllers, using the Airborne Re-Routing (ABRR) capability which is scheduled for nationwide operation in 2017. The sector controllers would then offer this time-saving route modification to the pilots of the affected flights via datalink (or voice), and implement the corresponding flight plan amendment if the pilots accept it. MFCR is implemented as an application in the software environment of the Future Air traffic management Concepts Evaluation Tool (FACET). This paper focuses on an initial subject matter expert (SME) evaluation of MFCR. The evaluation covers MFCRs operational concept, algorithm, and user interface.

Traffic flow management↗

Arbitrage and Capacity Firming in Coordination with Day-Ahead Bidding of a Hybrid PV Plant

A hybrid PV plant (HPP) combines a photovoltaic (PV) plant with a battery energy storage system (BESS), which is considered a promising step towards the future of renewable power plants by the U.S. Department of Energy. When the renewable penetration reaches a significant level, a hybrid PV plant can bid in as a controllable thermal plant in the future electricity market. In this study, a bidding and BESS scheduling model is proposed for the HPP. The robust optimization (RO) technique has been utilized to identify the worst-case scenario of uncertainties during the bidding process. To address the overly conservative issue of the single-stage RO, we have decoupled the BESS schedule for arbitrage and PV capacity firming by a two-stage RO formulation. By comparing the output of single-stage RO and two-stage RO, the two-stage RO bids and schedules in a more aggressive manner, which increases the income of HPP. Also, the penalty of under-generation is considered in our model so that the day-ahead bidding decision and arbitrage schedules can be adjusted based on the potential UNDER-GENERATION penalty. Because the proposed model is non-convex and contains multi-stages, the Column-and-Constraint Generation (C&CG) algorithm is applied to the model as the solution. The proposed model has shown better economic performance compared to a state-of-art single-stage bidding method in case studies.

BESS scheduling↗

The Necessity of Functional Analysis for Space Exploration Programs

As NASA moves toward expanded commercial spaceflight within its human exploration capability, there is increased emphasis on how to allocate responsibilities between government and commercial organizations to achieve coordinated program objectives. The practice of program-level functional analysis offers an opportunity for improved understanding of collaborative functions among heterogeneous partners. Functional analysis is contrasted with the physical analysis more commonly done at the program level, and is shown to provide theoretical performance, risk, and safety advantages beneficial to a government-commercial partnership. Performance advantages include faster convergence to acceptable system solutions; discovery of superior solutions with higher commonality, greater simplicity and greater parallelism by substituting functional for physical redundancy to achieve robustness and safety goals; and greater organizational cohesion around program objectives. Risk advantages include avoidance of rework by revelation of some kinds of architectural and contractual mismatches before systems are specified, designed, constructed, or integrated; avoidance of cost and schedule growth by more complete and precise specifications of cost and schedule estimates; and higher likelihood of successful integration on the first try. Safety advantages include effective delineation of must-work and must-not-work functions for integrated hazard analysis, the ability to formally demonstrate completeness of safety analyses, and provably correct logic for certification of flight readiness. The key mechanism for realizing these benefits is the development of an inter-functional architecture at the program level, which reveals relationships between top-level system requirements that would otherwise be invisible using only a physical architecture. This paper describes the advantages and pitfalls of functional analysis as a means of coordinating the actions of large heterogeneous organizations for space exploration programs.

program management↗

TV Energy Consumption Trends and Energy-Efficiency Improvement Options

The SEAD initiative aims to transform the global market by increasing the penetration of highly efficient equipment and appliances. SEAD is a government initiative whose activities and projects engage the private sector to realize the large global energy savings potential from improved appliance and equipment efficiency. SEAD seeks to enable high-level global action by informing the Clean Energy Ministerial dialogue as one of the initiatives in the Global Energy Efficiency Challenge. In keeping with its goal of achieving global energy savings through efficiency, SEAD was approved as a task within the International Partnership for Energy Efficiency Cooperation (IPEEC) in January 2010. SEAD partners work together in voluntary activities to: (1) ?raise the efficiency ceiling? by pulling super-efficient appliances and equipment into the market through cooperation on measures like incentives, procurement, awards, and research and development (R&D) investments; (2) ?raise the efficiency floor? by working together to bolster national or regional policies like minimum efficiency standards; and (3) ?strengthen the efficiency foundations? of programs by coordinating technical work to support these activities. Although not all SEAD partners may decide to participate in every SEAD activity, SEAD partners have agreed to engage actively in their particular areas of interest through commitment of financing, staff, consultant experts, and other resources. In addition, all SEAD partners are committed to share information, e.g., on implementation schedules for and the technical detail of minimum efficiency standards and other efficiency programs. Information collected and created through SEAD activities will be shared among all SEAD partners and, to the extent appropriate, with the global public.As of April 2011, the governments participating in SEAD are: Australia, Brazil, Canada, the European Commission, France, Germany, India, Japan, Korea, Mexico, Russia, South Africa, Sweden, the United Arab Emirates, the United Kingdom, and the United States. More information on SEAD is available from its website at http://www.superefficient.org/.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Arbitrage and Capacity Firming in Coordination with Day-Ahead Bidding of a Hybrid PV Plant: Preprint

A hybrid PV plant (HPP) combines a photovoltaic (PV) plant with a battery energy storage system (BESS), which is considered a promising step towards the future of renewable power plants by the U.S. Department of Energy. When the renewable penetration reaches a significant level, a hybrid PV plant can bid in as a controllable thermal plant in the future electricity market. In this study, a bidding and BESS scheduling model is proposed for the HPP. The robust optimization (RO) technique has been utilized to identify the worst-case scenario of uncertainties during the bidding process. To address the overly conservative issue of the single-stage RO, we have decoupled the BESS schedule for arbitrage and PV capacity firming by a two-stage RO formulation. By comparing the output of single-stage RO and two-stage RO, the two-stage RO bids and schedules in a more aggressive manner, which increases the income of HPP. Also, the penalty of under-generation is considered in our model so that the day-ahead bidding decision and arbitrage schedules can be adjusted based on the potential UNDER-GENERATION penalty. Because the proposed model is non-convex and contains multi-stages, the Column-and-Constraint Generation (C&CG) algorithm is applied to the model as the solution. The proposed model has shown better economic performance compared to a state-of-art single-stage bidding method in case studies.

BESS scheduling↗