Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “atomization energy”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

International MNSR Training Center

Plans for the conversion of the Chinese origin miniature neutron source reactors (MNSRs) to low-enriched uranium (LEU), and the return of the high- enriched uranium (HEU) core to China, were initiated in February 2011 when an international MNSR Working Group (WG) was established to coordinate these activities. Based on a Ghana Atomic Energy Commission (GAEC) decision, the MNSR core at the GHARR-1 facility was selected for pilot shipment. Working on the preparation of the HEU MNSR materials’ removal from the GHARR-1 facility as a training tool, a mock-up MNSR vessel was built for operator training. Experiencing the usefulness of the mock-up vessel in operator training in the Ghana case has since been developed further into a full-scale training facility, named the International MNSR Training Center (IMTC), which is now available for training operators from MNSR operating countries. The main objective of this Book is to document the IMTC as a full-scale MNSR training facility in operator training for HEU MNSR core discharge and packaging. The goal is to describe the IMTC in its full complexity — that is: (1) to present the IMTC’s buildings with its internal and outer areas; (2) to provide a full listing of the installed equipment, as well as a functional description, available at the IMTC site; (3) to introduce the training materials, tutorials, and training program; and (4) to present the training sessions and Dry-run demonstration of the recently completed NIRR-1 operator training, with their experiences and lessons-learned included. This Book serves as a kind of user manual for the IMTC, which contains all of the information to launch training courses at the site at any time. The target audience for this Book is the MNSR community, especially MNSR operators and regulators who are facing HEU-LEU core conversion and HEU material transportation, who require operator training to carry out their jobs safely and professionally.

99 - GENERAL AND MISCELLANEOUS↗

A Picture Speaks 360,000 Words - Virtual Reality as a Decommissioning Planning Tool - 19364

Whiteshell Laboratories, located in Manitoba, Canada, provided research facilities for the Canadian nuclear industry since the early 1960's. Decommissioning of Whiteshell Laboratories has been ongoing since 2002 under Atomic Energy of Canada (AECL) and, more currently, since 2015 under the WL Closure Project managed by Canadian Nuclear Laboratories (CNL). One of the key steps to ensuring safe decommissioning operations is effective planning, including pre-job briefings, and post-job verification and review. Effective planning involves clear and concise communication of the field conditions, system configurations, hazards, and task goals or achievements to front line employees, and task approvers and verifiers. In many instances, employees can enter, view, inspect, verify or otherwise familiarize themselves with the task and task location. However, in several cases, hazardous conditions in the task location make it difficult for employees to easily access the location themselves, due to hazardous conditions, PPE requirements, training qualification gaps or space limitations. Since 2016, 360 deg. cameras have been used to create a virtual 'tour' of the hazardous task locations at Whiteshell Laboratories, which can be viewed by one or all of the employees involved in a task, from a position of safety. This allows a task to be discussed with all employees involved without the need for added risk of exposure to dose or industrial hazards or costly PPE, and supports ALARA control techniques of removing the hazard by moving work planning walk downs away from hazardous locations and guarding the worker by limiting the time a worker is exposed to the hazard. This paper provides an overview of the technologies used to capture and present the 360 virtual tours, the benefits from a safety, schedule and cost perspective, and the limitations of the current implementation that could be improved upon in a future iteration. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Dealing with Historical Discrepancies: The Recovery of National Research Experiment (NRX) Reactor Fuel Rods at Chalk River Laboratories (CRL) - 13324

Following the 1952 National Research Experiment (NRX) Reactor accident, fuel rods which had short irradiation histories were 'temporarily' buried in wooden boxes at the 'disposal grounds' during the cleanup effort. The Nuclear Legacy Liabilities Program (NLLP), funded by Natural Resources Canada (NRCan), strategically retrieves legacy waste and restores lands affected by Atomic Energy of Canada Limited (AECL) early operations. Thus under this program the recovery of still buried NRX reactor fuel rods and their relocation to modern fuel storage was identified as a priority. A suspect inventory of NRX fuels was compiled from historical records and various research activities. Site characterization in 2005 verified the physical location of the fuel rods and determined the wooden boxes they were buried in had degraded such that the fuel rods were in direct contact with the soil. The fuel rods were recovered and transferred to a modern fuel storage facility in 2007. Recovered identification tags and measured radiation fields were used to identify the inventory of these fuels. During the retrieval activity, a discrepancy was discovered between the anticipated number of fuel rods and the number found during the retrieval. A total of 32 fuel rods and cans of cut end pieces were recovered from the specified site, which was greater than the anticipated 19 fuel rods and cans. This discovery delayed the completion of the project, increased the associated costs, and required more than anticipated storage space in the modern fuel storage facility. A number of lessons learned were identified following completion of this project, the most significant of which was the potential for discrepancies within the historical records. Historical discrepancies are more likely to be resolved by comprehensive historical record searches and site characterizations. It was also recommended that a complete review of the wastes generated, and the total affected lands as a result of this historic 1952 NRX accident be undertaken. These lessons and recommendations have lead to changes in how the NLLP is executed in the CRL waste management areas. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lattice cell and full core physics of internally cooled annular fuel in heavy water moderated reactors

A program is underway at Atomic Energy of Canada Limited (AECL) to develop a new fuel bundle concept to enable greater burnups for PT-HWR (pressure tube heavy water reactor) cores. One option that AECL is investigating is an internally cooled annular fuel (ICAF) element concept. ICAF contains annular cylindrical pellets with cladding on the inner and outer diameters. Coolant flows along the outside of the element and through the centre. With such a concept, the maximum fuel temperature as a function of linear element rating is significantly reduced compared to conventional, solid-rod type fuel. The preliminary ICAF bundle concept considered in this study contains 24 half-metre long internally cooled annular fuel elements and one non-fuelled centre pin. The introduction of the non-fuelled centre pin reduces the coolant void reactivity (CVR), which is the increase in reactivity that occurs on voiding the coolant in accident scenarios. Lattice cell and full core physics calculations of the preliminary ICAF fuel bundle concept have been performed for medium burnups of approximately 18 GWd/tU using WIMS-AECL and reactor fuel simulation program (RFSP). The results will be used to assist in concept configuration optimization. The effects of radial and axial core power distributions, linear element power ratings, refuelling rates and operational power ramps have been analyzed. The results suggest that burnups of greater than 18 GWd/tU can be achieved in current reactor designs. At approximately 18 GWd/tU, expected maximum linear element ratings in a PT-HWR with online-refuelling are approximately 90 kW/m. These conditions would be prohibitive for solid-rod fuel, but may be possible in ICAF fuel given the reduced maximum fuel temperature as a function of linear element rating. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Decommissioning of Active Ventilation Systems in a Nuclear R and D Facility to Prepare for Building Demolition (Whiteshell Laboratories Decommissioning Project, Canada) - 13073

Whiteshell Laboratories (WL) is a nuclear research establishment owned by the Canadian government and operated by Atomic Energy of Canada Limited (AECL) since the early 1960's. WL is currently under a decommissioning license and the mandate is to remediate the nuclear legacy liabilities in a safe and cost effective manner. The WL Project is the first major nuclear decommissioning project in Canada. A major initiative underway is to decommission and demolish the main R and D Laboratory complex. The Building 300 R and D complex was constructed to accommodate laboratories and offices which were mainly used for research and development associated with organic-cooled reactors, nuclear fuel waste management, reactor safety, advanced fuel cycles and other applications of nuclear energy. Building 300 is a three storey structure of approximately 16,000 m{sup 2}. In order to proceed with building demolition, the contaminated systems inside the building have to be characterized, removed, and the waste managed. There is a significant focus on volume reduction of radioactive waste for the WL project. The active ventilation system is one of the significant contaminated systems in Building 300 that requires decommissioning and removal. The active ventilation system was designed to manage hazardous fumes and radioactivity from ventilation devices (e.g., fume hoods, snorkels and glove boxes) and to prevent the escape of airborne hazardous material outside of the laboratory boundary in the event of an upset condition. The system includes over 200 ventilation devices and 32 active exhaust fan units and high efficiency particulate air (HEPA) filters. The strategy to remove the ventilation system was to work from the laboratory end back to the fan/filter system. Each ventilation duct was radiologically characterized. Fogging was used to minimize loose contamination. Sections of the duct were removed by various cutting methods and bagged for temporary storage prior to disposition. Maintenance of building heating, ventilation and air conditioning (HVAC) balancing was critical to ensure proper airflow and worker safety. Approximately 103 m{sup 3} of equipment and materials were recovered or generated by the project. Low level waste accounted for approximately 37.4 m{sup 3}. Where possible, ducting was free released for metal recycling. Contaminated ducts were compacted into B-1000 containers and stored in a Shielded Modular Above-Ground Storage Facility (SMAGS) on the WL site awaiting final disposition. The project is divided into three significant phases, with Phases 1 and 2 completed. Lessons learned during the execution of Phases 1 and 2 have been incorporated into the current ventilation removal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Jupiter: A Proposed Benchmark for Lead Void Worth with Plutonium

In the summer of 2017, a series of measurements were performed at the National Criticality Experiments Research Center (NCERC) in collaboration with the Japanese Atomic Energy Agency (JAEA) to measure the reactivity worth of voids in an array of lead and plutonium. This experiment, called Jupiter, measured multiple configurations of an array of aluminum boxes containing plutonium, aluminum, and lead plates. For some configurations, a selection of the lead interstitial plates were swapped with aluminum spacer frames to create “voids” in the lead interstitial material. Comparing the excess reactivity of the systems provides an empirical value of the lead void reactivity worth. These measurements were part of a larger collaboration to measure lead void reactivity worth with multiple nuclear material types and enrichments. This included other measurement series with both highly-enriched uranium (HEU), and a mixture of HEU and natural uranium to simulate low-enriched uranium (LEU). These data sets will be useful to the JAEA for a potential lead-bismuth cooled accelerator driven system. Additionally, there are not very many benchmarks in the International Criticality Safety Benchmark Evaluation Project (ICSBEP) handbook sensitive to lead cross sections. Given that lead is widely used as a radiation shield and is part of new reactor designs, having more benchmarks in the ICSBEP handbook to better support cross section validation is important. Additional integral experiments could also aid in determining whether improvements have been made in new lead cross section evaluations. A benchmark evaluation for this experiment is being proposed in order to help fulfill these needs. Such evaluations contain both measured data, results from detailed transport code models, and analyses of the uncertainties associated with each. Examples of these uncertainties include the uncertainty in the measured excess reactivity, the composition of components, or their positioning within the model. This means it is easier to make comparisons between the measured and simulated data and better understand where improvements can be made to nuclear data.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Not all Greater-Than-Class c (GTCC) waste streams are created equal - 15373

Greater-Than-Class C (GTCC) waste is a low level radioactive waste (LLRW) that exceeds the Class C concentration limits in Part 61.55 of Title 10 of the Code of Federal Regulations. Typically, this waste consists of irradiated metal components from reactors such as core shrouds, support plates, and core barrels, as well as filters and resins from reactor operations and decommissioning. Sealed sources used at hospitals, medical schools, research facilities, and universities can also be classified as GTCC waste. A third category, 'Other Waste', consisting of contaminated equipment, rubble, scrap metal, filters, soil, and solidified sludges may be classified as GTCC waste based on their differing radionuclides and concentration levels. The Low-Level Radioactive Waste Policy Amendments Act of 1985 requires the Federal Government to take responsibility for the disposal of GTCC waste. All GTCC waste created from U.S. Nuclear Regulatory Commission (NRC) licensed activities, under the Atomic Energy Act of 1954, as amended, must be disposed of in an NRC licensed facility that has been determined to be adequate to protect public health and safety. Information from Argonne National Laboratory's supplemental report on GTCC waste from 2010 anticipates that the total volume of GTCC waste will be approximately 8,800 m{sup 3} (311,000 ft{sup 3}) and the projected activity of that waste will be 5.92 x 10{sup 6} TBq (160 MCi) with generation activities ending in 2083. Currently, there is no pathway for the disposal of GTCC waste in the United States. A performance-based approach may be used to subdivide GTCC waste into various waste streams by reviewing the characteristics of GTCC waste with its associated hazards. Characteristics of GTCC waste include half-life and concentration. In creating the 10 CFR Part 61 waste classification tables, which define GTCC concentrations, a number of assumptions were made regarding waste inventory and exposure scenarios for the inadvertent intruder for a generic LLRW disposal facility. The findings from other exposure scenarios (e.g., construction, agriculture, well drilling), together with the findings from evaluations of radiological characteristics of GTCC, could be used as part of a performance-based approach for categorizing GTCC waste. The findings may determine that some GTCC waste streams will be closer in characteristics to Class C waste, while other GTCC waste streams will have characteristics similar to high-level waste and may require a higher degree of isolation from the public. The application of a site-specific and performance-based approach to GTCC waste stream characterization could assist the NRC in developing specific technical requirements for future disposal of various types of GTCC waste. Examples of part of a performance-based approach that examine and evaluate the radiological characteristics of GTCC waste will be presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of an Integrated Waste Plan for Chalk River Laboratories - 13376

To further its Strategic Planning, the Atomic Energy of Canada Limited (AECL) required an effective approach to developing a fully integrated waste plan for its Chalk River Laboratories (CRL) site. Production of the first Integrated Waste Plan (IWP) for Chalk River was a substantial task involving representatives from each of the major internal stakeholders. Since then, a second revision has been produced and a third is underway. The IWP remains an Interim IWP until all gaps have been resolved and all pathways are at an acceptable level of detail. Full completion will involve a number of iterations, typically annually for up to six years. The end result of completing this process is a comprehensive document and supporting information that includes: - An Integrated Waste Plan document summarizing the entire waste management picture in one place; - Details of all the wastes required to be managed, including volume and timings by waste stream; - Detailed waste stream pathway maps for the whole life-cycle for each waste stream to be managed from pre-generation planning through to final disposition; and - Critical decision points, i.e. decisions that need to be made and timings by when they need to be made. A waste inventory has been constructed that serves as the master reference inventory of all waste that has been or is committed to be managed at CRL. In the past, only the waste that is in storage has been effectively captured, and future predictions of wastes requiring to be managed were not available in one place. The IWP has also provided a detailed baseline plan at the current level of refinement. Waste flow maps for all identified waste streams, for the full waste life cycle complete to disposition have been constructed. The maps identify areas requiring further development, and show the complexities and inter-relationships between waste streams. Knowledge of these inter-dependencies is necessary in order to perform effective options studies for enabling facilities that may be necessary for multiple related waste streams. The next step is to engage external stakeholders in the optioneering work required to provide enhanced confidence that the path forward identified within future iterations of the IWP will be acceptable to all. (authors)

54 ENVIRONMENTAL SCIENCES↗

Development and Implementation of a Comprehensive Program to Deal with Canada's Nuclear Legacy Liabilities

The Government of Canada nuclear legacy liabilities have resulted from 60 years of nuclear research and development (R and D) carried out on behalf of Canada by the National Research Council (1944 to 1952) and Atomic Energy of Canada Limited (AECL, 1952 to present). These liabilities are largely located at AECL research sites, and consist of shutdown research buildings (including several prototype and research reactors), a wide variety of buried and stored wastes, and contaminated lands. The shutdown buildings and contaminated lands need to be safely decommissioned to meet federal regulatory requirements, and long-term solutions need to be developed and implemented for management of the wastes. More than half of the liabilities are the result of Cold War activities during the 1940's, 50's and early 60's. The remaining liabilities stem from R and D for medical isotopes and nuclear reactor technology, as well as national science programs. About 70 percent of the liabilities are located at AECL's Chalk River Laboratories (CRL) in Ontario, and a further 20 percent are located at AECL's shutdown Whiteshell Laboratories in Manitoba. The remaining 10 percent relate largely to three shutdown prototype reactors in Ontario and Quebec, which were key to the developmental stage of Canada's CANDU reactor technology. The inventory of legacy waste includes spent fuel, high-level, intermediate-level and low-level solid and liquid radioactive waste, and wastes (largely contaminated soils) from site clean-up work across Canada. Most of the wastes are in raw, unconditioned form, and limited characterization information is available for the wastes generated in past decades. In many cases unique and potentially costly solutions will be required to recover, handle and process the wastes. In conclusion: the Government of Canada has initiated a program to deal with nuclear legacy liabilities dating back to the Cold War and the birth of nuclear technologies and medicine in Canada. The 5-year start-up phase will address immediate health, safety and environmental priorities, as well as provide the facilities, studies and plans required for subsequent phases. Over the next few years, the long-term strategy will be further developed and refined, and public consultations are planned to inform this work and decisions on the next phase of the strategy.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Innovation in Contracting Strategy for a Master Services Agreement for Remediation of Low Level Radioactive Waste - 18381

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL), on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada. The safety of workers, the public and the environment while delivering the PHAI on time and within budget is CNL's number one priority. The PHAI is being carried out as two projects - the Port Hope Project and the Port Granby Project. The Port Hope Project is the larger of the two and includes the cleanup of approximately 1.2 million cubic metres of historic waste from several locations, including the Port Hope Harbour, a closed municipal landfill and approximately 800 residential properties. This complex project requires contracting the services of qualified, skilled and experienced environmental remediation contractors to meet the diverse needs of the myriad tasks that comprise the remediation and restoration of all properties. This paper will highlight how the CNL contracting services team developed an innovative approach to a contracting strategy designed to deliver the safe execution of work and keep the project on time and within budget. The approach addresses the complexities of a scope of work that consists of multiple work packages to be executed both concurrently and in tandem, and that require highly specialized trades/skills, as well as high-level project management expertise to ensure seamless coordination among the various contractors. The author will discuss CNL's strategy to engage the market with a Request for Expression of Interest to identify potential qualified suppliers and gauge their level of interest, issue a Request for Prequalification (RFPQ) to determine eligible contractors and, ultimately, issue a Request for Proposal for a Master Services Agreement (MSA) that would competitively evaluate each contractor's direct experience, technical expertise, quality management programs, safety systems compliance and track record. Using CNL's experience as a case study, the paper will highlight how an innovative approach can positively affect project timelines by describing how CNL addressed the challenge associated with the limited time available to implement procurement processes and deliver a series of executed agreements while ensuring that work would begin on time and key project milestones would be met. The author will summarize how CNL's strategy put the project back on schedule, without compromising the process guideline/requirements, and ensured that a qualified and experienced set of contractors, committed to a strong safety culture, will be available to perform the work required when the cleanup in the Port Hope community begins in 2018. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remediation of Temporary Storage Sites in Support of the Port Hope Area Initiative - 20295

The Port Hope Area Initiative is a community-based solution for the long-term management of historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the Town of Port Hope which is located in Ontario, Canada. The Eldorado refinery, on the north shore of Lake Ontario, began refining radium-226 from pitchblende ore, later transitioning to the refining of uranium. Through the history of the operation, LLRW was deposited throughout the town of Port Hope as a result of fugitive emissions from the plant and/or through the re-use of process residues as building material and backfill. Historical clean-up activities conducted in the late 1970's involved the remediation of approximately 400 properties and the relocation of 100,000 cubic metres of contaminated soil to a disposal facility in Chalk River operated by Atomic Energy of Canada Limited (AECL). Owing to space limitations at that disposal facility, any LLRW identified through construction monitoring since that time has been stored in the community at three temporary storage sites located throughout the town. These include: the Centre Pier mound that contained approximately of 19,800 m{sup 3} of LLRW-impacted soil that originated from the construction of a new water treatment plant; two mounds located at a licensed storage facility containing LLRW obtained from residential clean-up activities (11,000 m{sup 3}); and a small pad adjacent to the municipal sewage treatment plant containing 2200 m{sup 3} of LLRW-containing sludge. With the construction of a new long-term waste management facility (LTWMF) that has been designed to house all of the LLRW identified within Port Hope, the three sites were early candidates for remediation. The clean-up of the three temporary storage sites was a significant milestone for the Port Hope Area Initiative. After a decade of planning and consultation, this work represents the first sites in the municipality to be remediated with the waste being safety removed and transferred to the newly constructed LTWMF. This paper discusses the challenges associated with the clean-up activities for these three sites and the strategies employed to address those challenges. These included weather-related challenges, owing to the seasons over which the work was conducted as well as those associated with working within a closely-knit community. Canadian Nuclear Laboratories (CNL), working on behalf of the federal government, has worked diligently to develop a positive and trusting relationship with the community. Consequently, the successful execution of this project needed to be sensitive to, and respectful of the needs of the community. In addition to the usual Health, Safety and Environment training, project staff received community awareness training that spoke to the history of this community-based initiative and the expected behavior when working within the community. Transportation routes were defined based on safety and the need to minimize disruption to local traffic while haul-times where scheduled around school bus hours to enhance public safety. The successful completion of this first of many remediation projects to be completed under the Port Hope Area Initiative reflected years of careful planning. Nevertheless, there were a number of 'lessons learned' that have been applied on other ongoing projects be completed under the Port Hope Area Initiative. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Baseline Concept Description of a Small Modular High Temperature Reactor

The objective of this report is to provide a description of generic small modular high temperature reactors (herein denoted as an smHTR), summarize their distinguishing attributes, and lay out the research and development (R&D) required for commercialization. The generic concepts rely heavily on the modular high temperature gas-cooled reactor designs developed in the 1980s which were never built but for which pre-licensing or certification activities were conducted. The concept matured more recently under the Next Generation Nuclear Plant (NGNP) project, specifically in the areas of fuel and material qualification, methods development, and licensing. As all vendor-specific designs proposed under NGNP were all both ‘small’ or medium-sized and ‘modular’ by International Atomic Energy Agency (IAEA) and Department of Energy (DOE) standards, the technical attributes, challenges, and R&D needs identified, addressed, and documented under NGNP are valid and appropriate in the context of Small Modular Reactor (SMR) applications. Although the term High Temperature Reactor (HTR) is commonly used to denote graphite-moderated, thermal spectrum reactors with coolant temperatures in excess of 650oC at the core outlet, in this report the historical term High Temperature Gas-Cooled Reactor (HTGR) will be used to distinguish the gas-cooled technology described herein from its liquid salt-cooled cousin. Moreover, in this report it is to be understood that the outlet temperature of the helium in an HTGR has an upper limit of 950 degrees C which corresponds to the temperature to which certain alloys are currently being qualified under DOE’s ARC program. Although similar to the HTGR in just about every respect, the Very High Temperature Reactor (VHTR) may have an outlet temperature in excess of 950 degrees C and is therefore farther from commercialization because of the challenges posed to materials exposed to these temperatures. The VHTR is the focus of R&D under the Generation IV program and its specific R&D needs will be included in this report when appropriate for comparison. The distinguishing features of the HTGR are the refractory (TRISO) coated particle fuel, the low-power density, graphite-moderated core, and the high outlet temperature of the inert helium coolant. The low power density and fuel form effectively eliminate the possibility of core melt, even upon a complete loss of coolant pressure and flow. The graphite, which constitutes the bulk of the core volume and mass, provides a large thermal buffer that absorbs fission heat such that thermal transients occur over a timespan of hours or even days. As chemically-inert helium is already a gas, there is no coolant temperature or void feedback on the neutronics and no phase change or corrosion product that could degrade heat transfer. Furthermore, the particle coatings and interstitial graphite retain fission products such that the source terms at the plant boundary remain well below actionable levels under all anticipated nominal and off-normal operating conditions. These attributes enable the reactor to supply process heat to a collocated industrial plant with negligible risk of contamination and minimal dynamic coupling of the facilities. The exceptional retentive properties of coated particle fuel in a graphite matrix were first demonstrated in the DRAGON reactor, a European research facility that began operation in 1964.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Baseline Concept Description of a Small Modular High Temperature Reactor

The objective of this report is to provide a description of generic small modular high temperature reactors (herein denoted as an smHTR), summarize their distinguishing attributes, and lay out the research and development (R&D) required for commercialization. The generic concepts rely heavily on the modular high temperature gas-cooled reactor designs developed in the 1980s which were never built but for which pre-licensing or certification activities were conducted. The concept matured more recently under the Next Generation Nuclear Plant (NGNP) project, specifically in the areas of fuel and material qualification, methods development, and licensing. As all vendor-specific designs proposed under NGNP were all both ‘small’ or medium-sized and ‘modular’ by International Atomic Energy Agency (IAEA) and Department of Energy (DOE) standards, the technical attributes, challenges, and R&D needs identified, addressed, and documented under NGNP are valid and appropriate in the context of Small Modular Reactor (SMR) applications. Although the term High Temperature Reactor (HTR) is commonly used to denote graphite-moderated, thermal spectrum reactors with coolant temperatures in excess of 650oC at the core outlet, in this report the historical term High Temperature Gas-Cooled Reactor (HTGR) will be used to distinguish the gas-cooled technology described herein from its liquid salt-cooled cousin. Moreover, in this report it is to be understood that the outlet temperature of the helium in an HTGR has an upper limit of 950 degrees C which corresponds to the temperature to which certain alloys are currently being qualified under DOE’s ARC program. Although similar to the HTGR in just about every respect, the Very High Temperature Reactor (VHTR) may have an outlet temperature in excess of 950 degrees C and is therefore farther from commercialization because of the challenges posed to materials exposed to these temperatures. The VHTR is the focus of R&D under the Generation IV program and its specific R&D needs will be included in this report when appropriate for comparison. The distinguishing features of the HTGR are the refractory (TRISO) coated particle fuel, the low-power density, graphite-moderated core, and the high outlet temperature of the inert helium coolant. The low power density and fuel form effectively eliminate the possibility of core melt, even upon a complete loss of coolant pressure and flow. The graphite, which constitutes the bulk of the core volume and mass, provides a large thermal buffer that absorbs fission heat such that thermal transients occur over a timespan of hours or even days. As chemically-inert helium is already a gas, there is no coolant temperature or void feedback on the neutronics and no phase change or corrosion product that could degrade heat transfer. Furthermore, the particle coatings and interstitial graphite retain fission products such that the source terms at the plant boundary remain well below actionable levels under all anticipated nominal and off-normal operating conditions. These attributes enable the reactor to supply process heat to a collocated industrial plant with negligible risk of contamination and minimal dynamic coupling of the facilities (Figure 1). The exceptional retentive properties of coated particle fuel in a graphite matrix were first demonstrated in the DRAGON reactor, a European research facility that began operation in 1964.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Baseline Concept Description of a Small Modular High Temperature Reactor

The objective of this report is to provide a description of generic small modular high temperature reactors (herein denoted as an smHTR), summarize their distinguishing attributes, and lay out the research and development (R&D) required for commercialization. The generic concepts rely heavily on the modular high temperature gas-cooled reactor designs developed in the 1980s which were never built but for which pre-licensing or certification activities were conducted. The concept matured more recently under the Next Generation Nuclear Plant (NGNP) project, specifically in the areas of fuel and material qualification, methods development, and licensing. As all vendor-specific designs proposed under NGNP were all both ‘small’ or medium-sized and ‘modular’ by International Atomic Energy Agency (IAEA) and Department of Energy (DOE) standards, the technical attributes, challenges, and R&D needs identified, addressed, and documented under NGNP are valid and appropriate in the context of Small Modular Reactor (SMR) applications. Although the term High Temperature Reactor (HTR) is commonly used to denote graphite-moderated, thermal spectrum reactors with coolant temperatures in excess of 650oC at the core outlet, in this report the historical term High Temperature Gas-Cooled Reactor (HTGR) will be used to distinguish the gas-cooled technology described herein from its liquid salt-cooled cousin. Moreover, in this report it is to be understood that the outlet temperature of the helium in an HTGR has an upper limit of 950 degrees C which corresponds to the temperature to which certain alloys are currently being qualified under DOE’s ARC program. Although similar to the HTGR in just about every respect, the Very High Temperature Reactor (VHTR) may have an outlet temperature in excess of 950 degrees C and is therefore farther from commercialization because of the challenges posed to materials exposed to these temperatures. The VHTR is the focus of R&D under the Generation IV program and its specific R&D needs will be included in this report when appropriate for comparison. The distinguishing features of the HTGR are the refractory (TRISO) coated particle fuel, the low-power density, graphite-moderated core, and the high outlet temperature of the inert helium coolant. The low power density and fuel form effectively eliminate the possibility of core melt, even upon a complete loss of coolant pressure and flow. The graphite, which constitutes the bulk of the core volume and mass, provides a large thermal buffer that absorbs fission heat such that thermal transients occur over a timespan of hours or even days. As chemically-inert helium is already a gas, there is no coolant temperature or void feedback on the neutronics and no phase change or corrosion product that could degrade heat transfer. Furthermore, the particle coatings and interstitial graphite retain fission products such that the source terms at the plant boundary remain well below actionable levels under all anticipated nominal and off-normal operating conditions. These attributes enable the reactor to supply process heat to a collocated industrial plant with negligible risk of contamination and minimal dynamic coupling of the facilities (Figure 1). The exceptional retentive properties of coated particle fuel in a graphite matrix were first demonstrated in the DRAGON reactor, a European research facility that began operation in 1964.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Twenty years of dry interim storage of spent nuclear fuel (SNF) in Germany- History and developments - 15575

According to article 6 of the German Atomic Energy Act, storage of nuclear fuel requires a license granted by the competent authority in this field, which is the Federal Office of Radiation Protection. In 1983 a license to store spent nuclear fuel (SNF) and later expanded for vitrified high level waste (HAW) for the interim storage facility in Gorleben was granted. Dry Interim storage at the NPP sites in its actual form started in 2002 in the interim storage facility next to the NPP Lingen. Since this time each NPP erected its own storage facility and three central storage facilities have been built. All of these facilities use dry storage in metallic casks. The actual storage licenses for SNF and the HAW (which is stored in Gorleben and Rubenow) are limited to 40 years starting with the first cask emplacement. As no opening of the cask is intended during the storage period the condition of the inventory and the cask before loading has to be known in detail. This requires for instance detailed knowledge of the history of the SNF loaded as well as supervision of the manufacturing process of the cask. Within the last twenty years several mishaps influenced the regulatory point of view. During a loading campaign in a boiling water reactor traces of pool water remained in the gasket slot and during the drying procedure crystalline boron salts prevented the required tightness. After that event a long-term experiment was started and is still going on which studies the effects of water and minor damages to the gasket. As well changes in the loading procedure have been introduced. The pressure switch used to monitor the pressure in the space between primary and secondary lid has a self surveillance function. This indicated a malfunction 23 times in the last twenty years. Examinations of all events indicated no systematic failure, but a weak point seems to be the plug-in connection. The manufacturer introduced some modifications to improve the system. Introduction of FEM methods in safety analysis to amend the existing methods of testing allowed a new view on and in the cask safety analysis. Progress in this field is closely connected to the available computing capacity and stipulates experts to ongoing improvement. After expiring of the storage license which will be the case for the first cask loaded in 1992 and stored in Ahaus 2032 an extension or a new license can only be granted if the at this time relevant requirements are met. This will require detailed knowledge about the happenings and accidents during the previous storage period. All experience of the periodic safety assessment (PSA) which started in 2013 and accompanying experiments conducted till now and during the licensed storage time will be needed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remediation of Centre Pier, Port Hope, Ontario: Historical, Logistical, Regulatory and Technical Challenges - 13118

Centre Pier is a 3.9 ha property owned by the Commissioners of the Port Hope Harbour in the Municipality of Port Hope, Ontario, Canada. It is centrally located on the Port Hope waterfront and is bounded on the west by the Port Hope Harbour, on the east by the Ganaraska River, on the south by Lake Ontario, and on the north by a railway corridor. The property is currently leased by the Commissioners of the Port Hope Harbour to the Cameco Corporation which owns the four onsite building that are used as warehouse space for their uranium conversion facility located on the western side of the Harbour. Remediation of this site forms part of the Port Hope Project being undertaken by Atomic Energy of Canada Limited (AECL) and Public Works and Government Services Canada (PWGSC) as part of the Port Hope Area Initiative (PHAI). Soil impacts include radiological, metals and petroleum hydrocarbons resulting from long term historical industrial use. Radiological impacts in soil extend across most of the site primarily within the upper metre of fill. Metals-contaminated soil is present across the entire site in the underlying fill material. The metals-contaminated fill extends to a maximum depth of 2.0 m below grade at the north end of the site which is underlain by peat. However, the metals-contaminated soil could extend to the top of the bedrock on the remainder of the site. Based on the elevation of the bedrock in the adjacent river and Harbour Basin, the metals-contaminated soil may extend to a depth of 5.6 m or 6.5 m below existing grade. Petroleum-contaminated soil is present on the southeast side of the site, where a storage tank farm was previously located. Challenges include: - The complex history of the site both relating to site use and Pier construction. Pier development began in the 1800's and was undertaken by many different entities. Modifications and repairs were made over the years resulting in several different types of Pier walls and fill that must be considered during remediation. A wide variety of industrial activity on the Pier including extensive foundry operations as well as the industrial nature of the fill used to construct the Pier has resulted in extensive contamination distribution. The Pier structure will require reinforcement to permit both the remediation of the Pier and the adjacent Harbour and remediation techniques will need to be well suited to minimize disruption of wall structures as well as being able to deal with fill ranging from ash to boulders. - Multiple stakeholders are responsible for building demolition, remediation of radiological impacts, remediation of industrial impacts and the use of the site as a staging area for Harbour sediment remediation. The successful remediation of the Centre Pier will require careful negotiation and planning for the various remediation activities noted above. - The depth of contamination on the Pier would result in the complete removal of the Pier if all contamination were to be excavated. Therefore, a Risk Assessment will be conducted to determine the appropriate means for in situ risk management for materials to be left in place below a proposed depth of 1.5 m below current grade. With the concurrence of the property owners and Provincial regulators, the Risk Assessment will be undertaken in accordance with the Provincial requirements that will ensure adequate protection of the environment and future users of the site. - The end use of the Pier has yet to be confirmed by the Municipality. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Accelerating the Whiteshell Laboratories Decommissioning Through the Implementation of a Projectized and Delivery-Focused Organization - 13074

Whiteshell Laboratories (WL) is a nuclear research site in Canada that was commissioned in 1964 by Atomic Energy of Canada Limited. It covers a total area of approximately 4,375 hectares (10,800 acres) and includes the main campus site, the Waste Management Area (WMA) and outer areas of land identified as not used for or impacted by nuclear development or operations. The WL site employed up to 1100 staff. Site activities included the successful operation of a 60 MW organic liquid-cooled research reactor from 1965 to 1985, and various research programs including reactor safety research, small reactor development, fuel development, biophysics and radiation applications, as well as work under the Canadian Nuclear Fuel Waste Management Program. In 1997, AECL made a business decision to discontinue research programs and operations at WL, and obtained government concurrence in 1998. The Nuclear Legacy Liabilities Program (NLLP) was established in 2006 by the Canadian Government to remediate nuclear legacy liabilities in a safe and cost effective manner, including the WL site. The NLLP is being implemented by AECL under the governance of a Natural Resources Canada (NRCan)/AECL Joint Oversight Committee (JOC). Significant progress has since been made, and the WL site currently holds the only Canadian Nuclear Safety Commission (CNSC) nuclear research site decommissioning license in Canada. The current decommissioning license is in place until the end of 2018. The present schedule planned for main campus decommissioning is 30 years (to 2037), followed by institutional control of the WMA until a National plan is implemented for the long-term management of nuclear waste. There is an impetus to advance work and complete decommissioning sooner. To accomplish this, AECL has added significant resources, reorganized and moved to a projectized environment. This presentation outlines changes made to the organization, the tools implemented to foster projectization, and the benefits and positive impacts on schedule and delivery. A revised organizational structure was implemented in two phases, starting 2011 April 1, to align WL staff with the common goal of decommissioning the site through the direction of the WL Decommissioning Project General Manager. On 2011 September 1, the second phase of the reorganization was implemented and WL Decommissioning staff was organized under five Divisions: Programs and Regulatory Compliance, General Site Services, Decommissioning Strategic Planning, Nuclear Facilities and Project Delivery. A new Mission, Vision and Objectives were developed for the project, and several productivity enhancements are being implemented. These include the use of an integrated and fully re-sourced Site Wide Schedule that is updated and reviewed at Plan-of-the-Week meetings, improved work distribution throughout the year, eliminating scheduling 'push' mentality, project scoreboards, work planning implementation, lean practices and various process improvement initiatives. A revised Strategic Plan is under development that reflects the improved project delivery capabilities. As a result of these initiatives, and a culture change towards a projectized approach, the decommissioning schedule will be advanced by approximately 10 years. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Long Term Storage with Surveillance of Canadian Prototype Nuclear Power Reactors

Atomic Energy of Canada (AECL) was originally formed by the government of Canada in 1952 to perform research in radiation and nuclear areas. In the mid 1950's Canada decided to limit itself to peaceful uses of nuclear energy and AECL embarked on several research and development programs, one of them being the development of nuclear power plants. This led to the development of the CANDU{sup TM} design of heavy water power reactors, of which there are now 29 operating around the world. This presentation discusses the present state of the first two CANDU{sup TM} prototype reactors and a prototype boiling light water reactor and lessons learnt after being in a long-term storage with surveillance state for more than 20 years. AECL facilities undergo decommissioning by either a prompt or a deferred removal approach. Both approaches are initiated after an operating facility has been declared redundant and gone through final operational shutdown. For the deferred approach, initial decommissioning activities are performed to put the facility into a sustainable, safe, shutdown state to minimize the hazards and costs of the ensuing extended storage with surveillance (SWS) or Safestor phase. At the appropriate time, the facility is dismantled and removed, or put into a suitable condition for re-use. AECL has a number of facilities that were built during its history, and some of these are now redundant or will become redundant in the near future. The deferred removal approach is part of AECL's decommissioning strategy for several reasons: 1. Reduction in radiation doses to workers during the final dismantling, 2. No facilities are available yet in Canada for the management of quantity of wastes arising from decommissioning, 3. Financial constraints presented by the number of facilities that will undergo decommissioning, compared to the availability of funds to carry out the work. This has led to the development of a comprehensive decommissioning plan that includes all of AECL's redundant and presently operating facilities. Several significant issues have arisen over the decades these reactors have been in the SWS phase. With the long time frames encompassed by this approach to decommissioning, the storage and maintenance of facility information for future decommissioning, and the knowledge and training of successive generations of staff to perform facility inspections and maintenance are major issues. Complacency of both staff and management is a potential issue. The problem arises primarily because these facilities have been put into a comparatively low hazard state, are remotely located, and not much changes over time and changes are slow. During the period that these facilities have been in this state, regulatory scrutiny and expectations have increased. This along with continuing changes in regulatory staff requires a continuous education and communication activity with the regulator. Because of the long time frames involved, the building structures continue to deteriorate slowly, and repairs and maintenance are required upon occasion. The costs can be significant, for example, to replace a roof. When these occasions arise, the balance of cost and benefit is always questioned, i.e., 'Wouldn't it be better to spend the money on dismantling rather than fixing?'. One positive note is that ancillary buildings that either have very low radiation hazards or were decontaminated during the initial decommissioning activities have been used for several alternate uses. This has helped to defray costs, and also keeps an interest in maintaining the building structures and systems in good condition during the SWS phase. Over the past few years, the lessons learnt from these and other facilities in SWS, have been addressed in a holistic manner by moving from a short-term, project-oriented approach to a comprehensive, long term stewardship approach. Key to this approach was the development of an integrated plan to decommission all of AECL's facilities. One of the prime results of the implementation of this plan was the development of an organizational structure that addressed the lessons learnt to date including information management, quality assurance, training, waste management, funding, etc. that are required to successfully maintain these prototype reactors until they can be fully decommissioned.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗