Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “adaptive scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Near-optimal routing of noisy quantum states

Placement, routing, and scheduling are essential tasks for near-optimal performance of programs for noisy quantum processors. Reliable execution of an arbitrary quantum circuit on current devices requires routing methods that overcome connectivity limitations while meeting data locality requirements. However, current devices also express highly variable noise levels in both the quantum gates and quantum registers. This requires any routing algorithm to be adaptive to both the circuit and the operating conditions. We demonstrate near-optimal routing methods of noisy quantum states that minimize the overall error of data movement while also limiting the computational complexity of routing decisions. We evaluate our methods against the noise characteristics of a 20-qubit superconducting quantum processor.

Sadlier III, Ronald↗

Safety-Related Instrumentation & Control Pilot Upgrade Initiation Phase Implementation Report

This research report (1) describes the process followed and products developed during the SR I&C Pilot Project Initial Scoping Phase, and (2) captures lessons learned. Exelon Generation and LWRS collaborated to develop a Digital Transformation Strategy as part of a larger Advanced Concept of Operations. The proposed SR I&C Pilot Upgrade provides a foundation stone for this Digital Transformation that will improve plant safety, reliability, and operational performance while lowering plant Total Cost of Ownership (TCO). Initial Scoping Phase activities for this Pilot Project have been performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process (SDP) [Reference 2], NISP-EN-04, Standard Digital Engineering Process (SDEP) [Reference 3], and Electric Power Research Institute (EPRI) Report 3002011816, Digital Engineering Guide (DEG). Completing Initial Scoping Phase Engineering and Operations, Licensing, and Project Management Activities was necessary to sufficiently bound the scope, schedule, and estimated cost of the Project to enable utility management to authorize moving into the Conceptual Design Phase. A significant finding of the Business Case Analysis (BCA) methodology developed and applied as part of this effort was that the growth rate of material costs for sustaining the operation of obsolete SR I&C equipment is accelerating. This directly contributed to the Project Economic Analysis created to justify continuing the Project. Project Initial Scoping Phase lessons learned have also been captured to assist the larger industry in understanding the Digital Transformation Strategy and SR I&C Pilot Project Initial Scoping Phase efforts. This is in keeping with the public/private partnership that has been established between the Department of Energy (DOE) and Exelon for this effort with engagement from the NRC. By addressing first-of-a-kind (FOAK) risks and capturing lessons learned, the SR I&C Pilot Upgrade Project addresses technical, regulatory, and business risks to enable subsequent implementers of similar upgrades.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Network Communication as a Service-Oriented Capability

In widely distributed systems generally, and in science-oriented Grids in particular, software, CPU time, storage, etc., are treated as"services" -- they can be allocated and used with service guarantees that allows them to be integrated into systems that perform complex tasks. Network communication is currently not a service -- it is provided, in general, as a"best effort" capability with no guarantees and only statistical predictability. In order for Grids (and most types of systems with widely distributed components) to be successful in performing the sustained, complex tasks of large-scale science -- e.g., the multi-disciplinary simulation of next generation climate modeling and management and analysis of the petabytes of data that will come from the next generation of scientific instrument (which is very soon for the LHC at CERN) -- networks must provide communication capability that is service-oriented: That is it must be configurable, schedulable, predictable, and reliable. In order to accomplish this, the research and education network community is undertaking a strategy that involves changes in network architecture to support multiple classes of service; development and deployment of service-oriented communication services, and; monitoring and reporting in a form that is directly useful to the application-oriented system so that it may adapt to communications failures. In this paper we describe ESnet's approach to each of these -- an approach that is part of an international community effort to have intra-distributed system communication be based on a service-oriented capability.

99 GENERAL AND MISCELLANEOUS↗

2020 Exascale Computing Project Annual Meeting (Executive Summary Report)

The Exascale Computing Project (ECP) delivers specific applications, software products, and outcomes on DOE computing facilities. Integration across these elements for specific hardware technologies for exascale system instantiations is fundamental to ECP success. The outcome of the ECP is the delivery of a capable exascale computing ecosystem to provide breakthrough solutions addressing our most critical challenges in scientific discovery, energy assurance, economic competitiveness, and national security. This outcome is not a matter of ensuring more powerful computing systems. The ECP is designed to create more valuable and rapid insights from a wide variety of applications (“capable”), which requires a much higher level of inherent efficacy in all methods, software tools, and ECP-enabled computing technologies to be acquired by DOE laboratories (“ecosystem”). The ECP annual meeting provides a unique opportunity for the core technical expertise in the United States focused on achieving this next plateau of computational science and computing performance to engage in direct discussions on project execution. Face-to-face gatherings in technical communities like this are common and needed for the exchange of scientific ideas and technical performance. The ECP annual meeting stands apart from other technical conferences and meetings in the computing community as it is uniquely and solely focused on the execution of the ECP and the integration of technical activities leading to the creation of the exascale computing ecosystem for the future. The direct interaction of key critical technical staff, who are leaders in their respective fields, and the resulting give-and-take between software, applications, and hardware and the technical co-design therein, is unique and essential to the effective execution of the ECP. The first annual meeting was held in Knoxville, Tennessee, January 31 – February 2, 2017 and brought together, for the first time, a diverse collection of researchers from 16 DOE national laboratories as well as university computer and computational science researchers to discuss shared problems and joint solutions for the development of a capable exascale computing ecosystem. These interactions resulted in focused technical plans and an energized community centered on advances for ECP. The second annual meeting was held in Knoxville, Tennessee, February 5–9, 2018. It included 643 individual thought leaders and performers in application development, software research and deployment, and hardware research and integrators, all of whom are part of the multifaceted, billion dollar HPC community. This meeting provided a platform to discuss and disseminate numerous examples where researchers with common goals and synergistic solutions came together for the first time to deliver tangible results. Additionally, at the 2018 meeting, ECP researchers had the opportunity to digest all US HPC vendor R&D product roadmaps pointing to exascale – not only to learn how their research can play a role, but, more importantly, to influence those roadmaps to ensure successful delivery on DOE applications that will contribute to (if not solve) problems of national interest in national security, science, energy, and health, as well as growing security threats. The third annual meeting was held in Houston, Texas, January 14–17, 2019. With a 19% increase in the number of registrations (768 people), and the change in location, the third annual meeting was considered the most impactful of the three at the time. The new website provided a better platform for the dissemination of the content, the new venue as a meeting hotel instead of a conference center facilitated interactions and discussions after event hours, and the addition of an award-winning mobile event conference app (Whova) transformed dramatically the attendee experience at the event. This fourth annual meeting was held in Houston, Texas, February 3-7, 2020. This meeting had an increase in the number of attendees for a total of 824 people registered (782 attendees) and included numerous enhancements based on feedback and lessons learned from previous meetings, some of which are listed here: Improved quality of the sessions, their material and the whole program.; Had more industry participation and addition of external collaborators from overseas.; Published the full agenda earlier to better accommodate attendance and travel plans based on schedule.; Centralized all sessions in one venue.; Provided additional hotels and room blocks for the attendees.; Improved communication with the audience (links, material, directions, notifications, etc.) to go paperless.; Enhanced side meeting scheduling, management and user experience.; Made available additional space and tables for impromptu meetings and side discussions.; Improved IT and A/V solutions for speakers. In addition, our final survey captured the following points as opportunities for improvement in future meetings: consider a different meeting location that is more pedestrian friendly, reduce talks during working meals to allow more collaboration and informal time, adapt the agenda to acknowledge attendees from different timezones, consider recording some of the tutorials and/or sessions to share broadly with the HPC community, have a larger poster room, provide additional power strips, and improve the WiFi.

97 MATHEMATICS AND COMPUTING↗

Automatic learning rate adjustment for self-supervising autonomous robot control

Described is an application in which an Artificial Neural Network (ANN) controls the positioning of a robot arm with five degrees of freedom by using visual feedback provided by two cameras. This application and the specific ANN model, local liner maps, are based on the work of Ritter, Martinetz, and Schulten. We extended their approach by generating a filtered, average positioning error from the continuous camera feedback and by coupling the learning rate to this error. When the network learns to position the arm, the positioning error decreases and so does the learning rate until the system stabilizes at a minimum error and learning rate. This abolishes the need for a predetermined cooling schedule. The automatic cooling procedure results in a closed loop control with no distinction between a learning phase and a production phase. If the positioning error suddenly starts to increase due to an internal failure such as a broken joint, or an environmental change such as a camera moving, the learning rate increases accordingly. Thus, learning is automatically activated and the network adapts to the new condition after which the error decreases again and learning is 'shut off'. The automatic cooling is therefore a prerequisite for the autonomy and the fault tolerance of the system.

Arras, Michael K.↗

UVSTAR: An imaging spectrograph with telescope for the Shuttle Hitchhiker-M platform

UVSTAR is an EUV spectral imager intended as a facility instrument devoted to solar system and astronomy studies. It covers the wavelength range of 500 to 1250 A, with sufficient spectral resolution to separate emission lines and to form spectrally resolved images of extended plasma sources. Targets include the Io plasma torus at Jupiter, hot stars, planetary nebulae and bright galaxies. UVSTAR consists of a pair of telescopes and concave grating spectrographs that cover the overlapping spectral ranges of 500-900 and 850-1250 A. The telescopes use two 30 cm diameter off-axis paraboloids having focal length of 1.5 m. An image of the target is formed at the entrance slits of the two concave grating spectrographs. The gratings provide dispersion and re-image the slits at the detectors, intensified CCD's. The readout format of the detectors can be chosen by computer, and three slit widths are selectable to adapt the instrument to specific tasks. UVSTAR has internal gimbals which allow rotation of plus or minus 3 deg about each of two axes. Dedicated finding and tracking telescopes will acquire and track the target after rough pointing is achieved by orienting the Orbiter. Responsibilities for implementation and utilization of UVSTAR are shared by groups in Italy and the U.S. UVSTAR is scheduled for flight in early 1995, timed for an opportunity to observe the Jovian system.

Stalio, Roberto↗

Controlled Aeroelastic Response and Airfoil Shaping Using Adaptive Materials and Integrated Systems

This paper presents an overview of several activities of the Aeroelasticity Branch at the NASA Langley Research Center in the area of applying adaptive materials and integrated systems for controlling both aircraft aeroelastic response and airfoil shape. The experimental results of four programs are discussed: the Piezoelectric Aeroelastic Response Tailoring Investigation (PARTI); the Adaptive Neural Control of Aeroelastic Response (ANCAR) program; the Actively Controlled Response of Buffet Affected Tails (ACROBAT) program; and the Airfoil THUNDER Testing to Ascertain Characteristics (ATTACH) project. The PARTI program demonstrated active flutter control and significant rcductions in aeroelastic response at dynamic pressures below flutter using piezoelectric actuators. The ANCAR program seeks to demonstrate the effectiveness of using neural networks to schedule flutter suppression control laws. Th,e ACROBAT program studied the effectiveness of a number of candidate actuators, including a rudder and piezoelectric actuators, to alleviate vertical tail buffeting. In the ATTACH project, the feasibility of using Thin-Layer Composite-Uimorph Piezoelectric Driver and Sensor (THUNDER) wafers to control airfoil aerodynamic characteristics was investigated. Plans for future applications are also discussed.

Pinkerton, Jennifer L.↗

Evaluations of an adaptive planning technique incorporating dose feedback in image-guided radiotherapy of prostate cancer

Purpose: Online image guidance (IG) has been used to effectively correct the setup error and inter-fraction rigid organ motion for prostate cancer. However, planning margins are still necessary to account for uncertainties such as deformation and intra-fraction motion. The purpose of this study is to investigate the effectiveness of an adaptive planning technique incorporating offline dose feedback to manage inter-fraction motion and residuals from online correction. Methods: Repeated helical CT scans from 28 patients were included in the study. The contours of prostate and organs-at-risk (OARs) were delineated on each CT, and online IG was simulated by matching center-of-mass of prostate between treatment CTs and planning CT. A seven beam intensity modulated radiation therapy (IMRT) plan was designed for each patient on planning CT for a total of 15 fractions. Dose distribution at each fraction was evaluated based on actual contours of the target and OARs from that fraction. Cumulative dose up to each fraction was calculated by tracking each voxel based on a deformable registration algorithm. The cumulative dose was compared with the dose from initial plan. If the deviation exceeded the pre-defined threshold, such as 2% of the D{sub 99} to the prostate, an adaptive planning technique called dose compensation was invoked, in which the cumulative dose distribution was fed back to the treatment planning system and the dose deficit was made up through boost radiation in future treatment fractions. The dose compensation was achieved by IMRT inverse planning. Two weekly compensation delivery strategies were simulated: one intended to deliver the boost dose in all future fractions (schedule A) and the other in the following week only (schedule B). The D{sub 99} to prostate and generalized equivalent uniform dose (gEUD) to rectal wall and bladder were computed and compared with those without the dose compensation. Results: If only 2% underdose is allowed at the end of the treatment course, then 11 patients fail. If the same criteria is assessed at the end of each week (every five fractions), then 14 patients fail, with three patients failing the 1st or 2nd week but passing at the end. The average dose deficit from these 14 patients was 4.4%. They improved to 2% after the weekly compensation. Out of these 14 patients who needed dose compensation, ten passed the dose criterion after weekly dose compensation, three patients failed marginally, and one patient still failed the criterion significantly (10% deficit), representing 3.6% of the patient population. A more aggressive compensation frequency (every three fractions) could successfully reduce the dose deficit to the acceptable level for this patient. The average number of required dose compensation re-planning per patient was 0.82 (0.79) per patient for schedule A (B) delivery strategy. The doses to OARs were not significantly different from the online IG only plans without dose compensation. Conclusions: We have demonstrated the effectiveness of offline dose compensation technique in image-guided radiotherapy for prostate cancer. It can effectively account for residual uncertainties which cannot be corrected through online IG. Dose compensation allows further margin reduction and critical organs sparing.

61 RADIATION PROTECTION AND DOSIMETRY↗

SunDial – An Integrated SHINES System to Enable High-penetration Feeder-level PV

The Project Team of Fraunhofer USA, National Grid, and IPKeys developed and conducted a pilot deployment of the SunDial system, a virtual power plant platform that enables high-penetrations of solar PV to be integrated into the distribution grid. The pilot was conducted over a 15-month period from August 2018 through October 2019 on a National Grid distribution feeder in Shirley, MA. A vendor-agnostic control platform (the “Global Scheduler”) optimally shaped the net load for a virtual portfolio of non-co-located DERs based on user-defined policy objectives. The goal of the SunDial project was to simplify and reduce the risk associated with the deployment of solar in high-penetration environments by: (1) Developing an open-source, vendor-agnostic dispatch platform that can be readily adapted to optimize control of DERs over a variety of use cases; (2) Developing auto-calibrating load and solar prediction methodologies that can be readily implemented and scaled to new deployments; (3) Developing a methodology to use demand-side management with traditional electrochemical energy storage to provide “load shaping” services in high solar penetration environments; (4) Using grid-scale storage to minimize short-term intermittency association with PV production; and (5) Deploying on the National Grid distribution system to gain experience on the potential for (and limits of) integrated storage with demand-side management.

14 SOLAR ENERGY↗

Information adaptive system of NEEDS

The NASA End-to-End Data System (NEEDS) program was initiated by NASA to improve significantly the state of the art in acquisition, processing, and distribution of space-acquired data for the mid-1980s and beyond. The information adaptive system (IAS) is a program element under NEEDS Phase II which addresses sensor specific processing on board the spacecraft. The IAS program is a logical first step toward smart sensors, and IAS developments - particularly the system components and key technology improvements - are applicable to future smart efforts. The paper describes the design goals and functional elements of the IAS. In addition, the schedule for IAS development and demonstration is discussed.

Howle, W. M., Jr.↗

NASA Astronauts on Soyuz: Experience and Lessons for the Future

The U. S., Russia, and, China have each addressed the question of human-rating spacecraft. NASA's operational experience with human-rating primarily resides with Mercury, Gemini, Apollo, Space Shuttle, and International Space Station. NASA s latest developmental experience includes Constellation, X38, X33, and the Orbital Space Plane. If domestic commercial crew vehicles are used to transport astronauts to and from space, Soyuz is another example of methods that could be used to human-rate a spacecraft and to work with commercial spacecraft providers. For Soyuz, NASA's normal assurance practices were adapted. Building on NASA's Soyuz experience, this report contends all past, present, and future vehicles rely on a range of methods and techniques for human-rating assurance, the components of which include: requirements, conceptual development, prototype evaluations, configuration management, formal development reviews (safety, design, operations), component/system ground-testing, integrated flight tests, independent assessments, and launch readiness reviews. When constraints (cost, schedule, international) limit the depth/breadth of one or more preferred assurance means, ways are found to bolster the remaining areas. This report provides information exemplifying the above safety assurance model for consideration with commercial or foreign-government-designed spacecraft. Topics addressed include: U.S./Soviet-Russian government/agency agreements and engineering/safety assessments performed with lessons learned in historic U.S./Russian joint space ventures

Source record↗

ISS Double-Gimbaled CMG Subsystem Simulation Using the Agile Development Method

This paper presents an evolutionary approach in simulating a cluster of 4 Control Moment Gyros (CMG) on the International Space Station (ISS) using a common sense approach (the agile development method) for concurrent mathematical modeling and simulation of the CMG subsystem. This simulation is part of Training systems for the 21st Century simulator which will provide training for crew members, instructors, and flight controllers. The basic idea of how the CMGs on the space station are used for its non-propulsive attitude control is briefly explained to set up the context for simulating a CMG subsystem. Next different reference frames and the detailed equations of motion (EOM) for multiple double-gimbal variable-speed control moment gyroscopes (DGVs) are presented. Fixing some of the terms in the EOM becomes the special case EOM for ISS's double-gimbaled fixed speed CMGs. CMG simulation development using the agile development method is presented in which customer's requirements and solutions evolve through iterative analysis, design, coding, unit testing and acceptance testing. At the end of the iteration a set of features implemented in that iteration are demonstrated to the flight controllers thus creating a short feedback loop and helping in creating adaptive development cycles. The unified modeling language (UML) tool is used in illustrating the user stories, class designs and sequence diagrams. This incremental development approach of mathematical modeling and simulating the CMG subsystem involved the development team and the customer early on, thus improving the quality of the working CMG system in each iteration and helping the team to accurately predict the cost, schedule and delivery of the software.

Inampudi, Ravi↗

Building the RS-25 Engine for NASA’s Next Generation of Exploration.

NASA is aggressively pursuing a human lunar return to the Moon with the Artemis Program. The Space Launch System (SLS) is critical to the transportation architecture, providing both crew and cargo capability. To accelerate SLS development, NASA settled on space shuttle heritage propulsion technologies. Early missions will use repurposed RS-25 engines from the Shuttle Program adapted to SLS requirements. For future missions, however, NASA and engine contractor Aerojet Rocketdyne are restarting RS-25 production with a goal of using the latest manufacturing technologies to produce an RS-25 variant that will cost at least 30 percent less than the shuttle-era engines developed and flown for almost 30 years. The prospect of restarting the production line on these engines after many years and modifying the engine to reduce cost and better match the needs of the SLS vehicle presented unique challenges and opportunities for NASA and Aerojet Rocketdyne. NASA and AR are now deep into the process of adapting 16 RS-25 engines for the first four SLS Artemis flights and building the first RS-25 “Restart” engines for future Artemis missions. In addition to navigating programmatic, technical, and logistical challenges with the current RS-25 production work, NASA and AR have partnered to pursue new methods of building this engine through advanced manufacturing techniques to further reduce the cost and schedule required to build each RS-25 engine to contribute to the long-term affordability of the SLS vehicle. This presentation will discuss the goals for the restart program, the challenges, and results to date.

Jessica Jean Wood↗

Shipping Remote Handled Transuranic Waste to the Waste Isolation Pilot Plant - An Operational Experience

On January 18, 2007, the first ever shipment of Remote Handled Transuranic (RH TRU) waste left the gate at the Idaho National Laboratory (INL), headed toward the Waste Isolation Pilot Plant (WIPP) for disposal, thus concluding one of the most stressful, yet rewarding, periods the authors have ever experienced. The race began in earnest on October 16, 2006, with signature of the New Mexico Environment Department Secretary's Final Order, ruling that the '..draft permit as changed is hereby approved in its entirety.' This established the effective date of the approved permit as November 16, 2006. The permit modification was a consolidation of several Class 3 modification requests, one of which included incorporation of RH TRU requirements and another of which incorporated the requirements of Section 311 of Public Law 108-137. The obvious goal was to complete the first shipment by November 17. While many had anticipated its approval, the time had finally come to actually implement, and time seemed to be the main item lacking. At that point, even the most aggressive schedule that could be seriously documented showed a first ship date in March 2007. Even though planning for this eventuality had started in May 2005 with the arrival of the current Idaho Cleanup Project (ICP) contractor (and even before that), there were many facility and system modifications to complete, startup authorizations to fulfill, and many regulatory audits and approvals to obtain before the first drum could be loaded. Through the dedicated efforts of the ICP workers, the partnership with Department of Energy (DOE) - Idaho, the coordinated integration with the Central Characterization Project (CCP), the flexibility and understanding of the regulatory community, and the added encouragement of DOE - Carlsbad Field Office and at Headquarters, the first RH TRU canister was loaded on December 22, 2006. Following final regulatory approval on January 17, 2007, the historic event finally occurred the following day. While some of the success of this endeavor can be attributed to the sheer will and determination of the individuals involved, the fact that it was established and managed as a separate sub-project under the ICP, accounts for a majority of the success. Utilizing a structured project management approach, including development of, and management to, a performance baseline, allowed for timely decision making and the flexibility to adapt to changing conditions as the various aspects of the project matured. This paper provides some insight into how this was achieved, in a relatively short time, and provides an overview of the experience of start-up of a new retrieval, characterization, loading, and transportation operation in the midst of an aggressive cleanup project. Additionally, as one might expect, everything within the project did not go as planned, which provides a great opportunity to discuss some lessons learned. Finally, the first shipment was just the beginning. There are 224 additional shipments scheduled. In keeping with the theme of WM 2008, Phoenix Rising: Moving Forward in Waste Management, this paper will address the future opportunities and challenges of RH TRU waste management at the INL. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Stocking of Offsite Waters for Hungry Horse Dam Mitigation Creston National Fish Hatchery, FY 2006 Annual Report.

A total of 350,000, M012 strain, westslope cutthroat trout (WCT) eggs were received from Montana Fish Wildlife & Parks (MFWP), Washoe Park State Fish Hatchery in June of 2005 to accomplish this fishery management objective. These eggs were incubated, hatched and reared entirely inside the hatchery nursery building using a protected well water supply. Fish grew according to schedule and survival was excellent. The hatchery achieved a 0.78 feed fed to pounds gained conversion ratio for this group of WCT. Not all of the progenies from this fish lot were used for Hungry Horse Dam Fishery Mitigation Implementation. Some were used for other regional fishery management projects. Westslope cutthroat trout were reared using approved fish culture techniques as recommended in the USFWS Fish Hatchery Management Handbook and also utilizing a regimen adapted for hatchery specific site conditions. The fish health for these WCT was very good. Survival from first feeding fry stage to stocking was 79%. The hatchery had an annual fish health inspection performed by the USFWS Bozeman Fish Health Center in mid March of 2006. This inspection found all fish lots at Creston to be disease free. The Montana State Fish Health Board has placed the hatchery under a limited quarantine since May of 2005 due to an epizootic of Furunculosis. This classification has allowed the Creston NFH to stock disease free fish in locations approved by regional fish managers. The hatchery has been working with the State Fish Pathologist to remove the limited quarantine classification from the facility. Although fish health for all station fish lots remains disease free, MFWP has asserted it will not remove the limited quarantine until the new influent water treatment system, including the ultraviolet disinfection unit, is running full time, year round. The USFWS is working to secure the additional funding necessary to operate the treatment building year round. Distribution of the WCT took place from March through June. The stocking locations on the Flathead Reservation and State managed waters were identified by Confederated Salish and Kootenai Tribe (CSKT) and MFWP fishery biologists. Post release survival and angler success is monitored routinely by CSKT and MFWP fishery technicians. Stocking numbers and locations vary annually based on the results of biological monitoring, creel evaluations and adaptive management decisions. A total of 99,126 WCT were stocked during nine distribution trips in management approved waters (see Table 1). The average size of WCT at stocking was 3.91-inches. A total of 101,600, Arlee strain, rainbow trout (RBT) eggs were received from the Ennis National Fish Hatchery, Ennis, Montana, in December of 2005 and 35,000 Kamloops strain eggs were received from Murray Springs SFH, Eureka, Montana, in March of 2006 to accomplish this fishery management objective. The RBT were reared using approved fish culture techniques as recommended in the USFWS Fish Hatchery Management Handbook. There was no fish health related problems associated with this lot of fish. Survival from swim up fry stage to stocking was 93% for the Arlee's and 79% for the Kamloops. The hatchery achieved a 0.68 feed fed to pounds gained conversion ratio for the Arlee and 0.97 for the Kamloops RBT. The excellent feed conversion ratio can be attributed to refined feeding techniques and the use of an extruded high performance fry feed made with premium fish meal and marine fish oil. The Arlee strain of rainbow trout is requested for this fishery mitigation objective because the chosen stocking locations are terminal basin reservoirs or lakes, habitat conditions prevent natural spawning runs and returns to the creel are more favorable then for native westslope cutthroat trout. MFWP also requested a fall plant of Kamloops strain RBT and they will be evaluated for performance and future fall stockings in Echo Lake. Post release survival and angler success is monitored routinely by the Confederated Salish and Kootenai Tribe (CSKT) and Montana Fish Wildlife & Parks (MFWP) fishery technicians. Stocking numbers and locations vary annually based on the results of biological monitoring, creel evaluations and habitat conditions. The RBT were stocked in six distribution trips from June through September. The number of fish stocked and the receiving waters are identified below (see Table 2).

13 HYDRO ENERGY↗

NASA's In-Space Manufacturing Project: A Roadmap for a Multimaterial Fabrication Laboratory in Space

Human space exploration to date has been limited to low Earth orbit and the moon. The International Space Station (ISS) provides a unique opportunity for NASA to partner with private industry for development and demonstration of the technologies needed to support exploration initiatives. One challenge that is critical to sustainable and safer exploration is the ability to manufacture and recycle materials in space. This paper provides an overview of NASA's in-space manufacturing (ISM) project, its past and current activities (2014-2017), and how technologies under development will ultimately culminate in a multimaterial fabrication laboratory ("ISM FabLab") to be deployed on the International Space Station in the early 2020s. ISM is a critical capability for the long endurance missions NASA seeks to undertake in the coming decades. An unanticipated failure that can be adapted for in low earth orbit, through a resupply launch or a return to earth, may instead result in a loss of mission while in transit to Mars. To have a suite of functional ISM capabilities that are compatible with NASA's exploration timeline, ISM must be equipped with the resources necessary to develop these technologies and deploy them for testing prior to the scheduled de-orbit of ISS in 2024. The presentation provides a broad overview of ISM projects activities culminating with the Fabrication Laboratory for ISS. In 2017, the in-space manufacturing project issued a broad agency announcement for this capability. Requirements of the Fabrication Laboratory as stated in the solicitation will be discussed. The FabLab will move NASA and private industry significantly closer to changing historical paradigms for human spaceflight where all materials used in space are launched from earth. While the current ISM FabLab will be tested on ISS, future systems are eventually intended for use in a deep space habitat or transit vehicle. The work of commercial companies funded under NASA's Small Business Innovative Research Program (SBIR) is also discussed, as these activities, from development of recyclable packaging for ISS to additive manufacturing capabilities for metals and electronics, could also potentially be infused into future exploration capabilities. Key data from ISM projects to date will also be summarized.

Prater, Tracie↗

NASA's In-Space Manufacturing Project: Toward a Multimaterial Fabrication Laboratory for the International Space Station

uman space exploration to date has been limited to low Earth orbit and the moon. The International Space Station (ISS) provides a unique opportunity for NASA to partner with private industry for development and demonstration of the technologies needed to support exploration initiatives. One challenge that is critical to sustainable and safer exploration is the ability to manufacture and recycle materials in space. This paper provides an overview of NASA's in-space manufacturing (ISM) project, its past and current activities, and how technologies under development will ultimately culminate in a multimaterial fabrication laboratory ("ISM FabLab") to be deployed on the International Space Station in the early 2020s. ISM is a critical capability for the long endurance missions NASA seeks to undertake in the coming decades. An unanticipated failure that can be adapted for in low earth orbit, through a resupply launch or a return to earth, may instead result in a loss of mission while in transit to Mars. To have a suite of functional ISM capabilities that are compatible with NASA's exploration timeline, ISM must be equipped with the resources necessary to develop these technologies and deploy them for testing prior to the scheduled de-orbit of ISS in 2024. The paper provides a broad overview of ISM projects activities culminating with the Fabrication Laboratory for ISS. The FabLab will move NASA and private industry significantly closer to changing historical paradigms for human spaceflight where all materials used in space are launched from earth. While the current ISM FabLab will be tested on ISS, future systems are eventually intended for use in a deep space habitat or transit vehicle. The work of commercial companies funded under NASA's Small Business Innovative Research Program (SBIR) is also discussed, as these activities, from development of recyclable packaging for ISS to additive manufacturing capabilities for metals and electronics, could also potentially be infused into FabLab exploration capabilities as well.

Prater, Tracie↗

An Innovative Feedback Controls Design Approach for Aero Engines

The paper describes a feedback controls design approach for a generic regional jet turbofan engine, which can be adapted to aero engines in general. To demonstrate this approach, linear models for control design are generated at different operating conditions from a full envelope nonlinear simulation created with the NASA Glenn Research Center-developed Toolbox for the Modeling and Analysis of Thermodynamic Systems. The primary objective is to design a single feedback controller that achieves good performance, without the need of developing scheduled control designs to cover the engine operating envelope. An additional objective is to progressively design more robust controllers that can perform under large variations in plant dynamics to also cover control for engine limits and potentially for some off nominal or even damaged conditions.

Kopasakis, George↗