Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Workload”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Fatigue in Short-Haul Operations: Regulations and Research

Short-haul multi-segment flight operations are conducted within Part 117 table limits for Flight Time and Flight Duty Period, yet there are few data available regarding the impact on sleep, workload, and performance in these operations. The Civil Aerospace Medical Institute (CAMI) has invested in the planning and execution of a study that will result in data characterizing the effects of short-haul multi-segment flight operations on cumulative sleep loss and pilot workload across trip pairings. Scientific researchers from CAMI, in collaboration with NASA Ames Research Center, are currently running an operational field study to examine the human factors and elements of pilot performance associated with short-haul multi-segment flight operations to better understand the impact of sleep disruption and workload across trip pairings. The first half of this presentation will provide a brief overview of current duty and rest requirements and identify gaps in current operational research data. The second half of the presentation will focus on results from a focus group study which developed the scope of the larger field study, followed by an overview of the current field study.

short-haul↗

Lunar Terrain Vehicle (LTV) Remote Teleoperation Studies Under Four Lunar Communication Latencies

Remotely operating a lunar rover from Earth while subject to an Earth-Moon time delay of multiple seconds could result in a dangerous state where the roving vehicle is either damaged or lost, thereby potentially compromising an entire mission or series of missions. Providing the right capabilities to the remote operator to manage inherent communication latencies will be important for remote driving to be successful. NASA conducted two studies to investigate the average speed and number of kilometers per day that an operator on Earth could teleoperate a notional Artemis unpressurized rover with minimal remote operator capabilities under 0- and 4-second communication delays (April 2023 study) and 6- and 8-second delays (August 2023 study). A primary goal of these studies was to understand if an Artemis Lunar Terrain Vehicle (LTV) could cover 6 kilometers (km) in 24 hours when operated remotely. During the April 2023 evaluation, eight test operators used an in-house simulation of the lunar surface South Pole to teleoperate a NASA government reference LTV. Each operator received approximately 30 minutes of remote driving familiarization/training prior to their test run. Operators viewed the surrounding terrain via a single, rover mast-mounted, high-resolution camera with pan/tilt/zoom capabilities; continuous communication was provided throughout all testing. In the August 2023 evaluation, remote operators received approximately 3 hours of familiarization training in each latency, and the simulation environment provided remote operators with an operator-selected rate limiter to enable finer sensitivity in the hand controller and a predictive circle function to better assist operators with predicting the path the vehicle could take. All test operators were able to successfully navigate and drive through six different types of terrain and five planned traverse scenarios using natural lighting under all communication delays. Results for average speeds for each communication delay, computed by averaging the data from all test conditions for that latency and all operators, are shown in the table below. The average speed data was then used to derive the total time needed to cover 6 km, 8 km, and 20 km (distances relevant to LTV-SYS071 and -029 requirements). Remote operators drove slower and used the brake more frequently when subject to a communication latency as opposed to no communication latency. Subjective workload assessments revealed that while operating in a latency the overall workload significantly increased when compared to a 0-s delay with mental demand, frustration, and performance being the primary contributing factors. Driving strategies in the 0-s delay did not vary significantly among subjects; however, in the 4-s delay condition, three different driving strategies were identified. In the 6-s and 8-s latency conditions the operator’s use of the cruise control to maintain speed was more apparent. Additionally, over the course of the August study, the operator took advantage of the predictive circle indicator on the navigation display and over 95% of the operator’s navigation used the mast camera 180-degree panning function for ground truthing in terms of boulders and craters. Operators started to define more specific parameters in driving strategies for general operations. This consisted of setting the vehicle into a low-speed cruise mode of approximately 11.5 kph and noticing driving performance of the vehicle seemed to be much harder at slower speeds 0.4–0.8 kph; however, the vehicle was more responsive at speeds of 2.9–3.6 kph. Regardless of communication delay, operators used both the horizontal translation rails and the vehicle fenders as guides to predict a path for the vehicle through heavily concentrated terrain features. Test operators acknowledged that the teleoperations training for this study was substantially less than what an actual LTV remote operator will ultimately receive. They estimated a minimum of 20 to 100 hours spread across multiple days and weeks (e.g., strategies included immersion training over a 3-day period, to a short 8-week starter program) would be needed to get an operator ~ 60% proficient (i.e., able to complete a subset of remote driving tasks), to a yearlong program for full proficiency in remote driving tasks under all terrain types and natural lighting conditions. Remotely operating a vehicle on another planetary body while subject to communication latency is a complex task. Speed, distance covered, time spent driving, time spent navigating, brake usage and rock contacts are all affected by operator workload, driving strategies, workstation ergonomics and training. These studies provided a “first-look” answer to a potential system requirement (namely if a remote operator could cover a given distance in a given amount of time); however, considerable general knowledge was gained to begin to understand what it will take to make a successful lunar rover teleoperator.

LTV↗

Training the Powered-Lift Evaluation Pilot

This poster describes a project to prepare pilots for a study assessing novel aircraft automation concepts for electric Vertical Takeoff and Landing (eVTOL) aircraft using NASA’s Vertical Motion Simulator (VMS). By exploring the operational and learning challenges related to transitioning between forward flight and vertical landing, we seek to establish baselines of pilot workload and aircraft handling qualities across varying atmospheric conditions and automation states. The simulated eVTOL design differentiates flight control allocations as a function of airspeed across four speed ranges as the vehicle transitions between fully thrust-borne lift and wing-borne lift. As speed increases, side stick controls command: translational ground speeds, vertical and lateral acceleration, vertical rate, vertical flight path angle, and bank angle. This novel approach to flight control allocation creates a significant learning challenge for pilots. Since initial eVTOL aircraft may have limitations on hover capabilities, automation and flight guidance cues also vary with airspeed to provide efficient landing profiles while still providing cues suitable for cruise flight. The NASA team prepared the study pilots to follow these flight guidance cues along curved Required Navigation Performance (RNP) approaches and along 6o and 12o glide paths to energy-efficient assistive-hover landing and goarounds. The pre-VMS preparation sought to prepare pilots from diverse levels of experience and background. To do this, NASA researchers designed and developed a fixed-based, large field-ofview simulator with terrain, structures, and air traffic. With one day of combined classroom learning and skill development in the fixedbase simulator, pilots were largely able to fly the simulated eVTOL in the VMS with sufficient mastery to provide handling quality assessments using the Cooper-Harper Handling Qualities Rating and workload assessments through the Bedford Workload Scale.

AAM↗

Lunar Terrain Vehicle (LTV) Remote Teleoperation Studies Under Four Lunar Communication Latencies

Remotely operating a lunar rover from Earth while subject to an Earth-Moon time delay of multiple seconds could result in a dangerous state where the roving vehicle is either damaged or lost, thereby potentially compromising an entire mission or series of missions. Providing the right capabilities to the remote operator to manage inherent communication latencies will be important for remote driving to be successful. The National Aeronautics and Space Administration (NASA) conducted two studies to investigate the average speed and number of kilometers per day that an operator on Earth could teleoperate a notional Artemis unpressurized rover with minimal remote operator capabilities under 0- and 4-second communication delays (April 2023 study) and 6- and 8-second delays (August 2023 study). A primary goal of these studies was to understand if an Artemis Lunar Terrain Vehicle (LTV) could cover 6 kilometers (km) in 24 hours when operated remotely. During the April 2023 evaluation, eight test operators used an in-house simulation of the lunar surface South Pole to teleoperate a NASA government reference LTV. Each operator received approximately 30 minutes of remote driving familiarization/training prior to their test run. Operators viewed the surrounding terrain via a single, rover mast-mounted, high-resolution camera with pan/tilt/zoom capabilities; continuous communication was provided throughout all testing. In the August 2023 evaluation, remote operators received approximately 3 hours of familiarization training in each latency, and the simulation environment provided remote operators with an operator-selected rate limiter to enable finer sensitivity in the hand controller and a predictive circle function to better assist operators with predicting the path the vehicle could take. All test operators were able to successfully navigate and drive through six different types of terrain and five planned traverse scenarios using natural lighting under all communication delays. Results for average speeds for each communication delay, computed by averaging the data from all test conditions for that latency and all operators, are shown in the table below. The average speed data was then used to derive the total time needed to cover 6 km, 8 km, and 20 km. Remote operators drove slower and used the brake more frequently when subject to a communication latency as opposed to no communication latency. Subjective workload assessments revealed that while operating in a latency the overall workload significantly increased when compared to a 0-s delay with mental demand, frustration, and performance being the primary contributing factors. Driving strategies in the 0-s delay did not vary significantly among subjects; however, in the 4-s delay condition, three different driving strategies were identified. In the 6-s and 8-s latency conditions the operator’s use of the cruise control to maintain speed was more apparent. Additionally, over the course of the August study, the operator took advantage of the predictive circle indicator on the navigation display and over 95% of the operator’s navigation used the mast camera 180-degree panning function for ground truthing in terms of boulders and craters. Operators started to define more specific parameters in driving strategies for general operations. This consisted of setting the vehicle into a low-speed cruise mode of approximately 1–1.5 kph and noticing driving performance of the vehicle seemed to be much harder at slower speeds 0.4–0.8 kph; however, the vehicle was more responsive at speeds of 2.9–3.6 kph. Regardless of communication delay, operators used both the horizontal translation rails and the vehicle fenders as guides to predict a path for the vehicle through heavily concentrated terrain features. Test operators acknowledged that the teleoperations training for this study was substantially less than what an actual LTV remote operator will ultimately receive. They estimated a minimum of 20 to 100 hours spread across multiple days and weeks (e.g., strategies included immersion training over a 3-day period, to a short 8-week starter program) would be needed to get an operator ~ 60% proficient (i.e., able to complete a subset of remote driving tasks), to a yearlong program for full proficiency in remote driving tasks under all terrain types and natural lighting conditions. Remotely operating a vehicle on another planetary body while subject to communication latency is a complex task. Speed, distance covered, time spent driving, time spent navigating, brake usage and rock contacts are all affected by operator workload, driving strategies, workstation ergonomics and training. These studies provided a “firstlook” answer to a potential system requirement (namely if a remote operator could cover a given distance in a given amount of time); however, considerable general knowledge was gained to begin to understand what it will take to make a successful lunar rover teleoperator.

LTV↗

A Queuing Theory Approach to Pilot-Controller Coordination for m:N Operations

In recent years, attention and interest by industry and researchers has grown in a control paradigm for remotely piloted aircraft termed “m:N operations.” In an m:N operation, a team of m remote pilots in command (RIPCs) collaboratively manage the flights of N aircraft. A consequence of an m:N concept of operations is that the RPICs will have to switch attention from one aircraft to another and from one task to another. Previous research in m:N operations has focused on the workload experienced by an RPIC and their level of situation awareness on their flights. Researchers have found that RPIC workload and situation awareness are generally sensitive to increasing N, although NASA’s Multi-Vehicle (m:N) Working Group has suggested that the driver of workload/situation awareness is the number of exceptions requiring human intervention as opposed to the value of N itself. In any case, a natural antecedent of workload is task load. In this paper, queueing theory is applied to a 1:N Urban Air Mobility (UAM) air taxi operation in order to estimate pilot task load for managing radio communications with air traffic controllers (ATCs) under increasing N. An M/M/1 queueing system is used to model the RIPC’s servicing of calls and clearance requests (e.g., departure, arrival, or airspace transition) to ATC for the N aircraft. Important parameters for the queueing model are the task arrival rate and the average service time for task completion. Radio communication times from past human-in-the-loop simulation studies are used to measure service times for a 1:4 and 1:12 UAM operation and to interpolate service times for 4 < N < 12. A Monte Carlo method is then employed, using the measured and interpolated service times, to estimate arrival rate and related queueing statistics. The paper concludes by considering the estimated queuing statistics, particularly the RPIC’s utilization (i.e., proportion of time actively servicing tasks), the length of the task queue over time, and the implications for task-balanced system design.

task load↗

Communication Delays in Cislunar Space: A Lab Study Examining Human System Integration Architecture (HSIA) and Team Risk Concerns

BACKGROUND: Communication delays are an inherent challenge of space missions to the Moon and beyond. Past research studies showed that 50+ second delays adversely affected individual well-being, team cohesion, and overall task performance (Kintz et al., 2016; Larson et al., 2019). However, there is a dearth of research on the effects of shorter delays (on the order of 4-12 seconds one-way) that may present a more immediate challenge during the upcoming Artemis missions. Even these shorter delays could make it difficult or infeasible for ground control to provide real-time support to Artemis astronauts, especially in complex and time-critical tasks such as extra-vehicular activities (EVAs). Results from studies on longer or Mars-like delays cannot be directly applied to Artemis-like delays, due to the large differences in delay magnitude and task types between these mission categories. For example, real-time oversight and guidance from ground control is impossible under Mars-like delays but may be performed under Artemis-like delays, albeit with potentially high workload and communication difficulty. Thus, a better understanding of the effects of Artemis-like communication delays on collaborative task performance is needed. Additionally, there is a need to develop reliable task paradigms that can be used in future studies on communication delays. METHODS: This project will study the effects of Artemis-like communication delays on collaborative task performance in a simulated space-to-ground team task via a lunar Gateway-like interface prototype. Teams of two astronaut-like participants - one serving as “crewmember” and one as “flight controller” - will perform a spaceflight-relevant task under six delay conditions (i.e., 0, 4, 6, 8, 10, and 12 seconds). Audio, video, texting, and file transfer will be delayed between the participants to mimic lunar-like communication delays. Measures related to workload, situation awareness, system usability, task performance, team cohesion, well-being, and communication strategies will be collected. These measures will be compared across delay levels, participant roles, and off-nominal and nominal tasks. Participants will be given the choice to use any combination of video and text communication in order to study preferences in interaction modality. RESEARCH AIMS: One aim is to identify a delay level or range of levels at which there may be significant decrements in individual and team-based measures. Identifying such ranges may help design novel workload management or communication countermeasures for future space missions. Also, the spaceflight-relevant research tasks and corresponding communication delay technology developed as part of this effort may be used for future studies on communication delays. Results from this work are also expected to inform study scenarios in the Human Exploration Research Analog (HERA) Campaign.

S Upasani↗

Inflight exercise and work tolerance, experiment M003

The response of the cardiovascular system to a known exercise workload is used as index of the general physical condition of crewmembers during long duration space flight. Day-to-day evaluations of pulse rates before and after exercise periods were not remarkable. The response of the cardiovascular system to a calibrated workload was relatively constant for a given individual during space flights of as many as 14 days in connection with the Gemini Program.

Dietlein, L. F.↗

Landing approach evaluation of an integrated CRT display for general aviation aircraft

A flight director adaptable to general aviation aircraft was evaluated for the landing approach task in a twin turbojet business aircraft. The flight director combined aircraft heading, pitch and roll atitude, and ILS (Instrument Landing System) signals into a single picture on a small cathode ray tube (CRT) to give the pilot an integrated picture of the aircraft situation. The display is unique in that it presents the information on a CRT and gives quasi-command signals to the pilot. The particular display investigated was a preproduction version of the Kaiser Model FP-50 flight director. Approaches made with visual references only, with a conventional ILS displacement instrument, and with the CRT display were compared in terms of tracking performance and pilot workload. Tracking performance of three research pilots using the CRT display was superior to that using the conventional ILS instrument and comparable to that under VFR conditions. Pilot workload (based on pilot comments) was not clearly decreased.

Talbot, P. D.↗

Turbulence flight director analysis and preliminary simulation

A control column and trottle flight director display system is synthesized for use during flight through severe turbulence. The column system is designed to minimize airspeed excursions without overdriving attitude. The throttle system is designed to augment the airspeed regulation and provide an indication of the trim thrust required for any desired flight path angle. Together they form an energy management system to provide harmonious display indications of current aircraft motions and required corrective action, minimize gust upset tendencies, minimize unsafe aircraft excursions, and maintain satisfactory ride qualities. A preliminary fixed-base piloted simulation verified the analysis and provided a shakedown for a more sophisticated moving-base simulation to be accomplished next. This preliminary simulation utilized a flight scenario concept combining piloting tasks, random turbulence, and discrete gusts to create a high but realistic pilot workload conducive to pilot error and potential upset. The turbulence director (energy management) system significantly reduced pilot workload and minimized unsafe aircraft excursions.

Johnson, D. E.↗

Simulation study of intracity helicopter operations under instrument conditions to category 1 minimums

A fixed-base simulator study was conducted to define pilot workload and task performance associated with instrument flight operations for an intracity helicopter passenger service. Displays considered necessary to provide a minimal capability under Instrument Flight Rules conditions were used to fly a representative commercial helicopter route structure in the New York area, with each terminal assumed to be equipped with a precision approach guidance system. A cross section of pilots participated as test subjects, and despite the high workload level, the results indicated that for the assumptions employed, minimums of 61 m (200 ft) ceiling and 805 m (0.5 mile) visibility were feasible.

Callan, W. M.↗

The effect of communications and traffic situation displays on pilots awareness of traffic in the terminal area

The Air Traffic Control (ATC) system is evolving under a general plan specified by the Federal Aviation Administration. Among the developments being considered is the Discrete Address Beacon System (DABS). The use of this system, although relieving congestion on the communications frequencies, would eliminate information about other aircraft because the party line communications now in use would be lost. One alternative to restore this lost information is an Airborne Traffic Situation Display (TSD). Experienced airline and military pilots participated in a factorial design to evaluate two types of communication (discrete address, party line) and two types of displays (TSD, no TSD). A stop-action quiz was used to evaluate their knowledge of other aircrafts' position, altitude, speed, heading, rate of climb, identity, and landing sequence number. Significant differences between conditions were detected, primarily in the position variables. Workload, as measured by a spare capacity side-task, showed a main effect of displays and a significant interaction between displays and communications. The data are summarized by plotting each display/communication condition configuration in the plane defined by information and workload index. A limited number of blunders by other aircraft were included in the simulations with a significant, but not entirely satisfactory, improvement in blunder detection attributed to the TSD.

Melanson, D.↗

Application of active control technology to aircraft ride smoothing

Prototype Ride Smoothing System (RSSs) were synthesized for flight testing aboard the National Aeronautics and Space Administration General Purpose Airborne Simulator (GPAS). The systems were designed to meet comprehensive criteria including passenger comfort and aircraft handling qualities considerations. System performance estimates based on analytic expressions were compared to estimates derived from digital calculations. The effect of RSSs on pilot workload during ILS approach in turbulence was examined in a fixed-base simulator. A limited number of flights were conducted to verify predicted RSS performance. Results of these experiments indicate that RSSs reduce pilot workload and increase passenger comfort while maintaining handling qualities.

Jacobson, I. D.↗

A piloted-simulation evaluation of two electronic display formats for approach and landing

The results of a piloted-simulation evaluation of the benefits of adding runway symbology and track information to a baseline electronic-attitude-director-indicator (EADI) format for the approach-to-landing task were presented. The evaluation was conducted for the baseline format and for the baseline format with the added symbology during 3 deg straight-in approaches with calm, cross-wind, and turbulence conditions. Flight-path performance data and pilot subjective comments were examined with regard to the pilot's tracking performance and mental workload for both display formats. The results show that the addition of a perspective runway image and relative track information to a basic situation-information EADI format improve the tracking performance both laterally and vertically during an approach-to-landing task and that the mental workload required to assess the approach situation was thus reduced as a result of integration of information.

Steinmetz, G. G.↗

Timeline Analysis Program (TLA-1)

The Timeline Analysis Program (TLA-1) was described. This program is a crew workload analysis computer program that was developed and expanded from previous workload analysis programs, and is designed to be used on the NASA terminal controlled vehicle program. The following information is described: derivation of the input data, processing of the data, and form of the output data. Eight scenarios that were created, programmed, and analyzed as verification of this model were also described.

Miller, K. H.↗

Display/control requirements for VTOL aircraft

Quantative metrics were determined for system control performance, workload for control, monitoring performance, and workload for monitoring. Pilot tasks were allocated for navigation and guidance of automated commercial V/STOL aircraft in all weather conditions using an optimal control model of the human operator to determine display elements and design.

Hoffman, W. C.↗

Twelfth Annual Conference on Manual Control

Main topics discussed cover multi-task decision making, attention allocation and workload measurement, displays and controls, nonvisual displays, tracking and other psychomotor tasks, automobile driving, handling qualities and pilot ratings, remote manipulation, system identification, control models, and motion and visual cues. Sixty-five papers are included with presentations on results of analytical studies to develop and evaluate human operator models for a range of control task, vehicle dynamics and display situations; results of tests of physiological control systems and applications to medical problems; and on results of simulator and flight tests to determine display, control and dynamics effects on operator performance and workload for aircraft, automobile, and remote control systems.

Wempe, T. E.↗

Statistical evaluation of control inputs and eye movements in the use of instruments clusters during aircraft landing

Two different types of analyses were done on data from a study in which eye movements and other variables were recorded while four pilots executed landing sequences in a Boeing 737 simulation. Various conditions were manupulated, including changes in turbulence, starting position, and instrumentation. Control inputs were analyzed in the context of the various conditions and compared against ratings of workload obtained using the Cooper-Harper scale. A number of eye-scanning measures including mean dwell time and transition from one instrument to another were entered into a principal components factor analysis. The results show a differentiation between control inputs and eye-scanning behavior. This shows the need for improved definition of workload and experiments to uncover the important differences among control inputs, eye-scanning and cognitive processes of the pilot.

Dick, A. O.↗

Flight investigation of a vertical-velocity command system for VTOL aircraft

A flight investigation was undertaken to assess the potential benefits afforded by a vertical-velocity command system (VVCS) for VTOL (vertical take-off and landing) aircraft. This augmentation system was conceived primarily as a means of lowering pilot workload during decelerating approaches to a hover and/or landing under category III instrument meteorological conditions. The scope of the investigation included a determination of acceptable system parameters, a visual flight evaluation, and an instrument flight evaluation which employed a 10 deg, decelerating, simulated instrument approach task. The results indicated that the VVCS, which decouples the pitch and vertical degrees of freedom, provides more accurate glide-path tracking and a lower pilot workload than does the unaugmented system.

Kelly, J. R.↗