Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “UNIVERSITY PROGRAM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

XPRESS: eXascale PRogramming Environment and System Software, Final Report

The University of Oregon (UO) was a partner in the XPRESS project together with Sandia National Laboratories (SNL), Indiana University (IU), Lawrence Berkeley National Laboratory (LBL), Louisiana State University (LSU), Oak Ridge National Laboratory (ORNL), University of Houston (UH), and University of North Carolina (RENCI). UO's objective in the project was to develop "APEX (Asynchronous Performance Environment for eXascale)": performance measurement, analysis, feedback and control infrastructure to asynchronous tasking runtimes, specifically HPX (LSU) and HPX-5 (IU). During the project period, our efforts focused on the need to measure complex tasking models where the traditional instrumentation methods would not work due to an absent/meaningless call-path context and runtime control of task pre-emption and resumption, usually on a different operating system thread. In addition to the challenges of performance measurement, we developed a framework to provide information from all levels of the stack (hardware, operating system, runtime, application) to a feedback & control mechanism for controlling concurrency, task granularity, networking parameters, and other aspects of execution in order to improve execution performance, throughput and/or efficiency. UO demonstrated these developments on leading edge HPC machines at large scale, including a 2017 Gordon Bell submission in which APEX was used to optimize key bottlenecks in an astrophysics application. The following final report summarizes our accomplishments during the XPRESS project.

99 GENERAL AND MISCELLANEOUS↗

Criticality safety control of fuel debris produced by the accident of Fukushima Daiichi nuclear power plants - technical development in Japan from 2012 and the future

Full text of publication follows: On 11 March 2011, Japan was attacked by the '2011 off the Pacific coast of Tohoku Earthquake'. It was the greatest earthquake ever recorded around Japan. It caused big tsunami and it also attacked Tohoku sea coast area severely and violently. Approximately 16,000 people passed away and still about 2,600 people are lost by the earthquake and the tsunami. This extraordinary natural disaster affected the society of Japan deeply. But more serious problem is the severe accident occurred in Fukushima Daiichi Nuclear Power Plants (1FNPP) after the earthquake and tsunami attack. By the tsunami after the earthquake, because of loss of ultimate heat sink (LUHS), three reactors of 1FNPP were damaged and the intact fuel became fuel debris. After the accident, Government of Japan setup the council for the decommissioning of TEPCO's Fukushima Daiichi Nuclear Power Plant and it released the general plan for countermeasure of the severe accident occurred in Japan, i.e. 'Mid-and-long-Term Road map towards the Decommissioning of Fukushima Daiichi Nuclear Power Units 1-4'. According to the road map, nuclear power reactor vendors and research institutes in Japan have started the national project to carry out the decommissioning activity. International Research Institute for Nuclear Decommissioning (IRID) is the association for technical development for Fukushima site decommissioning. Under this umbrella, nuclear power reactor vendors in Japan, i.e. Toshiba, Hitachi and Mitsubishi, and Japan Atomic Energy Agency (JAEA) have carried out the technical development required for the criticality safety control of the Fukushima fuel debris. Furthermore, JAEA has a plan to use the criticality assembly STACY for obtaining the neutronics characteristics of the fuel debris by modifying STACY from the solution system to heterogeneous system. This program is conducted by entrustment of Nuclear Regulation Authority of Japan, independently from IRID framework. It is expected that it will reach first criticality in FY2018. Researchers in universities in Japan also have own research program to control reactivity of fuel debris. This presentation will summarize the on-going research programs in Japan for the criticality safety control in order to remove and store the fuel debris from Fukushima site. (author)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Large Pilot Scale Testing of Linde/BASF Post-Combustion CO 2 Capture Technology at the Abbott Coal-Fired Power Plant

The work summarized in this report is the first step towards a project that will re-train and create jobs for personnel in the coal industry and continue regional economic development to benefit regions impacted by previous downturns. The larger project is aimed at capturing ~300 tons/day (272 metric tonnes/day) CO 2 at a 90% capture rate from existing coal- fired boilers at the Abbott Power Plant on the campus of University of Illinois (UI). It will employ the Linde-BASF novel amine-based advanced CO 2 capture technology, which has already shown the potential to be cost-effective, energy efficient and compact at the 0.5-1.5 MWe pilot scales. The overall objective of the project is to design and install a scaled-up system of nominal 15 MWe size, integrate it with the Abbott Power Plant flue gas, steam and other utility systems, and demonstrate the viability of continuous operation under realistic conditions with high efficiency and capacity. The project will also begin to build a workforce that understands how to operate and maintain the capture plants by including students from regional community colleges and universities in the operation and evaluation of the capture system. This project will also lay the groundwork for follow-on projects that pilot utilization of the captured CO 2 from coal-fired power plants. The net impact will be to demonstrate a replicable means to (1) use a standardized procedure to evaluate power plants for their ability to be retrofitted with a pilot capture unit; (2) design and construct reliable capture systems based on the Linde-BASF technology; (3) operate and maintain these systems; (4) implement training programs with local community colleges and universities to establish a workforce to operate and maintain the systems; and (5) prepare to evaluate at the large pilot scale level various methods to utilize the resulting captured CO 2 . Towards the larger project goal, the UI-led team, together with Linde, has completed a preliminary design for the carbon capture pilot plant with basic engineering and cost estimates, established permitting needs, identified approaches to address Environmental, Health, and Safety concerns related to pilot plant installation and operation, developed approaches for long-term use of the captured carbon, and established strategies for workforce development and job creation that will re-train coal operators to operate carbon capture plants. This report describes Phase I accomplishments and demonstrates that the project team is well-prepared for full implementation of Phase 2, to design, build, and operate the carbon capture pilot plant.

01 COAL, LIGNITE, AND PEAT↗

More scalability, less pain : A simple programming model and its implementation for extreme computing.

This is the story of a simple programming model, its implementation for extreme computing, and a breakthrough in nuclear physics. A critical issue for the future of high-performance computing is the programming model to use on next-generation architectures. Described here is a promising approach: program very large machines by combining a simplified programming model with a scalable library implementation. The presentation takes the form of a case study in nuclear physics. The chosen application addresses fundamental issues in the origins of our Universe, while the library developed to enable this application on the largest computers may have applications beyond this one.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Rotating Detonation Combustion for Gas Turbines: Modeling and System Synthesis to Exceed 65% Efficiency Goal (Phase II)

As of May 2019, all RDE test hardware and test operations were completed for this program. Over 700 hot fire tests were conducted at 4 facilities with 7 RDE assemblies, with the data available for future analysis. In particular, measured static and dynamic pressure and computational fluid dynamics (CFD) provided basis for pressure gain combustion (PGC) analysis of the Engineering Scale RDE. It was demonstrated via measurements and CFD that a carefully designed diffuser can recover some total pressure of the highly oscillatory RDE exhaust. In general, the isolator/injector is largest contributor of pressure losses; however a low loss design was demonstrated that improves significantly on previous natural-gas/air RDEs. Also, a tailored injector and mixing technique was demonstrated that allowed NG-air RDE operation with overall equivalence ratio of less than 0.6. CFD models by AR, the UofM and Purdue University were extensively used throughout the program to refine diffuser design for improved pressure recovery, to simulate injection and mixing, to estimate turbine interaction, to estimate combustor pressure gain anchored with test data and to provide input to other design and analytical tasks. CFD analyses were completed for many of the configurations tested at Purdue with the 13.4” RDE including the shark fin and low area ratio isolators. Results were compared favorably to available hot fire test particle image velocimetry (PIV) measurements and wave speeds. The results of these CFD analyses suggest a modest pressure gain of 33% with a sufficiently low area ratio isolator. A thermodynamic power plant system model was set up which utilizes an RDE combustor. The performance of the RDE combustor module was scaled based on measurements from the Engineering Scale RDE tests with low loss injector and tailored fuel flow. This combined model indicates potential for significant plant efficiency improvement. The successful tailored fuel injection test result with lower than .6 equivalence ratio has implication that a power plant can use a RDE combustor configuration where all the air flows through the combustion zone thereby not requiring a bypass mixer. In this configuration, the results of the natural gas combined cycle (NGCC) plant system indicate net efficiency of 66.4%.

02 PETROLEUM↗

Universal Passive Synchronization Method for Grid-Forming Inverters Without Mode Transition

Power systems are transforming with increasing levels of inverter-based resources (IBRs). This transformation requires critical roles of grid-forming (GFM) inverters replacing synchronous generators for bulk power system stabilization and ancillary services, also allowing flexible power system operation, such as microgrid that is operated by multiple GFM IBRs to achieve system resilience against contingencies. To realize the resilient power systems allowing flexible in-and-out operation of GFM IBRs potentially programmed with different primary controls, a synchronization method universally applicable, i.e., independent of control types, would be beneficial to ease the integration process, but it has not been actively studied. To fill the gap, this paper proposes a universal synchronization method that achieves a passive synchronization to enable a smooth transition in a grid with off-nominal system parameters, i.e., voltage and frequency. The logic proposed requires no modification on the primary control, thus applicable to any type of GFMs with a voltage reference input. To validate the concept, a simulation of an IEEE 13-bus benchmark system modified with 3 GFM inverters is presented. It simulates an inverter-driven black start scenario in which GFM inverters autonomously turn on and connect to the grid under heavy loading, using the synchronization logic. The case study demonstrates that GFM inverters can tune their voltage reference to smoothly synchronize without severe transients, and contribute to a seamless black start of the grid under unbalanced load conditions. Two GFM methods - Droop and dispatchable virtual oscillator control - are used for the demo to validate feasibility and interoperability of the passive synchronization.

black start↗

Computational Modeling of Atmospheric Processes at Texas Southern University

Texas Southern University (TSU) is strengthening its research program in atmospheric chemistry and physics with a climate science emphasis by leveraging partnerships with the U.S. Department of Energy’s Atmospheric Radiation Measurement (ARM) Facility, Brookhaven National Laboratory (BNL), and the Tracking Aerosol Convection Interactions ExpeRiment (TRACER). This RDPP-supported program focuses on secondary organic aerosols (SOAs) and reactive atmospheric species that influence cloud formation, precipitation processes, and radiative forcing. SOAs play a critical role in cloud microphysics and Earth’s energy balance, yet the chemical and physical mechanisms governing SOA–cloud interactions remain a significant source of uncertainty in predictive climate models. Through computational modeling, observational data analysis, and national laboratory collaboration, this program develops a skilled cohort of students trained in atmospheric science, environmental data analysis, and climate-relevant modeling. These research experiences build technical competencies that are transferable to careers in government laboratories, academia, and industry. By engaging students from historically underrepresented communities in high-impact climate research, TSU expands participation in the atmospheric sciences workforce while contributing meaningful scientific insights to DOE-supported ARM research activities. This partnership strengthens national capacity in climate science and supports the development of the next generation of atmospheric researchers.

54 ENVIRONMENTAL SCIENCES↗

Regional Training Program: Promoting Undergraduate Minority Persistence in Nuclear Physics (RTP: PUMP-NP)

A total of two cohorts of research experience were conducted under this grant. The first year of the program in which a cohort of six students were recruited from three Historically Black Colleges and Universities (HBCUs). These students travelled to Durham, NC in summer to participate in this program. Prior to their arrival, the students participated in an orientation in which they selected from a choice of topics for summer research and were paired up with mentors from Triangle Universities Nuclear Laboratory (TUNL). The participants of the program were integrated with the larger cohort of summer students who had arrived at TUNL as part of other programs, such as the Research Experience for Undergraduates (REU).

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Correction to Norm-conserving pseudopotentials and basis sets to explore Lanthanide chemistry in complex environments

Correction was made to the funding and acknowledgment: Funding V.-A.G. was supported by the U.S. Department of Energy, Office of Science, Basic Energy Sciences, Chemical Sciences, Geosciences, and Biosciences Division. R.R. and M.-T.N. were supported by the Laboratory Directed Research and Development Program at Pacific Northwest National Laboratory (PNNL) CheMSR Agile Investment. PNNL is operated by DE-AC05-76RLO01830. J.-B.L. and J.L. were supported by the National Natural Science Foundation of China (Nos. 21433005, 91645203, and 21590792). D.C.C. was supported by Research and Innovation at the University of Nevada, Reno. ACKNOWLEDGMENTS The research was performed using resources available through Research Computing at Pacific Northwest National Laboratory (PNNL), Tsinghua National Laboratory for Information Science and Technology and the Computational Chemistry Laboratory under Tsinghua Xuetang Talents Program, and University of Nevada, Reno High Performance Computing. J.- B.L. and J.L. acknowledge discussions with Dr. Yang-Gang Wang (Southern University of Science and Technology).

Lu, Jun-Bo↗

Crystal structure of MutYX: a novel clusterless adenine DNA glycosylase with a distinct C-terminal domain and 8-oxoguanine recognition sphere

Abstract The [4Fe–4S] cluster is an important cofactor of the base excision repair (BER) adenine DNA glycosylase MutY to prevent mutations associated with 8-oxoguanine (OG). Several MutYs lacking the [4Fe–4S] cofactor have been identified. Phylogenetic analysis shows that clusterless MutYs are distributed in two clades suggesting cofactor loss has occurred in multiple independent evolutionary events. Herein, we determined the first crystal structure of a clusterless MutY complexed with DNA. On the basis of the dramatic structural divergence from canonical MutYs, we refer to this as representative of a clusterless MutY subgroup “MutYX.” Interestingly, MutYX compensates for the missing [4Fe–4S] cofactor to maintain positioning of catalytic residues by expanding a pre-existing α-helix and acquisition of a new α-helix. Surprisingly, MutYX also acquired a new C-terminal domain that uniquely recognizes OG using residues Gln201 and Arg209. Adenine glycosylase assays and binding affinity measurements indicate that Arg209 is the primary residue responsible for OG:A lesion specificity, while Gln201 assists by bridging OG and Arg209. Surprisingly, replacement of Arg209 and Gln201 with Ala increased activity toward G:A mismatches. The MutYX structure serves as an example of devolution, capturing structural features required to retain function in the absence of a metal cofactor considered indispensable.

Trasviña-Arenas, Carlos H [University of Californi↗

Site Environmental Report for 2016

Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab) is a multi-program scientific facility operated by the University of California (UC) for the U.S. Department of Energy (DOE). Berkeley Lab’s research is focused on the physical, biological, environmental, and computational sciences with the objective of delivering scientific knowledge and discoveries pertinent to DOE’s mission. This annual report describes environmental protection activities and potential impacts resulting from LBNL operations conducted in 2016. The format and content of this report satisfy the requirements of both DOE Order 231.1B Admin Chg 1, Environment, Safety, and Health Reporting, and the operating contract between UC and DOE (DOE Contract No. DE-AC02-05CH11231, also known as Contract 31). Activities are planned and conducted with full regard to protecting employees, the public, and the environment, as well as complying with all applicable environmental, safety, and health laws and regulations. Berkeley Lab implements an Environmental Management System (EMS) to oversee these compliance activities and improve overall environmental performance while maintaining operational capability and sustaining its overall mission. The effectiveness of the EMS and environmental programs is reviewed annually as part of the operating contract’s performance evaluation process. For fiscal year (FY) 2016, which began October 1, 2015, and ended September 30, 2016, the EMS was given a performance rating of A minus for its management of environmental activities (on a scale from A plus as the highest grade to F as the lowest). The measurement and rating system was developed jointly by Berkeley Lab, UC, and DOE. The FY 2016 rating was based on how Berkeley Lab met the objective in DOE’s FY 2017 Performance Evaluation and Measurement Plan (Appendix B in Contract 31, Section J) of providing an efficient and effective EMS. To support this rating, Berkeley Lab prepared a list of projects completed during the performance period that achieved reduced environmental impacts. The EMS was also graded through the federal Office of Management and Budget’s EMS Annual Report Data, in which elements of the International Organization for Standardization (ISO) 14001 standard are rated and the degree of integration between the EMS and Berkeley Lab’s sustainable practices is measured. Overall scores fall into one of three categories: green (highest), yellow (middle), or red (lowest). For FY 2016, Berkeley Lab received a score of green, as described in more detail in Chapter 2. An overview of environmental protection and restoration programs is provided (Chapter 3), including information about compliance activities, operating permits, and regulatory agency inspections that occurred during 2016. Six minor violations issued during these inspections are discussed, one of which was rescinded in 2017. This report also includes information on environmental monitoring performed in 2016 (Chapter 4). The results of these monitoring activities confirmed that groundwater cleanup actions continue to show improving conditions, and all emissions and discharges from LBNL operations were within environmental compliance release limits with the exception of some stormwater discharges. While most stormwater discharges measured throughout the LBNL site fall within acceptable levels established by the state's stormwater permit, iron and aluminum exceeded permitted levels. Berkeley Lab is aggressively implementing controls to reduce iron and aluminum discharge levels. The controls include construction of asphaltic berms to restrain and filter runoff to storm drains, and installation of filtration units in storm drain basins to absorb metal contaminants. The radiological dose assessments (Chapter 5) performed in 2016 concluded that the maximum dose to a hypothetical resident from Berkeley Lab’s airborne radionuclide releases was approximately 0.12% of the DOE and U.S. Environmental Protection Agency annual limit of 10 millirem per year (mrem/year); the dose from all radiation sources at Berkeley Lab was approximately 0.1% of the average natural background radiation dose of 310 mrem/yr in the United States, and about 0.4% of the DOE annual limit of 100 mrem/yr from all sources.

54 ENVIRONMENTAL SCIENCES↗

Site Environmental Report for 2017

Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab) is a multi-program scientific facility operated by the University of California (UC) for the U.S. Department of Energy (DOE). Berkeley Lab’s research is focused on the physical, biological, environmental, and computational sciences with the objective of delivering scientific knowledge and discoveries pertinent to DOE’s mission. This annual report describes environmental protection activities and potential impacts resulting from LBNL operations conducted in 2017. The format and content of this report satisfy the requirements of both DOE Order 231.1B, Administrative Change 1 (Environment, Safety, and Health Reporting) and the operating contract between UC and DOE (DOE Contract No. DE-AC02-05CH11231, also known as Contract 31). Activities are planned and conducted with full regard to protecting employees, the public, and the environment, as well as complying with all applicable environmental, safety, and health laws and regulations. Berkeley Lab implements an Environmental Management System (EMS) to oversee these compliance activities and continually improve overall environmental performance while maintaining operational capability and sustaining its overall mission. The effectiveness of the EMS and environmental programs is reviewed annually as part of the performance evaluation process of Contract 31. For fiscal year (FY) 2017, which began October 1, 2016, and ended September 30, 2017, the EMS was given a performance rating of B plus for its management of environmental activities (on a scale from A plus as the highest grade to F as the lowest). The measurement and rating system was developed jointly by Berkeley Lab, UC, and DOE. The FY 2017 rating was based on how Berkeley Lab met the objective in DOE’s FY 2017 Performance Evaluation and Measurement Plan (Appendix B in Contract 31, Section J) of providing an efficient and effective EMS. Six significant accomplishments, which ranged from effective teaming on projects and with regulatory agencies to improved program assessment approaches, were factors in the rating. The EMS was also graded through the federal Office of Management and Budget’s annual EMS performance metrics, in which a reporting scorecard rates elements of the International Organization for Standardization (ISO) 14001 standard and the degree of integration between the EMS and Berkeley Lab’s sustainable practices. Overall scores fall into one of three categories: green (highest), yellow (middle), or red (lowest). For FY 2017, Berkeley Lab received a score of green, as described in more detail in Chapter 2. An overview of environmental protection and restoration programs is provided, including information about compliance activities, operating permits, and regulatory agency inspections that occurred during 2017. Thirteen minor violations issued during City of Berkeley inspections of above and underground storage tanks, treatment units, and hazardous waste storage areas are discussed in this chapter. This report also includes information on environmental monitoring performed in 2017. The results of these monitoring activities confirmed that groundwater cleanup actions continue to show improving conditions, and all emissions and discharges from LBNL operations were within environmental compliance release limits, with the exception of some stormwater discharges. Most stormwater discharges measured throughout the LBNL site fall within acceptable levels established by the state’s stormwater permit; however, iron and aluminum exceeded Numeric Action Levels. To reduce iron and aluminum discharge levels, Berkeley Lab is aggressively implementing controls such as construction of asphaltic berms and check dams to restrain and filter runoff to storm drains, and installation of filtration units in storm drain basins to collect sediment and absorb metal contaminants. The radiological dose assessments performed in 2017 concluded that the maximum potential dose to a hypothetical resident from Berkeley Lab’s airborne radionuclide releases was approximately 0.1% of the DOE and U.S. Environmental Protection Agency annual limit of 10 millirem per year (mrem/yr); the potential dose from all radiation sources at Berkeley Lab was approximately 0.06% of the average natural background radiation dose of 310 mrem/yr in the United States, and about 0.2% of the DOE annual limit of 100 mrem/yr from all sources.

54 ENVIRONMENTAL SCIENCES↗

Site Environmental Report for 2018

Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab) is a multi-program scientific facility operated by the University of California (UC) for the U.S. Department of Energy (DOE). Berkeley Lab’s research is focused on the physical, biological, environmental, and computational sciences, with the objective of delivering scientific knowledge and discoveries pertinent to DOE’s mission. This annual report describes environmental protection activities and potential impacts resulting from LBNL operations conducted in 2018. The format and content of this report satisfy the requirements of both DOE Order 231.1B, Administrative Change 1 (Environment, Safety, and Health Reporting) and the operating contract between UC and DOE (DOE Contract No. DE-AC02-05CH11231, also known as Contract 31). LBNL activities are planned and conducted with full regard to protecting employees, the public, and the environment, as well as complying with all applicable environmental, safety, and health laws and regulations. As presented in Chapter 2, Berkeley Lab implements an Environmental Management System (EMS) to oversee environmental compliance activities and continually improve overall environmental performance while maintaining operational capability and sustaining its overall mission. The effectiveness of the EMS and environmental programs is reviewed annually as part of the performance evaluation process of Contract 31. For fiscal year (FY) 2018, which began October 1, 2017, and ended September 30, 2018, the EMS was given a performance rating of B plus for its management of environmental activities (on a scale from A plus as the highest grade, to F as the lowest). The measurement and rating system was developed jointly by Berkeley Lab, UC, and DOE. The FY 2018 rating was based on how Berkeley Lab met the objective in DOE’s FY 2018 Performance Evaluation and Measurement Plan (Appendix B in Contract 31, Section J) of providing an efficient and effective EMS. Six significant accomplishments, which ranged from effective teaming on projects and with regulatory agencies to improved program assessment approaches, were factors in the rating. The EMS was also graded through the federal Office of Management and Budget’s annual EMS performance metrics, in which a reporting scorecard rates elements of the International Organization for Standardization (ISO) 14001 standard and the degree of integration between the EMS and Berkeley Lab’s sustainable practices. Overall scores fall into one of three categories: green (highest), yellow (middle), or red (lowest). For FY 2018, Berkeley Lab received a score of green. A week-long formal conformity audit of the EMS was conducted at the end of July by a qualified external party, as is required every three years. The audit team found that Berkeley Lab’s EMS continues to conform to the ISO standard with no major nonconformance. An overview of environmental protection and restoration programs is provided in Chapter 3, including information about compliance activities, operating permits, and regulatory agency inspections and audits that occurred during 2018. Twenty-one minor violations and two Class II violations were issued during agency inspections of programs governing aboveground and underground storage tanks, hazardous waste treatment units, hazardous waste storage areas, hazardous materials management, and wastewater, stormwater, and air emission sources. This report also includes information on environmental monitoring performed in 2018 (Chapter 4). The results of these monitoring activities confirmed that groundwater cleanup actions have been effective in reducing concentrations of volatile organic compounds (VOCs) in the groundwater, although concentrations appear to be reaching asymptotic levels in some areas. Site groundwater plumes are stable or are attenuating, and VOCs are not migrating off site. All emissions and discharges from LBNL operations were within environmental compliance release limits except oxides of nitrogen and carbon monoxide from boilers (under 5 million BTUs) from Buildings 2, 66, and 88. The radiological dose assessments (Chapter 5) performed in 2018 concluded that the maximum potential dose to a hypothetical resident from Berkeley Lab’s airborne radionuclide releases was approximately 0.04% of the DOE and U.S. Environmental Protection Agency annual limit of 10 millirem per year (mrem/yr); the potential dose from all radiation sources at Berkeley Lab was approximately 0.15% of the average natural background radiation dose of 310 mrem/yr in the United States, and about 0.5% of the DOE annual limit of 100 mrem/yr from all sources.

54 ENVIRONMENTAL SCIENCES↗

Internal Audit of a Comprehensive IMRT Program for Prostate Cancer: A Model for Centers in Developing Countries?

Purpose: With improving regional prosperity, significant capital investments have been made to rapidly expand radiotherapy capacity across Southeast Asia. Yet little has been reported on the implementation of adequate quality assurance (QA) in patient management. The objective of this study is to perform an in-depth QA assessment of our definitive intensity-modulated radiotherapy (IMRT) program for prostate cancer since its inception. Methods and Materials: The department's prostate IMRT program was modeled after that of University of California San Francisco. A departmental protocol consisting of radiotherapy volume/dose and hormone sequencing/duration and a set of 18 dose objectives to the target and critical organs were developed, and all plans were presented at the weekly departmental QA rounds. All patients treated with definitive IMRT for nonmetastatic prostate cancer were retrospectively reviewed. Protocol adherence, dosimetry data, toxicities, and outcomes were evaluated. Results: Since 2005, 76 patients received IMRT: 54 with whole-pelvis and 22 with prostate-only treatment. Of the 1,140 recorded dosimetric end points, 39 (3.3%) did not meet the protocol criteria. At QA rounds, no plans required a revision. Only one major protocol violation was observed. Two and two cases of Grade 3-4 acute and late toxicities, respectively, were observed. Five (8.8%) patients developed proctitis, but only one required argon laser therapy. Conclusions: Our comprehensive, practice-adapted QA measures appeared to ensure that we were able to consistently generate conforming IMRT plans with acceptable toxicities. These measures can be easily integrated into other clinics contemplating on developing such a program.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Assessment of Readout Techniques for Passive Monitors

This fiscal year (FY) 2023 report on passive temperature sensors covers two main objectives: to demonstrate that the optical dilatometer can successfully process disc shaped silicon carbide (SiC) temperature monitors (TMs), and to demonstrate proof of concept for using the capacitance readout method to read printed melt wires. The SiC objective was successfully met by annealing and analyzing, via optical dilatometry, all eight 3-mm SiC discs provided by the Nuclear Science User Facilities (NSUF) Idaho State University (ISU) Nanostructured Steels for Enhanced Radiation Tolerance (N SERT) experiment, which was irradiated at Idaho National Laboratory (INL)’s Advanced Test Reactor (ATR). Per the ISU N SERT experiment, capsule 1 (KGT 3828 1 and KGT 3828-2) had a design temperature of 300°C +/- 50°C and an exposure of 2 dpa +/- 10%; capsule 2 (KGT 4600 and KGT 4609) had a design temperature of 300°C +/- 50°C and an exposure of 6 dpa +/- 10%; capsule 3 (KGT 4639 C and KGT 4639-D) had a design temperature of 500°C +/- 50°C and an exposure of 6 dpa +/- 10%; and capsule 4 (KGT 3841 3 and KGT 3841 4) had a design temperature of 500°C +/- 50°C and an exposure of 2 dpa +/- 10%. The target exposure rates, in dpa, are the neutron damage for various types of nanostructured steels. All but three SiC TMs (KGT 4600, KGT 4639 D, and KGT 3841 4) revealed averaged peak irradiation temperatures that fell within the design temperature ranges. The three SiC TMs that did not fall within the design temperatures ranges were at least 100°C below that target temperature. Furthermore, SiC TM KGT 3841 C revealed two irradiation regimes: one closer to the 300°C design temperature, and the other closer to the 500°C design temperature. Also, all the SiC TMs’ averaged peak irradiation temperatures came in anywhere between 20°C and 240°C below the irradiation temperatures predicted by the thermal models. This showed the optical dilatometry method to be a reliable and less time intensive process for determining averaged peak irradiation temperatures from passive SiC TMs such as rods and discs. Under the Advanced Sensors and Instrumentation (ASI) program in FY-23, Boise State University (BSU) proposed to demonstrate proof of concept for using a capacitance readout technique applicable to printed melt wires; however, they were stymied by the complexity of the capacitance readout method. In support of the BSU work, INL developed an additively manufactured (AM) ceramic package for encapsulating the new melt wires. Inks were synthesized at BSU that used new protocols rather than following previously established protocols implemented at INL, and testing of various temperatures was conducted at BSU to evaluate the melting behaviors of the printed melt wires. The result was that the capacitance readout technique showed promise but also created more challenges than originally anticipated. For example, the tin ink synthesized at BSU showed unusual melting behaviors that did nothing to enhance the performance of the final printed melt wire prototype in terms of the capacitance readout method. To make the proof of concept work when applied to the printed melt wires, the ASI program would need to invest further resources and time. Consequently, the program is not planning to continue this proof of concept work in FY-24, based on the progress and findings achieved in FY-23.

36 MATERIALS SCIENCE↗

Connecticut State University System Initiative for Nanotechnology-Related Equipment, Faculty Development and Curriculum Development

DOE grant used for partial fulfillment of necessary laboratory equipment for course enrichment and new graduate programs in nanotechnology at the four institutions of the Connecticut State University System (CSUS). Equipment in this initial phase included variable pressure scanning electron microscope with energy dispersive x-ray spectroscopy elemental analysis capability [at Southern Connecticut State University]; power x-ray diffractometer [at Central Connecticut State University]; a spectrophotometer and spectrofluorimeter [at Eastern Connecticut State University; and a Raman Spectrometer [at Western Connecticut State University]. DOE's funding was allocated for purchase and installation of this scientific equipment and instrumentation. Subsequently, DOE funding was allocated to fund the curriculum, faculty development and travel necessary to continue development and implementation of the System's Graduate Certificate in Nanotechnology (GCNT) program and the ConnSCU Nanotechnology Center (ConnSCU-NC) at Southern Connecticut State University. All of the established outcomes have been successfully achieved. The courses and structure of the GCNT program have been determined and the program will be completely implemented in the fall of 2013. The instrumentation has been purchased, installed and has been utilized at each campus for the implementation of the nanotechnology courses, CSUS GCNT and the ConnSCU-NC. Additional outcomes for this grant include curriculum development for non-majors as well as faculty and student research.

77 NANOSCIENCE AND NANOTECHNOLOGY↗

FY2014 LBNL LDRD Annual Report

Laboratory (Berkeley Lab or LBNL) is a multi-program national research facility operated by the University of California for the Department of Energy (DOE). As an integral element of DOE’s National Laboratory System, Berkeley Lab supports DOE’s missions in fundamental science, energy resources, and environmental quality. Berkeley Lab programs advance four distinct goals for DOE and the nation. The LDRD program supports Berkeley Lab’s mission in many ways. First, because LDRD funds can be allocated within a relatively short time frame, Berkeley Lab researchers can support the mission of the Department of Energy (DOE) and serve the needs of the nation by quickly responding to forefront scientific problems. Second, LDRD enables Berkeley Lab to attract and retain highly qualified scientists and to support their efforts to carry out worldleading research. In addition, the LDRD program also supports new projects that involve graduate students and postdoctoral fellows, thus contributing to the education mission of Berkeley Lab.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Final Report: Correctness Tools for Petascale Computing

In the course of developing parallel programs for leadership computing systems, subtle programming errors often arise that are extremely difficult to diagnose without tools. To meet this challenge, University of Maryland, the University of Wisconsin—Madison, and Rice University worked to develop lightweight tools to help code developers pinpoint a variety of program correctness errors that plague parallel scientific codes. The aim of this project was to develop software tools that help diagnose program errors including memory leaks, memory access errors, round-off errors, and data races. Research at Rice University focused on developing algorithms and data structures to support efficient monitoring of multithreaded programs for memory access errors and data races. This is a final report about research and development work at Rice University as part of this project.

97 MATHEMATICS AND COMPUTING↗