Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “TEAM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Team West Virginia/Rome Final Report

Overall, the team, West Virginia University (WVU) and University of Rome Tor Vergata (UTV), has a goal of building an attractive, low-cost, energy-efficient solar-powered home that represents both the West Virginian and Italian cultures.

14 SOLAR ENERGY↗

General Guidelines on Criteria for Adoption or Rejection of Evaluated Libraries and Data by the Nuclear Data Team

This memo contains general guidelines on what documentation and tools need to be in place as well as format and data testing requirements such that evaluated nuclear data sets or entire libraries can be adopted by the nuclear data team. Additional requirements beyond this memo might apply for specific nuclear data observables. These guidelines were established based on discussions between J.L. Conlin, M.G. Gray, A.P. McCartney, D. Neudecker, D.K. Parsons and M.C. White.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Waste Isolation Pilot Plant Technical Assessment Team Report

This report provides the results of the Waste Isolation Pilot Plant (WIPP) technical assessment led by the Savannah River National Laboratory and conducted by a team of experts in pertinent disciplines from SRNL and Lawrence Livermore National Laboratory (LLNL), Oak Ridge National Laboratory (ORNL), Pacific Northwest National Laboratory (PNNL), and Sandia National Laboratories (SNL).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PF-4 Seismic Performance Reassessment, Los Alamos National Laboratory, Project Charter and Integrated Project Team

This report presents the charter of the Integrated Project Team for conducting the PF-4 Seismic Performance Reassessment (P-SPRa) Project. The overall objective of the project is to compute the seismic performance of the PF-4 structure. The credited safety feature of the structure is to provide tertiary confinement of hazardous materials. This document highlights major tasks to be performed as part of the project. It includes a project schedule and a work breakdown structure dictionary. It also includes roles and responsibilities for key project personnel.

42 ENGINEERING↗

ALDCP Student Team 7/25/19 Briefing [Slides]

This set of slides documents the activities of the Associate Laboratory Directorate for Capital Projects (ALDCP) student team during the week of July 25, 2019. It summarizes the involvement of the group in the Smart Lab project, and the individual progress of separate projects, including the Life-Cycle Cost Analysis (LCCA) Calculator and Tests, the HVAC Renovation, and the Renovation Feasibility Study, with accomplishments and barriers for each.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

AGR-5/6/7 Operations Update for Technical Coordination Team (Apr 2020)

This is a powerpoint presentation designed to update the Technical Coordination Team (TCT) associated with the AGR irradiation experiment program on operations of the AGR-5/6/7 experiment over the past six months (since the last TCT meeting). The presentation primarily deals with operational challenges to failed fuel particles in capsule 1. Specifically, how to keep fission products from capsule 1 from entering the other four capsules in the experiment.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

TEAM project review, year 1

This note summarizes our research activities within the TEAM project between October 2019 and November 2020, funded by the ASCR Advanced Research in Quantum Computing program. Three research efforts have begun during the review period. The first effort, resulting in the JuQBox software, implemented a novel algorithm for optimal control in closed quantum systems based on symplectic time integration and exact calculations of the gradient of the discretized objective function. In our second effort, resulting in a code called Quandary, we consider the optimal control problem for open quantum systems. Here the evolution of the quantum system is modeled by the Lindblad master equation. In this code, we are considering both the realization of quantum gates as well as the optimal reset problem in which a general mixed quantum state is driven towards its ground state. In our third research effort we have begun the development of computational software for what we call Lindblad learning, i.e. the process of characterizing the equations governing our quantum computing hardware.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Waste Isolation Pilot Plant Technical Assessment Team Report

This report provides the results of the Waste Isolation Pilot Plant (WIPP) technical assessment led by the Savannah River National Laboratory and conducted by a team of experts in pertinent disciplines from SRNL and Lawrence Livermore National Laboratory (LLNL), Oak Ridge National Laboratory (ORNL), Pacific Northwest National Laboratory (PNNL), and Sandia National Laboratories (SNL).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SECARB Collect Data via Logging, Testing, and Sampling and Distribute to Project Team

Data collection was conducted from Phase III Project start date with completion of the NEPA review in Spring for 2009, through an intense characterization period during well drilling in the summer of 2009, to the start of injection December 1, 2009. During the early stages of injection, data collection was very intense. With staff onsite on 24 hour shifts until January, 2010. Detailed data collection was completed episodically during 2010, with an high injection rate in a tracer study completed during the spring of 2010, and then a repeat seismic survey with borehole gravity, VSP, cross-well and sonic logging conducted during the fall of 2010. By the report date at the end of 2011, data had been compiled and distributed to the team for analysis.

54 ENVIRONMENTAL SCIENCES↗

Nuclear Emergency Support Team Public Health and Safety [Slides]

RAP is the nation’s premier first-response resource for advising Federal, state, local and tribal decision-makers on steps to take to evaluate and minimize the hazards of a radiological or nuclear incident. RAP support ranges from giving technical information or advice over the telephone to sending highly trained personnel with state-of-the-art equipment to the incident site where team members help identify, characterize and minimize any radiological or nuclear hazards.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

ANL Design Team Analysis: Transportable Modular Reactor by Balance of Plant Elimination

HolosGen LLC is developing “Holos-Quad” a transportable gas-cooled reactor, with integral load following power conversion systems equipping subcritical power modules (SPMs), fully comprised within standard transport containers. The design eliminates the Balance of Plant (BoP) and greatly simplifies the design layout. A closed-loop full Brayton gas thermodynamic cycle converts the fuel cartridges thermal energy into electricity. This ARPA-E project utilizes advanced reactor modeling tools and manufacturing-testing of a scaled SPM equipped with a surrogate fuel cartridge to eliminate the most significant technology gaps to accelerate commercialization. The Argonne Design Team contributes to the research by demonstrating feasibility of various aspects of the Holos-Quad design by performing high-fidelity neutronic modeling, and investigating various reactivity control systems. This work consists of two main tasks: evaluation of HolosGen’s design features and alternative options study for reactivity control.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Camp Lejeune Federal Fleet Tiger Team EVSE Site Assessment

The National Renewable Energy Laboratory (NREL) was contracted by the Department of Defense (DOD) Environmental Security Technology Certification Program (ESTCP) and the Department of Energy (DOE) Federal Energy Management Program (FEMP) to develop a web tool and complete pilot assessments for the installation of Electric Vehicle Supply Equipment (EVSE). NREL has deployed Tiger Teams comprising engineers and fleet experts to support DOD and DOE on several EVSE site assessments since 2015. However, the advancements developed in support of this report, including a cost-estimation tool and geospatial mapping tool, will enable a user-driven path to assess EVSE needs. This report details the site design recommendations for Camp Lejeune, North Carolina.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Generative Artificial Intelligence Tools for Red Teams

This document analyzes the role of Generative Artificial Intelligence (GenAI) tools in cybersecurity, particularly for red teaming. While GenAI accelerates initial security assessments, its effectiveness wanes with complexity, necessitating experienced assessors. The review critiques marketing claims, highlights ethical concerns regarding uncensored models for cybercrime, and advocates for a robust defense strategy supported by skilled professionals.

97 MATHEMATICS AND COMPUTING↗

Tough Errors Are no Match (TEAM): Optimizing the quantum compiler for noise resilience

This report summarizes Unitary Fund’s contributions to the Department of Energy’s TEAM project (DE-SC0020266) under Thrust 2: Quantum Programming and Compilation. The central outcomes of this work have been the development of Mitiq, an open-source Python toolkit for applying quantum error mitigation (QEM) techniques to noisy quantum programs, and the invention, benchmarking and theoretical investigation of novel QEM techniques. Additional outcomes include the development of other open source software packages for the usage, simulation and control of quantum computers.

97 MATHEMATICS AND COMPUTING↗