Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Status”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

FRIB Beam Power Ramp-up: Status and Plans

After project completion on scope, on cost, and ahead of schedule, the Facility for Rare Isotope Beams began operations for scientific users in May of 2022. The ramp-up to a beam power of 400 kW is planned over a six-year period; 1 kW was delivered for initial user runs from in 2022, and 5 kW was delivered as of February 2023. Test runs with 10 kW 36Ar and 48Ca beams were conducted in July 2023. Upgrade plans include doubling the primary-beam energy to 400 MeV/nucleon for enhanced discovery potential (¿FRIB 400¿). This talk reports on the strategic plans towards high power operations emphasizing challenges and resolutions in beam-interception devices and targetry systems, radiation protection and controls, and legacy system renovation and integration.

43 PARTICLE ACCELERATORS↗

The RCS Design Status for the Electron Ion Collider

The design of the Electron-Ion Collider Rapid Cycling Synchrotron (RCS) to be constructed at Brookhaven National Laboratory is advancing to meet the injection requirements for the Electron Storage Ring (ESR). Over the past year activities are focused on developing the approach to inject two 28 nC bunches every second, up from the original design of one 10nC bunch every second. The solution requires several key changes concerning the injection and extraction kickers, charge accumulation via bunch merging and a carefully calibrated RF acceleration profile to match the longitudinal emittance required by the ESR.

Ranjbar, V. H.↗

The Status of the Energy Calibration, Polarization and Monochromatization of the FCC-ee

The Future Circular electron-positron Collider, FCC- ee, is designed for unprecedented precision for particle physics experiments from the Z-pole up to above the top-pair-threshold, corresponding to a beam energy range from 45.6 to 182.5 GeV. Performing collisions at various particle-physics resonances requires precise knowledge of the centre-of-mass energy (ECM) and collision boosts at all four interaction points. Measurement of the ECM by resonant depolarization of transversely polarized pilot bunches in combination with a 3D polarimeter, aims to achieve a systematic uncertainty of 4 and 100 keV for the Z-pole and W-pair-threshold energies respectively. The ECM itself depends on the RF-cavity locations, beamstrahlung, longitudinal impedance, the Earth’s tides, opposite sign dispersion and possible collision offsets. Application of monochromatization schemes are envisaged at certain beam energies to reduce the energy spread. The latest results of studies of the energy calibration, polarization and monochromatization are reported here.

43 PARTICLE ACCELERATORS↗

Status of Error Correction Studies in Support of FFA@CEBAF

In pursuit of higher energy at the Continuous Electron Beam Accelerator Facility (CEBAF), the FFA@CEBAF energy upgrade study is considering the implementation of a novel technology to recirculate electron beam through the accelerating gradient of the machine more times. The technology in question is Fixed-Field Alternating-gradient (FFA) bending accelerator arcs: these arcs may replace the present highest energy electromagnetic (EM) arcs, and due to a much wider energy acceptance allow several more passes. The survey and beam error tolerance of the FFA arcs need to be well understood prior to commissioning, in addition to the limits of planned correction magnets and diagnostics. This work explores the current state of error tolerance and correction studies in FFA arcs at CEBAF.

Benesch, J.↗

Status of the laser manipulations of H- beam at J-PARC

The laser manipulations of H- ion beam by single or double neutralization is a very promising technique and highly essential to utilized in accelerator processes such as stripping, pulse chopping, collimation, extraction, and beam diagnostics for the present and future high-intensity proton accelerators. At J-PARC, we are preparing for a POP (Proof-of-Principle) demonstration 400 MeV H- stripping by using only lasers. A prototype YAG laser system and a laser cavity system to reduce the laser power are being developed through 3 MeV H- neutralization studies. Fermilab utilizes H- neutralization at 0.75 MeV by establishing a laser Notcher system for a gap in the H- pulse needed for a clean beam extraction from the ring. To minimize the laser power and maximize the interaction efficiency are common issue at both laboratories. Under the US-Japan collaboration for high-intensity neutrino beam, we are closely working to establish recycling/reusing of seed laser pulses to reduce a size of the laser system. In parallel, we have also developed non-destructive beam diagnostic systems at lower H- energy of 3 MeV, which will be implemented to the 400 MeV as well as easily applicable to the Fermilab linac including PIP-II linac. Installation of the laser system at J-PARC linac for 400 MeV H- stripping is ongoing to start the POP experimental study in 2023.

43 PARTICLE ACCELERATORS↗

Horizontal Splitter Design For FFA@CEBAF Energy Upgrade: Current Status

Thomas Jefferson National Accelerator Facility (Jefferson Lab) is currently studying the feasibility of an energy upgrade based upon Fixed-Field Alternating Gradient (FFA) permanent magnet technology. The current plan is to replace the highest-energy recirculation arcs with FFA arcs, increasing the total number of beam recirculations, thus the energy. In order to accommodate multiple passes in the FFA arcs, horizontal splitters are being designed to control the beam parameters entering the FFA arcs, as well as the time of flight and R_56. In the current design, six passes will recirculate through the FFA arcs, necessitating the design of six independent beamlines to control the optics and beam dynamics matching into the arcs. These beamlines must fit into the current CEBAF tunnel, while allowing for personnel and equipment access. They must also be flexible enough to accommodate the beam under realistic operational conditions and fluctuations. The constraints on the system are highly restrictive, complicating the design. This document will describe the current state of the design, and indicate the work remaining for a complete conceptual design.

Benesch, Jay↗

First conduction cooled photoinjector status

SRF photoguns become a promising candidate to produce highly stable electrons for UEM/UED applications because of the ultrahigh shot-to-shot stability compared to room temperature RF photoguns. SRF technology was prohibitively expensive for industrial use until two recent advancements: Nb3Sn and conduction cooling. SRF gun can provide a CW operation capability while consuming only 2W of RF power which eliminates the need of an expensive high power RF system and saves a facility footprint. Euclid is developing a continuous wave (CW), 1.5-cell, MeV-scale SRF conduction cooled photogun operating at 1.3 GHz. We aim for generation of the first beam in 2024. In this paper, we present the most up-to-date progress including results of the first cool down of the gun-cavity in the newly developed conduction cooled cryomodule and LLRF system development.

43 PARTICLE ACCELERATORS↗

Current status of permanent magnet radiation resiliency studies at CEBAF

One possible future for Jefferson Lab’s Continuous Electron Beam Accelerator Facility (CEBAF) lies in upgrading its maximum nominal energy using Fixed-Field Alternating-gradient (FFA) technology for its recirculating arcs. The current proposal aims to use permanent magnets to supply the fixed fields. One concern among reviewers is the degradation of these permanent magnets during operation due to the radiation environment in which they will be present. This work, funded by a Laboratory Directed R&D grant, aims to measure the magnet degradation in the CEBAF tunnel enclosure, and extrapolate to the energies expected from the upgrade. We present the latest results of this study, as well as plans moving forward.

Accelerator Physics↗

eLog analysis for accelerators: status and future outlook

This work demonstrates electronic logbook (eLog) systems leveraging modern AI-driven information retrieval capabilities at the accelerator facilities of Fermilab, Jefferson Lab, Lawrence Berkeley National Laboratory (LBNL), SLAC National Accelerator Laboratory. We evaluate contemporary tools and methodologies for information retrieval with Retrieval Augmented Generation (RAGs), focusing on operational insights and integration with existing accelerator control systems. The study addresses challenges and proposes solutions for state-of-the-art eLog analysis through practical implementations, demonstrating applications and limitations. We present a framework for enhancing accelerator facility operations through improved information accessibility and knowledge management, which could potentially lead to more efficient operations.

Accelerator Physics↗

Status of SNS Proton Power Upgrade SRF Cavities Production Qualification

The Pro­ton Power Up­grade pro­ject at Oak Ridge Na­tional Lab’s Spal­la­tion Neu­tron Source (SNS PPU) cur­rently being con­structed will dou­ble the pro­ton beam power from 1.4 to 2.8 MW by adding 7 ad­di­tional cry­omod­ules, each con­tains four six-cell high beta (\beta = 0.81) su­per­con­duct­ing radio fre­quency cav­i­ties. The cav­i­ties were built by Re­search In­stru­ments, Ger­many, with all the cav­ity pro­cess­ing done at the ven­dor site, in­clud­ing elec­trop­o­l­ish­ing as the final ac­tive chem­istry step. All 28 cav­i­ties needed for 7 cry­omod­ules were de­liv­ered to Jef­fer­son Lab, ready to be tested. The cryo­genic RF qual­i­fi­ca­tions and he­lium ves­sel weld­ing were done at Jef­fer­son Lab. The per­for­mance largely ex­ceed the re­quire­ments, and greatly ex­ceeded the per­for­mance of the orig­i­nal SNS cav­ity pro­duc­tion se­ries. Here, we pre­sent the sum­mary of RF test on pro­duc­tion cav­i­ties to this date.

Dhakal, P.↗

Status of the LCLS-II-HE Project at Jefferson Lab

The Linac Coherent Light Source II High Energy (LCLS-II-HE) upgrade at the SLAC National Accelerator Laboratory is being constructed in partnership with the Thomas Jefferson National Accelerator Facility (JLab) and the Fermi National Accelerator Laboratory (FNAL). The cryomodule production scope consists of the design, procurement, construction, and acceptance testing of 24 eight-cavity, 1.3 GHz cryomodules, as well as R&D activities necessary to develop the required technology. To achieve this, JLab and FNAL are also contributing to SLAC’s effort to develop the cavity recipe and production processes necessary to meet the LCLS-II-HE goal of 20.8 MV/m and average Q₀ of 2.7·10¹⁰. This paper details the JLab scope, focusing on the project initiation phase, in particular technology development and prototyping, project development and planning, and implementation of lessons learned from LCLS-II.

Wilson, K. M.↗

PIP-II Project Overview and Status

The Proton Improvement Plan II (PIP-II) project is an essential upgrade to Fermilab’s particle accelerator complex to enable the world’s most intense neutrino beam for LBNF/DUNE and a broad particle physics program for many decades to come. PIP-II will deliver 1.2 MW of proton beam power from the Main Injector, upgradeable to multi-MW capability. The central element of PIP-II is an 800 MeV superconducting radio frequency (SRF) linac, which comprises a room temperature front end followed by an SRF section. The SRF section consists of five different flavors of cavities/cryomodules, including Half Wave Resonators (HWR), Single Spoke and elliptical resonators operating at, or above, state-of-the-art parameters. The first two PIP-II cryomodules, Half Wave Resonator (HWR) and Single Spoke Resonator 1 (SSR1) were installed in the PIP-II Injector Test facility (PIP2IT) and have accelerated beam to above 17 MeV. PIP-II is the first U.S. accelerator project that will be constructed with significant contributions from international partners, including India, Italy, France, United Kingdom and Poland. The project was baselined in April 2022, and the construction phase is underway.

43 PARTICLE ACCELERATORS↗

Cryogenic Carbon Capture™ (CCC) Status Report

The Cryogenic Carbon Capture™ (CCC) process separates CO2 from light gases in essentially any continuous process. CCC cools the gases to the frost or desublimation point of CO2 (-100 to -135 °C), separates and pressurizes the solids, and warms all streams to produce a CO2-depleted stream at ambient pressure and a pure (99+%) pressurized liquid CO2 stream typically to about 150 bar, both at ambient temperature. The process also recovers all gas moisture and most gas impurities less volatile than CO2 (NOx, SOx, Hg, PM, UHC, CCC, etc.) in separable streams. CCC nearly eliminates refrigeration energy for sensible temperature changes through heat integration. CCC does require energy to change the CO2 phase from a mixed vapor to a pressurized fluid, which represents the minimum energy required of any process for this separation. CCC uses additional energy for turbomachinery inefficiencies, heat losses, moisture removal and overall process pressure drop. Aside from these real-world energy demands, CCC operates near the minimum energy required to perform this gas separation by minimizing stream recycling. CCC compresses CO2 as a liquid, which is one of several reasons it costs about about half as much and consumes about half as much energy as an amine process when using flue gases with about 15% CO2. The process also has several major additional advantages, including (a) it is a bolt-on retrofit technology that does not need steam or any modification of existing equipment, (b) it recovers water and nearly all pollutants in addition to CO2 from the flue gas, (c) it enables highly efficient and cost effective energy storage at grid scale and on time scales of minutes, (d) it enables NG storage if the energy storage option is used, and (d) it has a small footprint and is minimally disruptive to existing plants, requiring only electrical power and a gas source to operate. Sustainable Energy Solutions (SES) has scaled this technology through several levels, the largest of which captures nominally 1 tonne of CO2/day and is called the skid system. Skid system field tests include utility-scale power plants, cement plants, heating plants, and other utility or industrial sites that burn natural gas, biomass, coal, shredded tires, municipal waste, and combinations of these fuels. These field tests produced 95-99% CO2 capture with CO2 purities of 99+% and initial CO2 contents that range from 4 to 28%. SES currently seeks to scale the system to merchant scale (10-80 tonnes of CO2 per day). In the process of doing so, SES has demonstrated the potential for CCC to contribute to energy storage and direct air capture in innovative and cost-effective ways. This presentation discusses the overall process and highlights results from field and in-house tests. These include (a) measured CO2 capture rates and operating conditions from in-house and field tests, and (b) predicted utility-scale costs and energy demands. This discussion also includes the application of the CCC technology to energy storage and direct air capture.

20 FOSSIL-FUELED POWER PLANTS↗

The status of the galactic center gamma-ray excess

The Galactic Center Gamma-Ray Excess has a spectrum, angular distribution, and overall intensity that agree remarkably well with that expected from annihilating dark matter particles in the form of a m_X \sim m X ∼ 50 GeV thermal relic. Previous claims that these photons are clustered on small angular scales or trace the distribution of known stellar populations once appeared to favor interpretations in which this signal originates from a large population of unresolved millisecond pulsars. More recent work, however, has overturned these conclusions, finding that the observed gamma-ray excess does not contain discernible small scale power, and is distributed with approximate spherical symmetry, not tracing any known stellar populations. In light of these results, it now appears significantly more likely that the Galactic Center Gamma-Ray Excess is produced by annihilating dark matter.

Hooper, Dan↗

Status of SRNL Radiological Field Lysimeter Experiment (RadFLEx) – Year 7

The Radiological Field Lysimeter Experiment (RadFLEx) began in 2012 and is a collaboration between the Savannah River National Laboratory (SRNL) and Clemson University. The purpose of this facility is to study the long-term (2 to 20 years) fate and transport of radionuclides in the Savannah River Site (SRS) vadose zone under natural field and meteorological conditions. The unique facility houses 48 5-L cores filled with sediments amended with various radionuclide sources. The results from these studies have been applied to the development of geochemical models used to assess the risk posed by subsurface nuclear waste disposal, environmental remediation, and waste form development. This report describes the refurbishment of the exterior of the RadFLEx facility and the synthesis and deployment of six plutonium(Pu) sources, four neptunium (Np) sources and one radium (Ra) source. It is anticipated that these newly installed lysimeter cores will be studied for up to 10 years.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance Assessment for the Environmental Restoration Disposal Facility (FY 2019 Annual Status Report)

DOE O 435.1 and DOE M 435.1-1 require that a determination of continued adequacy of the performance assessment (PA), composite analysis, and disposal authorization statement (DAS) be annually, and it must consider the results of data collection and analysis from research, field studies, and monitoring as well as update any Radioactive Waste Management Basis documents. Beginning in 1996, the Environmental Restoration Disposal Facility (ERDF) has accepted low-level radioactive, hazardous, and mixed wastes that were generated during cleanup activities at the Hanford Site. ERDF is composed of a series of cells (currently 10) or disposal areas and can accommodate future design expansions as needed. During this reporting period (fiscal year 2019, October 1, 2018, to September 30, 2019). approximately 139,721 U.S. tons of waste was disposed at ERDF. From inception through September 30, 2019, ERDF has received approximately 18.5 million U.S. tons of waste, which equates to consumption of approximately 88% of the disposal volume. As a condition of the DAS, disposal operations within ERDF must be in accordance with the waste acceptance criteria (WAC) that provide specific radionuclide disposal limits, waste from restrictions, and descriptions of acceptable waste packages in compliance with DOE M 435-1.1 requirements. The ERDF WAC stipulates that waste destined for disposal at ERDF be controlled based on source, physical form, and containment concentration and activity levels

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Composite Analysis for Low Level Waste Disposal in the Central Plateau of the Hanford Site (FY2019 Annual Status Report)

In accordance with DOE M 435.1-1 requirements and as implemented by DOE/RL-2000-29, the U.S. Department of Energy (DOE), Richland Operations Office has prepared this annual summary for fiscal year (FY) 2019. Originally reported in PNNL-11800 and PNNL-11800, Addendum 1, the Hanford Site Composite Analysis was approved through issuance of a 2002 memorandum. As required by DOE/RL-2000-29, an annual evaluation of new information and data developed by a number of onsite programs was completed. The reporting period for this annual evaluation is FY 2019 (October 1, 2018, through September 30, 2019). The information provided in this evaluation includes activities performed in FY 2019 that are considered pertinent to the Hanford Site Composite Analysis - information that could change source terms considered, and monitoring, research, and development results.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Status of GTA Gear Inspection after Testing in Sodium

The Mechanisms Engineering Test Loop (METL) is an intermediate-scale liquid metal experimental facility that provides purified reactor-grade (R-grade) sodium to various experimental test vessels. In these test vessels, components that are required to operate in an advanced fast reactor can be tested in a prototypical sodium environment. Experiments conducted in METL significantly assist in the development and maturation of systems and components for advanced reactors. The METL facility consists of multiple test segments including: a purification and diagnostic loop (cold trap was designed after EBR-II), two 18” diameter test vessels with 150 L capacities capable of operating in static or dynamic flow at 538°C, two 28” diameter test vessels with 644 L capacities capable of operating in static or dynamic flow at 650°C, a 3,180 L dump tank with 21 instrumentation ports, and the infrastructure to expand capacity in the future.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗