Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Stakeholder Value”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Livability Assessment of Urban Communities considering the Preferences of Different Age Groups

Livability is one of the major guiding principles for urban planning and policymaking, of which the definition and evaluation have become the crucial research topic. As the progress in socioeconomic development accelerates, the microscale living conditions require more urgent attention. However, few researchers have addressed the assessment of urban livability at a finer spatial scale such as the community scale. Thus, this article aims to evaluate the urban environmental quality at the community level given the residential community as the basic unit of urban living areas. We select eighteen objective indicators from five dimensions to establish an objective indicator system. Taking the preferences of different age groups into account, a comprehensive evaluation framework for the livability of communities combining both subjective perceptions and objective indicator is constructed. Then, it is applied to evaluate the livability of 1,394 residential communities in Ningbo City. There are three significant results from the study. First, different age groups have diverse preferences of demands to the livability of an urban community. The indicators they valued most concentrated in the following two dimensions: the convenience of transportation and the completeness of supporting facilities. Second, there exists significant heterogeneity in the livability of communities among districts. Third, the livability of communities shows a decreasing spatial pattern from the city center to the surroundings. These empirical results can be advantageous to urban planning departments and other relevant stakeholders.

Liang, Xiaojin↗

Approach to startup inventory for viable commercial fusion power plant

With the increasing efforts to commercialize fusion power, private and government organizations are investing heavily in the development of technology to support a viable fusion power plant. Deuterium-Tritium (DT) fueled reactors are more prevalent than other proposed designs, requiring tritium processing and handling technology for safe operations and self-sufficiency. Further, each fusion power plant will need a specific-to-design startup inventory of tritium to begin operations. This startup inventory is required prior to breeding and is the minimum tritium inventory required to fill each processing component in the fuel cycle, to offset radioactive decay losses, and to avoid a zero-fuel situation for continuous operation. We present an approach to calculate the startup tritium inventory for a 500 MW th reactor, with considerations for reserve inventory for maintenance and commissioning. A baseline startup inventory was calculated to be approximately 327 gs. This value was obtained using modest assumptions about the technology and operating parameters of a fusion power plant. The required operating reserve inventory or the inventory necessary to keep a fusion power plant operational using only direct internal recycling for 24 h for the same plant design is approximately 642 gs. The approach and findings of this paper will enable fusion energy stakeholders to better utilize the existing scarce global tritium supply.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Earth Observations and the Role of UAVs: A Capabilities Assessment

This document provides an assessment of the civil UAV missions and technologies and is intended to parallel the Office of the Secretary of Defense UAV Roadmap. The intent of this document is four-fold: 1. Determine and document desired future missions of Earth observation UAVs based on user-defined needs 2. Determine and document the technologies necessary to support those missions 3. Discuss the present state of the platform capabilities and required technologies, identifying those in progress, those planned, and those for which no current plans exist 4. Provide the foundations for development of a comprehensive civil UAV roadmap to complement the Department of Defense (DoD) effort (http://www.acq.osd.mil/uas/). Two aspects of the President's Management Agenda (refer to the document located at: www.whitehouse.gov/omb/budget/fy2002/mgmt.pdf ) are supported by this undertaking. First, it is one that will engage multiple Agencies in the effort as stakeholders and benefactors of the systems. In that sense, the market will be driven by the user requirements and applications. The second aspect is one of supporting economic development in the commercial sector. Market forecasts for the civil use of UAVs have indicated an infant market stage at present with a sustained forecasted growth. There is some difficulty in quantifying the value of the market since the typical estimate excludes system components other than the aerial platforms. Section 2.4 addresses the civil UAV market forecast and lists several independent forecasts. One conclusion that can be drawn from these forecasts is that all show a sustained growth for the duration of each long-term forecast.

Cox, Timothy H.↗

SPECs Early-Stage Decision Model: User Manual

The SPECs Early-Stage Decision (ESD) model is central to the SPECs procurement solutions toolkit. The ESD model is an Excel-based spreadsheet model, which provides information about the economic and strategic value of a proposed battery-storage project or solar-plus-storage (solar-plus) project. The model can be used to explore combinations of storage-related project value streams in order to define a potential project, while educating co-op decision-makers about project benefits and costs. A sensitivity analysis function speeds the development of "what-if" scenarios. A gap analysis function solves for top-priority metrics and supports the inclusion of hard-to-monetize strategic values, such as the value of storage to defer costly system upgrades in light of increasing distributed solar and other distributed energy resources (DERs). Model outputs include the utility data, assumptions, and use-case scenarios that are recommended content for the requests for proposals (RFPs). The model may also provide an initial "sanity check" for RFP responses, supporting further discussions among utility staff, vendors and stakeholders. The ESD is not a "finance-grade" modeling tool, and users are cautioned to be mindful of its limitations, but the model has been reviewed by users, who recommend it as a way to drive faster and better project design and planning, as well as to facilitate better communications with vendors, grid partners, and stakeholders.

14 SOLAR ENERGY↗

Advancing Wildfire Monitoring with TEMPO and ML tools: Hourly Smoke and Fire‑Front Mapping and Near‑Surface NO₂ Predictions

Wildfires impose substantial impacts on communities and regions downwind of wildfire smoke. We present a TEMPO‑enabled workflow that generates value‑added Level‑3 smoke‑plume masks and fire‑front maps for large wildfires, such as 2024 Park Fire, using the self‑supervised deep learning system SIT‑FUSE, along with near‑surface NO₂ predictions produced by a foundation model (Microsoft Aurora). We conclude by outlining a roadmap for expanding these capabilities to additional Western U.S. wildfire events and for delivering actionable tools to stakeholders. This open-source, reproducible workflow provides a scalable framework for cross-agency wildfire monitoring to overcome traditional limitations in smoke-cloud discrimination and air-quality forecasting by incorporating TEMPO data and beyond.

Xiaohua Pan↗

Air Pollutant Emissions and Regulatory Implications of a Biorefinery Co-Processing Bio-Oil in a Petroleum Refinery: Preprint

Pyrolysis oil, often referred to as bio-oil when derived from biomass through a fast pyrolysis process, has attracted considerable attention because of the high carbonaceous matter and high heating value compared to the original biomass. Pyrolysis oil provides a viable link between the agriculture/forestry and (petro-) chemical industry. Utilizing existing fossil fuel infrastructure by introducing bio-oil in petroleum refineries to produce renewable hydrocarbon fuels (i.e., repurposing existing assets) is appealing due to its relatively low capital requirement. Our analysis examined the air pollutant emissions for a biorefinery utilizing an ex situ catalytic fast pyrolysis process to produce raw bio-oil, with a design capacity of 2,000 dry metric tons of biomass per day. Such a biorefinery is capable of providing sufficient bio-oil to a 4,200 barrels per day capacity of fluidized catalytic cracking unit if the bio-oil is co-processed at 5% (by volume) feed rate. This research is focused on understanding the potential air pollutant regulatory and permitting implications for a refinery co-processing 5% bio-oil with 95% vacuum gas oil in a fluidized catalytic cracking unit for two scenarios: the first case assumes that an ex situ biorefinery is collocated with a petroleum refinery, and the second one assumes that a petroleum refinery will receive bio-oil from a stand-alone biorefinery. We estimated the potential-to-emit values for 4 biorefinery and FCC sizes and assessed technically feasible emission control options that could help to avoid being subject to prevention of significant deterioration requirements due to petroleum refinery modifications to co-process bio-oil. This research fills gaps and overcomes barriers related to air permitting requirements for co-processing bio-oil in existing refineries for various stakeholders. The insights gained from this analysis can facilitate decision making and help expedite permitting processes for petroleum refineries, which seek opportunities to produce lower carbon fuels in their existing infrastructure.

09 BIOMASS FUELS↗

Air Pollutant Emissions and Regulatory Implications of a Biorefinery Co-Processing Bio-Oil in a Petroleum Refinery

Pyrolysis oil, often referred to as bio-oil when derived from biomass through a fast pyrolysis process, has attracted considerable attention because of the high carbonaceous matter and high heating value compared to the original biomass. Pyrolysis oil provides a viable link between the agriculture/forestry and (petro-) chemical industry. Utilizing existing fossil fuel infrastructure by introducing bio-oil in petroleum refineries to produce renewable hydrocarbon fuels (i.e., repurposing existing assets) is appealing due to its relatively low capital requirement. Our analysis examined the air pollutant emissions for a biorefinery utilizing an ex situ catalytic fast pyrolysis process to produce raw bio-oil, with a design capacity of 2,000 dry metric tons of biomass per day. Such a biorefinery is capable of providing sufficient bio-oil to a 4,200 barrels per day capacity of fluidized catalytic cracking unit if the bio-oil is co-processed at 5% (by volume) feed rate. This research is focused on understanding the potential air pollutant regulatory and permitting implications for a refinery co-processing 5% bio-oil with 95% vacuum gas oil in a fluidized catalytic cracking unit for two scenarios: the first case assumes that an ex situ biorefinery is collocated with a petroleum refinery, and the second one assumes that a petroleum refinery will receive bio-oil from a stand-alone biorefinery. We estimated the potential-to-emit values for 4 biorefinery and FCC sizes and assessed technically feasible emission control options that could help to avoid being subject to prevention of significant deterioration requirements due to petroleum refinery modifications to co-process bio-oil. This research fills gaps and overcomes barriers related to air permitting requirements for co-processing bio-oil in existing refineries for various stakeholders. The insights gained from this analysis can facilitate decision making and help expedite permitting processes for petroleum refineries, which seek opportunities to produce lower carbon fuels in their existing infrastructure.

09 BIOMASS FUELS↗

Advanced Manufacturing and Materials for Hydropower: Challenges and Opportunities

Hydropower is a well-established industry that has been largely contributing to the global generation of clean and renewable energy for more than a century. In the United States in 2021, it accounted for 30% of all renewable energy generation and 6.1% of the total energy portfolio. Hydropower technology and designs have been optimized throughout the years, but manufacturing of hydropower components still relies heavily on traditional methods and materials. Changes in global energy production systems and international supply chain issues are inspiring the manufacturing sector to reconsider their processes. Similarly, the hydropower industry is facing manufacturing challenges stemming from well-known maintenance issues, environmental impact mitigations, and changes in operations. These challenges, along with continued innovation in new hydropower and pumped storage development and modernization of the fleet, present an opportunity for advanced manufacturing and materials (AMM) to provide immense value to the hydropower industry. In support of the US Department of Energy’s (DOE’s) Water Power Technologies Office (WPTO), this report aims to characterize the current and emerging manufacturing-related challenges in US hydropower and to identify the high-impact opportunities in AMM that could address these challenges. The results highlighted in this report were collected through literature review, individual stakeholder interviews, and an in-person workshop organized at DOE’s Oak Ridge National Laboratory Manufacturing Demonstration Facility that brought together hydropower industry stakeholders, advanced manufacturing R&D, and the government.

13 HYDRO ENERGY↗

Hydrogen Plus Other Alternative Fuels Risk Assessment Models (HyRAM+) Version 4.1 Technical Reference Manual

The HyRAM+ software toolkit provides a basis for conducting quantitative risk assessment and consequence modeling for hydrogen, methane, and propane systems. HyRAM+ is designed to facilitate the use of state-of-the-art models to conduct robust, repeatable assessments of safety, hazards, and risk. HyRAM+ integrates deterministic and probabilistic models for quantifying accident scenarios, predicting physical effects, characterizing hazards (thermal effects from jet fires, overpressure effects from delayed ignition), and assessing impacts on people. HyRAM+ is developed at Sandia National Laboratories to support the development and revision of national and international codes and standards, and to provide developed models in a publicly-accessible toolkit usable by all stakeholders. This document provides a description of the methodology and models contained in HyRAM+ version 4.1. The two most significant changes for HyRAM+ version 4.1 from HyRAM+ version 4.0 are direct incorporation of unconfined overpressure into the QRA calculations and modification of the models for cryogenic liquid flow through an orifice. In QRA mode, the user no longer needs to input peak overpressure and impulse values that were calculated separately; rather, the unconfined overpressure is estimated for the given system inputs, leak size, and occupant location. The orifice flow model now solves for the maximum mass flux through the orifice at constant entropy while conserving energy, which does not require a direct speed of sound calculation. This does not affect the mass flow for all-gaseous releases; the method results in the same speed of sound for choked flow. However, this method does result in a higher (and more realistic) mass flow rate for a given leak size for liquid releases than was previously calculated.

08 HYDROGEN↗

Survey and Gap Prioritization of U.S. Electric Vehicle Charge Management Deployments

The goal of this study was to survey and characterize the scope of current technical and programmatic knowledge pertaining to EV charge management technologies and practices in the US and relevant international jurisdictions. This characterization of existing field demonstrations and knowledge derived were used to determine gaps in the SCM demonstration landscape. Addressing these gaps through research and demonstration could increase confidence in the U.S. that load management and EV charge control could achieve overarching societal benefits. A survey of charge management deployments and input from stakeholders was completed to determine the state-of-the-art of smart charge management (SCM) where SCM is defined as controlling the amount of power exchanged between chargers and EVs to meet customers' charging needs while also responding to external power demand or pricing signals to provide load management, resilience, or other benefits to the customer and electric grid. The survey was the basis of the gap analysis in this report and determines which areas are well understood, with high confidence, and which areas need further investigation. Existing examples of EV charge management are characterized here to determine aspects that are ready for widespread deployment and have been demonstrated in the field. These include demonstration studies, pilots, programs, and EV-specific tariffs. In all, 110 examples of charge management were characterized. The data sources were public literature and utility filings as well as targeted interviews. In addition, 43 interviews with stakeholders were conducted with a consistent set of questions used in each interview. This study prioritized gaps in demonstrated SCM capabilities based on 1) Urgency of the particular use-case to offset traditional grid assets, 2) Impact, extensibility, and scaling of results across the entire spectrum of 3000+ utility service territories including projected technical and market potential for a given grid service, and 3) Value of federal funding in addressing the gap, including potential to leverage and/or add scope to existing field demonstrations funded by other non-federal funding mechanisms.

33 ADVANCED PROPULSION SYSTEMS↗

Transforming Uinta Basin Earth Materials for Advanced Products (TUBE-MAP)

The objectives of this project were to quantify, assess, and plan to enable the transformation of Uinta Basin earth resources, such as coal, oil shale, resin, rare earth elements, and critical minerals into high value metal, mineral, and carbon-based products. The specific major goals were 1) basinal assessments and initial planning (Task 2), 2) basinal assessment for waste stream reuse with associated plan development (Task 3), 3) basinal strategies development for infrastructure, industries, and business (Task 4), 4) technology assessment, development, and field-testing plan (Task 5), 5) technology innovation center plan (Task 6), and 6) stakeholder outreach and education plan (Task 7).

01 COAL, LIGNITE, AND PEAT↗

Waste Information Management System: One Year After Web Deployment

The implementation of the Department of Energy (DOE) mandated accelerated cleanup program created significant potential technical impediments. The schedule compression required close coordination and a comprehensive review and prioritization of the barriers that impeded treatment and disposition of the waste streams at each site. Many issues related to site waste treatment and disposal were potential critical path issues under the accelerated schedules. In order to facilitate accelerated cleanup initiatives, waste managers at DOE field sites and at DOE Headquarters in Washington, D.C., needed timely waste forecast information regarding the volumes and types of waste that would be generated by DOE sites over the next 30 years. Each local DOE site has historically collected, organized, and displayed site waste forecast information in separate and unique systems. However, waste information from all sites needed a common application to allow interested parties to understand and view the complete complex-wide picture. A common application allows identification of total waste volumes, material classes, disposition sites, choke points, and technological or regulatory barriers to treatment and disposal. The Applied Research Center (ARC) at Florida International University (FIU) in Miami, Florida, has completed the deployment of this fully operational, web-based forecast system. New functional modules and annual waste forecast data updates have been added to ensure the long-term viability and value of this system. In conclusion: WIMS continues to successfully accomplish the goals and objectives set forth by DOE for this project. WIMS has replaced the historic process of each DOE site gathering, organizing, and reporting their waste forecast information utilizing different database and display technologies. In addition, WIMS meets DOE's objective to have the complex-wide waste forecast information available to all stakeholders and the public in one easy-to-navigate system. The enhancements to WIMS made over the year since its web deployment include the addition of new DOE sites, an updated data set, and the ability to easily print the forecast data tables, the disposition maps, and the GIS maps. Future enhancements will include a high-level waste summary, a display of waste forecast by mode of transportation, and a user help module. The waste summary display module will provide a high-level summary view of the waste forecast data based on the selection of sites, facilities, material types, and forecast years. The waste summary report module will allow users to build custom filtered reports in a variety of formats, such as MS Excel, MS Word, and PDF. The user help module will provide a step-by-step explanation of various modules, using screen shots and general tutorials. The help module will also provide instructions for printing and margin/layout settings to assist users in using their local printers to print maps and reports. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Habitat Demonstration Unit Project Leadership and Management Strategies

This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project management team that put in place the key multi-center leadership skills and disciplines to enable a successful tiger team approach. Advocacy was established with key stakeholders and NASA Headquarters (HQ) by defining a strategic vision, mission, goals and objectives for the project and team. As a technology-pull testbed capability the HDU project was able to collaborate and leverage the Exploration Technology Development Program (ETDP) and individual NASA center investments which capitalized on their respective center core competencies and skills. This approach enable the leveraging of over $7.5m of value to create an operational habitat demonstration unit 2010 PEM configuration.

Kennedy, Kriss J.↗

Habitat Demonstration Unit Project: Leadership and Management Strategies for a Rapid Prototyping Project

This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies being used by the NASA HDU team for a rapid prototyping project. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team rapid prototyping approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project management team that put in place the key multi-center leadership skills and disciplines to enable a successful tiger team approach. Advocacy was established with key stakeholders and NASA Headquarters (HQ) by defining a strategic vision, mission, goals and objectives for the project and team. As a technology-pull testbed capability the HDU project was able to collaborate and leverage the Exploration Technology Development Program (ETDP) and individual NASA center investments which capitalized on their respective center core competencies and skills. This approach enable the leveraging of over $7.5m of value to create an operational habitat demonstration unit 2010 PEM configuration.

Kennedy, Kriss J.↗

Factors Influencing the Evaluation of Spent Fuel Rail Routes - 19010

The U.S. Department of Energy (DOE) is considering use of rail transport for future shipments of commercial spent nuclear fuel (SNF) from where it currently resides to storage or disposal facilities. Rail carriers transporting in commerce certain quantities of 'rail security sensitive materials,' including SNF, face a regulatory requirement from the U.S. Department of Transportation to perform route risk assessments on an annual basis. In performing these assessments, each affected rail carrier must take into consideration twenty-seven different route factors, and document its rationale for selecting preferred and alternative routes on the basis of the safety and security risk analysis results. The major freight rail carriers operating in the U.S. have invested in the development of a proprietary tool, for rail carrier use only, to assist them in making route selections. This tool utilizes operations data input by each affected rail carrier in conjunction with geographic information systems (GIS) data to represent proximate risk factors, to be integrated and assigned to individual points and segments on the railroad network. Separate safety and security risk values are generated for each rail route under consideration. These values are then placed on an equivalent scoring basis and summed together to allow direct comparison between different route options and to rank order each route in terms of its relative attractiveness. Each affected rail carrier files an annual report for evaluation by the Federal Railroad Administration (FRA) that documents its route risk assessment approach and analysis results. DOE has developed its own decision-support tool, Stakeholder Tool for Assessing Radioactive Transportation (START), which is capable of generating and analyzing routing options for transporting SNF by rail in addition to other freight modes. To better understand how affected rail carriers are likely to route SNF shipments in accordance with regulatory requirements and those route factors likely to be most influential in impacting DoE's evaluation of alternative SNF rail routes, a study was undertaken by DOE with the following objectives: - Review the shipment routes that have been historically used by rail carriers to move high hazard materials, including SNF; - Identify the physical, operational and proximate characteristics (attributes) associated with the rail segments that comprise these routes; - Evaluate the relationships between these attributes; - Make suggestions for how to streamline the factors used in DoE's rail route evaluations; - Contrast these relationships with how the factors are used by the rail carriers in applying their tool This paper describes the study approach, analysis results, and implications for rail route selection methodology. Differences between this evaluation and railroad industry information about rail route assessments are also discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Savannah River Site H-Canyon Collaborative Advanced Technology Demonstration (ATD) Program Review - 19499

The purpose of the Department of Energy-Environmental Management Office of Technology Development's (DOE-EM TD) Science of Safety (SOS) Robotics Initiative is to pull innovative commercial off the shelf (COTS) and near ready technologies to the field to expedite remaining EM mission clean up and enhance worker safety. A goal of this program is to demonstrate to DOE facilities the value of these available new technologies and their potential uses to solve difficult problems. In support of this goal, the Savannah River Site (SRS) H-Canyon Air Exhaust (HCAEX) tunnel biannual inspection task has been selected to demonstrate and evaluate the benefit of pulling advanced technology solutions to EM facilities. This is a highly collaborative task facilitated by SRNL and engaging SRS H-Canyon facility stakeholders, National Laboratory robotic and concrete inspection SMEs and university robotic and sensor researchers. Presently, the SRS HCAEX tunnel inspection consists of a visual examination to evaluate the structural integrity of the tunnel. Personal access is prohibited in the tunnel due to extreme conditions, thus the examination is accomplished remotely by deploying cameras mounted on a robotic crawler deployed into the tunnel. While the ability to see inside the tunnel in recent years has been highly valuable, it is desirable to have a better understanding of the environment to support a more thorough structural analysis and for long term planning purposes. This higher order of understanding can be accomplished through advanced COTS sensors and tools and those currently in development and near ready. The advanced technologies selected for demonstration will be evaluated for hosting on the FY19 HCAEX tunnel inspection crawler platform. The HCAEX ATD task is expected to be performed over a two-year period with year one now concluding. At WM2018, we presented the H-Canyon stakeholder's high priority inspection and remote handling needs, the collaboration team and the planned process of developing an integrated solution. This presentation will review the initial scope and inspection needs, then discuss the past year's progress to address these needs. The discussion includes the results of the Concrete Integrated Product Team (CIPT) formed to evaluate promising concrete NDE inspection technologies and a Lidar based tunnel mapping sensor suite solution. Highlighted in the discussion will be the engagement and pulling of university developed research and development to include student engagement through the formation and hosting of the SRNL Robotics and Sensors Intern team and collaboration with MSIPP funded Robotic Arm Concrete NDT Inspection University researchers. Lastly, the path forward to complete the demonstration will be presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Risk to Ecological Resources on Burial Waste Sites on the Hanford Site, Washington - 20248

The US and other nations have a large nuclear and chemical waste remediation task remaining from World War II, the Cold War, and industrial activities. The US Department of Energy (DOE) has the largest task in the U.S., with Hanford (Washington State) being the most contaminated site, with the longest and most costly cleanup program projected to extend to the end of the century. One of the greatest remediation problems at Hanford are the burial waste facilities, some of which are inside the 200 Areas on the Central Plateau, while others are outside the 200 Areas. These areas are associated with waste sites, pipes, and contaminated trenches, posing technical cleanup challenges to meet DoE's remediation goals, including protection of human health and the environment commensurate with Tri- Party Agreement and current regulatory requirements. In this paper we select one of the legacy waste sites (the BC Cribs and Trenches) as a case study to explore how risk to ecological resources varies during and as a consequence of remediation on sites primarily considered legacy waste sites. We used the risk methodology developed by the Consortium for Risk Evaluation with Stakeholder Participation (CRESP) during the Hanford Site-wide Risk Review. The CRESP methodology included evaluating the risk to receptors, including human health, the Columbia River, groundwater, and ecological and cultural resources. The risk evaluation process for ecological receptors included defining the boundaries of each evaluation unit (EU) to be remediated, definition of a suitable buffer area that might be affected, and consideration of the known resource value based on field work. This information, coupled with known remediation options or strategies, allowed us to develop a risk rating for ecological resources. Site risks were evaluated on a scale of 'not discernible' to 'very high' risk. Consideration of the risks at the buried waste sites was complicated by uncertainties in remediation methods and the degree of restoration that would occur as part of the remediation process. We use the BC Cribs and Trenches as a case study to explore why the risks are low currently but increase during remediation. The current 'not discernible to low' risk rating is due to the lack of high quality ecological resources on the BC Cribs and Trenches EU, except for edge areas (with some state-listed species). During remediation the risks increase to 'medium', mainly due to high quality resources on adjacent buffer lands, which could be disrupted during active remediation. Medium and high quality resources on the edge of the site are continuous with higher quality native shrub-steppe habitat on the buffer. Ecological resources on some of the areas surrounding the 200 East and West Areas are some of the highest quality shrub-steppe areas on the Hanford Site, and risk to these resources could be prevented by planning before and during remediation to minimize disruption. For example, lay down areas for the BC Cribs and Trenches can be minimized by careful planning. Heavy truck and other vehicular traffic can be minimized. Spread of the noxious weeds now on some of the site can be prevented, and the spread of invasive species into the site (particularly near undisturbed shrub-steppe habitat) can be reduced. Further, the areas around and between the 200 East and West Areas have been largely undisturbed and can serve as a source of seeds and propagules for any revegetation that occurs as part of the remediation process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Europa Explorer Operational Scenarios Development

In 2007, NASA conducted four advanced mission concept studies for outer planets targets: Europa, Ganymede, Titan and Enceladus. The studies were conducted in close cooperation with the planetary science community. Of the four, the Europa Explorer Concept Study focused on refining mission options, science trades and implementation details for a potential flagship mission to Europa in the 2015 timeframe. A science definition team (SDT) was appointed by NASA to guide the study. A JPL-led engineering team worked closely with the science team to address 3 major focus areas: 1) credible cost estimates, 2) rationale and logical discussion of radiation risk and mitigation approaches, and 3) better definition and exploration of science operational scenario trade space. This paper will address the methods and results of the collaborative process used to develop Europa Explorer operations scenarios. Working in concert with the SDT, and in parallel with the SDT's development of a science value matrix, key mission capabilities and constraints were challenged by the science and engineering members of the team. Science goals were advanced and options were considered for observation scenarios. Data collection and return strategies were tested via simulation, and mission performance was estimated and balanced with flight and ground system resources and science priorities. The key to this successful collaboration was a concurrent development environment in which all stakeholders could rapidly assess the feasibility of strategies for their success in the full system context. Issues of science and instrument compatibility, system constraints, and mission opportunities were treated analytically and objectively leading to complementary strategies for observation and data return. Current plans are that this approach, as part of the system engineering process, will continue as the Europa Explorer Concept Study moves toward becoming a development project.

Lock, Robert E.↗