Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Scenario optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Modeling Evolvable Water Recovery Systems for Short and Long-Duration Missions in Partial Gravity

Water recovery technologies on the International Space Station (ISS) are designed and optimized for microgravity environments, thus creating a need for innovative systems optimized for mission operations in the presence of gravity. Alternative water recovery technologies under research by the Life Support Systems division were compiled into a series of Partial Gravity Water Recovery System (PGWRS) architectures. Individual unit processes were modeled via fundamental physical-chemical process equations to simulate their method of treatment, including chemical or biological oxidation, flash evaporation, filtration, or a combination of adsorption and ion exchange processes. Dimension and sizing data were then utilized to scale each architecture. Modeling was completed on an assortment of architectures assuming three scenarios in which treatment methods could take advantage of partial gravity: a short-duration mission with a temporary surface habitat, a longer duration mission with a more permanent habitat, and a long duration mission without resupply. Total system mass was estimated to quantitatively compare architectures within scenarios, but qualitative observations were also made regarding system robustness, flexibility, and capacity to meet more stringent demands. Technologies that traded most favorably between the scenarios were those that included a pre-oxidation stage to minimize mass loading to downstream absorption and ion exchange beds, exploited gravity in liquid-vapor separation processes, and reconstituted wastewater components into recyclable material streams.

Avery Carlson↗

Modeling Evolvable Water Recovery Systems for Short and Long-Duration Missions in Partial Gravity

Water recovery technologies on the International Space Station (ISS) are designed and optimized for microgravity environments, thus creating a need for innovative systems optimized for mission operations in the presence of gravity. Alternative water recovery technologies under research by the Life Support Systems division were compiled into a series of Partial Gravity Water Recovery System (PGWRS) architectures. Individual unit processes were modeled via fundamental physical-chemical process equations to simulate their method of treatment, including chemical or biological oxidation, flash evaporation, filtration, or a combination of adsorption and ion exchange processes. Dimension and sizing data were then utilized to scale each architecture. Modeling was completed on an assortment of architectures assuming three scenarios in which treatment methods could take advantage of partial gravity: a short-duration mission with a temporary surface habitat, a longer duration mission with a more permanent habitat, and a long duration mission without resupply. Total system mass was estimated to quantitatively compare architectures within scenarios, but qualitative observations were also made regarding system robustness, flexibility, and capacity to meet more stringent demands. Technologies that traded most favorably between the scenarios were those that included a pre-oxidation stage to minimize mass loading to downstream absorption and ion exchange beds, exploited gravity in liquid-vapor separation processes, and reconstituted wastewater components into recyclable material streams.

Avery L. Carlson↗

Oceanic mesoscale variability and general circulation from satellite altimetry: A status report

Progress on the applications of satellite altimetry from SEASAT and Geos-3 to the study of oceanic mesoscale variability and general circulation is reviewed. The major conclusion for the applications to mesoscale variability is that an optimally designed altimetric mission with a lifetime of several years will improve our knowledge of the global mesoscale variability to an extent unattainable by any other practical means. The proposed Topex mission will allow one to view the global oceanic variability in such a wide range of periods and wavelengths: from 20 days to 3 to 5 years; from 50 to 10,000 km. However, the goal of determining the general circulation cannot be achieved by a single altimetric mission, because a highly accurate geoid needs to be determined independently. The scenario of the combination of Topex with Gravsat, a gravity mission that will give accurate geoid information, will allow the global general circulation to be determined at scales as small as 100 km. Areas of research needing to be performed with existing altimeter data are also discussed.

Fu, L. L.↗

A Concept for Airborne Precision Spacing for Dependent Parallel Approaches

The Airborne Precision Spacing concept of operations has been previously developed to support the precise delivery of aircraft landing successively on the same runway. The high-precision and consistent delivery of inter-aircraft spacing allows for increased runway throughput and the use of energy-efficient arrivals routes such as Continuous Descent Arrivals and Optimized Profile Descents. This paper describes an extension to the Airborne Precision Spacing concept to enable dependent parallel approach operations where the spacing aircraft must manage their in-trail spacing from a leading aircraft on approach to the same runway and spacing from an aircraft on approach to a parallel runway. Functionality for supporting automation is discussed as well as procedures for pilots and controllers. An analysis is performed to identify the required information and a new ADS-B report is proposed to support these information needs. Finally, several scenarios are described in detail.

Barmore, Bryan E.↗

Characteristics of a future aeronautical satellite communications system

A possible operational system scenario for providing satellite communications services to the future aviation community was analyzed. The system concept relies on a Ka-band (20/30 GHz) satellite that utilizes multibeam antenna (MBA) technology. The aircraft terminal uses an extremely small aperture antenna as a result of using this higher spectrum at Ka-band. The satellite functions as a relay between the aircraft and the ground stations. The ground stations function as interfaces to the existing terrestrial networks such as the Public Service Telephone Network (PSTN). Various system tradeoffs are first examined to ensure optimized system parameters. High level performance specifications and design approaches are generated for the space, ground, and aeronautical elements in the system. Both technical and economical issues affecting the feasibility of the studied concept are addressed with the 1995 timeframe in mind.

Sohn, Philip Y.↗

Characteristics of a future aeronautical satellite communications system

A possible operational system scenario for providing satellite communications services to the future aviation community was analyzed. The system concept relies on a Ka-band (20/30 GHz) satellite that utilizes Multibeam Antenna (MBA) technology. The aircraft terminal uses an extremely small aperture antenna as a result of using this higher spectrum at Ka-band. The satellite functions as a relay between the aircraft and the ground stations. The ground stations function as interfaces to the existing terrestrial networks such as the Public Service Telephone Network (PSTN). Various system tradeoffs are first examined to ensure optimized system parameters. High level performance specifications and design approaches are generated for the space, ground, and aeronautical elements in the system. Both technical and economical issues affecting the feasibility of the studied concept are addressed with the 1995 timeframe in mind.

Sohn, Philip Y.↗

Space transfer vehicle concepts and requirements, volume 2, book 1

The objective of the systems engineering task was to develop and implement an approach that would generate the required study products as defined by program directives. This product list included a set of system and subsystem requirements, a complete set of optimized trade studies and analyses resulting in a recommended system configuration, and the definition of an integrated system/technology and advanced development growth path. A primary ingredient in the approach was the TQM philosophy stressing job quality from the inception. Included throughout the Systems Engineering, Programmatics, Concepts, Flight Design, and Technology sections are data supporting the original objectives as well as supplemental information resulting from program activities. The primary result of the analyses and studies was the recommendation of a single propulsion stage Lunar Transportation System (LTS) configuration that supports several different operations scenarios with minor element changes. This concept has the potential to support two additional scenarios with complex element changes. The space based LTS concept consists of three primary configurations--Piloted, Reusable Cargo, and Expendable Cargo.

Source record↗

Leveraging Observing System Simulation Experiments for Satellite Instrument Design: Advancements and Challenges

This abstract highlights NASA's OSSE framework, developed at the Global Modeling and Assimilation Office, which has become a widely adopted tool for evaluating the impact of new observations on weather forecasts. The framework involves simulating realistic observations by introducing errors to mimic real-world scenarios. By utilizing advanced radiative transfer modeling, the accuracy of simulated observations is significantly improved, enhancing the reliability of experimental outcomes. The talk focuses on recent progress and challenges in three key areas. Firstly, it explores the techniques used to simulate synthetic observations, a crucial aspect of OSSE experiments. Secondly, the presentation also discusses the challenges of examining the observation errors that need to be added to the perfect observations to generate realistic simulated observations. Lastly, the assimilation of synthetic observations and their impact on forecast skills is evaluated, providing valuable insights for optimizing current and future observing systems for improving the weather forecasts. By sharing recent advancements and acknowledging challenges, this presentation seeks to inspire researchers to leverage the OSSE framework in weather forecasting. NASA's OSSE techniques hold promise for a better understanding of the atmosphere and the development of more accurate and reliable weather predictions.

Isaac Moradi↗

Fuzzy learning under and about an unfamiliar fuzzy teacher

This study addresses the problem of optimal parametric learning in unfamiliar fuzzy environments. Prior studies in the domain of unfamiliar environments, which employed either crisp or fuzzy approaches to model the uncertainty or imperfectness of the learning environment, assumed that the training sample labels provided by the unfamiliar teacher were crisp, even if not perfect. Here, the more realistic problem of fuzzy learning under an unfamiliar teacher who provides only fuzzy (instead of crisp) labels, is tackled by expanding the previously defined fuzzy membership concepts to include an additional component representative of the fuzziness of the teacher. The previously studied scenarios, namely, crisp and fuzzy learning under (crisp) unfamiliar teacher, can be looked upon as special cases of this new methodology. As under the earlier studies, the estimated membership functions can then be deployed during the ensuing classification decision phase to judiciously take into account the imperfectness of the learning environment. The study also offers some insight into the properties of several of these fuzzy membership function estimators by examining their behavior under certain specific scenarios.

Dasarathy, Belur V.↗

Climate Hazard Assessment for Stakeholder Adaptation Planning in New York City

This paper describes a time-sensitive approach to climate change projections, developed as part of New York City's climate change adaptation process, that has provided decision support to stakeholders from 40 agencies, regional planning associations, and private companies. The approach optimizes production of projections given constraints faced by decision makers as they incorporate climate change into long-term planning and policy. New York City stakeholders, who are well-versed in risk management, helped pre-select the climate variables most likely to impact urban infrastructure, and requested a projection range rather than a single 'most likely' outcome. The climate projections approach is transferable to other regions and consistent with broader efforts to provide climate services, including impact, vulnerability, and adaptation information. The approach uses 16 Global Climate Models (GCMs) and three emissions scenarios to calculate monthly change factors based on 30-year average future time slices relative to a 30- year model baseline. Projecting these model mean changes onto observed station data for New York City yields dramatic changes in the frequency of extreme events such as coastal flooding and dangerous heat events. Based on these methods, the current 1-in-10 year coastal flood is projected to occur more than once every 3 years by the end of the century, and heat events are projected to approximately triple in frequency. These frequency changes are of sufficient magnitude to merit consideration in long-term adaptation planning, even though the precise changes in extreme event frequency are highly uncertain

Horton, Radley M.↗

Predicting Unreinforced Fabric Mechanical Behavior with Recurrent Neural Networks

Unreinforced woven fabrics are widely employed in various high-performance applications, including parachute deployment systems, airbags, and ballistic armor. The analysis of such materials is inherently complex due to the multiscale structure of these materials, and the dependence of macroscale behavior on changes that occur at lower scales. Previously, NASA’s Multiscale Analysis Tool (NASMAT) showed its capability in predicting unreinforced fabric behavior at the macroscale by capturing finite rotations that occur at the mesoscale. Though effective, the tool can face high computational cost for large, complex problems, motivating the need for the development of a surrogate model that can capture the same behavior. A recurrent neural network (RNN) was developed and trained on virtual NASMAT data to mimic the physics-based solutions while improving the computational runtime. The architecture of the RNN to best simulate the fabric behavior was carefully crafted based on heuristic knowledge of predicting physics-based temporal data, manual hyperparameter case studies, and Hyperband optimization.. The resultant model was able to predict a variety of stress-strain curves for fabrics with different mesoscale geometries, and was further validated by comparing to experimental data for the K706 style Kevlar plain-weave fabric, demonstrating the ability of the model to effectively capture the geometric changes in the fabric without explicitly calculating them, as is done in NASMAT. Furthermore, the tool showed its ability to improve on the runtime by a factor of 10 for fabric solutions compared to the multiscale tool, which would further enable the simulation of complex loading scenarios on unreinforced fabrics.

Fabric↗

Abort performance for a winged-body single-stage to orbit vehicle

Optimal control theory is employed to determine the performance of abort to orbit (ATO) and return to launch site (RTLS) maneuvers for a single-stage to orbit vehicle. The vehicle configuration examined is a seven engine, winged-body vehicle, that lifts-off vertically and lands horizontally. The abort maneuvers occur as the vehicle ascends to orbit and are initiated when the vehicle suffers an engine failure. The optimal control problems are numerically solved in discretized form via a nonlinear programming (NLP) algorithm. A description highlighting the attributes of this NLP method is provided. ATO maneuver results show that the vehicle is capable of ascending to orbit with a single engine failure at lift-off. Two engine out ATO maneuvers are not possible from the launch pad, but are possible after launch when the thrust to weight ratio becomes sufficiently large. Results show that single engine out RTLS maneuvers can be made for up to 180 seconds after lift-off and that there are scenarios for which RTLS maneuvers should be performed instead of ATP maneuvers.

Lyon, Jeffery A.↗

Relationship between Aircraft Noise Contour Area and Noise Levels at Certification Points

The use of sound exposure level contour area reduction has been proposed as an alternative or supplemental metric of progress and success for the NASA Quiet Aircraft Technology program, which currently uses the average of predicted noise reductions at three community locations. As the program has expanded to include reductions in airframe noise as well as reduction due to optimization of operating procedures for lower noise, there is concern that the three-point methodology may not represent a fair measure of benefit to airport communities. This paper addresses several topics related to this proposal: (1) an analytical basis for a relationship between certification noise levels and noise contour areas for departure operations is developed, (2) the relationship between predicted noise contour area and the noise levels measured or predicted at the certification measurement points is examined for a wide range of commercial and business aircraft, and (3) reductions in contour area for low-noise approach scenarios are predicted and equivalent reductions in source noise are determined.

Powell, Clemans A.↗

Spot and Runway Departure Advisor

The Spot and Runway Departure Advisor (SARDA) is a research prototype of a decision support tool for ATC tower controllers to assist in manging and controlling traffic on the surface of an airport. SARDA employs a scheduler to generate an optimal runway schedule and gate push-back - spot release sequence and schedule that improves efficiency of surface operations. The advisories for ATC tower controllers are displayed on an Electronic Flight Strip (EFS) system. The human-in-the-loop simulation of the SARDA tool was conducted for east operations of Dallas-Ft. Worth International Airport (DFW) to evaluate performance of the SARDA tool and human factors, such as situational awareness and workload. The results indicates noticeable taxi delay reduction and fuel savings by using the SARDA tool. Reduction in controller workload were also observed throughout the scenario runs. The future plan includes modeling and simulation of the ramp operations of the Charlotte International Airport, and develop a decision support tool for the ramp controllers.

decision support tool↗

Localization of Ad-Hoc Lunar Constellations in Communication Failure Modes for Distributed Spacecraft Autonomy

As lunar missions increase in complexity inspired by NASA’s Artemis Program, they will require reliable and sufficient capability of the Position, Navigation, and Timing (PNT) system to support their scientific objectives. In addition, NASA's Commercial Lunar Payload Services (CLPS) program initiates the proliferation of public and private exploration partnerships using small satellites from commercial and private organizations, expanding traditionally confined low Earth orbit to be used for missions beyond geosynchronous orbit (Zucherman et al., 2022). Therefore, the Lunar PNT system is also required to provide navigation services compatible with the smaller platforms being sent by the public and private sectors, like CubeSats. However, traditional approaches to deep space missions’ navigation based on ground radio facilities have difficulties in providing sufficient support for the increasing number of users and communication at a distance from the Earth (Kaplev et al., 2022). In particular, the existing Lunar navigation technologies such as weak signal global positioning system (GPS) and deep space network (DSN) are not able to ensure operations of the upcoming small-scale Lunar missions due to their limitations in localization performance as well as capacity aspects. Another way to provide Lunar PNT service is to create a dedicated Lunar global navigation satellite system (GNSS) constellation, like GNSS systems on Earth. Space agencies like NASA, ESA, and JAXA are now developing the lunar communications relay and navigation systems (LCRNS) and Lunar navigation satellite systems (LNSS). In their systems, satellites will be deployed in moon orbits to provide the communication, positioning, navigation, and timing (CPNT) service at the lunar south pole region where the Artemis base camp will be expected (Murata et al., 2022). Meanwhile, common challenges considered in lunar PNT research arise from poor geometry of the terrestrial GNSS satellites when seen from the lunar user, highly perturbed lunar orbits, and limitations in power, size, and cost of the equipment on lunar satellites (Iiyama et al., 2023). It is also not clear if there will be enough Lunar users to support the cost and resources this would require as the Low-cost surface missions may not be able to support the large power, mass, and weight requirements that these navigation solutions entail (Niemoeller et al., 2022). As an alternative, existing Lunar science and exploration assets could be used to create a low-cost, autonomous, ad-hoc, and on-demand mission-centric Lunar PNT swarm capable of providing PNT services to these low-cost lunar missions (Hagenau et al., 2021). Introducing the non-dedicated and ad-hoc Lunar navigation constellation gives a way to provide PNT services on-demand. The non-dedicated swarm assets of Lunar constellations are designed to localize themselves with minimal interaction with Earth by adding cooperative autonomous localization to lunar missions, freeing up valuable bandwidth and ground segment resources. An autonomous localization of Lunar constellations is based on the concept of the decentralized PNT system with a distributed extended Kalman filter (DEKF) approach to state estimation for minimal onboard operating costs. In the distributed data processing algorithm, computation is broken down and assigned to each satellite, resulting in a considerably decreased computational amount while maintaining the accuracy of the orbit ephemeris and clock offsets as the result of centralized data processing (Wen et al., 2019). The DEKF requires spacecraft to perform two-way ranging operations with each other to communicate simultaneously, leveraging neighbor two-way intersatellite link (ISL) measurements such as pseudoranges to, and relative velocities between, visible satellites as sensor values (Frank et al., 2021). The Lunar autonomous PNT simulation (LAPS) demonstrated the feasibility of orbital asset localization among ad-hoc Lunar small-sat constellations based on the DEKF in Hagenau et al. (2021) and evaluated the matching algorithm proposed by Frank et al. (2021) in scheduling position estimation updates. In previous papers, all assets and measurements are assumed to be always available without consideration of the impact of intermittent and permanent communication failure. This study presents localization performance with increasing levels of network degradation for swarm assets and users to demonstrate the robustness of the decentralized Lunar PNT service in more realistic scenarios. Main issues arising from communication failure include spacecraft permanent or transient loss, antenna failures, message delays, etc. We tested four possible reasons for network degradation for 7 days in 21 satellites frozen with an altitude of 5500 km, evenly spaced around 3 circular, 40 inclination orbital planes where each spacecraft has two directional antennas. As anchor nodes with an independent estimate of their position are required in the DEKF approach, two ground nodes in each pole and one node in the gateway were implemented in the simulation. First, the most probable failure scenario involves the loss of a single spacecraft due to solar interference and technical malfunctions of the assets. Losing the availability of a single spacecraft means losing the two-way ISL measurement of the asset in the DEKF update. In order to provide the best possible quality of PNT service with limited time and resources, the distributed Lunar constellations must schedule the communication activities. The scheduler leverages mixed-integer linear programming (MILP) for the coordination and scheduling of the desired “as-needed” localization service (Niemoeller et al., 2022). We assume the scheduler has completely excluded the spacecraft information before the DEKF update in the failure scenario. When a random spacecraft has been turned off at a specific time, the robustness of the autonomous Lunar PNT system is evaluated. The simulation results give an 11.5% degradation in median position accuracy compared to the idealized performance excluding the asset loss. Second, a large number of assets may vanish due to major hardware problems or meteor strikes around the moon. A multiple spacecraft loss can degrade the localization performance very fast by losing the communication ability to do cross-plane measurements and in-plane measurements in a 3-plane constellation. When the matching-based scheduler is aware of ISL availability, we investigate a large number of in-plane and cross-plane asset vanishments both in close proximity and equally spaced throughout the orbital plane. According to the simulations, the loss of in-plane measurements gives 40.2% degradation while cross-plane measurements degrade 50.5% of asset localization performance among available assets. Therefore, it is concluded that cross-plane measurements are more important in improving the position estimation accuracy. Third, spacecraft failure information can be lost due to the internal message delay, resulting in the DEKF update scheduler to solve the matching problem with unavailable assets. The DEKF update cycle is comprised of network setup, communication, and computations where a global broadcast network and a 2-way ISL network setup take 6 minutes in total (Frank et al., 2021). Once the broadcast network successfully transmits and receives information, a random spacecraft may lose its availability right before solving the matching problem. This means the matching solution is no longer optimal, resulting in degradation in the localization performance. A numerical assessment shows the matching-based scheduler with knowing failure holds 11.5% of position accuracy degradation, whereas the scheduler without knowing failure gives 34% degraded localization performance without asset loss. Fourth, a transient loss of a single or multiple spacecraft may occur due to their antenna outages. After losing the two-way ISL availability for a few DEKF update cycles, the availability of spacecraft can easily be recovered as their states have been independently updated using measurements from anchor nodes. It is likely that the longer failure will result in worse localization performance. We have tested the transient failure of a random single asset for 30 min in the simulation, which is losing 3 update cycles in the DEKF system. From the simulation results, the position accuracy has been degraded to 4.84% which is better than the degraded localization performance of 11.5% from the permanent loss scenario among available assets. In conclusion, the autonomous Lunar PNT system based on the DEKF approach shows the ability to maintain resilience and robustness in the possible communication failure scenarios, ensuring that localization accuracy is preserved across various network degradation and outages. Future studies on investigating user localization performance near the South Pole and the broadcast network system will be continued in the following months.

Yeji Kim↗

Assessing Commercialization Strategies for Evolving Network Demand (ASCEND) in the NASA Space Communications and Navigation (SCaN) Program

What will NASA’s future communications demand and expenditure look like, in a paradigm where space policy encourages maximum private sector involvement? In this paper we consider this question, as NASA moves towards commercial procurement for Direct-To-Earth and Space Relay communication services. We develop a new quantitative Techno-Economic Assessment (TEA) model capable of evaluating the incremental cost over time to NASA of utilizing commercial communication services, for different mission and market scenarios. We find that current and future NASA demand could be viably procured from commercial services, with the potential to reduce cost using non-exclusive networks and the sharing of fixed costs. However, there is a key trade-off identified between maximizing economies of scale benefits and ensuring sufficient competition between communication providers to avoid collusion and excessive pricing. For example, procuring from 1-2 providers would maximize scale economies, whereas procuring from 5-6 providers would maximize competition. Given this context, it would be prudent to seek to award service contracts for 3-4 providers to optimize economies of scale benefits, while mitigating possible market collusion. These recommendations enable NASA to successfully achieve its scientific mission over the next decade, while managing limited financial and networking resources.

NSN↗

Model Evaluation of Methods for Estimating Surface Emissions and Chemical Lifetimes from Satellite Data

Column densities from satellite retrievals can provide valuable information for estimating emissions and chemical lifetimes objectively across the globe. To better understand the uncertainties associated with these estimates, we test four methods using simulated column densities from a point source: a box model approach, a 2D Gaussian fit, an Inverse Radius fit and an Exponentially-Modified Gaussian fit. The model results were simulated using the WRF and CAMx models for the year 2005, for a single point source outside Atlanta in Georgia, USA with specified emissions and three chemical scenarios: no chemical reactions, 12 h chemical lifetime and 1 h chemical lifetime. No other sources were included in the simulations. We find that the box model provides reliable estimates irrespective of plume speed and plume direction, if the plume speed and the chemical lifetime are known accurately. The 2D Gaussian fit was found to be sensitive to plume speed and direction, and requires omnidirectional dispersion in order to have a decent fit. However, the 2D Gaussian fit is only an approximate fit to the data, and the discrepancies mean that the results are dependent on the geographical domain used for the optimization. An Inverse Radius fit is introduced to correct this issue, which is found to provide improved emissions and lifetime estimates. The Exponentially-Modified Gaussian fit also gave improved estimates. It is however dependent on accurate plume rotation such that reported chemical lifetimes with this method could be significantly underestimated.

Emission inventory↗

Interleaved Observation Execution and Rescheduling on Earth Observing Systems

Observation scheduling for Earth orbiting satellites solves the following problem: given a set of requests for images of the Earth, a set of instruments for acquiring those images distributed on a collecting of orbiting satellites, and a set of temporal and resource constraints, generate a set of assignments of instruments and viewing times to those requests that satisfy those constraints. Observation scheduling is often construed as a constrained optimization problem with the objective of maximizing the overall utility of the science data acquired. The utility of an image is typically based on the intrinsic importance of acquiring it (for example, its importance in meeting a mission or science campaign objective) as well as the expected value of the data given current viewing conditions (for example, if the image is occluded by clouds, its value is usually diminished). Currently, science observation scheduling for Earth Observing Systems is done on the ground, for periods covering a day or more. Schedules are uplinked to the satellites and are executed rigorously. An alternative to this scenario is to do some of the decision-making about what images are to be acquired on-board. The principal argument for this capability is that the desirability of making an observation can change dynamically, because of changes in meteorological conditions (e.g. cloud cover), unforeseen events such as fires, floods, or volcanic eruptions, or un-expected changes in satellite or ground station capability. Furthermore, since satellites can only communicate with the ground between 5% to 10% of the time, it may be infeasible to make the desired changes to the schedule on the ground, and uplink the revisions in time for the on-board system to execute them. Examples of scenarios that motivate an on-board capability for revising schedules include the following. First, if a desired visual scene is completely obscured by clouds, then there is little point in taking it. In this case, satellite resources, such as power and storage space can be better utilized taking another image that is higher quality. Second, if an unexpected but important event occurs (such as a fire, flood, or volcanic eruption), there may be good reason to take images of it, instead of expending satellite resources on some of the lower priority scheduled observations. Finally, if there is unexpected loss of capability, it may be impossible to carry out the schedule of planned observations. For example, if a ground station goes down temporarily, a satellite may not be able to free up enough storage space to continue with the remaining schedule of observations. This paper describes an approach for interleaving execution of observation schedules with dynamic schedule revision based on changes to the expected utility of the acquired images. We describe the problem in detail, formulate an algorithm for interleaving schedule revision and execution, and discuss refinements to the algorithm based on the need for search efficiency. We summarize with a brief discussion of the tests performed on the system.

Khatib, Lina↗