Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SITE APPROVALS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Streamlined Approach for (SAFER) Plan for Corrective Action Unit 566: E-MAD Compound, Nevada Test Site, Nevada, Revision 0

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 566, EMAD Compound, identified in the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 566 comprises the following corrective action site (CAS) located in Area 25 of the Nevada Test Site: • 25-99-20, EMAD Compound This plan provides the methodology for field activities needed to gather the necessary information for closing CAS 25-99-20. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 566 using the SAFER process. Additional information will be obtained by conducting a field investigation before selecting the appropriate corrective action. It is anticipated that the results of the field investigation and implementation of a corrective action of clean closure will support a defensible recommendation that no further corrective action is necessary. If it is determined that complete clean closure cannot be accomplished during the SAFER, then a hold point will have been reached and the Nevada Division of Environmental Protection (NDEP) will be consulted to determine whether the remaining contamination will be closed under the alternative corrective action of closure in place. This will be presented in a closure report that will be prepared and submitted to NDEP for review and approval. The data quality objective (DQO) strategy for CAU 566 was developed at a meeting on April 30, 2009, by representatives of NDEP and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for CAU 566. The following text summarizes the SAFER activities that will support the closure of CAU 566: • Perform site preparation activities (e.g., utilities clearances, radiological surveys). • Collect environmental samples from designated target populations (e.g., stained soil) to confirm or disprove the presence of contaminants of concern (COCs) as necessary to supplement existing information. • Collect samples of materials to determine whether potential source material (PSM) is present that may cause the future release of a COC to environmental media. • If no COCs or PSMs are present at a CAS, establish no further action as the corrective action. • If COCs exist, collect environmental samples from designated target populations (e.g., clean soil adjacent to contaminated soil) and submit for laboratory analyses to define the extent of COC contamination. • If a COC or PSM is present at a CAS, either: - Establish clean closure as the corrective action. The material to be remediated will be removed, disposed of as waste, and verification samples will be collected from remaining soil, or - Establish closure in place as the corrective action and implement the appropriate use restrictions. • Confirm the selected closure option is sufficient to protect human health and the environment.

54 ENVIRONMENTAL SCIENCES↗

Drug Repositioning and Pharmacophore Identification in the Discovery of Hookworm MIF Inhibitors

The screening of bioactive compound libraries can be an effective approach for repositioning FDA-approved drugs or discovering new pharmacophores. Hookworms are blood-feeding, intestinal nematode parasites that infect up to 600 million people worldwide. Vaccination with recombinant Ancylostoma ceylanicum macrophage migration inhibitory factor (rAceMIF) provided partial protection from disease, thus establishing a 'proof-of-concept' for targeting AceMIF to prevent or treat infection. A high-throughput screen (HTS) against rAceMIF identified six AceMIF-specific inhibitors. A nonsteroidal anti-inflammatory drug (NSAID), sodium meclofenamate, could be tested in an animal model to assess the therapeutic efficacy in treating hookworm disease. Furosemide, an FDA-approved diuretic, exhibited submicromolar inhibition of rAceMIF tautomerase activity. Structure-activity relationships of a pharmacophore based on furosemide included one analog that binds similarly to the active site, yet does not inhibit the Na-K-Cl symporter (NKCC1) responsible for diuretic activity.

59 BASIC BIOLOGICAL SCIENCES↗

Mechanism of NMDA receptor channel block by MK-801 and memantine

The NMDA (N-methyl-d-aspartate) receptor transduces the binding of glutamate and glycine, coupling it to the opening of a calcium-permeable ion channel. Owing to the lack of high-resolution structural studies of the NMDA receptor, the mechanism by which ion-channel blockers occlude ion permeation is not well understood. Here we show that removal of the amino-terminal domains from the GluN1–GluN2B NMDA receptor yields a functional receptor and crystals with good diffraction properties, allowing us to map the binding site of the NMDA receptor blocker, MK-801. Here, this crystal structure, together with long-timescale molecular dynamics simulations, shows how MK-801 and memantine (a drug approved for the treatment of Alzheimer’s disease) bind within the vestibule of the ion channel, promote closure of the ion channel gate and lodge between the M3-helix-bundle crossing and the M2-pore loops, physically blocking ion permeation.

59 BASIC BIOLOGICAL SCIENCES↗

Localization of Southern Resident Killer Whales Using Two Star Arrays to Support Marine Renewable Energy

Tidal power has been identified as one of the most potential commercial-scale renewable energy sources. Puget Sound, Washington, is a potential site to deploy tidal power generating devices. The risk of injury for killer whales needs to be managed before the deployment of these types of devices can be approved by regulating authorities. A passive acoustic system consisting of two star arrays, each with four hydrophones, was designed and implemented for the detection and localization of Southern Resident killer whales. Deployment of the passive acoustic system was conducted at Sequim Bay, Washington. A total of nine test locations were chosen, within a radius of 250 m around the star arrays, to test our localization approach. For the localization algorithm, a least square solver was applied to obtain a bearing location from each star array. The final source location was determined by the intersection of the bearings given by each of the two star arrays. Bearing and distance errors were obtained to conduct comparison between the calculated and true (from Global Positioning System) locations. The results indicated that bearing errors were within 1.04º for eight of the test locations; one location had bearing errors slightly larger than expected due to the strong background noise at that position. For the distance errors, six of the test locations were within the range of 1.91 to 32.36 m. The other two test locations were near the intersection line between the centers of the two star arrays, which were expected to have large errors from the theoretical sensitivity analysis performed.

Passive acoustic system, localization, star array,↗

Developments in the Regulatory Framework of Interim Storage of Spent Nuclear Fuel (SNF) in Germany - 18137

According to article 6 of the German Atomic Energy Act, storage of nuclear fuel requires a license granted by the competent authority in this field, which is the Federal Office for Safety of Nuclear Waste Management (BfE). In 1995, a license for storage of spent nuclear fuel (SNF) and vitrified high level waste (HAW) was granted for the interim storage facility in Gorleben. Dry Interim storage at the NPP sites in its current form started in 2002 in the interim storage facility next to the nuclear power plant NPP Lingen. Since this time twelve NPPs erected their own storage facilities additionally to the three central storage facilities (Ahaus, Gorleben and Rubenow). In all of these facilities the concept of dry storage in metallic dual purpose casks (DPCs) is implemented. The actual storage licenses for SNF and the HAW (which is stored in Gorleben and Rubenow) are limited to 40 years after closing the transport and storage cask. The first license to expire will be the storage license for the interim storage facility in Gorleben in the year 2034. In Germany the decision about a repository site will be taken in the year 2031. To enable the utilities to hand over the SNF and HAW to the repository regime while the current licenses are still valid would require a very fast process licensing and construction of the required facilities at this location. As a delay cannot be excluded, necessary preparations have to be taken on the side of the regulator. In the German Atomic Energy Act precautions have already been taken and consulting the German parliament (Bundestag) is mandatory if inevitable events would require an extension of the currently licensed interim storage period. The new structure with the Federal Office BfE, and two companies for final disposal 'Bundesgesellschaft fuer Endlagerung' (BGE mbH) and interim storage 'Bundesgesellschaft fuer Zwischenlagerung' (BGZmbH) was established in 2017. The Federal Office for Safety of Nuclear Waste Management (BfE) is responsible for regulation in the field of nuclear disposal since 30.07.2016. So the package design approval for DPCs and the storage licenses for SNF will be granted by this office. Furthermore, it is the regulator for the repository and will finally grant a license for the German deep geological repository. Site selection and construction and operation of the repository will be the responsibility of BGE. On January 1, 2018, the BGZ will take over all remaining interim storage facilities operating under a license due to article six of the Atomic Energy Act. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Addendum to the Closure Report for Corrective Action Unit 165: Area 25 and 26 Dry Well and Washdown Areas, Nevada Test Site, Nevada (Rev. 0)

This document constitutes an addendum to the Closure Report for Corrective Action Unit 165: Area 25 and 26 Dry Well and Washdown Areas, Nevada Test Site, Nevada as described in the document Recommendations and Justifications To Remove Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office Federal Facility Agreement and Consent Order dated September 2013. The Use Restriction Removal document was approved by the Nevada Division of Environmental Protection on October 16, 2013. The approval of the UR Removal document constituted approval of each of the recommended UR removals. In conformance with the UR Removal document, this addendum consists of: This page that refers the reader to the UR Removal document for additional information The cover, title, and signature pages of the UR Removal document The NDEP approval letter The corresponding section of the UR Removal document This addendum provides the documentation justifying the cancellation of the UR for CAS 25-20-01, Lab Drain Dry Well. This UR was established as part of FFACO corrective actions and was based on the presence of tetrachloroethene contamination at concentrations greater than the action level established at the time of the initial investigation. Although total petroleum hydrocarbon diesel-range organics contamination at concentrations greater than the NDEP action level was present at the site, no hazardous constituents of TPH-DRO exceeded the U.S. Environmental Protection Agency (EPA) Region 9 preliminary remediation goals established at the time of the initial investigation.

54 ENVIRONMENTAL SCIENCES↗

Geologic Modeling and Simulation Report for the Aquistore Project

The Plains CO 2 Reduction (PCOR) Partnership, through the Energy & Environmental Research Center (EERC), has been supporting, and continues to support, the Petroleum Technology Research Centre (PTRC) Aquistore project. This support has been in the form of geologic characterization, involvement in the Science and Engineering Research Committee (SERC), involvement in public outreach, developing geologic models and running predictive simulations on the expected injection program at the site. The Aquistore project is part of the world’s first commercial postcombustion carbon capture, utilization, and storage project from a coal-fired power-generating facility, the SaskPower Boundary Dam, located in Saskatchewan, Canada, and will be acting as a storage site for a portion of the captured CO 2 from the Boundary Dam power plant. The Aquistore site includes one injection well and a 152-meter offset observation well. Both wells were drilled and completed in the Deadwood and Black Island Formations. At the time of this report, injection at the Aquistore site is anticipated to begin in late 2014. To better understand the storage implications of injecting carbon dioxide (CO 2 ) at the Aquistore site, the EERC has constructed P10, P50, and P90 geologic model realizations and run three new predictive simulation scenarios on each realization. These models and simulations were constructed to better understand both operational and geologic uncertainties that may exist at the Aquistore site. The geologic model realizations and simulations are an update to those completed in the original report entitled “Geologic Modeling and Simulation Report for the Aquistore Project,” Deliverable D93, approved in March 2014. In this update, the same fine-scale model extent of the 34-square-kilometer PTRC 3-D seismic survey area, with higher structural resolution, was continually used for the uncertainty analysis. A low (P10), mid (P50), and high volumetric (P90) case for the amount of pore volume accessible to store the potential injected CO 2 was ranked based on certain deviation variations of model-building parameters, including effective porosity and net-to-gross reservoir, in six sand units of the study area. Three cases with various injection rate and period schemes were simulated based on uncertainty models P10, P50, and P90.

54 ENVIRONMENTAL SCIENCES↗

Preliminary performance assessment for the Waste Management Area C at the Hanford site in southeast Washington - 15331

A performance assessment of Single-Shell Tank Waste Management Area C located at the U.S. Department of Energy's Hanford Site in southeastern Washington is being conducted to satisfy the requirements of the Hanford Federal Facility Agreement and Consent Order, as well as other Federal requirements and State-approved closure plans and permits. The Waste Management Area C performance assessment assesses the fate, transport, and impacts of radionuclides and hazardous chemicals within residual wastes left in tanks and ancillary equipment and facilities in their assumed closed configuration and the subsequent risks to humans into the far future. The part of the performance assessment focused on radiological impacts is being developed to meet the requirements for a closure authorization under U.S. Department of Energy Order 435.1 that include a waste incidental to reprocessing determination for residual wastes remaining in tanks, ancillary equipment, and facilities. An additional part of the performance assessment will evaluate human health and environmental impacts from hazardous chemical inventories in residual wastes remaining in Waste Management Area C tanks, ancillary equipment, and facilities needed to meet the requirements for permitted closure under the Resource Conservation and Recovery Act of 1976. Preliminary results of the performance assessment are evaluating the groundwater and air pathways to determine radiation exposure once radionuclides are released to the environment due to degradation of the engineered barriers. Per DOE Order 435.1, results of the preliminary analyses are being compared to the performance objectives during the 1,000-year post-closure period of compliance. Per the Order, performance assessment results are also being compared to the performance measures related to acute and chronic inadvertent intruder analyses and groundwater protection. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Puget Sound Tidal Energy In-Water Testing and Development Project (Final Technical Report)

Tidal energy represents potential for the generation of renewable, emission free, environmentally benign, and cost effective energy from tidal flows. A successful tidal energy demonstration project in Puget Sound, Washington may enable significant commercial development resulting in important benefits for the northwest region and the nation. This project promoted the United States Department of Energy's Wind and Hydropower Technologies Program's goals of advancing the commercial viability, cost-competitiveness, and market acceptance of marine hydrokinetic systems. The objective of the Puget Sound Tidal Energy Demonstration Project is to conduct in-water testing and evaluation of tidal energy technology as a first step toward potential construction of a commercial-scale tidal energy power plant. The specific goal of the project phase covered by this award was to conduct all activities necessary to complete engineering design and obtain construction approvals for a pilot demonstration plant in the Admiralty Inlet region of the Puget Sound. Public Utility District No. 1 of Snohomish County (The District) accomplished the objectives of this award through four tasks: Detailed Admiralty Inlet Site Studies, Plant Design and Construction Planning, Environmental and Regulatory Activities, and Management and Reporting. Pre-Installation studies completed under this award provided invaluable data used for site selection, environmental evaluation and permitting, plant design, and construction planning. However, these data gathering efforts are not only important to the Admiralty Inlet pilot project. Lessons learned, in particular environmental data gathering methods, can be applied to future tidal energy projects in the United States and other parts of the world. The District collaborated extensively with project stakeholders to complete the tasks for this award. This included Federal, State, and local government agencies, tribal governments, environmental groups, and others. All required permit and license applications were completed and submitted under this award, including a Final License Application for a pilot hydrokinetic license from the Federal Energy Regulatory Commission. The tasks described above have brought the project through all necessary requirements to construct a tidal pilot project in Admiralty Inlet with the exception of final permit and license approvals, and the selection of a general contractor to perform project construction.

16 TIDAL AND WAVE POWER↗

Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2007

This report provides the results of the semiannual post-closure inspections conducted at the closed Corrective Action Unit (CAU) sites located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2007 and includes inspection and repair activities completed at the following nine CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 404: Roller Coaster Lagoons and Trench (TTR); (3) CAU 407: Roller Coaster RadSafe Area (TTR); (4) CAU 423: Area 3 Underground Discharge Point, Building 0360 (TTR); (5) CAU 424: Area 3 Landfill Complexes (TTR); (6) CAU 426: Cactus Spring Waste Trenches (TTR); (7) CAU 427: Area 3 Septic Waste Systems 2, 6 (TTR); (8) CAU 453: Area 9 UXO Landfill (TTR); and (9) CAU 487: Thunderwell Site (TTR). In a letter from the Nevada Division of Environmental Protection (NDEP) dated December 5, 2006, NDEP concurred with the request to reduce the frequency of post-closure inspections of CAUs at TTR to an annual frequency. This letter is included in Attachment B. Post-closure inspections were conducted on May 15-16, 2007. All inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Attachment B, with the exception of CAU 400. CAU 400 does not require post-closure inspections, but inspections of the vegetation and fencing are conducted as a best management practice. The inspection checklists for each site inspection are included in Attachment C, the field notes are included in Attachment D, and the site photographs are included in Attachment E. Vegetation monitoring of CAU 400, CAU 404, CAU 407, and CAU 426 was performed in May 2007, and the vegetation monitoring report is included in Attachment F. Maintenance and/or repairs were performed at CAU 453. Animal burrows observed during the annual inspection at CAU 453 were backfilled on August 1, 2007. At this time, the TTR post-closure site inspections should continue as scheduled. Any potential problem areas previously identified (e.g., areas of erosion, subsidence) should be monitored closely, and periodic vegetation surveys of the vegetated covers should continue.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FUSRAP Maywood Site Remediation of Redstone Park, Lodi, NJ - 17534

The Formerly Utilized Sites Remedial Action Program (FUSRAP) is the U.S. government program started in 1974 to identify, investigate and clean up or control sites that became contaminated as a result of the nation's early atomic programs. FUSRAP was administered by the U.S. Department of Energy (DOE) until 1997, when it was transferred to the U.S. Army Corps of Engineers (USACE) by congressional action. Redstone Park is a 1.5-acre municipal park located in a residential neighborhood in Lodi, Bergen County, New Jersey, USA. The park is a designated vicinity property of the FUSRAP Maywood Superfund Site. This paper will summarize the FUSRAP history of the property spanning over 20 years and then focus on the construction and community relations challenges of recent FUSRAP actions at the site. All of Redstone Park except for a portion bordering a residential property was remediated under FUSRAP in 1996. This remaining portion was remediated in 1998. The 1996 remediation included some hand-digging of surface contamination around the roots of several large mature trees in the park. As part of this action, the DOE proposed alternate cleanup standards whereby subsurface contaminated soil would remain in place around the root balls of the trees and in deeper areas (greater than 1.2 meters [m]) under a large storm drain pipe (or culvert) that runs through the park. This proposal was made to preserve the natural value of the trees and to protect the drainage pipe from damage. After careful review which included an assessment of potential health hazards, the U.S. Environmental Protection Agency (EPA) approved this proposal. The Borough of Lodi also supported the proposal as a way to preserve the trees for the enjoyment of park users. In 2009, EPA conducted a mandatory Five-Year Review of the FUSRAP Maywood Site. The review identified data gaps which prevented a full assessment of remedy effectiveness at Redstone Park. The USACE reviewed all the historic soil data from the park [1] and developed a characterization plan to address those gaps. Field surveys and sampling confirmed that the material around the tree roots and under the pipe did not comply with the current FUSRAP Maywood Site unrestricted use soil cleanup criteria (an average of 5 pico Curies per gram of radium-226 and thorium-232 combined above background) as established in the site's Soils and Buildings Record of Decision [2]. As noted earlier, USACE also considered the widespread uprooting of trees in the region during Hurricane Sandy in 2012 in its re-evaluation of the earlier decision to leave the trees in the park in place. That re-evaluation concluded it was in the best interest of all stakeholders to remove the residual contamination in Redstone Park. USACE subsequently excavated the soil under and around the drainage pipe as Phase 1 of a two-phased approach to address this residual contamination. 1,116 cubic yards of soil were removed for safe offsite disposal during this action in June-July 2016. Phase 2 (removal of contaminated soil around the tree roots) began in September 2016 with expected completion by December 2016. The work was staged in two phases so as not to impact the park during the summer school vacation months when park use is heaviest. (authors)

54 ENVIRONMENTAL SCIENCES↗

Accelerating nuclear-integrated data center pursuits in the USA: SWOT analysis, power-thermal management strategies and demonstration plan

Here, this study explores the increasing interest in leveraging nuclear power to meet the escalating energy demands of data centers in the United States (U.S.) by focusing on key factors that contribute to accelerated deployment. The study highlights the importance of N+1/N+2 power supplies (where N is the required number of units), outlines research and innovations in nuclear-integrated data center thermal management and demonstration plan. It also provides updates about status and costing of various reactor system designs. A summarized strengths, weaknesses, opportunities, and threats (SWOT) analysis shows the potential options for grid connectivity, reactors, and site selection. Suitable site discussions consider land and water availability, grid access, and optical fiber connectivity, and the study presents graded prospects for Department of Energy (DOE) sites with a specific example. Community engagement and partnerships are emphasized, particularly the roles of local government, federal agencies, utilities, and data center industry partners, which are crucial for accelerating deployment, business outreach, and approvals. The study provides actionable insights for stakeholders to accelerate the deployment of nuclear-powered data centers.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Radioactive Waste Disposal Strategies within the US Army Corps of Engineers FUSRAP - 18328

The U.S. Army Corps of Engineers' (USACE) highest priority is the protection of human health and the environment and public and worker safety during the cleanup, transportation, and disposal of Formerly Utilized Sites Remedial Action Program (FUSRAP) material. In addition to following all appropriate federal and state rules and regulations, the USACE has its own safety program that ensures that we are being protective. One aspect of the USACE FUSRAP is the radioactive waste disposal strategies that we must consider. The USACE will only dispose of FUSRAP material in a facility that is licenses/permitted to accept it. The estimated exposures to facility workers and members of the public from the permitted disposal of FUSRAP wastes is evaluated as part of this process. The USACE uses the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process to study and remediate FUSRAP sites. An evaluation is performed to decide whether it is best to manage the waste on-site or off-site and the requirements for disposal. The action selected must be protective of human health and the environment and must comply with regulations. When making the decision, there are several other factors taken into consideration including cost of the disposal and whether the public and state agencies support the action. Prior to determining disposal options, wastes must first be characterized. This involves an evaluation of both site history and analytical data. Determining the proper disposal requirements and subsequent disposal option involves: Characterizing the waste as stated above. This is important because there are several regulatory agencies which may oversee management of the waste. The US Nuclear Regulatory Commission, the US Environmental Protection Agency (US EPA), the US Department of Transportation, and state hazardous waste and/or radiation protection agencies may all have varying degrees of involvement. Identifying disposal requirements. Certain wastes must be disposed at licensed radioactive waste disposal facilities. Wastes containing US EPA regulated hazardous waste must be disposed at permitted hazardous waste disposal facilities. Certain wastes must be disposed at facilities licensed/permitted for both radioactive and hazardous waste. Some lower activity wastes may be accepted for disposal at other types of landfills. Considering acceptance criteria of the disposal facility. Radionuclides and/or hazardous constituents in the waste, as well as physical and chemical form of the waste, are evaluated to ensure they meet the acceptance criteria of the receiving facility's license and/or permit. If they don't, another disposal location must be used. Considering the accessibility and location of the disposal facility. Some facilities are able to accept shipments only by truck and others can accept material via railcar as well. The distance to a disposal facility impacts the risk of transportation accidents and efficient use of project resources such as the number of trucks required to perform the transportation. These factors are also important in evaluating whether material can be cost effectively shipped to a disposal facility. Evaluating the compliance status of the receiving facility. It is not assumed that just because a facility has a license or permit that it is acceptable for the USACE' waste. Prior to selecting a facility for disposal of FUSRAP waste, a site visit, audit and consultation with the US EPA is required to determine whether there are any known relevant violations at the facility. Facilities that have violations that negatively impact the USACE or US EPA approval of the facility are not used for disposal of FUSRAP waste. Once a facility is selected. The USACE procures contracts, or utilizes existing contracts, to facilitate the transportation and disposal action. Additionally, the USACE continues to consult with US EPA routinely to confirm the compliance status of the facility. Considering state acceptance of wastes to a facility. The USACE seeks to obtain written authorization from the facility state regulator indicating the action is compliant with existing licenses, permits, laws, and regulations. Each of these factors is considered by the USACE in selecting a FUSRAP disposal location. The goal is to provide safe, cost effective disposal which is protective of human health and the environment and which complies with all regulatory requirements. These steps all feed in to the disposal strategy consideration that USACE must go through for our FUSRAP waste streams. There are a number of challenges in the process to include In order to achieve the Congressional mandate of completing cleanup work under FUSRAP in a more cost effective, timely manner, while assuring protection of public health and safety. USACE must determine all disposal options that are available for the types of waste at each FUSRAP site. As a solution, completion of a disposal strategy document can help ensure this goal is met and will foster consistency across the FUSRAP. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

September 2008 monitoring results for Centralia, Kansas.

In September 2005, periodic sampling of groundwater was initiated by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) in the vicinity of a grain storage facility formerly operated by the CCC/USDA at Centralia, Kansas. The sampling at Centralia is being performed on behalf of the CCC/USDA by Argonne National Laboratory, in accord with a monitoring program approved by the Kansas Department of Health and Environment (KDHE). The objective is to monitor levels of carbon tetrachloride contamination identified in the groundwater at Centralia (Argonne 2003, 2004, 2005a). Under a KDHE-approved monitoring plan (Argonne 2005b), the groundwater was sampled twice yearly (for a recommended period of two years) for analyses for volatile organic compounds (VOCs), as well as measurement of selected geochemical parameters to aid in the evaluation of possible natural contaminant degradation (reductive dechlorination) processes in the subsurface environment. The sampling in September 2007 represented the fifth and final monitoring event performed under the two-year twice yearly monitoring program (Argonne 2006a,b, 2007a, 2008a). The results from the two-year monitoring program demonstrated the presence of carbon tetrachloride contamination at levels exceeding the KDHE Tier 2 Risk-Based Screening Level of 5 {micro}g/L for this compound in a broad groundwater plume that has shown little movement. The relative concentrations of chloroform, the primary degradation product of carbon tetrachloride, suggested that some degree of reductive dechlorination or natural biodegradation was taking place in situ at the former CCC/USDA facility on a localized scale. The CCC/USDA subsequently developed an Interim Measure Conceptual Design (Argonne 2007b), proposing a pilot test of the Adventus EHC in situ chemical reduction technology, that was approved by the KDHE in November 2007 (KDHE 2007). Implementation of the proposed interim measure occurred in December 2007. The objective was to create highly reducing conditions that would enhance both chemical and biological reductive dechlorination in the injection test area (Argonne 2009). The KDHE has requested that sitewide monitoring continue at Centralia until a final remedy has been implemented and a comprehensive program of performance and compliance monitoring has been established for this site (KDHE 2008a). The groundwater sampling events at Centralia in March 2008 (Argonne 2008b) and September 2008 were performed in response to this request. The present report documents the results of groundwater sampling conducted in September 2008, in the network of 10 monitoring wells and 6 piezometers (Figure 1.1) previously approved by the KDHE for extended monitoring of the groundwater contamination at Centralia (KDHE 2005a,b). Sampling of additional piezometers specifically installed to monitor the progress of the interim measure pilot test (PMP1-PMP9; Figure 1.2) was also performed in September 2008; the results of these analyses are reported and discussed separately (Argonne 2009).

54 ENVIRONMENTAL SCIENCES↗

Preliminary Performance Assessment for the Waste Management Area C at the Hanford Site in Southeast Washington

A performance assessment (PA) of Single-Shell Tank (SST) Waste Management Area C (WMA C) located at the U.S. Department of Energy's (DOE) Hanford Site in southeastern Washington is being conducted to satisfy the requirements of the Hanford Federal Facility Agreement and Consent Order (HFFACO), as well as other Federal requirements and State-approved closure plans and permits. The WMP C PA assesses the fate, transport, and impacts of radionuclides and hazardous chemicals within residual wastes left in tanks and ancillary equipment and facilities in their assumed closed configuration and the subsequent risks to humans into the far future. The part of the PA focused on radiological impacts is being developed to meet the requirements for a closure authorization under DOE Order 435.1 that includes a waste incidental to reprocessing determination for residual wastes remaining in tanks, ancillary equipment, and facilities. An additional part of the PA will evaluate human health and environmental impacts from hazardous chemical inventories in residual wastes remaining in WMA C tanks, ancillary equipment, and facilities needed to meet the requirements for permitted closure under RCRA.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance Assessment for the Waste Management Area C at the Hanford Site in Southeast Washington - 17515

An initial performance assessment (PA) of Single-Shell Tank (SST) Waste Management Area C (WMA C) located at the U.S. Department of Energy's (DOE) Hanford Site in southeastern Washington has been completed to satisfy the requirements of the Hanford Federal Facility Agreement and Consent Order (HFFACO), as well as other Federal requirements and State-approved closure plans and permits. The WMA C PA assesses the fate, transport, and impacts of radionuclides within residual wastes left in tanks and ancillary equipment and facilities in their assumed closed configuration, and the subsequent risks to humans into the far future. This PA focused on radiological impacts has been developed to meet the requirements for a closure authorization under DOE O 435.1 that includes a waste incidental to reprocessing determination for residual wastes remaining in tanks, ancillary equipment, and facilities. PA results indicate that the performance objectives and measures for the all-pathways dose, the air pathway dose, the radon flux, and groundwater protection are met for both the 1,000-year compliance time period (2020 to 3020) and the post-compliance period (3020 to 12020). The peak dose for the all-pathways analysis in the 1,000-year compliance period is associated with the air pathway, with the peak dose of 4 x 10{sup -5} mSv/yr dominated by tritium resulting from upward gaseous diffusive flux from the residual waste. The peak dose within the sensitivity/uncertainty analysis time period (1,000 to 10,000 years after closure) occurs at about 1,500 years after closure, and results primarily from a peak in {sup 99}Tc groundwater concentration at 100 m down-gradient of the facility. The peak total dose within the sensitivity/uncertainty analysis time period is 0.001 mSv/yr. For all of the sensitivity analyses and uncertainty analyses evaluated, the disposal system also met the performance objectives. In the uncertainty analysis performed with the system level model based on GoldSim{sup C}, the highest calculated groundwater dose in the compliance period was about 7 x 10{sup -4} mSv/yr, and the highest calculated peak dose in the sensitivity/uncertainty analysis period was 0.025 mSv/yr.Doses associated with hypothetical inadvertent human intrusion were calculated for all sources in WMA C and compared to the acute and chronic performance measures in DOE O 435.1. The calculated doses for acute and chronic exposure scenario from potential intrusion into a waste transfer pipeline remain below the DOE O 435.1 performance measure for the time period evaluated beyond 100 years after closure. Acute exposure from drilling into the waste yielded a dose of about 0.36 mSv after the assumed 100-year institutional control period, well below the 5 mSv performance measure for acute exposure. Chronic exposure to waste from drill cuttings in a rural pasture scenario resulted in a dose of about 0.08 mSv/yr after the assumed 100-year institutional control period, well below the 1 mSv/yr performance measure for chronic exposure. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Identification of Waste Streams and Chemicals of Concern for CNL's Near Surface Disposal Facility - 18057

Canadian Nuclear Laboratories (CNL) has a 70-year history in nuclear Research and Development (R and D) and the original support to the Canada Deuterium Uranium (Candu) reactor fleet. The present laboratory and operations include multiple facilities including reactors, laboratories, and buildings at various locations in Canada. The onsite facilities produced and still produce numerous and complex waste streams which have historically been placed in waste storage areas at their sites. CNL has completed the design and is in the process of licensing a Near Surface Disposal Facility (NSDF) for CNL low level waste (LLW). The current plan, pending regulatory approvals would complete construction and commissioning in 2021. CNL has identified the waste streams that are proposed to be disposed of to determine which may or may not require treatment prior to disposal and the Chemicals of Concern (COCs) that require identification and control to protect the facility, workers, public and the environment. CNL gathered the information into a Waste Stream spreadsheet that identifies the waste. Each waste stream was then evaluated as to whether or not it should meet the NSDF Waste Acceptance Criteria (WAC), and if not, which treatment technologies would be appropriate to make it ready for disposal. Understanding the hazards and associated COCs of the waste is required to safely dispose the waste. COCs present at Chalk River Laboratories (CRL) need to be identified and subsequently evaluated to determine if they pose any type of risk due to their hazardous properties or quantities. The COC data base was modified into a tool to assist waste generators. CNL has developed waste stream and COC data bases to support safe disposal of radioactive waste. Identification of waste streams and COCs for disposal is important for any disposal facility. The lessons learned by CNL as to what information is important and how to obtain the information would be useful to many facilities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hardwood re-sprout control in hydrologically restored Carolina Bay depression wetlands.

Carolina bays are isolated depression wetlands located in the upper coastal plain region of the eastern Unites States. Disturbance of this wetland type has been widespread, and many sites contain one or more drainage ditches as a result of agricultural conversion. Restoration of bays is of interest because they are important habitats for rare flora and fauna species. Previous bay restoration projects have identified woody competitors in the seedbank and re-sprouting as impediments to the establishment of herbaceous wetland vegetation communities. Three bays were hydrologically restored on the Savannah River Site, SC, by plugging drainage ditches. Residual pine/hardwood stands within the bays were harvested and the vegetative response of the seedbank to the hydrologic change was monitored. A foliar herbicide approved for use in wetlands (Habitat® (Isopropylamine salt of Imazapyr)) was applied on one-half of each bay to control red maple (Acer rubrum L.), sweet gum (Liquidambar styraciflua L.), and water oak (Quercus nigra L.) sprouting. The effectiveness of the foliar herbicide was tested across a hydrologic gradient in an effort to better understand the relationship between depth and duration of flooding, the intensity of hardwood re-sprout pressure, and the need for hardwood management practices such as herbicide application.

60 APPLIED LIFE SCIENCES↗