Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “S-BAND”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

An advanced generation land mobile satellite system and its critical technologies

A conceptual design for a Land Mobile Satellite System (LMSS) for the 1990s is presented. LMSS involves small tranceivers accessing satellites directly, with ground reception through small car-top antennas. The satellite would have a large antenna and blanket coverage areas in the UHF. The call may originate from a home, be carried by wire to a gateway, transmitted to satellite on the S-band, converted to UHF on the satellite, and transmitted to the vehicle. The system design is constrained by the number of users in an area during the busiest hours, Shuttle storage, controllability factors, and the total area served. A 55-m antenna has been selected, with 87 spot beams and two 10 MHz UHF bands in the 806-890 MHz band. A 17 dB interbeam isolation level is required, implying that sufficient sub-bands can be generated to assure 8265 total channels. The mobile satellite (MSAT) would have an 83 m mast lower segment, a 34 m upper segment, and a second, 10 m antenna made of a deployable mesh. Various antenna function modes are considered.

Naderi, F.↗

The electronic switching spherical array antenna for the Earth Radiation Budget Spacecraft

The ESSA is a microprocessor-controlled antenna for low orbiting spacecraft for telemetry and command relay through the Tracking and Data Relay Satellite System (TDRSS). The array is a hemispherical shape covered with disk radiating elements. A group of radiating elements are continuously selected by the microprocessor controller to form a beam in the direction of a TDRS. A radial switching power divider uses PIN diodes to select the desired radiating elements. The antenna gain is a function of the size of the hemispherical dome. A 30-inch diameter dome is presently being built for the Earth Radiation Budget Spacecraft (ERBS). Gain of this antenna over a hemisphere is 14 dBi and polarization is lefthand circular. There are 145 radiating elements with 12 being used at one time to form a beam. The ESSA subsystem weights 74 pounds and power consumption is 20 watts. RF power handling capability is 30 watts. The S-Band radiating elements have a 10 percent bandwidth that allows simultaneous transmission and reception.

Kudrna, K.↗

Definitive orbit determination for the HEAO-2 spacecraft

Precise ephemerides for the High Energy Astronomy Observatory-2 (HEAO-2) were computed to assist in the Charles Stark Draper Laboratory development of an onboard orbit determination technique. Weighted least-squares, batch orbit solutions were calculated using a high-precision earth gravity model and an approximate model for intermittent spacecraft thrusting. With these improvements, orbit solution consistencies at the 50- to 100-meter level were attained using the Goddard Trajectory Determination System and NASA S-band tracking data.

Smith, R. L.↗

A scatter model for vegetation up to Ku-band

A scatter model is developed based on the matrix doubling method for volume scattering and the Kirchhoff method in rough surface scattering. Scattering from vegetation is assumed to be dominated by leaves and a single leaf is modeled by a thin dielectric disk. In developing the phase matrix for the disk, field within the disk is taken to be constant over the disk thickness, but phase changes across the surface of the disk are accounted for. Comparisons of this scatter model with radar measurements indicate good agreements in polarization, angular trends, and frequency up to Ku-band. This represents a considerable improvement over low-frequency scatter models which are valid up to S-band.

Eom, H. J.↗

Trajectories and orbital maneuvers for the ISEE-3/ICE comet mission

The ISEE-3/ICE spacecraft, (launched in 1978), and expected to obtain the first measurements of comet Giacobinni-Zinner in September 1985, has undertaken a combination of propulsive maneuvers, lunar swing-bys, and solar perturbations to produce its present trajectory profile. ISEE-3 is a drum-shaped, spin-stabilized spacecraft equipped with a redundant pair of high-resolution sun sensors, a medium-gain S-band antenna, a hydrazine propulsion system and a science experiment payload. After being placed into a sun-earth libration halo orbit in late 1978, ISEE-3 was retargeted to the geomagnetotail in mid-1982 and became the first spacecraft to explore the geomagnetic tail between 80 and 237 earth radii in 1983. These types of maneuvers may prove important for future scientific missions planned as follow-ons to ISEE-3/ICE, such as a joint NASA/ISAS project spacecraft scheduled for Shuttle launch in 1991, and a possible encounter with two comets in 1996 anad 1998.

Farquhar, R.↗

Measurements of electromagnetic interference on OV102 Columbia using the plasma diagnostics package

The third Space Shuttle mission's OSS-1 payload included 30 Hz-800 MHz and S-band receivers which assessed the intentional (transmitter) and unintentional (subsystem) EMI levels. It was noted that, at the pallet location, the UHF voice downlink transmitter field strengths did not exceed 0.1 V/m. At the remote manipulator system, the figure was 0.5 V/m. Below 300 kHz, the magnetic field noise was 30 dB pT + or - 20 dB, while the electric field noise was broadband and variable over at least 60 dB, depending on thruster firings and Orbiter attitude. This noise may have been generated by the Orbiter's interaction with the ambient plasma.

Shawhan, S. D.↗

ISEE-3/ICE navigation analysis

Efforts to assure communications continuity and navigational accuracy for the ISEE-3 (now called the International Cometary Explorer - ICE) spacecraft as it heads toward a passage through the Giacobini-Zimmer (G-Z) comet tail are reviewed. Sufficient energy was gained with a series of lunar swingbys to take the rendezvous attempt possible. Communications will be by an S-band link though the upgraded Deep Space Network. The G-Z encounter is scheduled for September 1983. A 512 bps data rate will be supported by 64-3 m dishes at various global sites. The tracking will continue for 6 mos as the spacecraft moves into an orbit that parallels that of Halley's Comet. Ground-based recovery of the G-Z location in the spring of 1984 provided data for calculating the ephemerides required for configuring a major course correction for ICE 100 days before rendezvous.

Efron, L.↗

64-meter to 70-meter Antenna Extension

The Deep Space Network 64-m antennas are being upgraded to improve their performance by increasing the diameter to 70 m, installing precision panels, and using a shaped surface. Performance improvement is expected to be 1.9 dB at X-band and 1.4 dB at S-band. The design and capabilities of the antenna are discussed.

Mcclure, D. H.↗

DSN 34-meter Antenna Optics Analysis for Wideband SETI Investigations

A DSN 34-meter symmetric Cassegrain antenna configuration is examined for wideband use over the frequency range of 1 to 10 GHz, rather than only at the narrow-band operational design frequencies of 2.295 GHz (S-band) and 8.448 GHz (X-band). Aperture efficiency and surface efficiency are calculated as the components determining the gain of the antenna. Noise temperature contributions arise from the ground, atmosphere, and quadripod scattering. These components are calculated as a function of frequency elevation angle to determine a G/T (gain/system noise temperature) figure-of-merit for a nominal 34-meter antenna configuration. A computational method was developed which will enable design of a multi-horn antenna feed system to optimally cover the 1 to 10 GHz frequency range.

Slobin, S. D.↗

Gravity Field of the Jovian System from Pioneer and Voyager Tracking Data

Data sets from the Voyager and Pioneer flybys of Jupiter and the Galilean satellites are employed to characterize the Jovian magnetic field and the effects of the Io torus on transmissions. Both optical and Doppler radio data are considered, except for periods when the Jovian radiation environment disturbed the oscillator stability of the radio transmitters. Account is taken of small accelerations of the spacecraft by tidal forces of a single rising satellite, density differences in the Great Red Spot producing a columnar gravitational change, and three unknown objects in the inner Jovian system. Correction parameters are developed for the effects on the S-band data induced by the Jovian plasmasphere inwards from the Io torus. Calculations are then made of the planet and satellite masses, gravity harmonic coefficients, and orientation of the rotational pole. Large reductions in the uncertainties in previous mass esimates are obtained.

Campbell, J. K.↗

Space Shuttle program communication and tracking systems interface analysis

The Space Shuttle Program Communications and Tracking Systems Interface Analysis began April 18, 1983. During this time, the shuttle communication and tracking systems began flight testing. Two areas of analysis documented were a result of observations made during flight tests. These analyses involved the Ku-band communication system. First, there was a detailed analysis of the interface between the solar max data format and the Ku-band communication system including the TDRSS ground station. The second analysis involving the Ku-band communication system was an analysis of the frequency lock loop of the Gunn oscillator used to generate the transmit frequency. The stability of the frequency lock loop was investigated and changes to the design were reviewed to alleviate the potential loss of data due the loop losing lock and entering the reacquisition mode. Other areas of investigation were the S-band antenna analysis and RF coverage analysis.

Dodds, J. G.↗

Slant path attenuation and cross-polarization prediction

The accuracy with which slant-path attenuation and cross-polarization are predicted using differential reflectivity (ZDR) radar data is discussed. Consideration is given to the use of generalized relationships between radar reflectivity (Z), ZDR, and rainfall rate (R); and between R, attenuation, and cross-polarization (XPD) on a slant path. The forward-scatter matrix which is used to calculate the slant path attenuation and XPD is described. It is shown that the use of a double exponential drop size distribution and forward-scatter matrices improves the accuracy of the prediction of slant-path attenuation and XPD. Data obtained with the VPI & SU S-band radar, using slow switching between orthorzonal polarizations is presented. The results are illustrated in graphs.

Pratt, T.↗

Low-level microburst wind structure using Doppler radar and PAM data

The Joint Airport Weather Studies (JAWS) observation network used at an airport in Denver, CO consisted of one S-band and two C-band radars, together with 27 Portable Automated Mesonet (PAM) stations. Each of the three microburst case studies observed during the JAWS experiment occurred within the surface PAM network, and these surface data were compared with the radar analyses. It emerges that if microburst vertical motions are to be accurately resolved, the spacing of the surface stations must be considerably less than 4 km.

Kessinger, C.↗

On the trail of Comet G-Z

The International Cometary Explorer (ICE) is to investigate the magnetic and electric fields, plasmas, and particles in the Comet Giacobini-Zinner (G-Z) and to study its interaction with solar wind. The ICE can pass through the comet only once and it will take 90 minutes to cross from one side of the tail to the other. Since the Comet G-Z often changes its orbit due to nongravitational forces changing its direction and velocity, ICE's position needs to be adjusted. The probe is aimed 10,000 km from the nucleus in order to be provided the best passage through the Comet G-Z. The 64-meter dishes of JPL's Deep-Space Network (DSN) will receive data transmitted on two adjacent S-band frequencies at the rate of 1024 bits per second. Also NASA has arranged for the radio telescope at Arecibo to record the transmission. The Japanese 64-meter tracking antenna at Usada, equipped with an ultrasensitive receiver for one ICE frequency, will provide pre-encounter and post-encounter tracking. The ICE data may provide information about the dust tail in the Comet G-Z which could be compared to previous research.

Maran, S. P.↗

Trajectory reconstruction and aerodynamic results from the first Discovery flight, STS-14(41-D)

Trajectory reconstruction results for the first Discovery flight are presented. Spacecraft dynamic measurements from IMU2 were utilized in conjunction with the ground based tracking data from two S-band stations, eight C-band, and five cameras at Edwards Air Force Base to determine the spacecraft trajectory from epoch through roll-out on Runway 17. Specifics as to the trajectory reconstruction are discussed in Section 1. The final inertial profile is BT14NO2/UN=169750N. Merging of this file with the final LAIRS atmosphere is discussed in Section 2. The final Extended BET is ST14BET/UN=274885C. Section 3 presents plots of relevant parameters from the AEROBET as well as aerodynamic performance comparison results. High frequency files for maneuver extraction were also generated as discussed in Section 4. Appendices are attached which contain: (1) spacecraft and physical parameters utilized, (2) final residuals obtained from the data fitting process, (3) listing of trajectory parameters, and (4) archival information.

Kelly, G. M.↗

Magellan Post Launch Mission Operation Report

Magellan was successfully launched by the Space Shuttle Atlantis from the Kennedy Space Center at 2:47 p.m. EDT on May 4, 1989. The Inertial Upper Stage (IUS) booster and attached Magellan Spacecraft were successfully deployed from Atlantis on Rev. 5 as planned, at 06:14 hrs Mission Elapsed Time (MET). The two IUS propulsion burns which began at 07:14 hrs MET and were completed at 07:22 hrs MET, placed the Magellan Spacecraft almost perfectly on its preplanned trajectory to Venus. The IUS was jettisoned at 07:40 hrs MET and Magellan telemetry was immediately acquired by the Deep Space Network (DSN). A spacecraft trajectory correction maneuver was performed on May 21 and the spacecraft is in the planned standard cruise configuration with all systems operating nominally. An initial attempt was made to launch Atlantis on April 28, 1989, but the launch was scrubbed at T-31 sec due to a failure of the liquid hydrogen recirculation pump on Space Shuttle Main Engine #1. The countdown had proceeded smoothly until T-20 min when the Magellan radio receiver "locked-on" the MIL 71 Unified S-Band (USB) transmission as the transmitter power was increased fro 2 kw to 10 kw in support of the orbiter launch. During the planned hold at T-9 min, the USB was confirmed as the source of the receiver "lock" and Magellan's launch readiness was reaffirmed. In addition a five-minute extension of the T-9 hold occurred when a range safety computer went off-line, creating a loss of redundancy in the range safety computer network. Following resumption of the countdown, both the orbiter and Magellan flows proceeded smoothly until the launch was scrubbed at T-31 sec.

Source record↗