Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Retrofitting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Glove port retrofit assembly and method of replacing components

What is disclosed is a system for retrofitting a sealed enclosure for performing work therein having an outer enclosure assembly configured to be clamped to the outer annular face of a port ring and form a sealed engagement with the outer annular surface of the port ring, a change assembly having an inner ring and an access element wherein the inner ring has a first annular cylinder body that is sized to be slidably received by the port ring and the access element is configured to be sealably and slidably positioned within the first annular cylinder body of the inner ring.

42 ENGINEERING↗

Crowne Plaza Renovation Retrofit Case Study

InterContinental Hotels Group (IHG) and its franchise partner B.F. Saul Company Hospitality Group (B.F. Saul Co.) partnered with the Department of Energy (DOE) to develop and implement solutions to retrofit existing buildings to reduce energy consumption by at least 30% versus requirements set by Standard 90.1-2004 of the American Society of Heating, Refrigerating, and Air-Conditioning Engineers (ASHRAE), the American National Standards Institute (ANSI), and the Illuminating Engineering Society of North America (IESNA) as part of DOE’s Commercial Building Partnerships (CBP) Program.

crowne plaza↗

Building America Case Study: Control Retrofits for Multifamily Domestic Hot Water Recirculation Systems, Brooklyn, New York

Domestic hot water (DHW) heating is the second largest energy end use in U.S. buildings, exceeded only by space conditioning. Recirculation systems consisting of a pump and piping loop(s) are commonly used in multifamily buildings to reduce wait time for hot water at faucets; however, constant pumping increases energy consumption by exposing supply and return line piping to continuous heat loss, even during periods when there is no demand for hot water. In this study, ARIES installed and tested two types of recirculation controls in a pair of buildings in order to evaluate their energy savings potential. Demand control, temperature modulation controls, and the simultaneous operation of both were compared to the baseline case of constant recirculation. Additionally, interactive effects between DHW control fuel reductions and space conditioning (heating and cooling) were estimated in order to make more realistic predictions of the payback and financial viability of retrofitting DHW systems with these controls. Results showed that DHW fuel consumption reduced by 7 percent after implementing the demand control technique, 2 percent after implementing temperature modulation, and 15 percent after implementing demand control and temperature modulation techniques simultaneously; recirculation pump runtime was reduced to 14 minutes or less per day. With space heating and cooling interactions included, the estimated annual cost savings were 8 percent, 1 percent, and 14 percent for the respective control techniques. Possible complications in the installation, commissioning and operation of the controls were identified and solutions offered.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Building America Case Study: Control Retrofits for Multifamily Domestic Hot Water Recirculation Systems, Brooklyn, New York

Domestic hot water (DHW) heating is the second largest energy end use in U.S. buildings, exceeded only by space conditioning. Recirculation systems consisting of a pump and piping loop(s) are commonly used in multifamily buildings to reduce wait time for hot water at faucets; however, constant pumping increases energy consumption by exposing supply and return line piping to continuous heat loss, even during periods when there is no demand for hot water. In this study, ARIES installed and tested two types of recirculation controls in a pair of buildings in order to evaluate their energy savings potential. Demand control, temperature modulation controls, and the simultaneous operation of both were compared to the baseline case of constant recirculation. Additionally, interactive effects between DHW control fuel reductions and space conditioning (heating and cooling) were estimated in order to make more realistic predictions of the payback and financial viability of retrofitting DHW systems with these controls. Results showed that DHW fuel consumption reduced by 7% after implementing the demand control technique, 2% after implementing temperature modulation, and 15% after implementing demand control and temperature modulation techniques simultaneously; recirculation pump runtime was reduced to 14 minutes or less per day. With space heating and cooling interactions included, the estimated annual cost savings were 8%, 1%, and 14% for the respective control techniques. Possible complications in the installation, commissioning and operation of the controls were identified and solutions offered.

ARIES↗

Apparatus and process of retrofitting a combined cycle power plant

A process for retrofitting an electric power plant that uses two 60 Hertz large frame heavy duty industrial gas turbine engines to drive electric generators and produce electricity, where each of the two industrial engines can produce up to 350 MW of output power. The process replaces the two 350 MW industrial engines with one twin spool industrial gas turbine engine that is capable of producing at least 700 MW of output power. Thus, two prior art industrial engines can be replaced with one industrial engine that can produce power equal to the two prior art industrial engines.

20 FOSSIL-FUELED POWER PLANTS↗

Process for retrofitting an industrial gas turbine engine for increased power and efficiency

A process for retrofitting an industrial gas turbine engine of a power plant where an old industrial engine with a high spool has a new low spool with a low pressure turbine that drives a low pressure compressor using exhaust gas from the high pressure turbine, and where the new low pressure compressor delivers compressed air through a new compressed air line to the high pressure compressor through a new inlet added to the high pressure compressor. The old electric generator is replaced with a new generator having around twice the electrical power production. One or more stages of vanes and blades are removed from the high pressure compressor to optimally match a pressure ratio split. Closed loop cooling of one or more new stages of vanes and blades in the high pressure turbine is added and the spent cooling air is discharged into the combustor.

Jones, Russell B.↗

Quantifying Occupant Health and Productivity for Deep Retrofits: Beyond Traditional IEQ Studies

As energy-efficiency standards for both new construction and existing building renovations become more stringent, further reductions become less tractable and more expensive. With increasing interest and rising investment in healthy built environments, integrating energy efficiency with improved occupant experience (i.e., health, comfort, and work performance) offers a new path to drive deep energy retrofits. However, the difficulty in quantifying and verifying health and productivity gains from building upgrades leads to lower valuation of human benefits in practice. Building codes and standards have progressive energy targets but often give minimum requirements to occupant health for factors such as ventilation and thermal comfort. State and federal laws in the United States that govern the energy service performance contract (ESPC) have no clear and consistent guidance on quantifying non-energy benefits and incorporating them into a formal cost-effectiveness analysis. This paper presents a methodology to measure a building’s potential performance improvement regarding occupant health based on existing evidence correlating IEQ to occupant outcomes. Health improvement measures are integrated with a building energy model to identify and measure the impact of holistic improvement strategies. The net present value of these measures is determined based on the investment costs required to attain those improvements, energy savings, and personnel gains. We will discuss results from one pilot building, which showed nearly $50 per square foot 20-year net present value using the integrated approach.

Keene, Kevin M.↗

User Guide for the Public Industrial CO2 Capture Retrofit Database Models

OBSOLETE CCRD – SUPERSEDED<p>The National Energy Technology Laboratory (NETL) user manual accompanies the carbon capture retrofit database (CCRD) model that allows users to evaluate the cost of carbon capture on industrial sources (ammonia, cement, ethanol, hydrogen, and natural gas processing). The model was created by the National Energy Technology Laboratory (NETL) based on the technical report titled &quot;Cost of Capturing CO2 from Industrial Sources&quot; (NETL/DOE-2022/3319). Revised 12/21/22.</p>

Hughes, Sydney↗

Industrial CO2 Capture Retrofit Database (IND CCRD)

OBSOLETE CCRD - SUPERSEDED<p>This carbon capture retrofit database (CCRD) model allows users to evaluate the cost of carbon capture on industrial sources (ammonia, cement, ethanol, hydrogen, and natural gas processing). The model was created by the National Energy Technology Laboratory (NETL) based on the technical report titled Cost of Capturing CO2 from Industrial Sources (NETL/DOE-2022/3319). Revised 12/21/22.</p>

Hughes, Sydney↗

Updated Costs for Carbon Capture Retrofits

OBSOLETE CCRD – SUPERSEDED<p>This National Energy Technology Laboratory (NETL) presentation addresses updated costs for the retrofit of post-combustion carbon capture on natural gas combined cycle (NGCC) power plants. Presented at the 2021 Carbon Management and Oil and Gas Research Project Review Meeting (virtual).</p>

Fout, Timothy↗

NETL's Cost of Capturing CO2 from Industrial Sources and Industrial Carbon Capture Retrofit Database

This presentation was given on behalf of NETL's Strategic Systems Analysis and Engineering Directorate, Energy Process Analysis Team at a United States Energy Association webinar on January 24, 2023. The presentation summarizes techno economic analysis results of nine industrial CO2 capture cases, and also gave an overview and brief demonstration of the industrial sources Carbon Capture Retrofit Database, which is a publicly available tool that estimates capture costs for a subset of the industrial sources appearing in the companion systems analysis report.

Hughes, Sydney↗

Energy Retrofit Field Study and Best Practices in a Hot-Humid Climate

Energy efficiency improvement as a component of comprehensive renovation was investigated under U.S. Department of Energy (DOE) funding of the Building America Partnership for Improved Residential Construction (BA-PIRC). Researchers at the Florida Solar Energy Center (FSEC) worked with affordable housing partners renovating foreclosed homes built from the 1950's through the 2000's in the hot-humid climate (within the Southern census region), primarily in Florida. Researchers targeted a 30% improvement in whole-house energy efficiency along with the health and safety, durability, and comfort guidelines outlined in DOE's Builders Challenge Program (Version 1) Quality Criteria.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Applying Best Practices to Florida Local Government Retrofit Programs

In some communities, local government and non-profit entities have funds to purchase and renovate distressed, foreclosed homes for resale in the affordable housing market. Numerous opportunities to improve whole house energy efficiency are inherent in these comprehensive renovations. BA-PIRC worked together in a multi-year field study making recommendations in individual homes, meanwhile compiling improvement costs, projected energy savings, practical challenges, and labor force factors surrounding common energy-related renovation measures. The field study, Phase 1 of this research, resulted in a set of best practices appropriate to the current labor pool and market conditions in central Florida to achieve projected annual energy savings of 15-30% and higher. This report describes Phase 2 of the work where researchers worked with a local government partner to implement and refine the 'current best practices.' A simulation study was conducted to characterize savings potential under three sets of conditions representing varying replacement needs for energy-related equipment and envelope components. The three scenarios apply readily to the general remodeling industry as for renovation of foreclosed homes for the affordable housing market. Our new local government partner, the City of Melbourne, implemented the best practices in a community-scale renovation program that included ten homes in 2012.

30% SAVINGS↗

Applying Best Practices to Florida Local Government Retrofit Programs, Central Florida (Fact Sheet)

In some communities, local government and non-profit entities have funds to purchase and renovate distressed, foreclosed homes for resale in the affordable housing market. Numerous opportunities to improve whole house energy efficiency are inherent in these comprehensive renovations. BA-PIRC worked together in a multi-year field study making recommendations in individual homes, meanwhile compiling improvement costs, projected energy savings, practical challenges, and labor force factors surrounding common energy-related renovation measures. The field study, Phase 1 of this research, resulted in a set of best practices appropriate to the current labor pool and market conditions in central Florida to achieve projected annual energy savings of 15-30% and higher. This report describes Phase 2 of the work where researchers worked with a local government partner to implement and refine the "current best practices". A simulation study was conducted to characterize savings potential under three sets of conditions representing varying replacement needs for energy-related equipment and envelope components. The three scenarios apply readily to the general remodeling industry as for renovation of foreclosed homes for the affordable housing market. Our new local government partner, the City of Melbourne, implemented the best practices in a community-scale renovation program that included ten homes in 2012.

30% SAVINGS↗

Energy Retrofit Field Study and Best Practices in a Hot-Humid Climate

Energy efficiency improvement as a component of comprehensive renovation was investigated under U.S. Department of Energy (DOE) funding of the Building America Partnership for Improved Residential Construction (BA-PIRC). Researchers at the Florida Solar Energy Center (FSEC) worked with affordable housing partners renovating foreclosed homes built from the 1950's through the 2000's in the hot-humid climate (within the Southern census region), primarily in Florida. Researchers targeted a 30% improvement in whole-house energy efficiency along with the health and safety, durability, and comfort guidelines outlined in DOE's Builders Challenge Program (Version 1) Quality Criteria.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Applying Best Practices to Florida Local Government Retrofit Programs

In some communities, local government and non-profit entities have funds to purchase and renovate distressed, foreclosed homes for resale in the affordable housing market. Numerous opportunities to improve whole house energy efficiency are inherent in these comprehensive renovations. BA-PIRC worked together in a multiyear field study making recommendations in individual homes, meanwhile compiling improvement costs, projected energy savings, practical challenges, and labor force factors surrounding common energy-related renovation measures. The field study, Phase 1 of this research, resulted in a set of best practices appropriate to the current labor pool and market conditions in central Florida to achieve projected annual energy savings of 15%-30% and higher. This report describes Phase 2 of the work where researchers worked with a local government partner to implement and refine the "current best practices". A simulation study was conducted to characterize savings potential under three sets of conditions representing varying replacement needs for energy-related equipment and envelope components. The three scenarios apply readily to the general remodeling industry as for renovation of foreclosed homes for the affordable housing market. The new local government partner, the City of Melbourne, implemented the best practices in a community-scale renovation program that included ten homes in 2012.

30% savings↗