Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Projects”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

LH CO 2 MENT Colorado Project (Final Report)

The objective of Electricore’s pre-FEED project “LH CO 2 MENT COLORADO PROJECT” is to accelerate the implementation of a 1.5 million tonnes per year (TPY), and first-of-a-kind (FOAK) at world scale, Svante VeloxoTherm™ carbon capture plant. This project represents a quantum leap to a large-scale facility that will launch Svante’s carbon capture technology into the next era of accomplishments and market acceptance. By completing the Front-End Loading (FEL) Feasibility Study Report (FEL-2) for a fit-for-purpose design at the HOLCIM cement plant, located near Florence Colorado, USA, this technology can be proven as the future of large-scale deployment for carbon capture and storage. This carbon capture plant was designed with the goal of reaching a target of near Net Zero Emissions by capturing 90% of the carbon dioxide (CO 2 ) emissions from the HOLCIM cement plant and from the boiler which produces steam required to regenerate the adsorbent. Additionally, this project will be leveraging a renewable Power Purchase Agreement (PPA) using solar energy to acquire power at the target price of 0.04 $/kWh or less. In its current configuration CO 2 emissions from the HOLCIM cement plant is around 700 – 800 kg/ton of clinker produced. The proposed new carbon capture plant will allow a reduction of CO 2 emissions to about 100 kg/ton of clinker produced. The scope of work consists of the process design and capital & operating cost estimation (Class IV) for a total plant capacity of 4,750 TPD of pipeline grade CO 2 . The Svante VeloxoTherm™ technology is comprised of a Rotary Adsorption Machine (RAM) for intensified Thermal Swing Adsorption (TSA) using Structured Adsorbent Beds (SABs) and related Balance of Plant (BOP), including CO 2 compression. A business case (financial analysis) evaluation has been undertaken for the Owner’s management review. Recommendations on how best to proceed to the next stage of the project have been conveyed and are documented within this report. This analysis has relied on a detailed and comprehensive Project Financial Model, evaluating the Total Project IRR (after tax, unlevered, and including all forecast 45Q PTCs and 100% tax efficiency) – the project financial analysis (as opposed to standard TEA analysis) only considered a 12 year plant economic lifetime as a result of 45Q being the sole driver considered at this stage. The Total Project IRR was evaluated across a large number of potential scenarios. The evaluation demonstrated that if the 45Q PTD is increased to $85/MT for sequestration, there are a large number of feasible scenarios which demonstrate economic returns.

01 COAL, LIGNITE, AND PEAT↗

IACMI Project 4.10: Blade Finishing Automation (Final Report)

IACMI Project 4.10, the Innovative Wind Turbine Blade Finishing with Advanced Automated Technology project, performed research addressing the challenges and opportunities associated with automating wind turbine blade finishing operations, including blade trimming and grinding. These activities, developed and conducted in close cooperation with wind industry partners, included: • The development of new automation technology and systems; • The integration of automation technology and components; • The improvements of sensor technology and their deployment in automation systems • The elimination of extensive manual programing for the automation of wind blade finishing; • The rethinking of the approach to specific work tasks for automation systems; • The demonstration at scale of innovative wind turbine blade finishing automations systems. The IACMI Wind TA team worked with GE Renewable Energy and LM Wind Power to establish the metrics of the automated blade finishing system developed in the project. In addition, the project team helped to integrate the advanced automated systems into wind turbine blade production facilities. This project was divided into two phases. Phase I provided project management, preliminary techno-economic model development, early US wind turbine industry outreach, and early research into robotic solutions for automated wind blade finishing. This second phase continued with project management, as well as final techno-economic model development, advanced research into robotic solutions for automated wind blade finishing, as well as specifications and procurement of a robotic system for automated wind blade finishing. The 4.10 project leveraged the capabilities and facilities established through the Institute for Advanced Composites Manufacturing Innovation (IACMI), the Colorado Office of Economic Development and International Trade (OEDIT) and the National Renewable Energy Laboratory (NREL). The IACMI Wind Technology Area (TA) designed and prepared for deployment a robotic automated wind turbine blade finishing system at the NREL/IACMI Composites Manufacturing Education and Technology (CoMET) facility. The results of this project led to follow-on funding to build upon and expand research in automated wind turbine blade finishing.

17 WIND ENERGY↗

Walla Walla River Fish Passage Operations Project : Annual Progress Report October 2007 - September 2008.

In the late 1990s, the Confederated Tribes of the Umatilla Indian Reservation, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife, along with many other agencies, began implementing fisheries restoration activities in the Walla Walla Basin. An integral part of these efforts is to alleviate the inadequate fish migration conditions in the basin. Migration concerns are being addressed by removing diversion structures, constructing fish passage facilities, implementing minimum instream flow requirements, and providing trap and haul efforts when needed. The objective of the Walla Walla River Fish Passage Operations Project is to increase the survival of migrating adult and juvenile salmonids in the Walla Walla River basin. The project is responsible for coordinating operation and maintenance of ladders, screen sites, bypasses, trap facilities, and transportation equipment. In addition, the project provides technical input on passage and trapping facility design, operation, and criteria. Operation of the various passage facilities and passage criteria guidelines are outlined in an annual operations plan that the project develops. Beginning in March of 2007, two work elements from the Walla Walla Fish Passage Operations Project were transferred to other projects. The work element Enumeration of Adult Migration at Nursery Bridge Dam is now conducted under the Walla Walla Basin Natural Production Monitoring and Evaluation Project and the work element Provide Transportation Assistance is conducted under the Umatilla Satellite Facilities Operation and Maintenance Project. Details of these activities can be found in those project's respective annual reports.

13 HYDRO ENERGY↗

Grande Ronde Basin Fish Habitat Enhancement Project : 2007 Annual Report.

On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an intergovernmental contract to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the contract, and in 1996 the Wallowa River subbasin was added. The primary goal of 'The Grande Ronde Basin Fish Habitat Enhancement Project' is to create, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing opportunities for natural fish production within the basin. This project provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife and partners is on private lands and therefore requires that considerable time be spent developing rapport with landowners to gain acceptance of, and continued cooperation with this program throughout 10-15 year lease periods. Both passive and active restoration treatment techniques are used. Passive regeneration of habitat, using riparian exclosure fencing and alternate water sources are the primary method to restore degraded streams when restoration can be achieved primarily through changes in management. Active restoration techniques using plantings, bioengineering, site-specific instream structures, or whole stream channel alterations are utilized when streams are more severely degraded and not likely to recover in a reasonable timeframe. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and coordinated by the Grande Ronde Model Watershed Program (Project. No.199202601). Work undertaken during 2007 included: (1) Starting 1 new fencing project in the NFJD subbasin that will protect an additional 1.82 miles of stream and 216.2 acres of habitat; (2) Constructing 0.47 miles of new channel on the Wallowa River to enhance habitat, restore natural channel dimensions, pattern and profile and reconnect approximately 18 acres of floodplain and wetland habitat; (3) Planting 22,100 plants along 3 streams totaling 3.6 stream miles; (4) Establishing 34 new photopoints on 5 projects and retaking 295 existing photopoint pictures; (5) Monitoring stream temperatures at 10 locations on 5 streams and conducting other monitoring activities; (6) Completing riparian fence, water gap and other maintenance on 116.8 miles of project fences; (7) Initiated writing of a comprehensive project summary report that will present a summary of conclusions of the benefits to focal species and management recommendations for the future. Since initiation of this program 56 individual projects have been implemented, monitored and maintained along 84.8 miles of anadromous fish bearing streams that protect and enhance 3,501 acres of riparian and instream habitat.

13 HYDRO ENERGY↗

FinalReport for completed IPP-0110 and 0110A Projects:"High Energy Ion Technology of Interfacial Thin Film Coatings for Electronic, Optical and Industrial Applications"

The DOE-supported IPP (Initiatives for Proliferation Prevention) Project, IPP-0110, and its accompanying 'add-on project' IPP-0110A, entitled 'High Energy Ion Technology of Interfacial Thin Film Coatings for Electronic, Optical and Industrial Applications' was a collaborative project involving the Lawrence Berkeley National Laboratory (LBNL) as the U.S. DOE lab; the US surface modification company, Phygen, Inc., as the US private company involved; and the High Current Electronics Institute (HCEI) of the Russian Academy of Sciences, Tomsk, Siberia, Russia, as the NIS Institute involved. Regular scientific research progress meetings were held to which personnel came from all participating partners. The meetings were held mostly at the Phygen facilities in Minneapolis, Minnesota (with Phygen as host) with meetings also held at Tomsk, Russia (HCEI as host), and at Berkeley, California (LBNL as host) In this way, good exposure of all researchers to the various different laboratories involved was attained. This report contains the Final Reports (final deliverables) from the Russian Institute, HCEI. The first part is that for IPP-0110A (the 'main part' of the overall project) and the second part is that for the add-on project IPP-0110A. These reports are detailed, and contain all aspects of all the research carried out. The project was successful in that all deliverables as specified in the proposals were successfully developed, tested, and delivered to Phygen. All of the plasma hardware was designed, made and tested at HCEI, and the performance was excellent. Some of the machine and performance parameters were certainly of 'world class'. The goals and requirements of the IPP Project were well satisfied. I would like to express my gratitude to the DOE IPP program for support of this project throughout its entire duration, and for the unparalleled opportunity thereby provided for all of the diverse participants in the project to join in this collaborative research. The benefits are superb, as measured in quite a number of different ways.

43 PARTICLE ACCELERATORS↗

CONCEPT OF OPERATIONS PLANS for Phase I the INTERNATIONAL PILOT FOR Global Radiological source SORTING, Tracking, AND MONITORING (GradSStraM) Using eMERGING RFID AND WEB 2.0 TECHNOLOGIES TO PROVIDE TOTAL ASSET AND INFORMATION VISUALIZATIONA United states- European Union Lighthouse Priority Project for fostering trade and reducing regulatory burden

Thousands of shipments of radioisotopes developed in the United States (US) are transported domestically and internationally for medical and industrial applications, including to partner laboratories in European Union (EU) countries. Over the past five years, the Environmental Protection Agency (EPA), the Department of Energy (DOE), and Oak Ridge National Laboratory (ORNL) have worked with state regulatory compliance personnel, key private sector shippers and carriers, the Department of Homeland Security (DHS), the Department of Transportation (DOT), the Department of Defense (DoD) and the Nuclear Regulatory Commission (NRC) on Radio Frequency Identification (RFID) tracking and monitoring of medical and industrial radioisotopes in commerce. The EPA Radiological Source Tracking and Monitoring (RadSTraM) project tested, evaluated, and integrated RFID technologies in laboratory settings, and at multiple private-sector shipping and distribution facilities (Perkin Elmer and DHL) using common radioisotopes used in everyday commerce. The RFID tracking was also tested in association with other deployed technologies including radiation detection, chemical/explosives detection, advanced imaging, lasers, and infrared scanning. At the 2007 EU-US Summit, the leaders of the US Department of Commerce (DOC) and EU European Commission (EC) committed to pursue jointly directed Lighthouse Priority Projects. These projects are intended to 'foster cooperation' and 'reduce regulatory burdens' with respect to transatlantic commerce. The Transatlantic Economic Council (TEC) Lighthouse Project on Radio Frequency Identification (RFID) has been directed to 'develop a joint framework for cooperation on identification and development of best practices for Radio Frequency Identification (RFID) technologies.' The RFID Lighthouse Priority Project commits both sides to endeavor to align U.S. and EU regulatory and policy approaches on RFID technologies, including pilot projects in the public sector. The RadSTraM project was specifically cited as a candidate for a RFID Lighthouse Project by the EU/DOC collaboration in meeting their mutual goal of developing a 'joint framework for cooperation on identification and development of best practices for RFID technologies.' Concurrently, the Universal Postal Union (UPU) identified this project as a candidate for radioisotope packages shipped by the postal service between the United State Postal Service (USPS). and European Post Agencies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Are long-term climate projections useful for on-farm adaptation decisions?

The current literature on climate services for farmers predominantly focuses on seasonal forecasts, with an assumption that longer-term climate projections may not be suitable for informing farming decisions. In this paper, we explore whether certain types of long-term climate projections may be useful for some specific types of farming decisions. Through interviews with almond tree crop farmers and farm advisors in California, we examine how farmers perceive the utility and accuracy levels of long-term climate projections and identify the types of projections that they may find useful. The interviews revealed that farmers often perceive long-term climate projections as an extension of weather forecasts, which can lead to their initial skepticism of the utility of such information. However, we also found that when farmers were presented with long-term trends or shifts in crop-specific agroclimatic metrics (such as chill hours or summer heat), they immediately perceived these as valuable for their decision-making. Hence, the manner in which long-term projections are framed, presented, and discussed with farmers can heavily influence their perception of the potential utility of such projections. The iterative conversations as part of the exploratory interview questions, served as a tool for “ joint construction of meaning” of complex and ambiguous terms such as “long-term climate projections,” “long-term decisions” and “uncertainty.” This in-turn supported a joint identification (and understanding) of the types of information that can potentially be useful for on-farm adaptive decisions, where the farmer and the interviewer both improvise and iterate to find the best types of projections that fit specific decision-contexts. Overall, this research identifies both the types of long-term climate information that farmers may consider useful, and the engagement processes that are able to effectively elicit farmers' long-term information needs.

Jagannathan, Kripa↗

Transport Cost for Carbon Removal Projects With Biomass and CO2 Storage

Strategies to remove carbon from the atmosphere are needed to meet global climate goals. Promising strategies include the conversion of waste biomass to hydrogen, methane, liquid fuels, or electricity coupled with CO 2 capture and storage (CCS). A key challenge for these projects is the need to connect geographically dispersed biomass supplies with geologic storage sites by either transporting biomass or CO 2 . We assess the cost of transport for biomass conversion projects with CCS using publicly available cost data for trucking, rail, and CO 2 pipelines in the United States. We find that for large projects (order of 1 Mt/yr CO 2 or greater), CO 2 by pipeline is the lowest cost option. However, for projects that send most of the biomass carbon to storage, such as gasification to hydrogen or electricity production, biomass by rail is a competitive option. For smaller projects and lower fractions of carbon sent to storage, such as for pyrolysis to liquid fuels, CO 2 by rail is the lowest cost option. Assessing three plausible example projects in the United States, we estimate that total transport costs range from $24/t-CO 2 stored for a gasification to hydrogen project traversing 670 km to $\$ 36$/t for a gasification to renewable natural gas project traversing 530 km. In general, if developers have flexibility in choosing transport mode and project type, biomass sources and storage sites can be connected across hundreds of kilometers for transport costs in the range of $20-40/t-CO 2 stored. Truck and rail are often viable modes when pipelines cannot be constructed. Distances of 1,000 km or more can be connected in the same cost range when shared CO 2 pipelines are employed.

09 BIOMASS FUELS↗

Genomic Encyclopedia of Type Strains, Phase I: The one thousand microbial genomes (KMG-I) project

The Genomic Encyclopedia of Bacteria and Archaea (GEBA) project was launched by the JGI in 2007 as a pilot project with the objective of sequencing 250 bacterial and archaeal genomes. The two major goals of that project were (a) to test the hypothesis that there are many benefits to the use the phylogenetic diversity of organisms in the tree of life as a primary criterion for generating their genome sequence and (b) to develop the necessary framework, technology and organization for large-scale sequencing of microbial isolate genomes. While the GEBA pilot project has not yet been entirely completed, both of the original goals have already been successfully accomplished, leading the way for the next phase of the project. Here we propose taking the GEBA project to the next level, by generating high quality draft genomes for 1,000 bacterial and archaeal strains. This represents a combined 16-fold increase in both scale and speed as compared to the GEBA pilot project (250 isolate genomes in 4+ years). We will follow a similar approach for organism selection and sequencing prioritization as was done for the GEBA pilot project (i.e. phylogenetic novelty, availability and growth of cultures of type strains and DNA extraction capability), focusing on type strains as this ensures reproducibility of our results and provides the strongest linkage between genome sequences and other knowledge about each strain. In turn, this project will constitute a pilot phase of a larger effort that will target the genome sequences of all available type strains of the Bacteria and Archaea.

59 BASIC BIOLOGICAL SCIENCES↗

Governance of the International Linear Collider Project

Governance models for the International Linear Collider Project are examined in the light of experience from similar international projects around the world. Recommendations for one path which could be followed to realize the ILC successfully are outlined. The International Linear Collider (ILC) is a unique endeavour in particle physics; fully international from the outset, it has no 'host laboratory' to provide infrastructure and support. The realization of this project therefore presents unique challenges, in scientific, technical and political arenas. This document outlines the main questions that need to be answered if the ILC is to become a reality. It describes the methodology used to harness the wisdom displayed and lessons learned from current and previous large international projects. From this basis, it suggests both general principles and outlines a specific model to realize the ILC. It recognizes that there is no unique model for such a laboratory and that there are often several solutions to a particular problem. Nevertheless it proposes concrete solutions that the authors believe are currently the best choices in order to stimulate discussion and catalyze proposals as to how to bring the ILC project to fruition. The ILC Laboratory would be set up by international treaty and be governed by a strong Council to whom a Director General and an associated Directorate would report. Council would empower the Director General to give strong management to the project. It would take its decisions in a timely manner, giving appropriate weight to the financial contributions of the member states. The ILC Laboratory would be set up for a fixed term, capable of extension by agreement of all the partners. The construction of the machine would be based on a Work Breakdown Structure and value engineering and would have a common cash fund sufficiently large to allow the management flexibility to optimize the project's construction. Appropriate contingency, clearly apportioned at both a national and global level, is essential if the project is to be realised. Finally, models for running costs and decommissioning at the conclusion of the ILC project are proposed. This document represents an interim report of the bodies and individuals studying these questions inside the structure set up and supervised by the International Committee for Future Accelerators (ICFA). It represents a request for comment to the international community in all relevant disciplines, scientific, technical and most importantly, political. Many areas require further study and some, in particular the site selection process, have not yet progressed sufficiently to be addressed in detail in this document. Discussion raised by this document will be vital in framing the final proposals due to be published in 2012 in the Technical Design Report being prepared by the Global Design Effort of the ILC.

43 PARTICLE ACCELERATORS↗

Final Technical Report for the project titled "Manganese Based Permanent Magnet with 40 MGOe at 200°C"

The objective of project was to develop MnBi based permanent magnet for high temperature application (~150°C). This objective is derived based on MnBi’s unique positive temperature dependence of coercivity, which is doubled from ~1 T at RT to ~2.5 T at 200°C. Because of its limited magnetization (<0.9 T at RT), the MnBi magnet is best suited to fill in the gap between rare earth based NdFeB-Dy or SmCo magnet (20 MGOe) and the AlNiCo magnet (10 MGOe) at 150°C. It is expected that if successfully developed, MnBi will effectively mitigate the world’s demand on Dy. Before this project, the highest LTP content in MnBi powder is about 90% if the quantity of the powder is less than 5 gram (using melt-spin method); or 80% if the quantity is greater than 100 gram (using conventional powder metallurgical method such as arc melting and annealing). After this project, large quantities (5kg/batch) with high LPT phase content (>92 wt%) can be routinely synthesized. This achievement is made possible by the newly developed synthesis method based on conventional metallurgical processing technique involving arc melting, two-stage ingot annealing, grinding, sieving, and vacuum annealing. Before this project, the finest powder particle size is about 35 μm with overall powder composition maintaining at about 85% LTP phase. The reason why LTP phase content is listed along with particle size is because LTP MnBi is easy to decompose when exposed to temperature higher than 350 °C. As result, only low energy ball milling can be used to refine the particle size; moreover, the ball milling time cannot exceed 4 hrs, or else the decomposed LTP MnBi phase will exceed 10%. After this project, the finest powder size is reduced to 1~5 μm while maintain the 90% LTP MnBi phase content. This achievement is made possible by a newly developed cryogenic ball milling system, which provides -70 °C ambient for the rolling container. Before this project, it is not clear if MnBi will ferromagnetically exchange-couple with soft magnetic phase such as Fe or Co. After this project, it is established that MnBi will ferromagnetically exchange couple with Co, but not with Fe. It is also possible for MnBi to ferromagnetically exchange couple with Fe-Co alloy, but the amount of Fe cannot be more than 50 at.%. This conclusion is made possible by a series of electronic structure calculation followed by a series of thin film experimentation. As the result, 25 MGOe energy product was demonstrated using a MnBi-Co film. Before this project, the highest energy product for a bulk MnBi magnet is about 5 MGOe with 70% green density, and near-fully dense magnet is not available. After this project, the highest energy density is about 8.6 MGOe with 95% green density. This achievement is made possible by a modified warm-compaction system developed at University of Texas at Arlington. This system has 2.1 T alignment field vs the previous 1.8 T, and the compaction ambient maintains <1 ppm oxygen partial pressure. The estimated cost of MnBi magnet is about $110/kg when conventional magnet fabrication method is used, and about $84/kg when warm extrusion method is used. In comparison the cost of NdFeB, SmCo, AlNiCo, and Sr-Ferrite magnets is $150/kg, $180/kg, $119/kg, and $20/kg, respectively. The near term future work should focus on further improve the purity of the LTP MnBi, pushing it from the current 91 wt.% to 99 wt.%. If successful, the increased 8% LTP phase will increase the remanent magnetization, which in turn, increase the energy product. In addition, high reduction ratio warm extrusion method should be investigated to further push the texture to >90%.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Advances in Grid Computing for the FabrIc for Frontier Experiments Project at Fermialb

The FabrIc for Frontier Experiments (FIFE) project is a major initiative within the Fermilab Scientic Computing Division charged with leading the computing model for Fermilab experiments. Work within the FIFE project creates close collaboration between experimenters and computing professionals to serve high-energy physics experiments of diering size, scope, and physics area. The FIFE project has worked to develop common tools for job submission, certicate management, software and reference data distribution through CVMFS repositories, robust data transfer, job monitoring, and databases for project tracking. Since the projects inception the experiments under the FIFE umbrella have signicantly matured, and present an increasingly complex list of requirements to service providers. To meet these requirements, the FIFE project has been involved in transitioning the Fermilab General Purpose Grid cluster to support a partitionable slot model, expanding the resources available to experiments via the Open Science Grid, assisting with commissioning dedicated high-throughput computing resources for individual experiments, supporting the eorts of the HEP Cloud projects to provision a variety of back end resources, including public clouds and high performance computers, and developing rapid onboarding procedures for new experiments and collaborations. The larger demands also require enhanced job monitoring tools, which the project has developed using such tools as ElasticSearch and Grafana. in helping experiments manage their large-scale production work ows. This group in turn requires a structured service to facilitate smooth management of experiment requests, which FIFE provides in the form of the Production Operations Management Service (POMS). POMS is designed to track and manage requests from the FIFE experiments to run particular work ows, and support troubleshooting and triage in case of problems. Recently a new certicate management infrastructure called Distributed Computing Access with Federated Identities (DCAFI) has been put in place that has eliminated our dependence on a Fermilab-specic third-party Certicate Authority service and better accommodates FIFE collaborators without a Fermilab Kerberos account. DCAFI integrates the existing InCommon federated identity infrastructure, CILogon Basic CA, and a MyProxy service using a new general purpose open source tool. We will discuss the general FIFE onboarding strategy, progress in expanding FIFE experiments presence on the Open Science Grid, new tools for job monitoring, the POMS service, and the DCAFI project.

Herner, K.↗

Study on Evaluation of Project Management Data for Decommissioning of Uranium Refining and Conversion Plant - 12234

Some of nuclear facilities that would no longer be required have been decommissioned in JAEA (Japan Atomic Energy Agency). A lot of nuclear facilities have to be decommissioned in JAEA in near future. To implement decommissioning of nuclear facilities, it was important to make a rational decommissioning plan. Therefore, project management data evaluation system for dismantling activities (PRODIA code) has been developed, and will be useful for making a detailed decommissioning plan for an object facility. Dismantling of dry conversion facility in the uranium refining and conversion plant (URCP) at Ningyo-toge began in 2008. During dismantling activities, project management data such as manpower and amount of waste generation have been collected. Such collected project management data has been evaluated and used to establish a calculation formula to calculate manpower for dismantling equipment of chemical process and calculate manpower for using a green house (GH) which was a temporary structure for preventing the spread of contaminants during dismantling. In the calculation formula to calculate project management data related to dismantling of equipment, the relation of dismantling manpower to each piece of equipment was evaluated. Furthermore, the relation of dismantling manpower to each chemical process was evaluated. The results showed promise for evaluating dismantling manpower with respect to each chemical process. In the calculation formula to calculate project management data related to use of the GH, relations of GH installation manpower and removal manpower to GH footprint were evaluated. Furthermore, the calculation formula for secondary waste generation was established. In this study, project management data related to dismantling of equipment and use of the GH were evaluated and analyzed. The project management data, manpower for dismantling of equipment, manpower for installation and removal of GH, and secondary waste generation from GH were considered. Establishment of the calculation formula for dismantling of each kind of equipment makes it possible to evaluate manpower for dismantling the whole facility. However, it is not easy to prepare calculation formula for all kinds of equipment that exist in the facility. Therefore, a simpler evaluation method was considered to calculate manpower based on facility characteristics. The results showed promise for evaluating dismantling manpower with respect to each chemical process. For dismantling of contaminated equipment, a GH has been used for protection of the spread of contamination. The use of a GH increases manpower for installation and removal of GH etc. Moreover, structural materials of the GH such as plastic sheets, adhesive tape become a burnable secondary waste. To create an effective dismantling plan, it is necessary to carefully consider use of a GH preliminarily. Thus, an evaluation method of project management data such as manpower and secondary waste generation was considered. The results showed promise for evaluating project management data of GH by using established calculation formula. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A Comparison of Social and Economic Engagement Approaches: Lessons from Recent International Radioactive Waste Projects - 17478

The central challenge of any proposed radioactive waste management project is securing not only regulatory permissions, but also a social license to operate. 'Social license' generally refers to a community's acceptance or approval of a specific project. Oftentimes development of social license occurs outside of, or in parallel to, formal regulatory or permitting processes, and requires sustained commitment and proposed economic benefits to communities by proponents to acquire, build, and sustain social capital in the context of trust-based relationships. Historically, radioactive waste management projects have defaulted to demagoguery and 'siege warfare' modes of thinking and action by both proponents and opponents. While radioactive waste management projects are always inherently controversial, it is only recently that project owners and developers have experimented with alternative forms of social engagement outside of, or in addition to, formal regulatory processes. This paper compares and contrasts recent projects in Canada, Australia, the United Kingdom, and the United States, by examining distinct approaches to social engagement, with a focus on new methods that have been used to promote mutual understanding, foster rational debate, build confidence, promote economic development, and secure social license. The projects examined span the life-cycle of radioactive waste management development, from ones that are purely aspirational, to ones in early planning stages, to ones seeking a host community, to one that is focused on sustainment of existing social license. Several notable lessons and innovative practices are identified that will be of interest to radioactive waste management project owners and developers, non-governmental organizations, potential host communities, and political decision-makers for such projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Chute Silo ILW Project Berkeley - 16649

Magnox, a Tier 1 Site Licensed Company (SLC), is the management and operations contractor responsible for the decommissioning of twelve of the Nuclear Decommissioning Authority's (NDA) nuclear sites in the UK. Aquila Nuclear Engineering is a specialist Tier 3, turnkey engineering company based in the UK, delivering mission critical engineering solutions to Europe's nuclear and nuclear medicine industries. Berkeley Nuclear Power Station, Berkeley, England started generating electricity in 1962, ceasing operation 27 years later in 1989. The Chute Silo ILW Project at this Reactor Site had been set up to retrieve irradiated control rods and charge chutes disposed of within a subterranean vault (silo). The project involved in-silo size reduction of waste in to 30-35 waste baskets. The waste basket was then to be retrieved via a pintle grab and hoist mechanism in to a Transfer Flask (through a silo and a Transfer Flask gamma gate). The Transfer Flask was then to transit along existing crane rails, out of the silo building and over the top of an Import/Export Facility. A Ductile Cast Iron Container (DCIC) was to be imported into Import/Export Facility and inspected/prepared to receipt the waste basket from the Transfer Flask. Once filled, the DCIC was then to be sealed and exported to an on-site storage facility. Due to an issue with the Magnox Tier 2 Framework holder in delivering a cost effective and viable solution for their Chute Silo ILW Retrieval Project, Magnox took the ground breaking decision to 'self-perform'. This involved dividing the larger project into several smaller packages. Two of these packages - for the shielded Transfer Flask and the Import/Export facility - were put out for competitive tendering directly to the Tier 3 Supply Chain. The work completed by the Tier 2 Company was shared with the Tier 3's, but Magnox expressly requested the Tier 2 proposals were scrutinised and that far more cost effective, robust and simpler solutions were provided for within the Tier 3 Tenders. Aquila won both work packages and delivered them with significant and demonstrable cost savings, on time and under budget. This was achieved by the collaborative arrangements between Aquila and Magnox, the methodologies of both company's project teams and the innovation and 'fitness for purpose' of Aquila's design pragmatism. The original Tier 2 Framework holder's price to Magnox for the Chute Silo ILW Project was between UK Pounds 2-3 M. Aquila delivered the equivalent scope for under UK Pounds 1 M. Aquila's original programme was maintained despite the award of additional scope and (Magnox) delays on site. Aquila came under the original target price for each discrete phase of the project. The above was achieved because of: - the collaborative arrangements between Aquila and Magnox; - the methodologies of both company's project teams; - the design features put forward by Aquila (welcomed and adopted by Magnox). In 2014 Aquila Nuclear Engineering received formal recognition of its achievements on this project by winning an NDA Supply Chain Award for 'Best example of supplier 'going the extra mile''. Points highlighted in the award were: - improved customer focus, leading to stronger relationships - encouraging challenge and innovation - continuous suggestions for improvement - UK Pounds 1 million savings and three months programme reduction.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cameco Corporation's Vision in Motion Project - 19128

Cameco Corporation is a world leader in uranium production. Cameco is also a major supplier of uranium processing services required to produce fuel for the generation of clean energy. These operations are based in Blind River, Cobourg and Port Hope, Ontario and are collectively referred to as the Fuel Services Division. The Fuel Services Division produces uranium trioxide from uranium ore concentrate at the Blind River Refinery. Cameco produces uranium hexafluoride and uranium dioxide at the Port Hope Conversion Facility. Cameco operates a fuel manufacturing facility in Port Hope, Ontario and a metal fabrication facility located in Cobourg, Ontario. The company manufactures fuel bundles utilized in the Candu reactors. Cameco is undertaking a major site cleanup and renewal of its Port Hope Conversion Facility (PHCF) which is located in the Municipality of Port Hope (MPH). This undertaking is known as the Vision in Motion (VIM) project. This project is unique and timely opportunity that has been made possible because of the Port Hope Area Initiative (PHAI). The PHAI Port Hope project is being undertaken by Canadian Nuclear Laboratories (CNL) and includes the construction of a long-term waste management facility (LTWMF) in the MPH. VIM entails an extensive remediation and redevelopment of much of the PHCF and includes: - the cleanup and demolition of a number of old or underutilized buildings; - the removal of contaminated soils, building materials and stored wastes; and - modifications to existing buildings at the PHCF with associated landscaping and infrastructure. Overall, the VIM project will allow for environmental remediation, improved site operations, enhancement of site safety and security through site design and improved aesthetics. This paper will discuss the status of this project underway at the Port Hope Conversion Facility. After years of community consultation, planning, and a successful environmental assessment and licensing of the project, the VIM project at the PHCF is now underway. Physical transfer of waste materials began in June 2018. Cameco is committed to seeing the project through to completion and is working with CNL to ensure this happens within the operating time frame of the LTWMF. Cameco keeps the CNSC and MPH well informed of all project related activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Feedback from Reactor Internals Segmentation Projects in Europe - 19141

Westinghouse has accumulated significant know-how in the reactor dismantling activities. The approach to internals segmentation and packaging has been continuously enhanced by incorporating lessons learned and best practices into each successive project. Building on the most recent successful experience at Jose Cabrera in Spain, Westinghouse has won several major awards with 13 reactors currently under contract at Chooz A (France), Barsebaeck 1-2 (Sweden), Bohunice V1 (two units in Slovakia), Neckarwestheim I, Philippsburg 1, and more recently at Unterweser, Grafenrheinfeld, Grohnde, Isar 1, Isar 2, Brokdorf (Germany). The primary challenges of a segmentation and packaging project are to separate the highly activated materials from the less-activated materials and package them into appropriate containers for disposal. The choice of the optimum cutting technology is important for a successful project implementation and depends on some specific constraints like disposal costs, project schedule, available work areas or safety. The selected technology for all recent Westinghouse projects is mechanical cutting with different types of designed cutting equipment (hydraulic shears, band saw, disc saw). All segmentation tools are remotely controlled due to the high radiation levels and ALARA and personal safety is the number one priority during the challenging site work. Training on mock-ups in the Westinghouse facility before going to the site is a very important step in order to optimize all procedures and thereby maximize the efficiency on site in order to finalize the project on time or before. The work covers the segmentation of reactor internals but also, in some cases, some replaced components during plant operation that were stored in the spent fuel pool. The cutting equipment proved to be reliable and flexible which is very valuable for the execution of such a challenging project. The Barsebaeck Unit 2 site work has been finished end of October 2017 and its lessons learned are taken into consideration for future activities. Site work is currently on-going simultaneously at Chooz A, Barsebaeck 1, Neckarwestheim I and Philippsburg 1. This paper will provide an overview of all these on-going segmentation projects and will focus on feedback from the first projects executed on site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SUBTASK 1.6 – BASIN ELECTRIC CARBON STORAGE RESEARCH PROJECT: NOVEL MONITORING TECHNIQUES

The Energy & Environmental Research Center (EERC) conducted baseline activities associated with an applied research project at Basin Electric Power Cooperative’s (Basin’s) carbon capture and storage (CCS) site in Beulah, North Dakota, to establish novel carbon storage-monitoring techniques as commercial methods under Cooperative Agreement No. DE-FE0024233, Subtask 1.6. The following report summarizes the baseline activities performed and briefly describes the subsequent (operational monitoring) activities that have been proposed to the U.S. Department of Energy (DOE) as part of the overall project to develop and demonstrate novel monitoring techniques at North America’s largest permitted CCS operation. Dakota Gasification Company (DGC), a wholly owned subsidiary of Basin, owns and operates the Great Plains Synfuels Plant (GPSP) approximately 5 miles northwest of the town of Beulah, North Dakota (Figure 1). In 2023, DGC received approval from the North Dakota Industrial Commission (NDIC) to develop a storage facility on-site for injecting a stream of carbon dioxide (CO2) captured from GPSP. DGC will transport the captured CO2 stream with approximately 6.8 miles of transmission lines that extend north of GPSP and inject >1 million tonnes (MMt) of CO2 annually (>1 MMt/yr) over a 12-year period with up to six underground injection control (UIC) Class VI-compliant injection wells completed in the Broom Creek Formation, a predominantly sandstone reservoir and saline aquifer underlying GPSP. The Broom Creek Formation lies approximately 5900 feet (ft) below ground surface (bgs) at GPSP. The commercial scale (i.e., >1 MMt/yr) of DGC’s permitted carbon storage project is ideal for developing and testing the novel monitoring techniques included within Subtask 1.6. The goals of this project are to demonstrate 1) the cost-effectiveness of novel monitoring technologies included as part of this research, 2) technology capability for tracking the CO2 plume and/or associated pressure response in the subsurface and monitoring out-of-zone migration, and 3) compliance with UIC Class VI program requirements. The research activities proposed for the overall project include 1) design of an automated, integrated, modular (AIM) monitoring station; 2) time-lapse electromagnetic (EM) field surveys; 3) drone-based surveillance studies; 4) time-lapse monitoring with seismic methods; 5) advanced wellbore-monitoring methods; 6) deployment of an AIM monitoring network; 7) EM monitoring of CO2 with real-time data processing; 8) continued seasonal drone-based surveillance studies; 9) seismic monitoring with passive and active surveys; and 10) wellbore monitoring with nuclear magnetic resonance (NMR) for near-surface characterization. Completion of Activities 1.0–5.0 (baseline activities) are described in this report. Upon authorization of funding by DOE, the EERC will initiate Activities 6.0– 10.0 (operational monitoring activities). Current state-of-the-art (SOA) carbon storage-monitoring techniques require countless labor hours dedicated to the acquisition of data. Once data are gathered, these SOA techniques often rely on commercial facilities to process raw data from the field. However, it is anticipated that next-generation monitoring techniques, such as those being demonstrated, will lower acquisition footprints, be less operationally intensive, and improve data acquisition efficiencies. These new techniques are more conducive to the application of machine learning, artificial intelligence, and automation, thus providing a pathway for integration into active control systems, informing site operability, and improving the integration of data for future CCS projects across the United States. Additionally, reclaimed and active mining lands are present within the project site, creating a unique opportunity to demonstrate the effectiveness of remote sensing and surface-based geophysics monitoring techniques at similar project sites that may include disturbed, unconsolidated, or actively excavated near-surface environments. The efforts included in the overall project will produce necessary designs, learnings, and data acquired during the baseline and operational monitoring periods that are necessary for time-lapse demonstration and validation of the described monitoring techniques. In addition, it is anticipated that the monitoring technologies included in this study will be compliant with UIC Class VI requirements to enable the potential for implementation at other CCS sites across the United States.

42 ENGINEERING↗