Fluor Idaho's Technical and Programmatic Approach That Resolved the Problems with the Integrated Waste Treatment Unit - 19290

The Integrated Waste Treatment Unit (IWTU) is a facility designed to treat approximately 900,000 gallons of radioactive liquid waste, referred to as Sodium Bearing Waste (SBW). IWTU is a Fluidized Bed Steam Reforming process that will be used to treat the SBW to produce a granular sodium carbonate and sodium aluminate product. The product is planned to be managed as remote handled transuranic waste. Construction of the IWTU was completed in 2011 and Critical Decision 4 was achieved in 2012 with the expectation that the treatment of the SBW would be completed in 2012. However, process instabilities and equipment problems prevented the safe and reliable operation of the facility. All of the nonradiological tests of the IWTU had to be stopped prematurely because each time the IWTU was operated, the process would become unstable within a few days of initiating the operation. The instabilities were associated with the primary fluidized bed reaction vessel, the Denitration Mineralization Reformer (DMR). The instabilities included difficulties maintaining fluidization conditions and scale formation within the DMR. Design inadequacies and equipment reliability problems in other parts of the facility also hampered the testing the IWTU. The U.S. Department of Energy (DOE) awarded the Idaho Clean-up contract to Fluor Idaho (Fluor) in 2016. To resolve the issues with the IWTU, Fluor assembled a dedicated team to develop the technical and programmatic strategy to resolve the issues with the IWTU and get it operational. Fluor's approach has successfully resolved the primary issues with the IWTU. As a result of modifications of equipment and operating strategies implemented by Fluor, the core part of the IWTU process now works reliably when processing simulated Sodium Bearing Waste over a wide range of operating conditions. This paper describes Fluor's approach and summarize key steps in the process to resolve the issues with the IWTU. Fluor has used strong fundamentals including a first principles approach and unique program management techniques to solve the technical problems with the IWTU. The successful approach has provided renewed confidence in the IWTU process enabling the troubled project to move forward. Important factors in the success of the project include using a dedicated project team separate from the IWTU line organization, a Technical Review Group, the Chemistry Team and a diverse set of supporting contractors and National Laboratories. Fluor typically used multiple means to validate solutions before testing them in the IWTU. Fluor's successful full-scale demonstration runs of the IWTU confirm the process will reliably produce a compliant, treated waste product over a wide range of operating conditions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Supplement to M&V Guidelines: Measurement and Verification for Performance-Based Contracts Version 4.0

Measurement and verification (M&V) are key to determining and confirming the continued operation of, and savings associated with, performance-based contracts. The Federal Energy Management Program (FEMP) updates these guidelines to reflect the evolution of M&V to incorporate industry best practices and ensure that savings from these performance-based projects are properly planned, communicated, and realized. FEMP released M&V Guidelines: Measurement and Verification for Federal Energy Projects Version 3.0 in 2008. This document was developed with input from industry-government working groups, previous M&V guideline authors, and national laboratory subject matter experts. The document provided the methods and guidelines, with a focus on federal energy savings performance contracts (ESPCs). When FEMP released M&V Guidelines: Measurement and Verification for Performance-Based Contracts Version 4.0 in 2015, FEMP expanded the intended audience to include anyone (energy managers, procurement officers, and contractors) involved in implementing performance-based contracts. The streamlined M&V Guidelines Version 4.0 provided the procedures and guidelines needed to quantify savings resulting from installing energy-efficient equipment, water conservation, improved operation and maintenance (O&M), renewable energy, and cogeneration projects with a performance-based contract; however, it removed some of the associated details on topics such as developing regression models and sampling plans. The details and information provided in M&V Guidelines v. 3.0 are still pertinent to M&V for performance-based contracts. The objective is to keep FEMP M&V version 4.0 condensed, providing the reference document for specifying M&V methods and procedures and a resource for developing project-specific M&V plans; this supplement provides additional details. The content of this supplement has been updated to include pertinent revisions between M&V version 3.0 and M&V version 4.0 by providing details and updating the content to ensure relevancy.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Lessons Learned From the Cesium Pond Soil Shipping Campaign at Whiteshell Laboratories - 18206

Whiteshell Laboratories (WL), located in Manitoba, Canada is the first major decommissioning project of a nuclear research establishment in Canada. With the focus now active remediation to return the site to green state, the majority of legacy radioactive waste and waste generated from decommissioning and demolition of nuclear facilities must be transported off site to Chalk River Laboratories (CRL), located in Ontario, Canada. No large radioactive waste shipment campaigns have been undertaken by WL until now. A newly established Waste Management Program specifically designed to support the WL Closure Project has executed its first major shipping campaign of radioactive material, making approximately one hundred shipments and reducing WL's total volume of low-level radioactive waste to transport by seven percent. The shipped waste was approximately 1800 m{sup 3} (2600 metric tons) of known Cs-137 contaminated soil material generated from the excavation of an Experimental Cesium Pond Project designed to study the distribution of dose received by organisms living at the mud-water interface from Cs-137 contamination. This paper outlines the cost benefit analysis undertaken to determine the most cost effective method for transporting the radioactively contaminated soil to CRL, storage challenges experienced by both WL and CRL, the selection of the most appropriate waste package, training of shippers, and the continual optimization of increasing the number of generated waste packages and the number of waste packages shipped and accepted at CRL. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Data Center Energy Efficiency

Private and public sector efforts are underway to reduce energy use in data centers and the Office of Management and Budget’s Data Center Optimization Initiative outlines the energy efficiency requirements and strategies for federal data centers. The Federal Energy Management Program (FEMP) helps federal agencies meet these requirements. FEMP sponsors the Center of Expertise for Energy Efficiency in Data Centers (CoE), which helps federal agencies and other organizations implement data center energy efficiency projects by supplying technical support, tools, best practices, analyses, and the introduction of technologies. The CoE, located at the Lawrence Berkeley National Lab, partners with key public and private stakeholders to further efficiency efforts

Center of Expertise for Energy Efficiency in Data ↗

Considering Climate Change Scenarios in Site Resilience Planning

This paper was prepared in support of the U.S. Department of Energy’s Federal Energy Management Program. The paper serves as a resource for site-level personnel who are performing energy and water resilience planning at their sites and who need to identify and incorporate data that may help them assess risks to infrastructure and operations as a result of future climate change impacts. Specifically, the paper is a high-level look at available scenarios of future climate that can be incorporated into assessments based on U.S. regional models.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

ESPC ESA Webinar Series: ESPC IDIQ Contract Vehicle Overview

This webinar provides instructions and resources for financing distributed energy projects (e.g. on-site renewable energy, storage, and combined heat and power) using an energy savings performance contract (ESPC) energy sales agreement (ESA) through the U.S. Department of Energy (DOE) indefinite-delivery, indefinite-quantity (IDIQ) energy savings performance contract (ESPC) vehicle. The DOE IDIQ ESPC contract vehicle uses a streamlined master contract that allows federal agencies to work with 21 energy service companies holding the current DOE IDIQ ESPC. Topics covered in the webinar include: An overview of the DOE IDIQ contract vehicle; ESA-specific considerations for IDIQ contracts; and Specific use cases. The webinar also provides an overview of the resources available on the Federal Energy Management Program website, such as IDIQ tools and templates. This webinar is the fifth in a series that provides information, best practices, and resources for implementing an ESPC ESA project. ESPC ESAs are a great option for federal sites that are motivated to reduce site costs, have no capital investment funding, and cannot use the U.S. Department of Defense 10 USC 2922a authority for long-term contracting.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

ESPC ESA Webinar Series: ESPC ENABLE Contract Vehicle Overview

This webinar provides instructions and resources for financing distributed energy projects (e.g. on-site renewable energy, storage, and combined heat and power) using an energy savings performance contract (ESPC) energy sales agreement (ESA) through the U.S. Department of Energy's (DOE) ESPC ENABLE contract vehicle. The ESPC ENABLE contract vehicle is a streamlined procurement process that uses a standard investment grade audit tool and standard contract templates. Topics covered in the webinar include: An overview of the ESPC ENABLE contract vehicle; ESA-specific considerations for ENABLE contracts; and Case studies. This webinar also provides an overview of the resources available on the Federal Energy Management Program website, such as ESPC ENABLE templates. This webinar is the fourth of a series that provides information, best practices, and resources for implementing an ESPC ESA project. ESPC ESAs are a great option for federal sites that are motivated to reduce site costs, have no capital investment funding, and cannot use the U.S. Department of Defense 10 USC 2922a authority for long-term contracting.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

REopt Screenings Catalyze Development of Hundreds of Megawatts of Renewable Energy for Federal Agencies

The U.S. Department of Energy's (DOE's) Federal Energy Management Program (FEMP) offers project assistance to federal agencies, which often begins with a desktop screening to develop a prioritized portfolio of renewable energy project opportunities. FEMP uses the National Renewable Energy Laboratory's (NREL) REopt energy planning platform to quickly and efficiently screen potential renewable energy opportunities at a single site or across a range of sites. REopt helps organizations prioritize the most economically and technically viable projects for further study, and identifies the size and mix of technologies that meet the organization's goals at minimum cost, along with the optimal operating strategies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Integrated emergency control board including design extended conditions for Krsko NPP - 297

In the aim of implementing post-Fukushima safety measures, Krsko Nuclear Power Plant is developing a Safety Upgrade Program. Krsko NPP is upgrading the remote shutdown capabilities and implementing ways to prevent and mitigate the consequences of potential Severe Accidents. This modification enhances remote shutdown capabilities of the plant to prevent potential severe accidents and improve the ways to mitigate their consequences. Within the set of plant design modifications, addressed the design, construction, and commissioning, of a new Emergency Control Room (EMCB. Tecnatom is the responsible of the design modification of the plant together with Idom, that participates with Tecnatom in the project as a joint venture, who provides a new set of field instrumentation, including its design and the corresponding wiring. EMCB integrates Human- System Interface throughout centralizing capabilities to safety shutdown and cooldown the plant as well as to control the new Design Extension Systems. The process relies on a Human Factors Engineering (HFE) analysis applying a specific methodology based on NUREG-0711 . Tecnatom has developed a specific HFE Program Management Plan to proceed with the analysis in a documented, traceable and reliable way. HFE activities ends with an Integrated System Validation in the actual full scope simulator involving MCR crews. This paper describes different phases of the project, the integrated schedule between HFE and I and C activities, benefits of upgrading main and emergency control rooms beyond design bases and addresses Tecnatom lessons learned obtained during the project execution. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Flammable Gas Generation and Control at the Idaho Completion Project Legacy Combustible Gas Generation - 20191

On April 11, 2018, four drums containing transuranic waste at the Idaho National Laboratory underwent over-pressurization, ejecting their lids and spreading radiological waste within a facility. An investigation has found that waste in the drums generated methane gas, which contributed to the event. Subsequent to the investigation, the potential for drums to have methane and other flammable analytes whose concentrations could approach or exceed the lower flammability limit (LFL) and the adequacy of the controls to prevent or mitigate a possible deflagration was evaluated. An extensive review of the historical records was performed to determine how many drums exceed the LFL. The historical record identified a small quantity of drums that exceeded the LFL for xylene, hydrogen, and methane. The primary codified applicable code or standard for handling drums is 29 CFR 1910.120 (j) 'Handling Drums and Containers.' It is used throughout the commercial and government sector. This code is integrated throughout the Fluor Idaho safety management programs and procedures to control the Standard Industrial Hazards (SIHs) associated with drum and container handling. Example requirements include: - Drums and containers are inspected, and their integrity assured prior to being moved. - Site operations are organized to minimize the amount of drum or container movement. - When there is a reasonable possibility of flammable atmospheres being present, material handling equipment and hand tools are of the type to prevent sources of ignition. Drums and containers under pressure, as evidenced by bulging or swelling, are not moved until the cause for excess pressure is determined and appropriate containment procedures have been implemented to protect employees from explosive relief of the drum. Drums which exceed the WIPP FGA limit have NCRs associated with them. Once a drum fails flammable gas sampling, an NCR is initiated. The NCR drives placement into NCR dense pack rows. A standing order drives placement of the FGA failures to a single planer segregation location. These drums are not allowed for further processing or shipment until the NCR has been cleared. Once in the single planer rows, follow-up FGA testing is performed by CCP. The NCR is dispositioned by follow-up sampling occurring after adequate time has been provided for the gas to diffuse through the filter assembly, or, in some cases, the drums are repackaged into additional drums to reduce the source term. To date, the ICP project has performed approximately 1.5 million drums moves without a deflagration event due to combustible gas generation. Flammable gas generation in a transuranic waste drum is not unique to the ICP but is common across the DOE complex. Based on the experience at Idaho, application of industry standards is sufficient to control the risk of drum deflagration due to drum movements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Yellowstone National Park Federal Fleet Tiger Team EVSE Site Assessment [Slides]

The U.S. Department of Energy Federal Energy Management Program (FEMP) helps federal agencies reduce petroleum consumption and increase alternative fuel use through its resources for sustainable federal fleets. A key element of this assistance involves supporting agencies in the transition to zero-emission vehicles (ZEVs). Fleet electrification is part of a federal policy to achieve net-zero emissions economy-wide and a carbon pollution-free electricity sector, established through two executive orders (EOs) - EO 14008: Tackling the Climate Crisis at Home and Abroad and EO 14057: Catalyzing America's Clean Energy Industries and Jobs through Federal Sustainability. This site report supports the development of a ZEV deployment plan for Yellowstone National Park, which can ultimately be incorporated into the overall U.S. Department of the Interior ZEV fleet strategy.

33 ADVANCED PROPULSION SYSTEMS↗

Golden Gate National Recreation Area Federal Fleet Tiger Team EVSE Site Assessment

The U.S. Department of Energy Federal Energy Management Program (FEMP) helps federal agencies reduce petroleum consumption and increase alternative fuel use through its resources for sustainable federal fleets. A key element of this assistance involves supporting agencies in the transition to zero-emission vehicles (ZEVs). Fleet electrification is part of a federal policy to achieve net-zero emissions economy-wide and a carbon pollution-free electricity sector, established through two executive orders (EOs) - EO 14008: Tackling the Climate Crisis at Home and Abroad and EO 14057: Catalyzing America's Clean Energy Industries and Jobs through Federal Sustainability. This site report supports the development of a ZEV deployment plan for the Golden Gate National Recreation Area, which can ultimately be incorporated into the overall U.S. Department of the Interior ZEV fleet strategy.

33 ADVANCED PROPULSION SYSTEMS↗

MyEMSL Reader

The MyEMSL Reader is a library used by manager programs in PRISM, the Proteomics Research Information and Management System. The library allows the managers to push files into MyEMSL and later search for and retrieve the files.

Monroe, Matthew↗

A Photovoltaic System Payback Calculator

The Roof Asset Management Program (RAMP) is a DOE NNSA initiative to manage roof repairs and replacement at NNSA facilities. In some cases, installation of a photovoltaic system on new roofs may be possible and desired for financial reasons and to meet federal renewable energy goals. One method to quantify the financial benefits of PV systems is the payback period, or the length of time required for a PV system to generate energy value equivalent to the system's cost. Sandia Laboratories created a simple spreadsheet-based solar energy valuation tool for use by RAMP personnel to quickly evaluate the estimated payback period of prospective or installed photovoltaic systems.

14 SOLAR ENERGY↗

Multi-community command and control systems in law enforcement: An introductory planning guide

A set of planning guidelines for multi-community command and control systems in law enforcement is presented. Essential characteristics and applications of these systems are outlined. Requirements analysis, system concept design, implementation planning, and performance and cost modeling are described and demonstrated with numerous examples. Program management techniques and joint powers agreements for multicommunity programs are discussed in detail. A description of a typical multi-community computer-aided dispatch system is appended.

Sohn, R. L.↗

Space Shuttle management issues

This paper describes the many management methods being implemented on the Space Shuttle Program. Management attention to cost reduction and the techniques being used to meet the Shuttle cost commitment are described. A detailed explanation is given for the NASA Performance Measurement System but all other major management tools being used are also discussed.

Roseman, H. M.↗