Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Procurement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Development of the European Service Module Propulsion Subsystem for the Multi-Purpose Crew Vehicle

2013, NASA and the European Space Agency (ESA) entered into an international partnership to develop the European Service Module (ESM) for use on NASA's Multi-Purpose Crew Vehicle (MPCV), also known as Orion. The MPCV will be used as the principal spacecraft for future human space exploration missions beyond low earth orbit. The ESM Propulsion Subsystem (PSS) is a pressure-fed, bi-propellant propulsion system, being developed by Airbus Defense and Space under contract to ESA. For this effort, NASA is responsible for the traditional role of insight/oversight to ensure that the PSS delivered by Airbus meets all MPCV Program requirements. In addition, the NASA Propulsion team also has some unique responsibilities that are a result of the Implementing Agreement (IA) between NASA and ESA for development of the ESM. These responsibilities include: (1) providing the main engine and Thrust Vector Control (TVC) assembly for the PSS. This is being accomplished through the delta qualification and re-use the Space Shuttle Orbital Maneuvering System (OMS) engine and TVC assembly; (2) procurement and delivery of the Auxiliary engines (R-4Ds) for the PSS. These engines are being procured by NASA from Aerojet-Rocketdyne via Lockheed Martin, the prime contractor for the MPCV, per an Airbus-provided specification; and (3) conducting the integrated systems hot-fire test which will qualify the end-to-end PSS for flight on MPCV. This test is being conducted at the NASA White Sands Test Facility (WSTF) using an Airbus-provided test article known as the Propulsion Qualification Model (PQM).

Multi-Purpose Crew Vehicle↗

Artemis: An Overview of NASA’s Activities to Return Humans to the Moon

NASA is well underway in its plans to return humans to the Moon and build long-term infrastructure both in orbit and on the surface. Following the Artemis I and Artemis II flight tests, NASA will begin crewed landings and regular missions to the Moon. Artemis will return value to the American public and the global community, enable groundbreaking scientific discovery, and prepare NASA and its partners for exploration of the solar system. Work on the initial Human Landing System (HLS), procurement activities for future HLS, and work on the initial modules of the lunar-orbiting Gateway are underway. International partnerships are playing a critical role in the planning, development, and execution of these missions. As of December 2021, three international partners have entered agreements to contribute to the Gateway and 14 nations have signed the Artemis accords. A new spacesuit acquisition strategy will stimulate economic growth and meet the growing needs of NASA and emerging customers. Requirements development is underway for an unpressurized lunar surface rover and plans for a pressurized rover, foundation surface habitat, and the Artemis Base Camp are in work. This paper will provide an update on the HLS demonstration missions and the procurement status for HLS services; a comprehensive look at the Gateway’s components and related statuses; a summary of planned surface systems; and an outline of the strategies NASA will use to successfully implement these plans, preparing for humanity's next giant leap: Mars.

Artemis↗

Commercial Low-Earth Orbit Destination (CLD) Concept of Operations

This concept of operations describes: - High-level Government goals, objectives, and needs for the CLD program, vehicle(s), and missions, - Strategies, policies, and processes for developing, certifying, maintaining, using, and retiring CLDs in the context of Government use, and - Government and CLD partner roles, responsibilities, and interactions during various phases of Government CLD operations. The intent of this document is to describe the overall high-level concept of how the end-to-end CLD service will be used to convey the nature and scope of services the Government intends to procure from the CLD partner. It will provide insight into NASA’s concepts for CLD operations rather than to provide mature, explicit, or complete requirements. It addresses how the concept of operations will be used to meet NASA expectations from an operational perspective to facilitate an understanding of the end-to-end CLD service needs, goals, and objectives (NGOs). Formal CLD requirements and standards are detailed in the NASA Commercial LEO Development Program’s (CLDP) various requirements, interface, process, and standards documents, as well as the contractual Statements of Work (SOW) and Data Requirement Deliverables (DRD). As such, the Concept of Operations can use terms such as “should” or “may” or “expects to” since it is not a contractual requirements document. It exists solely to convey the initial nature and type of services the Government intends to procure and is not, per se, a requirements document.

Operations↗

Process Development and Testing for Lunar Habitats

Non-metallic solutions for Lunar bases are appealing due to their light weight and ability to block many forms of radiation. Composite materials made from different combinations of these non-metallic materials enable effective mating of dissimilar materials for strong structures such as pressurized habitats. Inserting and manufacturing composite structural materials on the Moon presents several challenges, however: the oxygen levels inside pressurized habitats will be relatively high, radiation that is blocked causes damage and the lack of atmosphere results in a high-magnitude negative pressure environment. In the past two years, the Materials and Processes Lab (EM01) invested in two internal research and development (IRAD) proposals for testing and procurement of composite materials. One proposal endeavors to determine flammability and radiation damage of various composite materials with a focus on carbon fiber and ultra-high molecular weight polyethylene (UHWMPE). The other proposal enables procurement of chopped fiber spray equipment materials which will be used to develop a novel technique for chopped UHMWPE fiber layup, similar to the chopped fiberglass layups used for making large structures such a boat hulls and hot tubs.

Composite↗

The Human Research Program Grant Lifecycle & Data Integration Schedule: Infographic

The Human Research Program (HRP) Grant Lifecycle process can be described using information from several government authoritative sources with overlapping generalizations. It is the responsibility of the HRP Program Planning & Control (PP&C) Office and the Data Management Integration Office (DMIO)to interpret this information into a cohesive process that can be communicated to the human research organization. PP&C and DMIO have been exploring training opportunities to facilitate understanding through the form of infographics. This communication tool combines eye-catching visuals and text making complex information and data more digestible and shareable. The infographic poster tells a short story about a federally awarded grant and is intended to help both the new and experienced HRP workforce understand the timeline for a research procurement and where their specific tasks fall within the 4 phases of the grant lifecycle. The Pre-Award, Award, Post-Award, and Closeout phases are overlayed with business swimlanes so HRP stakeholders can see where they fit into the timeline rather than working in an isolated part. This includes the Chief Scientist Office (CSO), PP&C, the Data Management Integration Office (DMIO), the Principal Investigator (PI), the Element stakeholders, the LSDA Archivists, and the Research & Operations Integration (ROI) team along with the stakeholders in the Human Health and Performance Directorate. Additionally, the poster introduces (1) the HRP Data Integration Schedule identified in the HRP Data Management Plan HRP-48047, Table 8-2 and (2) a Smartsheet Solution to automate the grants tracking business process. Emphasis is given to the Data Integration Schedule which is the basis for the milestone tasks that are to be completed during the Post-Award phase in the grant lifecycle. The poster is also an opportunity to present the Smartsheet Solution, a software collaboration and work management tool used to assign tasks and track project progress. This PP&C FY24 effort will facilitate an end-to-end solution to track grants and provide insight to the health of HRP grant research procurements using metrics, reports, and dashboards.

J Peace↗

Bromocriptine increased operant responding for high fat food but decreased chow intake in both obesity-prone and resistant rats

Dopamine (DA) and DAD{sub 2} receptors (D2R) have been implicated in obesity and are thought to be involved in the rewarding properties of food. Osborne-Mendel (OM) rats are susceptible to diet induced obesity (DIO) while S5B/P (S5B) rats are resistant when given a high-fat diet. Here we hypothesized that the two strains would differ in high-fat food self-administration (FSA) and that the D2R agonist bromocriptine (BC) would differently affect their behavior. Ad-libitum fed OM and S5B/P rats were tested in a FSA operant chamber and were trained to lever press for high-fat food pellets under a fixed-ratio (FR1) and a progressive ratio (PR) schedule. After sixteen days of PR sessions, rats were treated with three different doses of BC (1, 10 and 20 mg/kg). No significant differences were found between the two strains in the number of active lever presses. BC treatment (10 mg/kg and 20 mg/kg) increased the number of active lever presses (10 mg/kg having the strongest effect) whereas it decreased rat chow intake in the home cage with equivalent effects in both strains. These effects were not observed on the day of BC administration but on the day following its administration. Our results suggest that these two strains have similar motivation for procuring high fat food using this paradigm. BC increased operant responding for high-fat pellets but decreased chow intake in both strains, suggesting that D2R stimulation may have enhanced the motivational drive to procure the fatty food while correspondingly decreasing the intake of regular food. These findings suggest that susceptibility to dietary obesity (prior to the onset of obesity) may not affect operant motivation for a palatable high fat food and that differential susceptibility to obesity may be related to differential sensitivity to D2R stimulation.

60 APPLIED LIFE SCIENCES↗

Status and Outlook for the U.S. Non-Automotive Fuel Cell Industry: Impacts of Government Policies and Assessment of Future Opportunities

Fuel cells (FCs) are considered essential future energy technologies by developed and developing economies alike. Several countries, including the United States, Japan, Germany, and South Korea have established publicly funded R&D and market transformation programs to develop viable domestic FC industries for both automotive and non-automotive applications. Important non-automotive applications include large scale and small scale distributed combined heat and electrical power, backup and uninterruptible power, material handling and auxiliary power units. The U.S. FC industry is in the early stages of development, and is working to establish sustainable markets in all these areas. To be successful, manufacturers must reduce costs, improve performance, and overcome market barriers to new technologies. U.S. policies are assisting via research and development, tax credits and government-only and government-assisted procurements. Over the past three years, the industry has made remarkable progress, bringing both stack and system costs down by more than a factor of two while improving durability and efficiency, thanks in part to government support. Today, FCs are still not yet able to compete in these markets without continued policy support. However, continuation or enhancement of current policies, such as the investment tax credit and government procurements, together with continued progress by the industry, appears likely to establish a viable domestic industry within the next decade.

30 DIRECT ENERGY CONVERSION↗

Lessons Learned From The 200 West Pump And Treatment Facility Construction Project At The US DOE Hanford Site - A Leadership For Energy And Environmental Design (LEED) Gold-Certified Facility

CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built in an accelerated manner with American Recovery and Reinvestment Act (ARRA) funds and has attained Leadership in Energy and Environmental Design (LEED) GOLD certification, which makes it the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. There were many contractual, technical, configuration management, quality, safety, and LEED challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility. This paper will present the Project and LEED accomplishments, as well as Lessons Learned by CHPRC when additional ARRA funds were used to accelerate design, procurement, construction, and commissioning of the 200 West Groundwater Pump and Treatment (2W P&T) Facility to meet DOE's mission of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Power Supply Changes for NSTX Resistive Wall Mode Coils

The National Spherical Torus Experiment (NSTX) has been designed and installed in the existing facilities at Princeton Plasma Physics Laboratory (PPPL). Most of the hardware, plant facilities, auxiliary sub-systems, and power systems originally used for the Tokamak Fusion Test Reactor (TFTR) have been used with suitable modifications to reflect NSTX needs. Prior to 2004, the NSTX power system was feeding twelve (12) circuits in the machine. In 2004 the Resistive Wall Mode (RWM) Coils were installed on the machine to correct error fields. There are six of these coils installed around the machine in the mid-plane. Since these coils need fast and accurate controls, a Switching Power Amplifier (SPA) with three sub-units was procured, installed and commissioned along with other power loop components. Two RWM Coils were connected in series and fed from one SPA sub-unit. After the initial RWM campaign, operational requirements evolved such that each of the RWM coils now requires separate power and control. Hence a second SPA with three sub-units has been procured and installed. The second unit is of improved design and has the controls and power components completely isolated. The existing thyristor rectifier is used as DC Link to both of the Switching Power Amplifiers. The controls for the RWM are integrated into the overall computer control of the DC Power systems for NSTX. This paper describes the design changes in the RWM Power system for NSTX.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Lessons Learned from the 200 West Pump and Treatment Facility Construction Project at the US DOE Hanford Site - A Leadership for Energy and Environmental Design (LEED) Gold-Certified Facility

CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy’s (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built to an accelerated schedule with American Recovery and Reinvestment Act (ARRA) funds. There were many contractual, technical, configuration management, quality, safety, and Leadership in Energy and Environmental Design (LEED) challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility to meet DOE’s mission objective of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012. The project team’s successful integration of the project’s core values and green energy technology throughout design, procurement, construction, and start-up of this complex, first-of-its-kind Bio Process facility resulted in successful achievement of DOE’s mission objective, as well as attainment of LEED GOLD certification, which makes this Bio Process facility the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cost Control Best Practices for Net Zero Energy Building Projects: Preprint

For net zero energy (NZE) buildings to become the norm in commercial construction, it will be necessary to design and construct these buildings cost effectively. While industry leaders have developed workflows (for procurement, design, and construction) to achieve cost-effective NZE buildings for certain cases, the expertise embodied in those workflows has limited penetration within the commercial building sector. Documenting cost control best practices of industry leaders in NZE and packaging those strategies for adoption by the commercial building sector will help make the business case for NZE. Furthermore, it will promote market uptake of the innovative technologies and design approaches needed to achieve NZE. This paper summarizes successful cost control strategies for NZE procurement, design, and construction that key industry users (such as building owners, architects, and designers) can incorporate into their everyday workflows. It will also evaluate the current state of NZE economics and propose a path forward for greater market penetration of NZE buildings. By demonstrating how to combine NZE technologies and design approaches into an overall efficiency package that can be implemented at minimal (zero, in certain cases) incremental capital cost, the domain of NZE design and construction can be expanded from a niche market to the commercial construction mainstream.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

High Performance Residential Housing Units at U.S. Coast Guard Base Kodiak: Preprint

The United States Coast Guard (USCG) constructs residential housing throughout the country using a basic template that must meet the minimum Leadership in Energy and Environmental Design (LEED) Silver criteria or better for the units. In Kodiak, Alaska, USCG is procuring between 24 and 100 residential multi-family housing units. Priorities for the Kodiak project were to reduce overall energyconsumption by at least 20% over existing units, improve envelope construction, and evaluate space heating options. USCG is challenged with maintaining similar existing units that have complicated residential diesel boilers. Additionally, fuel and material costs are high in Kodiak. While USCG has worked to optimize the performance of the housing units with principles of improved buildingenvelope, the engineers realize there are still opportunities for improvement, especially within the heating, ventilation, and air conditioning (HVAC) system and different envelope measures. USCG staff also desires to balance higher upfront project costs for significantly reduced life-cycle costs of the residential units that have an expected lifetime of 50 or more years. To answer thesequestions, this analysis used the residential modeling tool BEoptE+ to examine potential energy- saving opportunities for the climate. The results suggest criteria for achieving optimized housing performance at the lowest cost. USCG will integrate the criteria into their procurement process. To achieve greater than 50% energy savings, USCG will need to specify full 2x 6 wood stud R-21 insulationwith two 2 inches of exterior foam, R-38 ceiling insulation or even wall insulation in the crawl space, and R-49 fiberglass batts in a the vented attic. The air barrier should be improved to ensure a tight envelope with minimal infiltration to the goal of 2.0 ACH50. With the implementation of an air source heat pump for space heating requirements, the combination of HVAC and envelope savings inthe residential unit can save up to 58% in source energy over existing residential units.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The Geography of Green Power

Green power refers to the voluntary purchase of renewable electricity by retail electricity customers. Green power is unlike compliance-based renewable energy procurement imposed by law or regulation. In 2016, over six million customers procured about 95 million megawatt-hours (MWh) of green power in the United States, which represents about 28% of all U.S. renewable energy sales, excluding large hydropower. In this fact sheet, we use available data to illustrate the geography of green power demand (in terms of number of customers) and supply (in terms of MWh of generation) by state.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Chapter 4 - Environmental Sustainability Aspects of Forest Biomass Mobilisation. In the book Mobilisation of Forest Bioenergy in the Boreal and Temperate Biomes

The environmental sustainability of forest biomass procurement needs to be well understood, as the capacity of ecosystems to provide biomass without negative impacts on ecological functioning limits the biomass potential. Emerging bioenergy markets typically first take advantage of secondary residue streams of various wood processing industries and tertiary end-of-life residues. The use of these secondary and tertiary wood resources is not likely to compromise the environmental sustainability of forests. When these resources in any region become scarce or fully utilized, primary residues (i.e., by-products of forestry harvesting operations and silvicultural practices) such as branches, tops, and non-merchantable trees become increasingly targeted as feedstock sources. Forest biomass procurement in the boreal and temperate biomes should therefore not be analyzed as a stand-alone activity, but rather as an intensification of land use and of forest management, in which tree parts and trees are harvested in addition to conventional forest product fractions. Thus, principles of protection and sustainability should remain the same whether forests are managed for conventional forest products only or also for biomass for energy. Some modifications may be needed to properly identify and find mitigation strategies for sensitive conditions where field evidence suggests that the incremental removal of biomass or other forms of intensive management may not be sustainable. Silvicultural practices such as fertilization, competition control, and soil preparation are options to manage the microenvironment, tree growing conditions, and prevent or mitigate negative impacts. Moreover, landscape management regulations should be put in place to ensure that sufficient biodiversity-important features such as dead wood, aging stands, corridors, etc. are preserved. Special attention should then be directed to trees and stands with high biodiversity values or those important for maintaining ecosystem services which, without a bioenergy market, would have been left uncut. Applying the concept of adaptive forest management, ecological monitoring following harvesting operations, scientific field testing and modeling should be combined to produce better knowledge that could help improve practices. The forestry sector needs to start adapting to a future situation where it is expected to provide conventional forest products, biomaterials and bioenergy. To achieve this, good governance mechanisms such as landscape-level land use planning and science-based improvements of practices will become increasingly important to ensure sustainable forest product supply chains.

09 BIOMASS FUELS↗

Constant Rate Production: DOE Approach to Meeting NASA Needs for RPS for Nuclear-Enabled Launches.

The use of radioisotope power systems (RPS) for nuclear-enabled NASA missions is a long-standing arrangement between DOE and NASA. The requirements for the power system come from NASA, while DOE performs the procurement, fueling, testing and delivery. Recent examples include Mars Science Laboratory and New Horizons. A challenge has been interplay between the schedule for RPS availability from DOE versus the schedule NASA has for competitively selected missions. By mutual agreement, the actual operations to procure an RPS and prepare it for fueling, has always waited until the final selection of a mission. This timeline for a New Frontiers class mission leaves approximately 5-6 years from the time of final mission selection to the actual launch date. The number of RPS used for a Frontier class mission can be 1 to 3 units, i.e., the recent New Frontiers-2025 announcement of opportunity published in December 2016. If 1 or 2 units are needed for a specific mission, the timeline from the decision point to the launch date is a challenge, but doable. The activities taking place in this timeframe would include manufacturing the power system, producing the fuel, and performing the assembly/testing and delivery operations. If the mission selected requires 3 RPS the logistics of accomplishing all activities during the 5-6 years is problematic. The challenge involves appropriate resourcing for plutonium production, heat source production and assembly/testing operations. Typically, the time between RPS-enabled missions involve staffing attrition and reduction at the heat source production and the assembly/testing facilities that can be down to 60-75 percent of peak staffing levels to reduce costs. The duration for increasing staffing in these areas, which includes hiring, nuclear workforce training and obtaining the appropriate security clearance is 2 years. Taking account for this 2 years and the 6 months prior to launch arrival of the RPS at Kennedy Space Center erodes too much of the 5-6 years to comfortably support the use of 3 RPS on a mission and doesn't leave much schedule margin for a 2 RPS unit mission. To provide better support for NASA nuclear-enabled missions a different approach was devised, constant rate production. This involves a higher level of base capability at Los Alamos National Laboratory (LANL), Idaho National Laboratory (INL) and Oak Ridge National Laboratory (ORNL) to provide a stabilized work force. This will enable 10-15 heat sources to be produced annually at LANL, and subsequently shipped to the INL to be placed into a stable intermediate form that enables storage for up to several years that leads to quick production of general purpose heat source modules when a mission is selected. The up-front production of Pu-238 at ORNL is maintained so that there is material constantly in the pipeline. Production of key specialized components at ORNL is also maintained using this model. This allows for a reduction of risk to the nuclear-enabled missions, yet always having quantities of hardware available “on the shelf” to support production of RPS for NASA.

99 GENERAL AND MISCELLANEOUS↗

The Geography of Green Power (2017 Data)

Green power refers to the voluntary purchase of renewable electricity by retail electricity customers, as opposed to renewable energy procurement to comply with mandates imposed by law or regulation. In 2017, over five million customers procured about 113 million megawatt-hours (MWh) of green power in the United States, which represents about 27% of all U.S. renewable energy sales, excluding large hydropower. In this fact sheet, we use available data to illustrate the geography of green power demand (in terms of number of customers) and supply (in terms of MWh of generation) by state.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Utility Green Tariff Programs in the U.S.: Overview and Opportunities for Cost Savings

Federal agencies may want to procure renewable energy from an off-site generator. Green tariffs allow large utility customers in traditionally regulated states to procure renewable energy from their utility through a special tariff for energy from a specific renewable energy project, typically through a long-term contract. Some of these green tariffs provide customers with cost savings. The webinar will explain how these tariffs are structured, how to evaluate cost savings potential and what agencies need to consider when examining this purchasing option.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗