Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PROCESSING EQUIPMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Space processing applications payload equipment study. Volume 2D: SPA supplemental power and heat rejection kit

The design and application of a supplementary power and heat rejection kit for the Spacelab are discussed. Two subsystems of electric power and thermal control were analyzed to define the requirements for the power and heat rejection kit (PHRK). Twelve exemplary experiments were defined and power timelines were developed. From these timeline, the experiment requirements for sustained power, peak power, and energy were determined. The electrical power subsystem of the PHRK will consist of two fuel cells, oxygen and hydrogen reactant tank assemblies, water storage tanks, plumbing, cabling, and inverters to convert the nominal 28 volt dc fuel cell output to ac power.

Hammel, R. L.↗

Custom Equipment Development for Processing of Surplus Plutonium

The Strategic Laboratory Assessment (SLA), a collaborative team of SRNL and ORNL personnel, has been established to advance the objectives of the Surplus Plutonium Disposition (SPD) Project, by identifying and developing technologies to accelerate disposition, reduce life cycle costs, minimize worker radiation exposure, improve worker safety, and minimize Surplus Plutonium Disposition Program risks. [1] The SLA team has identified can cutting and plutonium (Pu) oxide size reduction as two glovebox processes where technology enhancements would be valuable. The DOESTD-3013 package currently in use for Pu downblending requires cutting two nested cans before the inner convenience can that holds the Pu oxide may be accessed for further processing. A rotary tubing-style cutter is used for opening the 3013 packages within the glovebox. Collet changeouts are required between cutting of the outer and inner cans. The SLA team is currently developing and testing an adjustable-clamp can cutter design that eliminates collet changeouts and allows cutting of the outer and inner can at the same time, resulting in significant reduction of radiological dose and process time, as well as improved ergonomics. To meet the Pu oxide particle size requirement, size reduction of Pu oxide agglomerations must be performed within the process gloveboxes. The SLA team has identified jaw crushing technology as an alternative to the currently employed rotary mill. Jaw crusher advantages include reduced dust within the glovebox, increased batch sizes, and easier integration with other glovebox processes due to the flow-through nature of jaw crushing. Commercially manufactured jaw crushers are either too large and/or too heavy for implementation in the SPD gloveboxes, so the SLA team is developing and testing a custom jaw crusher to meet the needs of the SPD Project.

Krementz, Daniel [Savannah River National Laborato↗

Design of a telescoping tube system for access and handling equipment

Spacecraft processing presents unique problems for the design of ground support equipment. A telescoping tube system consists of a number of nested structural tubes that can be extended and retracted (telescoped) while supporting a load. A typical telescoping tube system provides lateral, torsional, and vertical support for an access platform. Several concepts for improved telescoping tubes were developed with emphasis placed on reliability, ease of maintenance, and cost effectiveness. The most promising prototype design utilizes adjustable rollers running on tracks bolted to the tube sections. A wire rope deployment system ensures that all tube sections are controlled during extension and retraction. Track shimming and roller adjustment allow for fabrication of a high precision tube assembly that does not require extensive machining or unusually large shop equipment. The use of rolling contact eliminates the contamination problems encountered with sliding tubes in previous designs. The prototype design is suitable for indoor or outdoor use. A prototype tube assembly was fabricated and tested for strength, stiffness, maintainability, and endurance.

Littlefield, Alan C.↗

High Throughput Solvent-free Manufacturing of Battery Electrodes

The project goal is to develop and demonstrate an advanced solvent-free lithium-ion battery electrode process through proposed Advanced Dry Electrode Process (ADEP) equipment, which is expected to exhibit a better binder fibrillization and high throughput and suitable for high performance electrode manufacturing, and commonize the anode and cathode dry processing equipment, supply chain and operation for lithium-ion battery OEMs for replacing the solvent-based slurry casting. Our proposed approach will facilitate low-cost battery production by addressing the following gaps in present dry electrode processing: • Extend the dry electrode fabrication process to lithium-ion battery anode manufacturing • Increase the active material content for anodes and cathodes • Intensify the process through improved mixing, powder rheology and surface modifications • Enable processing of next-generation electrode materials that are not stable to solvent or ambient air exposure. The project objectives include the development of anode-compatible binder and binder fibrillization promoter for low irreversible capacity loss, low electrode binder content yet higher film mechanical strength, and the optimization of solvent-free anode and cathode process for low cost (>60% electrode cost reduction), high performance (10% increase in energy density without sacrificing cycle life) and high throughput to enable next generation lithium-ion battery electrode production. Solvent-free electrode manufacturing will also enable next-generation cell designs based on prelithiated anodes or solid-state electrolytes.

25 ENERGY STORAGE↗

EFRT M-12 Issue Resolution: Comparison of Filter Performance at PEP and CUF Scale

Pacific Northwest National Laboratory (PNNL) has been tasked by Bechtel National Inc. (BNI) on the River Protection Project-Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to perform research and development activities to resolve technical issues identified for the Pretreatment Facility (PTF). The Pretreatment Engineering Platform (PEP) was designed and constructed and is to be operated as part of a plan to respond to issue M12, Undemonstrated Leaching Processes. The PEP is a 1/4.5-scale test platform designed to simulate the WTP pretreatment caustic leaching, oxidative leaching, ultrafiltration solids concentration, and slurry washing processes. The PEP replicates the WTP leaching processes using prototypic equipment and control strategies. The PEP also includes non-prototypic ancillary equipment to support the core processing. Two operating scenarios are currently being evaluated for the ultrafiltration process (UFP) and leaching operations. The first scenario has caustic leaching performed in the UFP-2 ultrafiltration feed vessels (i.e., vessel UFP-VSL-T02A in the PEP and vessels UFP-VSL-00002A and B in the WTP PTF). The second scenario has caustic leaching conducted in the UFP-1 ultrafiltration feed-preparation vessels (i.e., vessels UFP-VSL-T01A and B in the PEP; vessels UFP-VSL-00001A and B in the WTP PTF). In both scenarios, 19-M sodium hydroxide solution (NaOH, caustic) is added to the waste slurry in the vessels to leach solid aluminum compounds (e.g., gibbsite, boehmite). Caustic addition is followed by a heating step that uses direct injection of steam to accelerate the leach process. Following the caustic leach, the vessel contents are cooled using vessel cooling jackets and/or external heat exchangers. The main difference between the two scenarios is that for leaching in UFP1, the 19-M NaOH is added to un-concentrated waste slurry (3 to 8 wt% solids), while for leaching in UFP2, the slurry is concentrated to nominally 20 wt% solids using cross-flow ultrafiltration before the addition of caustic. The work described in this report presents filter flux results obtained at two different scales based on tests performed with a Hanford tank waste simulant. The tests were made at the lab-bench scale on a cold (i.e., designated for non-radioactive simulant test materials) Cells Unit Filter [CUF]) and in the Pretreatment Engineering Platform (PEP), which is a 1/4.5-scale mock-up of key PTF process equipment. One set of tests was conducted with the simulant feed (low solids), and one test was conducted at a relatively high solids concentration. The results of these tests are compared to support a scale factor for use in the WTP.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

EFRT M-12 Issue Resolution: Caustic-Leach Rate Constants from PEP and Laboratory-Scale Tests

Pacific Northwest National Laboratory (PNNL) has been tasked by Bechtel National Inc. (BNI) on the River Protection Project-Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to perform research and development activities to resolve technical issues identified for the Pretreatment Facility (PTF). The Pretreatment Engineering Platform (PEP) was designed, constructed and operated as part of a plan to respond to issue M12, “Undemonstrated Leaching Processes” of the External Flowsheet Review Team (EFRT) issue response plan.( ) The PEP is a 1/4.5-scale test platform designed to simulate the WTP pretreatment caustic leaching, oxidative leaching, ultrafiltration solids concentration, and slurry washing processes. The PEP replicates the WTP leaching processes using prototypic equipment and control strategies. The PEP also includes non-prototypic ancillary equipment to support the core processing. The work described in this report addresses caustic leaching under WTP conditions, based on tests performed with a Hanford waste simulant. Because gibbsite leaching kinetics are rapid (gibbsite is expected to be dissolved by the time the final leach temperature is reached), boehmite leach kinetics are the main focus of the caustic-leach tests. The tests were completed at the laboratory-scale and in the PEP, which is a 1/4.5-scale mock-up of key PTF process equipment. Two laboratory-scale caustic-leach tests were performed for each of the PEP runs. For each PEP run, unleached slurry was taken from the PEP caustic-leach vessel for one batch and used as feed for both of the corresponding laboratory-scale tests.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

EFRT M-12 Issue Resolution: Caustic Leach Rate Constants from PEP and Laboratory-Scale Tests

Testing Summary Pacific Northwest National Laboratory (PNNL) has been tasked by Bechtel National Inc. (BNI) on the River Protection Project-Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to perform research and development activities to resolve technical issues identified for the Pretreatment Facility (PTF). The Pretreatment Engineering Platform (PEP) was designed and constructed and is to be operated as part of a plan to respond to issue M12, “Undemonstrated Leaching Processes.” The PEP is a 1/4.5-scale test platform designed to simulate the WTP pretreatment caustic leaching, oxidative leaching, ultrafiltration solids concentration, and slurry washing processes. The PEP replicates the WTP leaching processes using prototypic equipment and control strategies. The PEP also includes non-prototypic ancillary equipment to support the core processing. Two operating scenarios are currently being evaluated for the ultrafiltration process (UFP) and leaching operations. The first scenario has caustic leaching performed in the UFP-2 ultrafiltration feed vessels (i.e., vessel UFP-VSL-T02A in the PEP and vessels UFP-VSL-00002A and B in the WTP PTF). The second scenario has caustic leaching conducted in the UFP-1 ultrafiltration feed preparation vessels (i.e., vessels UFP-VSL-T01A and B in the PEP; vessels UFP-VSL-00001A and B in the WTP PTF). In both scenarios, 19-M sodium hydroxide solution (NaOH, caustic) is added to the waste slurry in the vessels to leach solid aluminum compounds (e.g., gibbsite, boehmite). Caustic addition is followed by a heating step that uses direct injection of steam to accelerate the leaching process. Following the caustic leach, the vessel contents are cooled using vessel cooling jackets and/or external heat exchangers. The main difference between the two scenarios is that for leaching in UFP-1, the 19-M NaOH is added to un-concentrated waste slurry (3 to 8 wt% solids), while for leaching in UFP-2, the slurry is concentrated to nominally 20 wt% solids using cross-flow ultrafiltration before adding caustic. The work described in this report addresses the kinetics of caustic leach under WTP conditions, based on tests performed with a Hanford waste simulant. The tests were completed at the lab-scale and in the PEP, which is a 1/4.5-scale mock-up of key PTF process equipment. The purpose of this report is to summarize the results from both scales that are related to caustic leach chemistry to support a scale-up factor for the submodels to be used in the G2 model, which predicts WTP operating performance. The scale-up factor will take the form of an adjustment factor for the rate constant in the boehmite leach kinetic equation in the G2 model.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Equipment Testing Environment (ETE) Process Specification

This document is intended to be utilized with the Equipment Test Environment being developed to provide a standard process by which the ETE can be validated. The ETE is developed with the intent of establishing cyber intrusion, data collection and through automation provide objective goals that provide repeatability. This testing process is being developed to interface with the Technical Area V physical protection system. The document will overview the testing structure, interfaces, device and network logging and data capture. Additionally, it will cover the testing procedure, criteria and constraints necessary to properly capture data and logs and record them for experimental data capture and analysis.

97 MATHEMATICS AND COMPUTING↗

Standard Materials and Processes Requirements for Spacecraft

This NASA Technical Standard is directed toward materials and processes (M&P) used in the design, fabrication, and testing of space program flight hardware for NASA, including but not limited to crewed, uncrewed, robotic, launch vehicle, lander, in-space and surface systems, and spacecraft program/project hardware elements. All spaceflight hardware is covered by the M&P requirements of this document, including vendor-designed, off-the-shelf, and vendor-furnished items. M&P used in interfacing ground support equipment (GSE), test equipment, hardware processing equipment, hardware packaging, and hardware shipment is covered by the M&P requirements of this NASA Technical Standard only to the extent required to prevent damage to or contamination of spaceflight hardware (see section 4). M&P used in NASA aircraft and aircraft operations are not covered by the M&P requirements of this document.

Materials↗

Human Systems Integration: Managing Risk in Anesthesia

The practice of anesthesia relies on clinicians’ ability to safely manage increasingly complex equipment. Devices such as ventilators, drug infusion pumps, and physiologic monitors use sophisticated algorithms to deliver care, but most clinicians are only trained to manage automated systems during normal operation. Few if any receive training on how to manage system failures. Although manufacturers are required to consult with human factors engineers as part of the equipment design process, most pieces of equipment are ultimately brought to market without extensive input from clinicians. Systems in the operating room can be as simple as an oxygen tank, or as complex as a multi-institutional healthcare organization. Humans are also a complex system, and play a critical role in the domains of operations, design, fabrication, maintenance, repair, and ultimately, dismantling and closeout. HSI seeks to provide a means for advocating the human side of the system. Human Systems Integration (HSI) is the cross disciplinary process used as part of the Systems Engineering process to reduce risk in systems. HSI professionals consider the human, hardware, and software elements of system design to optimize system performance and improve safety. HSI professionals work in domains of study that include training, management, human factors engineering, safety, and occupational health, among others. This article discusses the role of systems in the practice of anesthesia, and how consideration of the human during all phases of the system life cycle helps manage risks and promote a better patient outcome.

Human Factors↗

Solar-Cell-Junction Processing System

System under development reduces equipment costs. Processing system will produce solar-cell junctions on 4 in. (10.2 cm) round silicon wafers at rate of 10 to seventh power per year. System includes non-mass-analyzed ion implanter, microcomputer-controlled, pulsed-electron-beam annealer, and wafertransport system with vacuum interlock. These features eliminate large, expensive magnet and plates, circuitry, and power source otherwise needed for scanning.

Bunker, S. N.↗

Development of Waste Disposal Strategy for RH LLW Stored in the ATR Canal - 19453

The Advanced Test Reactor (ATR), located at Idaho National Laboratory (INL), is 250 megawatt research reactor designed and operated for the United States Department of Energy for irradiation testing of advanced nuclear fuels and material samples. The pressurized light-water moderated and cooled reactor achieved criticality in 1967. It is designed to allow high neutron flux irradiation of structural materials and nuclear fuels to replicate long-term exposure of materials in traditional lower-flux reactor cores. The ATR also produces rare isotopes for the use in the medical and other industries. The ATR is one of only four reactors in the world with this high-flux irradiation capability. Adjacent to the ATR is a water-filled canal which is used to handle casks, prepare experiments, perform irradiation experiments, and store irradiated components generated from reactor operations. The canal is used to store irradiated (activated) metals that are subsequently determined to be waste. In many instances, these items are too radioactive to remove from the canal and remain in temporary storage until a sufficient decay period has elapsed to where they can be safely removed. The more highly-radioactive remote-handled (RH) waste items requiring hundreds of years to decay have been in storage in the canal since the first ATR core internal changeout (CIC) which was conducted in the 1970's. The INL has recently completed construction and startup of a new Remote-Handled Low-Level Waste (RH LLW) Disposal Facility, which will serve as the final disposal capability for legacy RH (greater than 200 mR/hr on contact) metal waste currently stored in the canal. The ATR will need to develop a method for packaging, characterizing, removing, and shipping this material to the new disposal facility. Based on the configuration of the new disposal cells at the RH LLW Disposal Facility, the ATR must produce an entire new process for handing and packaging the legacy RH waste and preparing it for transport and final disposal. The ATR Canal RH LLW Cleanup Project scope is to develop the processes, tools, and equipment for safely sizing, packaging, and removing RH LLW from the canal. This paper presents highlights and challenges the project faces to develop and implement this capability: - Designing new tools, fabricating new equipment, and implementing new processes at an active Hazard Category-I nuclear facility. - Ensuring new equipment and tools are compatible with the existing equipment and processes at both the generator and the disposal facilities. - Sizing legacy waste under water using remote tools and equipment to minimize void space in waste disposal canisters while ensuring as low as reasonably achievable (ALARA) goals are met. - Loading waste containers underwater and preparing them to meet the liquid-free criteria of the disposal facility waste acceptance criteria (WAC). - Providing a new shielded transport container to transfer waste from ATR to the new on-site RH LLW Disposal Facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Configurable Hardware And Software For Multiple Related Uses

Control Monitor Unit (CMU) is system of configurable hardware and software undergoing development for use in controlling and monitoring complex systems of equipment. Provides comprehensive array of capabilities for such functions as processing equipment-test data for calibration and diagnosis, controlling operation of equipment in real time, simulating operation of equipment, and processing large streams of scientific-measurement data. Automates many of ground operations involved in preparing and testing spacecraft prior to launch. Also useful in variety of similar applications; for example, testing aircraft, ships, power plants, and automated production lines.

Uhrlaub, David R.↗

Industrializing Offshore Wind Power with Serial Assembly and Lower-cost Deployment - Final Report

A team of engineers and contractors has developed a method to move offshore wind installation toward lower cost, faster deployment, and lower environmental impact. A combination of methods, some incremental and some breaks from past practice, interact to yield multiple improvements. Three designs were evaluated based on detailed engineering: 1) a 5 MW turbine on a jacket with pin piles (base case), 2) a 10 MW turbine on a conventional jacket with pin piles, assembled at sea, and 3) a 10 MW turbine on tripod jacket with suction buckets (caissons) and with complete turbine assembly on-shore. The larger turbine, assembly ashore, and the use of suction buckets together substantially reduce capital cost of offshore wind projects. Notable capital cost reductions are: changing from 5 MW to 10 MW turbine, a 31% capital cost reduction, and assembly on land then single-piece install at sea an additional 9% capital cost reduction. An estimated Design 4) estimates further cost reduction when equipment and processes of Design 3) are optimized, rather than adapted to existing equipment and process. Cost of energy for each of the four Designs are also calculated, yielding approximately the same percentage reductions. The methods of Design 3) analyzed here include accepted structures such as suction buckets used in new ways, innovations conceived but previously without engineering and economic validation, combined with new methods not previously proposed. Analysis of Designs 2) and 3) are based on extensive engineering calculations and detailed cost estimates. All design methods can be done with existing equipment, including lift equipment, ports and ships (except that design 4 assumes a more optimized ship). The design team consists of experienced offshore structure designers, heavy lift engineers, wind turbine designers, vessel operators, and marine construction contractors. Comparing the methods based on criteria of cost and deployment speed, the study selected the third design. That design is, in brief: a conventional turbine and tubular tower is mounted on a tripod jacket, in turn atop three suction buckets. Blades are mounted on the tower, not on the hub. The entire structure is built in port, from the bottom up, then assembled structures are queued in the port for deployment. During weather windows, the fully-assembled structures are lifted off the quay, lashed to the vessel, and transported to the deployment site. The vessel analyzed is a shear leg crane vessel with dynamic positioning like the existing Gulliver, or it could be a US-built crane barge. On site, the entire structure is lowered to the bottom by the crane vessel, then pumping of the suction buckets is managed by smaller service vessels. Blades are lifted into place by small winches operated by workers in the nacelle without lift vessel support. Advantages of the selected design include: cost and time at sea of the expensive lift vessel are significantly reduced; no jack up vessel is required; the weather window required for each installation is shorter; turbine structure construction is continuous with a queue feeding the weather-dependent installation process; pre-installation geotechnical work is faster and less expensive; there are no sound impacts on marine mammals, thus minimal spotting and no work stoppage Industrializing Offshore Wind Power 6 of 96 9 for mammal passage; the entire structure can be removed for decommissioning or major repairs; the method has been validated for current turbines up to 10 MW, and a calculation using simple scaling shows it usable up to 20 MW turbines.

17 WIND ENERGY↗

Kerfless Silicon Precursor Wafer Formed by Rapid Solidification: October 2009 - March 2010

1366 Direct Wafer technology is an ultra-low-cost, kerfless method of producing crystalline silicon wafers compatible with the existing dominant silicon PV supply chain. By doubling utilization of silicon and simplifying the wafering process and equipment, Direct Wafers will support drastic reductions in wafer cost and enable module manufacturing costs < $1/W. This Pre-Incubator subcontractenabled us to accelerate the critical advances necessary to commercialize the technology by 2012. Starting from a promising concept that was initially demonstrated using a model material, we built custom equipment necessary to validate the process in silicon, then developed sufficient understanding of the underlying physics to successfully fabricate wafers meeting target specifications. Thesewafers, 50 mm x 50 mm x 200 ..mu..m thick, were used to make prototype solar cells via standard industrial processes as the project final deliverable. The demonstrated 10% efficiency is already impressive when compared to most thin films, but still offers considerable room for improvement when compared to typical crystalline silicon solar cells.

14 SOLAR ENERGY↗

Biochemical Refining of Lignocellulose for Biofuels: Status and Prospects (Presentation)

Presentation describes progress to develop and demonstrate cost-competitive biochemical refining technologies, including recent progress at NREL to reduce the cost of converting cellulosic biomass to ethanol and new initiatives to convert biomass derived sugars to other advanced biofuels. The potential for process intensification to reduce capital equipment and process operating costs isillustrated. Remaining technical barriers and as-yet unrealized opportunities to stimulate biorefinery commercialization are discussed.

09 BIOMASS FUELS↗

Efficient and compact mobile equipment based on the new RADEON-NWM technology to process liquid radioactive wastes resulted from the accidents of the nuclear installations

During the operation of nuclear reactors important volume of liquid and solid radioactive wastes are generated, which, in normal conditions, becomes processed by stationary equipment by different methods to minimize their volume and then sent to specially constructed storages. The cases of accidents of Chernobyl and Fukushima showed that the localization of rejected big quantity of radioactive wastes is a prior problem for their further processing by stationary equipment. In this regard it is very important the processing of radioactive wastes on the contaminated areas to localize them by mobile equipment based on the efficient technologies. RADEONNWM new technology allows resolving this problem. This technology is compact, completely automated, which makes possible to assemble it on a standard 40-ft by 7-ft trailer driven by heavy-duty truck. The new technology is fully elaborated, the necessary tests are conducted. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗