Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PERFORMANCE TESTING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Annual Performance Testing of Tracer Gas Detectors for use in Radionuclide NESHAP Compliance Testing

Los Alamos National Laboratory’s (LANL’s) compliance with Radionuclide NESHAP0F 1 regulations is managed by the Radioactive Air Emissions Management (RAEM) team, part of LANL’s Compliance Programs group (EPC-CP). One area of the Radionuclide NESHAP addresses requirements for siting a stack sample system. Prior to commissioning a new stack sampling system, the ANSI Standard for stack sampling requires that the stack sample location must meet several criteria, including uniform mixing of tracer gas (sulfur hexafluoride, SF 6 ) and tracer aerosol (liquid oil droplets) in the air stream. This memorandum will specifically focus on the tracer gas portion of the ANSI Standard. For these mix tests, tracer gas is injected into the stack air stream and the resulting air concentrations are measured across the plane of the stack at the proposed sampling location. The coefficient of variation of the media concentration must be under 20% when evaluated over the central 2/3 area of the stack or duct.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Precision Time Protocol Performance Testing Over Optical Transport Network

The US Department of Energy Office of Electricity has partnered with Oak Ridge National Laboratory (ORNL) to find alternative precision timing solutions for the nation’s power grid. This effort is in response to the vulnerabilities identified in the Global Navigation Satellite System (GNSS), of which the US Global Positioning System (GPS) platform is a part. Additionally, Executive Order 139055 has highlighted the need for alternative or backup timing solutions. ORNL has established a Timing Lab and has been testing various technologies and timing devices as part of this effort. Precision Time Protocol (PTP), and the off-the-shelf timing devices and network connections that support it, are among the alternatives being tested. This work reports the accuracy of PTP over an Optical Transport Network (OTN) and is part of a series published by the Center for Alternative Synchronization and Timing (CAST).

24 POWER TRANSMISSION AND DISTRIBUTION↗

VLBI clock synchronization tests performed via the ATS-1 and ATS-3 satellites

Clock synchronization experiments were carried out May 10 to June 10, 1971, by the NASA/Goddard Space Flight Center and the Smithsonian Astrophysical Observatory via the ATS-1 and 3 geostationary satellites at the NASA tracking stations Rosman and Mojave, during a VLBI (Very Long Baseline Interferometer) experiment in order to determine the clock-offset between the two stations. Ten microsecond pulses at C-band with very sharp risetime were exchanged by the two stations through the dual transponders of the satellites. At each station, a time-interval counter was started by the transmitted pulse and stopped by the received pulse. The probable error of the difference in the mean values of the clock-offset is 10 nanoseconds.

Ramasastry, J.↗

Performance testing of thermoelectric generators at JPL

Several thermoelectric generators, ranging in output power from 170 watts to microwatts, are undergoing testing at JPL. They represent a wide range of technologies using advanced PbTe, SiGe and cascaded PbTe and BiTe thermoelectric materials. Several of these generators are of an advanced concept while others are representative of the Nimbus, Transit, Viking and the multi-hundred-watt (MHW) technology. Of interest is the behavior of generators which have been tested for times in excess of 60,000 hours.

Rouklove, P.↗