Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Operations coordination plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Task Allocation for Single Pilot Operations: A Role for the Ground

Researchers at NASA Ames Research Center and NASA Langley Research Center are jointly investigating issues associated with potential configurations for an environment in which a single pilot, or reduced crew, might operate. The research summarized in this document represents several of the efforts being put forth at NASA Ames Research Center. Specifically, researchers at NASA Ames Research Center coordinated and hosted a technical interchange meeting in order to gain insight from members of the aviation community. A description of this meeting and the findings are presented first. Thereafter, plans for ensuing research are presented.

Johnson, Walter↗

Hydropower Role in a Power Grid with a High Proportion of Variable Renewables

The importance of hydropower increases as the power grid evolves with the higher variable renewable contribution. As conventional thermal power plants are retired, the importance of hydropower contribution increases to balance the variability of solar and wind generation. However, reservoir water resources are constrained by multiple constraints, and variability of water inflow to the reservoirs creates limitations to dam water releases for power grid needs. Coordination of multiple tools, including water resources modeling, ecological modeling, and technical and economic power grid modeling, informs dam water releases. Better representation of ecological constraints and other water use details in the suit of power grid models are required to identify the hydropower flexibility to provide multiple power grid services. Impacts of water planning and hydropower operation changes to a power grid are better understood by production cost model simulations with technical and economic data, including unserved energy, reserve failures, transmission congestion to serve load, and local marginal price increases. Similarly, PCM simulation of current and future projected power grid information, including LMP, and carbon emission rates, informs short-term water release plans and long-term investments for power plant upgrades for technical and ecological needs. Hydropower operations of several case studies are simulated to understand operation patterns, revenue, water release decisions in multiple time scales (month, day, minutes), hydropower contracts scheduling, and water variability impacts.

environmental↗

Use of Historical EM Practices and Policies for Management of Cleanup Program and Address GAO Concerns - 20222

As Department of Energy (DOE) Environmental Management (EM) program policies and management practices are revised over time, it might be useful to periodically reflect on the DOE EM program's past to identify practices that have worked and those that might be appropriate for possible reuse in the future. An added impetus to examine alternative approaches is the recent Government Accountability Office (GAO) report entitled 'Nuclear Waste Cleanup - DOE Could Improve Program and Project Management by Better Classifying Work and Following Leading Practices.' The February 2019 GAO report states that EM categorizes most of its work in a way that does not adequately involve independent experts and DOE senior leadership. It also noted that EM has not followed leading practices for program and project management that could help keep the cleanup efforts on schedule and control costs. The GAO report recommended that EM, working with DOE Office of Project Management (PM): - Establish requirements and then assess EM's ongoing operations activities to determine if some activities should be reclassified as capital asset projects based on these newly established requirements. - Review and revise EM's 2017 cleanup policy to include program management leading practices related to scope, cost, schedule performance, and independent reviews. - Update the cleanup policy to require that earned value management (EVM) systems be maintained and used in a way that follows EVM best practices. - Develop a policy to ensure that work is categorized as level of effort (LOE) only in appropriate, specified circumstances, such as when work is not measurable or when measurement is impractical. - Integrate EVM data into EM's performance metrics for operations activities. To assist with improving program performance and implementing audit recommendations, this paper reviewed past successful cleanups such as Weldon Springs, Rocky Flats, Fernald, Ashtabula, Battelle Columbus (abs, and other historical resources and people with experience during the early years of EM program. As such, there are several past practices which may well be suited for reuse today. Some of these practices include: - In 1990's, as the DOE EM cleanup program, known as Environmental Restoration came into effect, the known cleanup scope at each geographic location or site was organized into four levels ranging from overall site-wide cleanup effort to the individual 'release sites', providing high granularity to the program. - The cleanup program was organized by geography (Northwest, Southwest, Eastern Area Programs, etc.). These 'sub-program' managers provided a degree of Headquarters oversight and management allowing upper management (EM-1, 2, and 3) to focus on major decisions and issues. - Budget levels at selected cleanup sites were funded above 'minimum-safety' levels to accelerate actual cleanup work. - Past practice utilized EVM techniques and uniform EM oversight over all discrete project-like activities, providing for a coordinated cleanup effort. - EM managed LOE activities using benchmarking and best in class management practice techniques to help manage costs. - EM managed and reviewed entire site cleanup baselines, not only individual projects, focusing on a successful overall outcome. - Sites had a 'Road map' or 'Management Action Plan' that provided the overall strategy or plan for that site's cleanup - this helped with understanding and coordination of efforts. - EM had a robust lessons-learned program and database to capture and transmit worthy ideas. - EM had well-structured cleanup baseline change control policies to control cost and schedule changes, at the contractor and higher Headquarters levels. Finally, some of the GAO observations may be valid, however it is not clear as to their extent. For example, for some operation types of work, the use of the Level of Effort (LOE) earned value method to track progress may be appropriate. Also, to ensure independence of thought, and to obtain useful insight on past practices, it may be suitable to have former EM employees to assist with understanding past practices or to verify that activities have been properly identified. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Acquisition of Kerr Dam and Establishment of a Wholesale Power Generation Corporation to Operate It: Hiring of Power market Coordinator and Staff Engineer (Final Report)

This project aimed at supporting one key component of a major multi-step undertaking on the part of the CSKT: the acquisition of the Kerr Hydroelectric project and its subsequent operation as a wholesale power generation facility. This project provided support to kick-start the development of the organizational structure to acquire and operate the facility by acquiring critical expertise necessary for the acquisition by funding in part two key personnel for the first two years of the four-year organizational development process. These individuals provided the Tribes with expert knowledge in the highly specialized areas of resource balancing, power marketing, and hydro-engineering; essential prerequisites to the Tribes' ability to build an organization for the operation of the Kerr Project and to securing financial backing for the acquisition. Goals achieved: • Establishing an efficient and economic conveyance process, and transition plans • Establishing an efficient and effective Tribal wholesale power generation corporation to manage the plant, balance the resources, and market the power from the Kerr Project. The success of this project, which is essential to the Tribes' acquisition of the Kerr Hydroelectric facility, helps to address poverty and unemployment among Tribal members by generating a number of highly skilled and specialized, high-paying Tribal member jobs and providing a stream of income from power sales that will be used for Tribal economic development. Objectives achieved: The project supported the position of Power Plant Operations and Maintenance engineer and power marketing coordinator positions. These are key, in part, to the Tribes' successful acquisition and operation of the facility because they will enable to the Tribes to gain the very specialized expertise required to operate a large wholesale power generation facility. Specific objectives include: Objective 1: Hire a power marketing coordinator to develop and coordinate the appropriate power marketing strategy for the sale of power generated by the operation of Kerr Dam. Objective 2: Hire a staff engineer.

13 HYDRO ENERGY↗

The importance of capturing power system operational details in resource adequacy assessments

Traditional methods for assessing the resource adequacy (RA) of a power system are becoming obsolete due to emerging trends such as the increasing deployment of variable renewable energy and storage. Consequently, analysts are recommending that RA be assessed using a Monte Carlo simulation approach that models chronological power system operations over many instances of possible operating conditions. However, this approach is necessarily more complex and computationally demanding, which is an obstacle to real-world implementation. Here, in this study, we investigate which operational details of power systems are important to capture in order to accurately evaluate a system's RA, versus details that add complexity but do not meaningfully affect RA results. To do so, we develop a probabilistic RA assessment framework by adapting an existing production cost model and apply it to a case study based on the IEEE Reliability Test System. Our results indicate that multi-year data, storage dispatch, and transmission limits are key details to incorporate. Accurate RA results can be obtained using non-economic dispatch strategies as long as they are coordinated with detailed operational strategies. We also demonstrate how popular expectation-based RA metrics can mask important differences in the characteristics of loss of load events.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Evaluating the Impact of the 2017 Solar Eclipse on U.S. Western Interconnection Operations

With support from the U.S. Department of Energy (DOE) Solar Energy Technologies Office (SETO), the National Renewable Energy Laboratory (NREL) partnered with Peak Reliability to evaluate the impact of the August 21, 2017 total solar eclipse on the reliability and grid operations in the Western Electricity Coordinating Council (WECC) territory.

14 SOLAR ENERGY↗

A Methodology to Evaluate the Grid Reliability Impact of Oscillations Induced by Large Loads

The rapid growth of hyperscale AI data centers is bringing renewed attention to the reliability risk that sustained forced oscillations pose to bulk power systems, with cyclic computational workloads emerging as a new forcing source. Unlike the broadband, stochastic disturbances from traditional industrial loads such as arc furnaces, AI training and inference facilities can inject large active power swings concentrated at specific frequencies over extended durations - characteristics that existing grid planning practices do not account for. While the North American Electric Reliability Corporation (NERC) has recognized this gap and called for system-level studies of large load interconnections, no standardized methodology exists to screen, simulate, and quantify these risks at the planning stage. This report presents the Risk Assessment Tool for Large Load-induced Events (RATLLE), a Python-based, publicly available script suite developed at the Pacific Northwest National Laboratory to evaluate bulk power system reliability risks from data center-induced oscillations. RATLLE implements a three-module workflow: a screening module that identifies vulnerable interconnection locations and excitable system modes; a simulation module that models cyclic data center load behavior using a commercial positive sequence simulation platform; and an analysis module that computes risk metrics and generates interactive visualization dashboards. The risk metrics, formulated around simulation observables, map oscillation impacts to a three-stage severity scale spanning latent equipment fatigue through imminent cascading failure. The methodology is demonstrated on two Western Electricity Coordinating Council (WECC) system models: a publicly available 240-bus reduced representation and a detailed 2031 Heavy Winter planning case. Case studies illustrate that even modest 50 MW forced oscillations at resonant frequencies can produce wide-area power swings, N-1 security constraint violations, and cascading generator trips through protection actions - outcomes that would not occur under normal operating conditions without oscillations present. The results underscore the need for standardized oscillation impact assessment in large load interconnection studies and provide a reproducible, extensible framework for utilities to adopt or customize within their existing planning workflows.

Biswas, Shuchismita↗

OMS FDIR: Initial prototyping

The Space Station Freedom Program (SSFP) Operations Management System (OMS) will automate major management functions which coordinate the operations of onboard systems, elements and payloads. The objectives of OMS are to improve safety, reliability and productivity while reducing maintenance and operations cost. This will be accomplished by using advanced automation techniques to automate much of the activity currently performed by the flight crew and ground personnel. OMS requirements have been organized into five task groups: (1) Planning, Execution and Replanning; (2) Data Gathering, Preprocessing and Storage; (3) Testing and Training; (4) Resource Management; and (5) Caution and Warning and Fault Management for onboard subsystems. The scope of this prototyping effort falls within the Fault Management requirements group. The prototyping will be performed in two phases. Phase 1 is the development of an onboard communications network fault detection, isolation, and reconfiguration (FDIR) system. Phase 2 will incorporate global FDIR for onboard systems. Research into the applicability of expert systems, object-oriented programming, fuzzy sets, neural networks and other advanced techniques will be conducted. The goals and technical approach for this new SSFP research project are discussed here.

Taylor, Eric W.↗

Control Architecture for Robotic Agent Command and Sensing

Control Architecture for Robotic Agent Command and Sensing (CARACaS) is a recent product of a continuing effort to develop architectures for controlling either a single autonomous robotic vehicle or multiple cooperating but otherwise autonomous robotic vehicles. CARACaS is potentially applicable to diverse robotic systems that could include aircraft, spacecraft, ground vehicles, surface water vessels, and/or underwater vessels. CARACaS incudes an integral combination of three coupled agents: a dynamic planning engine, a behavior engine, and a perception engine. The perception and dynamic planning en - gines are also coupled with a memory in the form of a world model. CARACaS is intended to satisfy the need for two major capabilities essential for proper functioning of an autonomous robotic system: a capability for deterministic reaction to unanticipated occurrences and a capability for re-planning in the face of changing goals, conditions, or resources. The behavior engine incorporates the multi-agent control architecture, called CAMPOUT, described in An Architecture for Controlling Multiple Robots (NPO-30345), NASA Tech Briefs, Vol. 28, No. 11 (November 2004), page 65. CAMPOUT is used to develop behavior-composition and -coordination mechanisms. Real-time process algebra operators are used to compose a behavior network for any given mission scenario. These operators afford a capability for producing a formally correct kernel of behaviors that guarantee predictable performance. By use of a method based on multi-objective decision theory (MODT), recommendations from multiple behaviors are combined to form a set of control actions that represents their consensus. In this approach, all behaviors contribute simultaneously to the control of the robotic system in a cooperative rather than a competitive manner. This approach guarantees a solution that is good enough with respect to resolution of complex, possibly conflicting goals within the constraints of the mission to be accomplished by the vehicle(s).

Huntsberger, Terrance↗

Transition to Operations Support at the Community Coordinated Modeling Center

The Community Coordinated Modeling Center (CCMC) is a multi-agency partnership, which aims at the creation of next generation space weather models. The goal of the CCMC is to support the research and developmental work necessary to substantially increase the present-day modeling capability for space weather purposes, and to provide models for transition to the rapid prototyping centers at the space weather forecast centers. This goal requires close collaborations with and substantial involvement of the research community. The physical regions to be addressed by CCMC-related activities range from the solar atmosphere to the Earth's upper atmosphere. The CCMC is an integral part of the National Space Weather Program Implementation Plan, of NASA's Living With a Star (LWS) initiative, and of the Department of Defense Space Weather Transition Plan. CCMC includes a facility at NASA Goddard Space Flight Center, as well as distributed computing facilities provided by the US Air Force. CCMC also provides, to the research community, access to state-of-the-art space research models. This paper will focus on a status report on CCMC activities in support of model transition to operations at US space weather forecasting centers. In particular, an update will be given on past and present transition activities, on developments that address operational needs, and on future opportunities for transition-to-operations support.

Hesse, M.↗

Policy, Permit, Perform: Using City Benchmarking Data and Building Construction Permit History to Identify Energy Performance Improvements

The City of Portland (City) and Multnomah County 2015 Climate Action Plan targets a 40 percent reduction in carbon emissions below 1990 levels by 2030. To reach this goal, the plan includes a key objective to reduce the total energy use of existing buildings by 25 percent. Buildings are responsible for one-half of carbon emissions in Portland, Oregon, U.S., and improving their performance is critical to achieving the City’s climate goals. As part of its climate action planning, the City passed an ordinance on April 22, 2015, requiring commercial buildings 20,000 ft2 and larger to benchmark and disclose annual energy performance metrics through ENERGY STAR® Portfolio Manager® (ESPM), including greenhouse gas emissions, building energy use intensity (EUI) and ENERGY STAR scores. Twenty-five cities in the U.S. have adopted similar policies requiring energy benchmarking. These policies are generating a treasure trove of data about the drivers of building performance, but practitioners are only beginning to link benchmarking data to other datasets to produce actionable insight into improving building performance. In 2016, the City received a financial assistance award from the U.S. Department of Energy (DOE) through the Cities Leading through Energy Analysis and Planning project (Award Number DE-0007737). Portland’s project evaluated the application of the DOE Building Energy Asset Score Tool and rating system developed by Pacific Northwest National Laboratory (PNNL) to commercial buildings that report to the City. The City used building construction permit history to develop Asset Scores for a set of office buildings that reported energy performance for 2015 – the first year the City mandated energy benchmarking and reporting for commercial buildings 50,000 ft2 and larger. The primary project objective was to link energy benchmarking data and commercial building permit data to analyze commercial buildings systems that present the best, specific opportunities to improve energy performance. Integrating these datasets from two City departments, the Bureau of Development Services and the Bureau of Planning and Sustainability, could expand Portland’s use of analytics to inform climate policy decisions and strategic targeting of financial incentives for building owners and managers who are best positioned to improve the performance of their buildings. The project began with the commercial benchmarking data received for 340 commercial buildings that submitted calendar year 2015 energy reports. The City retained Research Into Action and Energy 350 (RIA team) to evaluate this self-reported benchmarking data. Based on a survey of 53 building managers, the RIA team found that most respondents used the City’s compliance tools, including a How-to Guide and Help Desk, and found access to utility data to be straightforward. However, almost one-third of the respondents encountered challenges when estimating the gross floor area (GFA), and some experienced confusion regarding the input of property use types and details into ESPM. Based on the RIA team’s recommendations, the City refined its How-to Guide, created online answers to frequently asked questions, and hosted office hour sessions to help building managers accurately characterize their building’s physical characteristics and operations in ESPM. Concurrently with the RIA team’s evaluation, the City worked with PNNL to estimate DOE Asset Score Preview (Preview) scores for 181 of the 340 commercial buildings that submitted ESPM reports to the City. Asset Score Tool is a web-based tool developed by PNNL for DOE to evaluate and rate the as-built energy efficiency of a building. Asset Score Tool’s full analysis capability runs a detailed energy model based on building geometry, age, envelope, lighting and mechanical systems using standard operating assumptions to give the building a score, similar to a miles per gallon rating for a car. Preview, a simplified deployment of the full Asset Score Tool, provides a preliminary score range using only seven data points, six of which are readily available in the ESPM benchmarking data. Analysis of the combined Preview scores and the operational ESPM scores identified buildings with a high potential for energy improvements through either retro-commissioning and retuning of existing operations or capital investments into building systems. The City contracted Whole Building Solutions (WBS) to mine building permit history and develop full Asset Scores for a subset of 26 office buildings that were eligible for both ENERGY STAR scores and Asset Scores. WBS researched permits and building plans to identify mechanical, lighting and envelope systems and other building characteristics necessary to complete Asset Scores. This historical data was recorded using the web-based Asset Score Tool, which evaluates the as designed energy efficiency of existing buildings. Much of this City information was available online after 2010; however, WBS had to search through microfiche files and the City’s database to obtain permit and plan history prior to 2010. Although building geometry, mechanical system type and basic envelope information was consistently identifiable, WBS found permit data gaps that prevented complete and accurate Asset Scores for most of the office buildings. If the City decides to develop Asset Scores based on building permit information in the future, WBS recommended requiring lighting plans, control diagrams and as-built drawings that reflect how the buildings are actually constructed. In addition, WBS recommended uploading plans and permits from microfiche storage into a more comprehensive, searchable database consistent with the City’s current online permit information. To identify the actual lighting types, WBS and City staff conducted site visits of all 26 office buildings. As part of managing the flow of ESPM and Asset Score data for the project, Earth Advantage, a sub-recipient of the Cities-LEAP award, created a DOE Standard Energy Efficiency Data (SEED) (USDOE 2018) instance for the City and used Asset Score’s Application Programming Interface (API) (Asset Score 2018) capabilities to develop two new features in the SEED Platform™: (1) automated Asset Score Preview ranges calculated based on benchmarking data and the City’s estimate of number of building floors; and (2) storage of full Asset Score information. Leveraging the construction permit history and site visit information for the 26 office buildings, The Cadmus Group (Cadmus) analyzed benchmarking data and Asset Score information to identify opportunities and drivers to improve performance. Correlation and regression analysis of the combined dataset was completed to determine whether building operations or specific systems – mechanical, lighting or envelope – present the best opportunities to improve energy performance. The central outcome of this project was Cadmus’ detailed analysis of the richer dataset that was created by combining the City of Portland’s commercial building permit activity and building-specific energy performance information based on metrics from ESPM and Asset Score Tool. Some of their findings collaborate with well-known facts, such as buildings with less efficient lighting systems are good targets for efficiency improvements through lighting upgrades. This analysis also helped identify that individual heating, ventilation, and air conditioning (HVAC) equipment efficiency does not necessarily correlate with building performance. However, overall HVAC system performance, as measured with the Total System Performance Ratio (TSPR) metric, is a better indicator of building performance (Goel et al. 2014). As a metric, TSPR considers whole system performance that includes equipment efficiency and system controls, such as resets for static pressure and chilled water setpoints, which can be more effective and financially feasible options for improving building performance. Given the high cost associated with envelope retrofits, opportunities to upgrade envelope insulation are likely to be limited. However, buildings with single-pane and non-thermal break windows are good candidates for window replacements, such as upgrading to double-pane windows with thermal breaks. This research project determined that developing Asset Scores based on site visits is preferable to mining City building permit data. In addition, the use of benchmarking data to develop Asset Score Preview Scores is recommended as a first step in engaging building managers to develop full Asset Scores. Asset Score Tool outputs can help building managers quickly identify opportunities for improvement and then work with the utility incentive administrator and energy service providers to develop their retrofit plan. Where full Asset Scores are available, analysis using a quadrant matrix with ENERGY STAR scores is recommended to identify buildings that present the best opportunities for operational-behavioral improvements versus ones with opportunities for upgrades to physical building systems. This workflow and the tools will help cities, utility incentive administrators, building portfolio managers and energy service providers develop energy programs and strategies for screening and analysis of buildings with the greatest energy savings potential. This report describes the project approach and research results to inform future coordination of ESPM and Asset Score data, including the use of benchmarking data to generate Preview scores. Given better awareness of energy performance, building managers can make more informed decisions to reduce energy consumption and carbon emissions. With cities, states and jurisdictions adopting benchmarking and auditing ordinances, there are substantial amounts of data submitted to cities that could be used to inform investments in energy efficiency.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Observing Campaign for Potential Deep Impact Flyby Target 163249 (2002 GT)

The Deep Impact spacecraft is currently on course for a Jan. 4, 2020 flyby of the sub-kilometer near-Earth asteroid 163249 (2002 GT). The re-targeting will be complete with a final small maneuver scheduled for Oct. 4, 2012. 2002 GT, which is also designated as a Potentially Hazardous Asteroid (PHA), has a well-determined orbit and is approx 800 m in diameter (H=18.3). Little more is known about the nature of this object, but in mid-2013 it will pass near the Earth, affording an exceptional opportunity for ground-based characterization. At this apparition 2002 GT will be in range of Arecibo. In addition to Doppler measurements, radar delay observations with precisions of a few microseconds are expected and have a good chance of revealing whether the system is binary or not. The asteroid will be brighter than 16th mag., which will facilitate a host of observations at a variety of wavelengths. Light curve measurements across a wide range of viewing perspectives will reveal the rotation rate and ultimately lead to strong constraints on the shape and pole orientation. Visible and infrared spectra will constrain the mineralogy, taxonomy, albedo and size. Along with the radar observations, optical astrometry will further constrain the orbit, both to facilitate terminal guidance operations and to potentially reveal nongravitational forces acting on the asteroid. Coordinating all of these observations will be a significant task and we encourage interested observers to collaborate in this effort. The 2013 apparition of 2002 GT represents a unique opportunity to characterize a potential flyby target, which will aid interpretation of the high-resolution flyby imagery and aid planning and development of the flyby imaging sequence. The knowledge gained from this flyby will be highly relevant to the human exploration program at NASA, which desires more information on the physical characteristics of sub-kilometer near-Earth asteroids.

Pittichova, Jana↗

Reactive Sequencing for Autonomous Navigation Evolving from Phoenix Entry, Descent, and Landing

Virtual Machine Language (VML) is an award-winning advanced procedural sequencing language in use on NASA deep-space missions since 1997, and was used for the successful entry, descent, and landing (EDL) of the Phoenix spacecraft onto the surface of Mars. Phoenix EDL utilized a state-oriented operations architecture which executed within the constraints of the existing VML 2.0 flight capability, compatible with the linear "land or die" nature of the mission. The intricacies of Phoenix EDL included the planned discarding of portions of the vehicle, the complex communications management for relay through on-orbit assets, the presence of temporally indeterminate physical events, and the need to rapidly catch up four days of sequencing should a reboot of the spacecraft flight computer occur shortly before atmospheric entry. These formidable operational challenges led to new techniques for packaging and coordinating reusable sequences called blocks using one-way synchronization via VML sequencing global variable events. The coordinated blocks acted as an ensemble to land the spacecraft, while individually managing various elements in as simple a fashion as possible. This paper outlines prototype VML 2.1 flight capabilities that have evolved from the one-way synchronization techniques in order to implement even more ambitious autonomous mission capabilities. Target missions for these new capabilities include autonomous touch-and-go sampling of cometary and asteroidal bodies, lunar landing of robotic missions, and ultimately landing of crewed lunar vehicles. Close proximity guidance, navigation, and control operations, on-orbit rendezvous, and descent and landing events featured in these missions require elaborate abort capability, manifesting highly non-linear scenarios that are so complex as to overtax traditional sequencing, or even the sort of one-way coordinated sequencing used during EDL. Foreseeing advanced command and control needs for small body and lunar landing guidance, navigation and control scenarios, work began three years ago on substantial upgrades to VML that are now being exercised in scenarios for lunar landing and comet/asteroid rendezvous. The advanced state-based approach includes coordinated state transition machines with distributed decision-making logic. These state machines are not merely sequences - they are reactive logic constructs capable of autonomous decision making within a well-defined domain. Combined with the JPL's AutoNav software used on Deep Space 1 and Deep Impact, the system allows spacecraft to autonomously navigate to an unmapped surface, soft-contact, and either land or ascend. The state machine architecture enabled by VML 2.1 has successfully performed sampling missions and lunar descent missions in a simulated environment, and is progressing toward flight capability. The authors are also investigating using the VML 2.1 flight director architecture to perform autonomous activities like rendezvous with a passive hypothetical Mars sample return capsule. The approach being pursued is similar to the touch-and-go sampling state machines, with the added complications associated with the search for, physical capture of, and securing of a separate spacecraft. Complications include optically finding and tracking the Orbiting Sample Capsule (OSC), keeping the OSC illuminated, making orbital adjustments, and physically capturing the OSC. Other applications could include autonomous science collection and fault compensation.

asteroid↗

2016 American Conference on Neutron Scattering (ACNS)

The 8th American Conference on Neutron Scattering (ACNS) was held July 10-14, 2016 in Long Beach California, marking the first time the meeting has been held on the west coast. The meeting was coordinated by the Neutron Scattering Society of America (NSSA), and attracted 285 attendees. The meeting was chaired by NSSA vice president Patrick Woodward (the Ohio State University) assisted by NSSA president Stephan Rosenkranz (Argonne National Laboratory) together with the local organizing chair, Brent Fultz (California Institute of Technology). As in past years the Materials Research Society assisted with planning, logistics and operation of the conference. The science program was divided into the following research areas: (a) Sources, Instrumentation, and Software; (b) Hard Condensed Matter; (c) Soft Matter; (d) Biology; (e) Materials Chemistry and Materials for Energy; (f) Engineering and Industrial Applications; and (g) Neutron Physics.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

CyDER: A Cyber Physical Co-simulation Platform for Distributed Energy Resources in Smartgrids

The CyDER project aimed at developing an open-source, modular and scalable co-simulation platform for power grids with large shares of Distributed Energy Resources (DERs). The project partners are the Lawrence Berkeley National Lab (LBNL), Lawrence Livermore National Lab (LLNL), PG&E, SolarCity, and ChargePoint. The prime recipient is LBNL; SolarCity and ChargePoint were partners for the project’s first two years. Increased DER integration introduces a number of challenges in power grid operation including a more dynamic interaction between the transmission grid and distribution grids, and increased modeling complexity. Although specialized software exists to precisely model different components of the power system, it is far from trivial to integrate all various models and perform a holistic simulation. Instead of replicating all models in a common simulation program, a commonly accepted approach to tackle this model diversity is to couple third-party simulators and models through a co-simulation platform that coordinates information exchange among the various components. Following this line of research, this project’s objective was to develop a co-simulation platform based on a widely accepted industrial standard called Functional Mockup Interface (FMI). Within this process, the project developed models compliant with the FMI standard, called Functional Mockup Units (FMUs), and used them to perform various operational and planning power system analyses. Relying and building upon an industrial standard is the main differentiation of this project compared with previous or parallel efforts in the co-simulation area. Particular emphasis was put on delivering software utilities to facilitate setting up and running co-simulations by end-users. Furthermore, a strong aspect of this project is demonstrating that co-simulation techniques can be used to perform Hardware-in-the-Loop (HIL) simulations that couple software components (e.g., simulated models) with hardware components (e.g., real devices such PV systems and batteries). The long-term goal of CyDER project is to help establish FMI as a powerful standard for co-simulation and promote adoption by electric utilities and other interested stakeholders. The main accomplishments of the project include the development of several FMUs including distribution and transmission grid models, PV inverters with Volt/Var/Watt controllers, batteries, and predictive optimal controllers. Additionally, a unique software package was developed, called SimulatorToFMU, which is capable of exporting any Python-driven simulator or Python script as an FMU. This is an important contribution towards establishing FMI as one of the main co-simulation standards, because more and more third-party programs for sub-system modeling and simulation are delivered with Python APIs. The CyDER platform was used to perform PV hosting capacity analyses in real utility feeders with and without smart inverter controls, battery storage, and EV charging. Smart inverter controls include conventional Volt/Var/Watt controls for reactive power support and active power curtailment, but also predictive controls that optimize the charging and discharging profile of the battery connected on the DC side in order to minimize the customer’s economic benefit. Finally, an important result of this project is delivering an experimental setup that consists of residential-scale PV inverters with battery storage, a real-time grid simulator with an ideal voltage source as grid emulator, and micro Phasor Measurement Units (PMUs). All these components and additional software modules are coupled to one another using the FMI standard and can be co-simulated with the CyDER platform.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Fuel Cycle Research & Development: Technical Monthly – June 2012

Topics are: (1) MPACT Campaign - (a) Management and Integration • Coordination meetings between NE and NA-22, NA-24, and NA-82 were conducted the week of June 11th. Preparations are being made for the next MPACT working group meeting, scheduled for Aug 28-30 at Idaho Falls. In addition to covering accomplishments and discussing future plans, a site tour of INL facilities (MFC, EBR, ATR, INTEC) is being organized. (2) Accounting and Control Technologies - (a) Microcalorimetry • Now operating 256-pixel array at LANL. We are in the process of tuning detector parameters to improve and optimize performance. Preliminary measurements show approximate number of live pixels is similar to that observed previously at NIST. Continuing to study contribution to systematic error from uncertainties in tabulated gamma-ray energies. (b) Electrochemical Sensor • Testing of sensors fashioned from different precursor materials continued. SEM analysis of all used sensors has been or will be performed. (c) Lead Slowing Down Spectrometer • Ongoing perturbation calculations are providing information on the fundamental systematic error limits of LSDS. In order to achieve separating the contribution of Pu and 235U to the signal, there will need to be tight controls on systematic errors. Continuing to look into a He4 detector. Research into local construction of a He4 detector continued. We have started to apply the algorithm to test the LSDS using experimental data from previous RPI measurements. PNNL also developed a plan to address the lack of statistics in the MCNP modeling of the NGSI 64 assemblies. The ISU graduate student built and tested a fission chamber to gain experience with them. (d) Fast Neutron Imaging to Quantify Nuclear Materials • The imaging detector design was modified for each pixel to have an 8 x 8 pixel array. Quotations and purchasing process for components, including the new PSD scintillator are in progress. (e) Fast Neutron Multiplicity Analysis • The team submitted two papers to the upcoming INMM meeting that are related to the fast neutron multiplicity R&D effort. Progress was made on the project's main goal of designing a concept for a prototype fast-neutron multiplicity counter. We started laying out the outline for the final report. We have been working with our ORNL collaborators to develop a new digitizer system to support our experimental campaign planned for next year. (3) MPACT Analysis Tools - (a) Multi-isotope Process Monitor • Fuel characterization framework development continued during June. A report describing the methodologies is being completed. Kenneth Dayman, from University of Texas, spent a week at PNNL wrapping up his master's research and working on a journal submission covering that work. The target journal is the IEEE transactions on Nuclear Science; submission is planned for the end of July. A proposal to instrument H-Canyon is being prepared in conjunction with SRNL and the NNSA's NGSI program. The impact of gamma-ray spectrum counting statistics on the precision of relative radioisotope component intensities as reconstructed via Principal Component Regression (PCR) continued in June with Monte Carlo simulations of a two-component (i.e., two radioisotope) system. This work generalizes earlier studies in FY12 in which Poisson counting variations of only a single spectrum component were simulated. (b) Modeling and Simulation for Analysis of Safeguards Performance (Electrochemical) • Preliminary insights into safeguards challenges and the initial design for an electrochemical plant have been written up into an INMM paper and will be presented at the INMM Summer Meeting. Work is currently adding a new visualization capability for integrating materials accountancy with physical protection. (c) Material Control including Process Monitoring (Pattern Recognition, Sensors) • Fabrication of quartz chips continued at an external foundry. Awaiting delivery of the heat exchange manifold and chip holder. (d) MPACT System Integration and Technical Support • The initial report on cost-basis metrics for nuclear material security risk and proliferation risk was completed as scheduled. (4) Safeguards and Security by Design - (a) Used fuels storage security analysis, guidance and best practices • RFP was finalized and sent out. Awaiting response from World Institute for Nuclear Security. Coordinated with Scott Demuth on joint report • LANL milestone on best practices. Attended Nuclear Energy Institute National Nuclear Security Conference. Developed plan for soliciting input on prioritized issues for used fuel storage security. Worked on setting up a meeting with the Nuclear Regulatory Commission. Worked on FY2013 work package planning.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Packages of Distributed Energy Technologies Demonstrating Demand Flexibility at Community Scale

The combination of increased electric load growth across all sectors, deferred electrical infrastructure investment, and other factors resulting in variable electric power supply, has created technical challenges to maintaining a resilient and reliable grid. Many federal, regional, and local efforts are in play to modernize the electric grid, including advancing building technologies and distributed energy resources (DERs) that are utilizing smarter controls to become responsive to both occupant and grid needs. This report reviews ten pilot projects demonstrating how groups of buildings combined with behind-the-meter (BTM) DERs such as electric vehicle (EV) charging, battery storage, flexible HVAC and domestic hot water systems, and photovoltaic systems can reliably and cost effectively provide grid services. Each of the ten pilot projects aim to deliver both energy efficiency and demand flexibility (DF) while supporting load growth. The ten demonstration teams are piloting flexible DER packages across diverse communities of residential and commercial buildings to address a variety of regional grid needs. The outcomes of these pilot projects will be used to inform future scaling through utility program development. This paper characterizes the ten teams, showcasing the decision-making process used by each group to develop their packages (Section 2), the grid services they plan to deliver (Section 3), the types of DER packages selected for deployment within building sectors (Section 4) and trends between building sector, DER types, and grid services In order to achieve community scale benefits, the pilot projects must utilize aggregated control mechanisms for coordinating buildings and DERs together. Several types of coordinated control architectures have evolved amongst the teams, influenced by use type, existing market conditions, and integration type. Three coordinated controls architectures have been characterized, highlighting their use cases, benefits, challenges, and tradeoffs in their design. These insights can aid utilities, control vendors, and developers in scaling community-level energy systems (Paul, 2024). Ultimately, the technology packages selected by the ten teams will be coordinated to provide power system services, also known as grid services. Insights from these demonstrations will be useful for grid operators, regulators, aggregators and other stakeholders as they look to deploy demand flexible resources as grid services in the future. The grid services that each team is targeting for demonstration are described in Section 3 and Section 4. Methods for evaluating the grid services have been described in the paper Metrics for Evaluating Grid Service Provision from Communities of Grid-interactive and Efficient Buildings and other DER (MacDonald, 2023). To identify technology packages for demonstration, Section 2 shows that project teams used a range of analysis approaches, including building energy modeling, AMI data analysis, cost-benefit frameworks, and utility pilot data. Some teams emphasized technical modeling to quantify grid impacts and demand reduction potential, while others prioritized economic evaluations, stakeholder input, or exploratory pilots to inform deployment decisions. This diversity reflects the need to tailor selection methods to project goals, available data, and organizational context. Section 5 discusses trends between the DER technologies deployed and the grid service provisions from each team. Residential buildings (multifamily and single family) lean towards technologies that enhance energy efficiency (e.g. weatherization upgrades, smart thermostats) and onsite power generation integration (e.g. solar PV). Commercial building demonstrations prioritize technologies that ensure operational reliability (e.g. battery storage) and centralized energy management systems and optimization solutions. Teams that are deploying controllable storage-based technologies are more likely to provide grid services that require a near real-time response. Teams incorporating load shifting technologies like smart thermostats with HEMs are likely to include energy markets participation and customer bill management offerings. Campus demonstrations are adopting diverse sets of DERs to emphasize renewable generation, paired with centralized control. This section also describes technologies that were considered during project planning but ultimately excluded from final deployment. These demonstrations reveal that effective DER package design should be tailored to building type, customer segment, and construction vintage. Multifamily buildings benefit from centralized HVAC upgrades and supervisory controls, while single-family homes are well-suited for individualized technologies like solar, storage, and smart home energy monitors. Commercial and campus settings prioritize EMIS integration and load optimization. New construction enables cost-effective integration of DER-ready infrastructure, whereas retrofits require deployments aligned with owner and tenant value streams. For utility program planners, early coordination with developers and building owners, paired with segmented and modular program offerings, can improve adoption, scalability, and grid impact.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Intelligent control and adaptive systems; Proceedings of the Meeting, Philadelphia, PA, Nov. 7, 8, 1989

Various papers on intelligent control and adaptive systems are presented. Individual topics addressed include: control architecture for a Mars walking vehicle, representation for error detection and recovery in robot task plans, real-time operating system for robots, execution monitoring of a mobile robot system, statistical mechanics models for motion and force planning, global kinematics for manipulator planning and control, exploration of unknown mechanical assemblies through manipulation, low-level representations for robot vision, harmonic functions for robot path construction, simulation of dual behavior of an autonomous system. Also discussed are: control framework for hand-arm coordination, neural network approach to multivehicle navigation, electronic neural networks for global optimization, neural network for L1 norm linear regression, planning for assembly with robot hands, neural networks in dynamical systems, control design with iterative learning, improved fuzzy process control of spacecraft autonomous rendezvous using a genetic algorithm.

Rodriguez, Guillermo↗